CN104184071B - Unmanned plane installs 110kV 500kV line security ground wire device - Google Patents
Unmanned plane installs 110kV 500kV line security ground wire device Download PDFInfo
- Publication number
- CN104184071B CN104184071B CN201410426240.8A CN201410426240A CN104184071B CN 104184071 B CN104184071 B CN 104184071B CN 201410426240 A CN201410426240 A CN 201410426240A CN 104184071 B CN104184071 B CN 104184071B
- Authority
- CN
- China
- Prior art keywords
- wire
- arm card
- upper arm
- card
- ground wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000725 suspension Substances 0.000 claims abstract description 14
- 238000009434 installation Methods 0.000 claims description 12
- 239000004020 conductor Substances 0.000 claims description 7
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 6
- 229910052802 copper Inorganic materials 0.000 claims description 6
- 239000010949 copper Substances 0.000 claims description 6
- 239000000203 mixture Substances 0.000 claims 2
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000012423 maintenance Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 6
- 230000005540 biological transmission Effects 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 3
- 206010049565 Muscle fatigue Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本发明涉及一种高压电力线路用的安全接地装置,尤其是一种无人机装设110kV‑500kV线路安全地线装置。所述的包括无人机本体、无人机悬挂装置、导线、挂壁卡、地线及配重块;配重块固定安装在挂壁卡上;导线、挂壁卡及地线为顺次串联活动电连接。本发明具有使用安全和操作便捷的特点,保障了工作人员的安全,避免了高空触电危险,而且安全接地操作过程方便快捷,降低了进行输电线路检修接地线作业的难度,减少了工作人员的劳动强度,节约了停电带来的损失,有显著的经济效益。
The invention relates to a safety grounding device for a high-voltage power line, in particular to a safety grounding device for an unmanned aerial vehicle installed with a 110kV-500kV line. The above includes the UAV body, UAV suspension device, wire, wall card, ground wire and counterweight; the counterweight is fixedly installed on the wall card; the wire, wall card and ground wire are in order Series active electrical connection. The invention has the characteristics of safe use and convenient operation, guarantees the safety of the staff, avoids the danger of electric shock at high altitudes, and the safe grounding operation process is convenient and quick, reduces the difficulty of carrying out the grounding wire operation of power transmission line maintenance, and reduces the labor of the staff Strength, save the loss caused by power outages, and have significant economic benefits.
Description
技术领域technical field
本发明涉及一种高压电力线路用的安全接地装置,尤其是一种无人机装设110kV-500kV线路安全地线装置。The invention relates to a safety grounding device for a high-voltage power line, in particular to a safety grounding device for an unmanned aerial vehicle installed with a 110kV-500kV line.
背景技术Background technique
停电、验电、挂接地线是保证输电线路停电检修安全的重要技术措施,接地线是电力安全生产中经常使用的安全工具。按照接地工具、作业类型及整个电网检修规划和具体实施作业标准要求,现有的主要接地线安全保护方法,通常是根据调度计划和统一停电安排,作业单位依据工作票列定的接地线组数和杆塔对照,待整条线路停电后,发出工作指令;工作人员办理工作票,交待安全措施和危险点;作业人员到达工作票所列位置,验电、做需要保护接地安全措施,保护段两侧需要多个工作组做好接地保护措施。登杆高空作业时,电压等级越高,接地点与导线的距离也越大,线路杆塔转角度数越大,接地线就要求越长,人员作业时就越不容易挂;有时遇有风,作业所需要的悬挂时间就更长。在作业过程中杆上与杆下人员劳动强度高,容易造成肌肉疲劳发生危险。特别是杆塔的作业人员,极易发生高空坠落事故。由于接地线悬挂时间长,工作段得不到保护,其它工作组也无法开始工作,就会影响工作进度和延误作业时间。因此,现有技术都是通过人工进行实施,对于电压等级低时可以施行,而在超高压和特高压线路上实施就非常困难。Power failure, power inspection, and grounding wire are important technical measures to ensure the safety of power transmission line maintenance. According to the requirements of grounding tools, operation types, maintenance planning of the entire power grid, and specific implementation of operation standards, the existing main grounding wire safety protection methods are usually based on dispatching plans and unified power outage arrangements, and the number of grounding wire groups listed by the operating unit according to the work ticket Compared with the pole tower, after the power failure of the whole line, a work order is issued; the staff handles the work ticket and explains the safety measures and dangerous points; On the side, multiple working groups need to take good grounding protection measures. When working at high altitude on poles, the higher the voltage level, the greater the distance between the grounding point and the wire, the larger the angle of rotation of the line pole tower, the longer the grounding wire is required, and the less easy it is for personnel to hang up when working; sometimes when there is wind, The hang time required for the job is just longer. During the operation process, the labor intensity of the personnel on and off the pole is high, which may easily cause muscle fatigue and cause danger. Especially the operators of pole towers are very prone to high-altitude fall accidents. Due to the long suspension time of the grounding wire, the working section is not protected, and other working groups cannot start working, which will affect the work progress and delay the work time. Therefore, the existing technologies are all implemented manually, which can be implemented when the voltage level is low, but it is very difficult to implement on ultra-high voltage and ultra-high voltage lines.
发明内容Contents of the invention
本发明所要解决的技术问题是提供无人机装设110kV-500kV线路安全地线装置,解决利用现有技术进行输电线路检修接地线作业难度大,作业时间长以及检修人员容易发生登电杆塔事故的问题。The technical problem to be solved by the present invention is to provide a safety grounding device for installing a 110kV-500kV line in an unmanned aerial vehicle, so as to solve the difficulty of using the existing technology to carry out the maintenance of the grounding line of the power transmission line, the operation time is long, and the maintenance personnel are prone to accidents on the power pole. The problem.
为了解决上述技术问题,本发明的技术方案是这样实现的:In order to solve the problems of the technologies described above, the technical solution of the present invention is achieved in the following way:
无人机装设110kV-500kV线路安全地线装置,包括无人机本体、无人机悬挂装置、导线、挂臂卡、地线及配重块;配重块固定安装在挂臂卡上;导线、挂臂卡及地线为顺次串联活动电连接。The UAV is equipped with a 110kV-500kV line safety grounding device, including the UAV body, UAV suspension device, wire, arm card, ground wire and counterweight; the counterweight is fixed on the arm card; The wire, the hanging arm card and the ground wire are electrically connected in series in series.
进一步,所述的地线为架空地线或接地地线;Further, the ground wire is an overhead ground wire or a grounded ground wire;
进一步,所述的导线为三相导线或两相导线;Further, the wires are three-phase wires or two-phase wires;
进一步,所述的挂臂卡分为导线挂臂卡和地线挂臂卡;导线挂臂卡为三相挂臂卡或两相挂臂卡,都由铜管、导线卡头、伸缩弹簧卡头及吊勾组成,且导线挂臂卡可并联使用,导线卡头及伸缩弹簧卡头活动电连接各相导线;地线挂臂卡为两相挂臂卡,由铜管、导线卡头、伸缩弹簧卡头及吊勾组成,导线卡头与导线任意一相导线活动电连接,伸缩弹簧卡头与架空地线活动电连接;Further, the hanging arm card is divided into a wire hanging arm card and a ground wire hanging arm card; The wire hanger card can be used in parallel, the wire clamp head and the telescopic spring clamp head are movable and electrically connected to the wires of each phase; the ground wire hanger card is a two-phase hanger card, which is composed of a copper tube, a wire clamp head, Composed of a telescopic spring clip and a hook, the wire clip is electrically connected to any phase of the wire, and the telescopic spring clip is electrically connected to the overhead ground wire;
进一步,所述的无人机本体及无人机悬挂装置为安装工具,所述的将导线挂臂卡放置在导线上,以及将地线挂臂卡放置在导线和架空地线上,导线、导线挂臂卡、地线挂臂卡及架空地线顺次串联活动电连接形成良好的电导通,完成接地操作。Further, the UAV body and the UAV suspension device are installation tools, the wire hanging arm card is placed on the wire, and the ground wire hanging arm card is placed on the wire and the overhead ground wire, the wire, The wire hanging arm card, the ground wire hanging arm card and the overhead ground wire are sequentially connected in series to form a good electrical conduction, and the grounding operation is completed.
进一步,所述的无人机本体及无人机悬挂装置为安装工具,所述的将接地地线与导线的任意一相活动电连接,以及将导线挂臂卡放置在导线上,导线、导线挂臂卡及接地地线顺次串联活动电连接形成良好的电导通,完成接地操作。Further, the UAV body and the UAV suspension device are installation tools, the ground wire is electrically connected to any phase of the wire, and the wire hanging arm is placed on the wire, the wire, the wire The hanging arm card and the grounding wire are sequentially connected in series to form a good electrical conduction, and the grounding operation is completed.
本发明相比现有技术的有益效果:The beneficial effect of the present invention compared with prior art:
本发明具有使用安全和操作便捷的特点,保障了工作人员的安全,避免了高空触电危险,而且安全接地操作过程方便快捷,降低了进行输电线路检修接地线作业的难度,减少了工作人员的劳动强度,节约了停电带来的损失,有显著的经济效益。The invention has the characteristics of safe use and convenient operation, guarantees the safety of the staff, avoids the danger of electric shock at high altitudes, and the safe grounding operation process is convenient and quick, reduces the difficulty of carrying out the grounding wire operation of power transmission line maintenance, and reduces the labor of the staff Strength, save the loss caused by power outages, and have significant economic benefits.
附图说明Description of drawings
图1是本发明中三相挂臂卡结构图。Fig. 1 is a structure diagram of a three-phase hanging arm card in the present invention.
图2是本发明中两相挂臂卡结构图。Fig. 2 is a structural diagram of the two-phase hanging arm card in the present invention.
图3是导线水平排列时本发明的安全地线安装图。Fig. 3 is an installation diagram of the safety ground wire of the present invention when the wires are arranged horizontally.
图4是导线三角排列时本发明的安全地线安装图。Fig. 4 is an installation diagram of the safety ground wire of the present invention when the wires are arranged in a triangle.
图5是导线垂直排列时本发明的安全地线安装图。Fig. 5 is an installation diagram of the safety ground wire of the present invention when the wires are arranged vertically.
图6是本发明中四轴无人机本体及无人机悬挂装置的结构示意图。Fig. 6 is a structural schematic diagram of the four-axis drone body and the drone suspension device in the present invention.
图7是本发明中四旋翼无人机本体及无人机悬挂装置的结构示意图。Fig. 7 is a schematic structural view of the quadrotor UAV body and UAV suspension device in the present invention.
具体实施方式detailed description
以下结合附图对本发明作进一步地详细描述。The present invention will be described in further detail below in conjunction with the accompanying drawings.
如图1所示,本发明中三相挂臂卡结构包括铜管1、导线卡头2、第一伸缩弹簧卡头3、第二伸缩弹簧卡头4及吊勾5。As shown in FIG. 1 , the three-phase hanging arm clip structure in the present invention includes a copper pipe 1 , a wire clip 2 , a first telescopic spring clip 3 , a second telescopic spring clip 4 and a hook 5 .
如图2所示,本发明中两相挂臂卡结构包括铜管1、导线卡头2、伸缩弹簧卡头3及吊勾5。As shown in FIG. 2 , the two-phase hanging arm clip structure in the present invention includes a copper pipe 1 , a wire clip 2 , a retractable spring clip 3 and a hook 5 .
如图3、6及7所示,导线水平排列时本发明的安全地线安装结构包括三相导线6、两相挂臂卡11、架空地线7及配重块;配重块固定安装在两相挂臂卡11上;三相导线6、两相挂臂卡11及架空地线7为顺次串联活动电连接。两相挂臂卡有三个,其中两个作为导线挂臂卡,另一个作为地线挂臂卡;无人机本体8及无人机悬挂装置9为安装工具,将两个导线挂臂卡活动卡设在水平放置的三相导线6上形成串联电连接,以及将地线挂臂卡活动卡设在三相导线6的任意一相和架空地线7上,三相导线6、导线挂臂卡、地线挂臂卡及架空地线7顺次串联活动电连接形成良好的电导通,完成接地操作。As shown in Figures 3, 6 and 7, when the wires are arranged horizontally, the safety ground wire installation structure of the present invention includes a three-phase wire 6, a two-phase hanging arm card 11, an overhead ground wire 7 and a counterweight; the counterweight is fixedly installed on On the two-phase hanging arm card 11; the three-phase conductor 6, the two-phase hanging arm card 11 and the overhead ground wire 7 are movable electrical connections in series in sequence. There are three two-phase hanging arm cards, two of which are used as wire hanging arm cards, and the other is used as a ground wire hanging arm card; the drone body 8 and the drone suspension device 9 are installation tools, and the two wire hanging arm cards are moved The card is set on the horizontally placed three-phase wire 6 to form a series electrical connection, and the ground wire hanging arm card is movable and set on any phase of the three-phase wire 6 and the overhead ground wire 7, the three-phase wire 6, the wire hanging arm The card, the ground wire hanging arm card and the overhead ground wire 7 are electrically connected in series in series to form a good electrical conduction, and the grounding operation is completed.
如图4、6及7所示,导线三角排列时本发明的安全地线安装结构包括三相导线6、两相挂臂卡11、架空地线7及配重块;配重块固定安装在两相挂臂卡11上;三相导线6、两相挂臂卡11及架空地线7为顺次串联活动电连接。两相挂臂卡有三个,其中两个作为导线挂臂卡,另一个作为地线挂臂卡;无人机本体8及无人机悬挂装置9为安装工具,将两个导线挂臂卡活动卡设在三角放置的三相导线6上形成串联电连接,以及将地线挂臂卡活动卡设在三相导线6的任意一相和架空地线7上,三相导线6、导线挂臂卡、地线挂臂卡及架空地线7顺次串联活动电连接形成良好的电导通,完成接地操作。As shown in Figures 4, 6 and 7, when the wires are arranged in a triangle, the safety ground wire installation structure of the present invention includes a three-phase wire 6, a two-phase hanging arm card 11, an overhead ground wire 7 and a counterweight; the counterweight is fixedly installed on the On the two-phase hanging arm card 11; the three-phase conductor 6, the two-phase hanging arm card 11 and the overhead ground wire 7 are movable electrical connections in series in sequence. There are three two-phase hanging arm cards, two of which are used as wire hanging arm cards, and the other is used as a ground wire hanging arm card; the drone body 8 and the drone suspension device 9 are installation tools, and the two wire hanging arm cards are moved The card is set on the three-phase conductor 6 placed in a triangle to form a series electrical connection, and the ground wire hanging arm card is movably clamped on any phase of the three-phase conductor 6 and the overhead ground wire 7, the three-phase conductor 6, the wire hanging arm The card, the ground wire hanging arm card and the overhead ground wire 7 are electrically connected in series in series to form a good electrical conduction, and the grounding operation is completed.
如图5、6及7所示,导线垂直排列时本发明的安全地线安装结构包括三相导线6、三相挂臂卡10、两相挂臂卡11、架空地线7及配重块;配重块固定安装在挂臂卡上;三相导线6、三相挂臂卡10、两相挂臂卡11及架空地线7为顺次串联活动电连接。两相挂臂卡为地线挂臂卡,三相挂臂卡为导线挂臂卡;无人机本体8及无人机悬挂装置9为安装工具,将导线挂臂卡活动卡设在垂直放置的三相导线6上,以及将地线挂臂卡活动卡设在三相导线6的任意一相和架空地线7上,三相导线6、导线挂臂卡10、地线挂臂卡11及架空地线7顺次串联活动电连接形成良好的电导通,完成接地操作。As shown in Figures 5, 6 and 7, when the wires are arranged vertically, the installation structure of the safety ground wire of the present invention includes a three-phase wire 6, a three-phase hanging arm card 10, a two-phase hanging arm card 11, an overhead ground wire 7 and a counterweight The counterweight is fixedly installed on the hanging arm card; the three-phase wire 6, the three-phase hanging arm card 10, the two-phase hanging arm card 11 and the overhead ground wire 7 are sequentially connected in series. The two-phase hanging arm card is the ground wire hanging arm card, and the three-phase hanging arm card is the wire hanging arm card; the UAV body 8 and the UAV suspension device 9 are installation tools, and the wire hanging arm card movable card is set in a vertical position. on the three-phase wire 6 of the three-phase wire, and the movable card of the ground wire hanging arm card is set on any phase of the three-phase wire 6 and on the overhead ground wire 7, the three-phase wire 6, the wire hanging arm card 10, and the ground wire hanging arm card 11 and the overhead ground wire 7 are electrically connected in series in series to form a good electrical conduction to complete the grounding operation.
本实用新型的操作方法:Operation method of the utility model:
当导线需安装地线处无架空地线7时,可由无人机本体8及无人机悬挂装置9将接地地线活动卡设在导线任意一相上。然后用导线挂臂卡活动卡设在不同放置方式的导线上,导线挂臂卡、导线及接地地线顺次串联活动电连接形成良好的电导通,完成接地操作。When there is no overhead ground wire 7 at the place where the wire needs to be installed, the ground wire can be clamped on any phase of the wire by the UAV body 8 and the UAV suspension device 9 . Then use the wire hanging arm card movable card to be set on the wires placed in different ways, and the wire hanging arm card, the wire and the grounding ground wire are connected in series in series to form a good electrical conduction, and the grounding operation is completed.
综上所述,以上仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。To sum up, the above are only preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410426240.8A CN104184071B (en) | 2014-08-27 | 2014-08-27 | Unmanned plane installs 110kV 500kV line security ground wire device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410426240.8A CN104184071B (en) | 2014-08-27 | 2014-08-27 | Unmanned plane installs 110kV 500kV line security ground wire device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104184071A CN104184071A (en) | 2014-12-03 |
CN104184071B true CN104184071B (en) | 2017-03-01 |
Family
ID=51964918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410426240.8A Expired - Fee Related CN104184071B (en) | 2014-08-27 | 2014-08-27 | Unmanned plane installs 110kV 500kV line security ground wire device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104184071B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108347007A (en) * | 2018-04-28 | 2018-07-31 | 广东电网有限责任公司 | Unmanned aerial vehicle carrying hook for overhead transmission line |
CN113161919A (en) * | 2020-01-07 | 2021-07-23 | 中国电力科学研究院有限公司 | Power transmission line unmanned aerial vehicle auxiliary operation method and device |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201038346Y (en) * | 2006-12-25 | 2008-03-19 | 云南电网公司思茅供电局 | Transmission line short circuit grounding wire clamp device |
CN201274324Y (en) * | 2008-08-01 | 2009-07-15 | 渭南供电局 | Operation apparatus of ultra-high-voltage grounding wire |
US8720863B2 (en) * | 2012-03-29 | 2014-05-13 | Vmr Aviation Ltd. | Apparatus for stringing a line underneath a cross member |
CN103368103B (en) * | 2013-05-09 | 2016-01-20 | 衡水众翔电子科技有限公司 | For hanging flight instruments and the method for sag rope to transmission line |
CN204144786U (en) * | 2014-08-27 | 2015-02-04 | 李明明 | Unmanned plane installing 110kV-500kV line security ground wire device |
-
2014
- 2014-08-27 CN CN201410426240.8A patent/CN104184071B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104184071A (en) | 2014-12-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202026034U (en) | Overhead wire insulation wire lifter for 10-kilovolt circuit | |
CN102882153B (en) | Phase replacing insulator string method in charged for replacement circuit many times towers | |
CN104882825B (en) | Electrification in high voltage breaking and connecting thread guide devices and lead method | |
CN203351105U (en) | High voltage line repair training teaching aid | |
CN201490618U (en) | A grounding wire device for transmission line maintenance | |
CN101692541B (en) | Overhauling and hooking method for earthing lines of power transmission lines | |
CN204241521U (en) | A kind of high-altitude insulation junction pole | |
CN204144786U (en) | Unmanned plane installing 110kV-500kV line security ground wire device | |
CN105932601B (en) | Disconnected strand of overhead grounding wire method for repairing and mending | |
CN104184071B (en) | Unmanned plane installs 110kV 500kV line security ground wire device | |
CN104377599A (en) | Cradle for live overhaul of helicopter | |
CN202712459U (en) | Angle adjustable ground wire device for electric power system | |
CN204086456U (en) | 750kV insulating tool segmentation alternating-current voltage resistance test device | |
CN103746316B (en) | A device and method for live replacement of straight-line corner tower insulator strings | |
CN209607932U (en) | A kind of ground line electroscopic device | |
CN203909080U (en) | Telescopic wiring post used for transformation ratio tests of current transformer in transformer station | |
CN204679527U (en) | Telescopic high altitude test wire connector | |
CN104113007A (en) | Operation method for replacing strain insulator of 35kV overhead distribution line in live state | |
CN204144800U (en) | The special cross-arm card of a kind of ZML type tower | |
CN204028209U (en) | Quick high aloft electroscope | |
CN203039273U (en) | Transformer station tubular busbar double-clamp grounding device | |
CN203365556U (en) | Temporary earthing device for public change earth resistance measurement | |
CN202616664U (en) | Insulation wire lifter | |
CN104897931A (en) | Telescopic wiring device for high-altitude test | |
CN104113006A (en) | Operation method for replacing linear rod angle steel cross arm of 35kV overhead distribution line in live state |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170301 Termination date: 20170827 |