CN201742027U - Special tool for replacing insulators in electriferous state for 110kV single tower double circuit - Google Patents

Special tool for replacing insulators in electriferous state for 110kV single tower double circuit Download PDF

Info

Publication number
CN201742027U
CN201742027U CN2010202730434U CN201020273043U CN201742027U CN 201742027 U CN201742027 U CN 201742027U CN 2010202730434 U CN2010202730434 U CN 2010202730434U CN 201020273043 U CN201020273043 U CN 201020273043U CN 201742027 U CN201742027 U CN 201742027U
Authority
CN
China
Prior art keywords
epoxy tube
lead screw
fixed
hook
handle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202730434U
Other languages
Chinese (zh)
Inventor
鞠振
王井营
李荣德
杜玉营
张建勋
朱宗勇
禹伟
李铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taian Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Taian Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taian Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Taian Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN2010202730434U priority Critical patent/CN201742027U/en
Application granted granted Critical
Publication of CN201742027U publication Critical patent/CN201742027U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型公开了一种110kV同塔双回线路带电更换绝缘子专用工具,工具包括环氧管、绝缘紧固挂钩、丝杠、端部带有操作环的角铁挂钩、顶杆和端部带有操作环的手柄,绝缘紧固挂钩固定在环氧管的一端,丝杠插入环氧管的另一端并与环氧管螺纹连接,丝杠的另一端通过连接件固定连接角铁挂钩,顶杆的上端套接固定在丝杠上,顶杆的下端固定连接手柄。该工具具有强度高、绝缘性能好、重量轻、携带方便、操作方便的特点。

Figure 201020273043

The utility model discloses a special tool for replacing live insulators of a 110kV double-circuit line on the same tower. There is a handle with an operating ring, and the insulating fastening hook is fixed on one end of the epoxy tube. The lead screw is inserted into the other end of the epoxy tube and threaded with the epoxy tube. The other end of the lead screw is fixed to the angle iron hook through a connector. The upper end of the rod is sleeved and fixed on the lead screw, and the lower end of the push rod is fixedly connected with the handle. The tool has the characteristics of high strength, good insulation performance, light weight, easy to carry and easy to operate.

Figure 201020273043

Description

110kV同塔双回线路带电更换绝缘子专用工具 Special tools for live replacement of insulators on 110kV double-circuit lines on the same tower

技术领域technical field

本实用新型涉及一种更换绝缘子的专用工具。 The utility model relates to a special tool for replacing an insulator. the

背景技术Background technique

为了减少线路占地面积和节省投资,目前110kV线路大量使用双回路垂直排列塔,但因其结构原因,两层横担间距仅为3.5米,而带电导线位于两层横担间,因此进行带电作业时,带电作业电工不能满足安全距离要求,且人员借助于绝缘平梯、绝缘软梯等工具进入电位时组合间隙不够,对线路中雷击闪络、零值、线夹过热和巡视中发现的设备缺陷和隐患不能及时带电解决,大量的工作只有靠停电检修才能完成。当等电位更换110kV线路双回直线铁塔绝缘子时,同样带电作业存在安全隐患,只能停电更换,不利于供电的可靠性,造成不必要的经济损失。 In order to reduce the line footprint and save investment, the current 110kV line uses a large number of double-circuit vertically arranged towers. However, due to structural reasons, the distance between the two-layer cross-arms is only 3.5 meters, and the live wires are located between the two-layer cross-arms. During operation, live working electricians cannot meet the safety distance requirements, and the combination gap is not enough when personnel enter the potential with the help of insulating flat ladders, insulating soft ladders and other tools. Defects and hidden dangers cannot be solved in a timely manner, and a large amount of work can only be completed by power outage maintenance. When the insulators of the 110kV line double-circuit straight line iron towers are replaced at the same potential, there are also potential safety hazards in live work, and they can only be replaced after a power outage, which is not conducive to the reliability of power supply and causes unnecessary economic losses. the

发明内容Contents of the invention

为解决现有带电不能更换绝缘子的问题,本实用新型提供了一种110kV同塔双回线路带电更换绝缘子专用工具,其所采取的技术方案为: In order to solve the existing problem that the insulator cannot be replaced when it is live, the utility model provides a special tool for replacing the insulator when the 110kV double-circuit line on the same tower is live. The technical solution adopted is:

该工具包括环氧管、绝缘紧固挂钩、丝杠、端部带有操作环的角铁挂钩、顶杆和端部带有操作环的手柄,绝缘紧固挂钩固定在环氧管的一端,丝杠插入环氧管的另一端并与环氧管螺纹连接,丝杠的另一端通过连接件固定连接角铁挂钩,顶杆的上端套接固定在丝杠上,顶杆的下端固定连接手柄。 The tool includes an epoxy tube, an insulating fastening hook, a lead screw, an angle iron hook with an operating ring at the end, a push rod and a handle with an operating ring at the end, the insulating fastening hook is fixed at one end of the epoxy tube, The lead screw is inserted into the other end of the epoxy pipe and threaded with the epoxy pipe. The other end of the lead screw is fixed to the angle iron hook through the connector. The upper end of the ejector rod is sleeved and fixed on the lead screw. . the

该工具具有强度高、绝缘性能好、重量轻、携带方便、操作方便的特点,提高了作业人员的操作安全性,满足人员、设备的安全要求,突破了110kV同塔双回线路安全距离的限制,采用带电作业方式,缩短操作时间,减少线路停电机会,保证线路的安全、可靠供电,对电网安全经济运行、提高供电可靠性和社会经济效益意义重大。 The tool has the characteristics of high strength, good insulation performance, light weight, easy to carry, and easy to operate, which improves the operating safety of operators, meets the safety requirements of personnel and equipment, and breaks through the limit of the safety distance of 110kV double-circuit lines on the same tower , the use of live working methods shortens the operating time, reduces the chance of line outages, and ensures the safe and reliable power supply of the line. the

附图说明Description of drawings

附图1为本实用新型的结构示意图。 Accompanying drawing 1 is the structural representation of the utility model. the

具体实施方式Detailed ways

下面结合附图1对本实用新型做进一步说明: Below in conjunction with accompanying drawing 1 the utility model is further described:

如图所示,角铁挂钩4和手柄6的端部均带有操作环,绝缘紧固挂钩2固定在环氧管1的一端,丝杠3插入环氧管1的另一端并与环氧管1螺纹连接,丝杠3的另一端通过连接件7固定连接角铁挂钩4,顶杆5的上端套接固定在丝杠3上,顶杆5的下端固定连接手柄6。 As shown in the figure, the ends of the angle iron hook 4 and the handle 6 are equipped with operating rings, the insulating fastening hook 2 is fixed on one end of the epoxy tube 1, and the lead screw 3 is inserted into the other end of the epoxy tube 1 and connected with the epoxy tube 1. The pipe 1 is threaded, the other end of the lead screw 3 is fixedly connected to the angle iron hook 4 through the connector 7, the upper end of the push rod 5 is sleeved and fixed on the lead screw 3, and the lower end of the push rod 5 is fixedly connected to the handle 6. the

使用前在地面将工具各部组合成一整体,地面人员用绝缘绳将工具至传递安装位置,地电位电工A用绝缘操作杆端头操作钩置入角铁挂钩4的操作环内,与地面电工配合将工具角铁挂钩4固定在绝缘子挂点处角铁上。地电位电工B用操作杆将绝缘紧固挂钩2移至带电导线前端操作环,A与B配合将导线提升后,地电位电工A用操作杆的操作钩置入手柄6的操作环,通过顶杆5转动丝杠3,进而调整丝杠3在环氧管1内的插入的深度,逐渐增加整个工具的长度,使导线被撑开,最后进行绝缘子的更换。更换完成后A与B配合将导线恢复至运行状态,拆除工具下落至地面,人员下塔,工作完成。 Before use, combine the parts of the tool into a whole on the ground. The ground personnel use the insulating rope to transfer the tool to the installation position. The ground potential electrician A uses the operating hook at the end of the insulating operating rod to put it into the operation ring of the angle iron hook 4, and cooperates with the ground electrician. Fix the tool angle iron hook 4 on the angle iron at the hanging point of the insulator. Ground potential electrician B uses the operating rod to move the insulating fastening hook 2 to the front end operation ring of the live wire. Rod 5 rotates lead screw 3, and then adjusts the depth of insertion of lead screw 3 in epoxy tube 1, increases the length of whole tool gradually, leads are strutted, and finally carries out the replacement of insulator. After the replacement is completed, A cooperates with B to restore the wire to the running state, the removal tool falls to the ground, and the personnel go down the tower, and the work is completed. the

Claims (1)

1. 110kV common-tower double-return circuit charged for replacement insulator specific purpose tool, comprise epoxy tube (1), fastening hook (2) insulate, leading screw (3), the end has the angle bar hook (4) of operation ring, push rod (5) and end have the handle (6) of operation ring, it is characterized in that: the fastening hook (2) that insulate is fixed on an end of epoxy tube (1), leading screw (3) inserts the other end of epoxy tube (1) and is threaded with epoxy tube (1), the other end of leading screw (3) is by the fixedly connected angle bar hook of connector (7) (4), the upper end socket of push rod (5) is fixed on the leading screw (3), the fixedly connected handle in lower end (6) of push rod (5).
CN2010202730434U 2010-07-22 2010-07-22 Special tool for replacing insulators in electriferous state for 110kV single tower double circuit Expired - Fee Related CN201742027U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202730434U CN201742027U (en) 2010-07-22 2010-07-22 Special tool for replacing insulators in electriferous state for 110kV single tower double circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202730434U CN201742027U (en) 2010-07-22 2010-07-22 Special tool for replacing insulators in electriferous state for 110kV single tower double circuit

Publications (1)

Publication Number Publication Date
CN201742027U true CN201742027U (en) 2011-02-09

Family

ID=43557304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202730434U Expired - Fee Related CN201742027U (en) 2010-07-22 2010-07-22 Special tool for replacing insulators in electriferous state for 110kV single tower double circuit

Country Status (1)

Country Link
CN (1) CN201742027U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102623924A (en) * 2012-03-28 2012-08-01 上海市电力公司 Mechanical hook for power live working for voltage of 10KV and below
CN103166147A (en) * 2011-12-16 2013-06-19 宁夏电力公司宁东供电局 Power supply circuit cross arm suspension frame
CN108711774A (en) * 2018-04-17 2018-10-26 国家电网公司 A kind of electrification confinement insulator specific purpose tool

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103166147A (en) * 2011-12-16 2013-06-19 宁夏电力公司宁东供电局 Power supply circuit cross arm suspension frame
CN103166147B (en) * 2011-12-16 2016-06-01 宁夏电力公司宁东供电局 Supply line's cross-arm suspension
CN102623924A (en) * 2012-03-28 2012-08-01 上海市电力公司 Mechanical hook for power live working for voltage of 10KV and below
CN102623924B (en) * 2012-03-28 2016-03-30 上海市电力公司 The electric power live line working mechanical hook of a kind of 10KV and following voltage
CN108711774A (en) * 2018-04-17 2018-10-26 国家电网公司 A kind of electrification confinement insulator specific purpose tool

Similar Documents

Publication Publication Date Title
CN201742027U (en) Special tool for replacing insulators in electriferous state for 110kV single tower double circuit
CN102290743A (en) Electrified linkage pin-pulling device for replacing 220kV linear insulator string
CN201466574U (en) A device for equipotential replacement of transmission line tower insulators and accessories
CN203607744U (en) Special tool for resetting overhanging insulator lead-side socket W-shaped pin at ground potential
CN106371050A (en) a test rod
CN203690799U (en) Device for replacing suspension angle tower insulator string in live state
CN203672919U (en) Wiring clamp for breaker insulation resistance testing
CN202422954U (en) 10KV incoming bridge grounding conductor terminal for transformer
CN201234089Y (en) Protective interval for live operation on 1000kV AC very high voltage line
CN203289003U (en) Multifunctional insulating operating lever of transformer station
CN206057549U (en) A kind of reference test bar
CN204230763U (en) A kind of 10kV overhead distribution electrical verification operation insulating bar
CN203931680U (en) A kind of composite insulator one-shot forming compression bonding apparatus
CN204885071U (en) 10kV drop -out fusion tube is taken and is measured insulating bar simultaneously
CN204103353U (en) 110kV high-tension line replacing insulator under electrified protection against electric shock instrument
CN202190028U (en) A live-replacing 220kV linear insulator series movable pin remover
CN201549854U (en) Insulation support device between conductors
CN104897931A (en) Telescopic wiring device for high-altitude test
CN201813099U (en) Potential shift shunting rod for live working of AC ultra/extra high voltage circuit
CN204886008U (en) Change large -tonnage wire insulator chain's traditional thread binding putting of carrying with electricity
CN204303232U (en) A kind of low-voltage power distribution station area teaching mould
CN104158118B (en) A kind of conductors on quad bundled protects line hook
CN101335430B (en) A protection gap for live working of 1000kV AC UHV line
CN205791271U (en) Fixing sleeve for wire stripper
CN203760876U (en) Simple grounding grid overhaul device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110209

Termination date: 20110722