Temporary plugging wall for underground reinforced concrete box culvert structure Download PDFInfo
- Publication number
- CN203213147U CN203213147U CN 201320174122 CN201320174122U CN203213147U CN 203213147 U CN203213147 U CN 203213147U CN 201320174122 CN201320174122 CN 201320174122 CN 201320174122 U CN201320174122 U CN 201320174122U CN 203213147 U CN203213147 U CN 203213147U
- Authority
- CN
- China
- Prior art keywords
- box culvert
- interim
- block wall
- earlier
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sewage (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses a temporary plugging wall for an underground reinforced concrete box culvert structure. The temporary plugging wall comprises a temporary plugging wall concrete structure and is characterized in that a thin film isolation layer is attached to the end face of a pre-built box culvert main structure, and the temporary plugging wall concrete structure and the pre-built box culvert main structure are connected through a reinforced concrete connecting block. Embedded connecting reinforcements are arranged at the end of the pre-built box culvert main structure, the reinforced concrete connecting block is connected with the pre-built box culvert main structure through the embedded connecting reinforcements, and the reinforced concrete connecting block is connected with the temporary plugging wall concrete structure through connecting reinforcements. The temporary plugging wall has the advantages that not only can construction be performed simply, rapidly and conveniently, but also water stops are protected effectively.
Description
Technical field
When the utility model relates to the segmented construction of cut and cover tunneling cast-in-situ steel reinforced concrete underground chamber structure (comprising roads and tunnels structure etc.), be arranged at the interim block wall of end.
Technical background
In underground chamber when construction, according to the requirement of execution conditions and construction speed, often need carry out segmented construction to underground structure box culvert, in the end of implementing box culvert in advance the interim block wall of steel concrete is set, and block wall cut to continue again to apply when follow-up construction.
When former method is met this type of situation, processing method generally has two kinds of methods: the one, and in box culvert main body reinforced concrete member such as top, base plate and side wall, close on deformation joint and reserve the stressed main reinforcement monobloc cast of interim block wall concrete, the end deformation joint adopts and buries waterstop in the measures protections such as plain concrete and back-up sand, pastes parts such as waterstop outward, top, box culvert cross section, base plate and side wall end inner peripheral arrange plain concrete as load transfering strip (burying waterstop in avoiding), the outer subsides of outside back-up sand protection, in bury waterstop; The 2nd, all adopt plain concrete protection paste outward, in bury waterstop (all the other are with above-mentioned).Above-mentioned job practices problem is as follows: the one, and block wall cuts the comparison difficulty; The 2nd, as adopting the back-up sand method, building the plain concrete load transfering strip sets up template and need dodge waterstop, not only construction inconvenience but also the waterstop quality also had certain influence, or as adopt whole plain concretes to build the protection waterstop, and when cutting, will influence the waterstop quality and then influence waterproof effect; The 3rd, interim block wall outsourcing waterproof is difficult enforcement.
The utility model content
The purpose of this utility model is to provide a kind of underground reinforced concrete box culvert structure interim block wall, further reduces to cut block wall to building the influence of box culvert structure when continuing construction, and only the contiguous block that need cut between block wall and agent structure gets final product.Adopt this method not only can simple and convenient rapid construction, and more effective to the waterstop protection.
To achieve these goals, technical solutions of the utility model are: the interim block wall of a kind of underground reinforced concrete box culvert structure, comprise interim block wall concrete structure, it is characterized in that building earlier the box culvert agent structure end face film separation layer of applying ointment or plaster, interim block wall concrete structure and building earlier between the box culvert agent structure connects by contiguous block.Formerly build box culvert agent structure end and be provided with built-in connection, contiguous block by described built-in connection with build the box culvert agent structure earlier and be connected, contiguous block also is connected with interim block wall concrete structure by connector.Build earlier the box culvert agent structure also be provided with in buried rubber fastening band, external labeling type rubber fastening band and the pre-pipe laying of shearing bar, interim block wall concrete structure and build earlier and PVC is set between the box culvert agent structure fills block is arranged in and builds box culvert agent structure outer buried rubber fastening band, external labeling type rubber fastening band and the pre-pipe laying of shearing bar earlier and all be positioned at described PVC and fill block.Described contiguous block is the steel concrete contiguous block, and described built-in connection is pre-buried connecting reinforcement, and described connector is connecting reinforcement.Described contiguous block adopts the steel member, and wherein built-in connection adopts embedded nut, and connector adopts bolt.
At first interim block wall concrete structure is carried out piecemeal cutting, cuts can unload behind the steel concrete contiguous block and clear before the follow-up construction, also effectively reduce when having improved efficiency of construction and cut block wall to the influence of agent structure; Secondly PVC filling block is made whole removal and get final product, the waterstop quality is not had influence substantially.Then can carry out follow-up box culvert construction according to conventional method.Advantage of the present utility model is: not only can simple and convenient rapid construction, and also more effective to the waterstop protection.
Description of drawings
Fig. 1 is box culvert structure section steel concrete contiguous block arrangement diagram.
Fig. 2 is the A-A sectional view of Fig. 1, and namely joint block wall skiagraph is reserved in the box culvert end.
Fig. 3 is the box culvert top board connection detail at B place among Fig. 2.
Fig. 4 is the box culvert base plate connection detail at C place among Fig. 2.
Fig. 5 is the D-D sectional view of Fig. 2, i.e. box culvert side wall connection detail.
The specific embodiment
Among the figure: 1. interim block wall concrete structure; 2. block wall steel bar stress; 3. pre-buried connecting reinforcement; 4. PVC fills block; 5. build the box culvert agent structure earlier; 6. steel concrete contiguous block; 7. paste waterproof roll outward; 8. buried rubber fastening band in; 9. external labeling type rubber fastening band; 10. the pre-pipe laying of shearing bar; 11. shearing bar; 12. film separation layer; 13 is the connecting reinforcement between steel concrete contiguous block and the interim block wall concrete structure.
Below in conjunction with accompanying drawing the utility model is further described:
The interim block wall of a kind of underground reinforced concrete box culvert structure, comprise interim block wall concrete structure 1, it is characterized in that building earlier the box culvert agent structure 5 end faces film separation layer 12 of applying ointment or plaster, interim block wall concrete structure 1 and building earlier between the box culvert agent structure 5 connects by steel concrete contiguous block 6.Formerly build box culvert agent structure 5 ends and be provided with pre-buried connecting reinforcement 3, steel concrete contiguous block 6 by described pre-buried connecting reinforcement 3 with build box culvert agent structure 5 earlier and be connected, steel concrete contiguous block 6 also is connected with block wall concrete structure 1 temporarily by connecting reinforcement 13.Build earlier the box culvert agent structure also be provided with in buried rubber fastening band 8, external labeling type rubber fastening band 9 and the pre-pipe laying 10 of shearing bar; interim block wall concrete structure 1 and build earlier and PVC is set between the box culvert agent structure 5 fills block 4; build earlier the box culvert agent structure outer in buried rubber fastening band 8, external labeling type rubber fastening band 9 and the pre-pipe laying 10 of shearing bar all be positioned at described PVC and fill block so that protect above-mentioned in buried rubber fastening band 8, external labeling type rubber fastening band 9 and the pre-pipe laying 10 of shearing bar.
The utility model is a kind of interim block wall design and construction method, and its implementation method step is as follows:
1. when colligation underground chamber top, base plate and side wall reinforcing bar, the position arranges pre-buried connecting reinforcement 3 in accordance with regulations, the pre-pipe laying 10 of buried rubber fastening band 8, external labeling type rubber fastening band 9 and shearing bar in pre-buried, build and build box culvert agent structure 5 concrete (also steel concrete contiguous block 6 can be built simultaneously, require connecting reinforcement 13 colligations simultaneously this moment) earlier;
2. formerly build the box culvert agent structure 5 end faces film separation layer 12 of applying ointment or plaster, PVC is set fills block 4, this operation can be built the sequential segmentation according to interim block wall and be implemented;
The interim block wall steel bar stress 2 of colligation and within the walls other structure or handling reinforcement and connecting reinforcement 13(such as step 1 implemented steel concrete contiguous block 6, only connecting reinforcement 13 is connected with reinforcing bar binding in the interim block wall herein get final product);
4. build interim block wall 1 and build steel concrete contiguous block 6(simultaneously such as block wall is then only built in concreting that step 1 has been implemented steel concrete contiguous block 6), interim block wall 1 is connected by contiguous block 6 with box culvert agent structure 5, guarantees the stable of interim block wall;
Before the follow-up box culvert construction, arrange according to steel concrete contiguous block 6, interim block wall 1 is carried out cutting section in advance, then progressively cut steel concrete contiguous block 6 and cut off pre-buried connecting reinforcement 3, interim block wall is cleared in the piecemeal lifting, can carry out follow-up construction after dismounting PVC fills block 4.
Claims (5)
1. interim block wall of underground reinforced concrete box culvert structure, comprise interim block wall concrete structure, it is characterized in that building earlier the box culvert agent structure end face film separation layer of applying ointment or plaster, interim block wall concrete structure and building earlier between the box culvert agent structure connects by contiguous block.
2. interim block wall as claimed in claim 1, it is characterized in that formerly building box culvert agent structure end and be provided with built-in connection, contiguous block by described built-in connection with build the box culvert agent structure earlier and be connected, contiguous block also is connected with interim block wall concrete structure by connector.
3. interim block wall as claimed in claim 1, it is characterized in that building earlier the box culvert agent structure also be provided with in buried rubber fastening band, external labeling type rubber fastening band and the pre-pipe laying of shearing bar, interim block wall concrete structure and build earlier and PVC is set between the box culvert agent structure fills block, build earlier the box culvert agent structure outer in buried rubber fastening band, external labeling type rubber fastening band and the pre-pipe laying of shearing bar all be positioned at described PVC and fill block.
4. interim block wall as claimed in claim 2 is characterized in that described contiguous block is the steel concrete contiguous block, and described built-in connection is pre-buried connecting reinforcement, and described connector is connecting reinforcement.
5. interim block wall as claimed in claim 2 is characterized in that described contiguous block adopts the steel member, and connector adopts bolt, builds earlier in the box culvert agent structure and is embedded with nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320174122 CN203213147U (en) | 2013-04-09 | 2013-04-09 | Temporary plugging wall for underground reinforced concrete box culvert structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320174122 CN203213147U (en) | 2013-04-09 | 2013-04-09 | Temporary plugging wall for underground reinforced concrete box culvert structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203213147U true CN203213147U (en) | 2013-09-25 |
Family
ID=49202696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320174122 Expired - Fee Related CN203213147U (en) | 2013-04-09 | 2013-04-09 | Temporary plugging wall for underground reinforced concrete box culvert structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203213147U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107558501A (en) * | 2017-07-26 | 2018-01-09 | 上海市政工程设计研究总院(集团)有限公司 | A kind of underpass spare interface construction method excavated from the later stage |
CN107604952A (en) * | 2017-07-26 | 2018-01-19 | 上海市政工程设计研究总院(集团)有限公司 | A kind of underpass spare interface construction excavated from the later stage |
CN114059459A (en) * | 2021-11-26 | 2022-02-18 | 华蓝设计(集团)有限公司 | Connecting method for waterproof settlement joints at joints of new box culvert and old box culvert |
-
2013
- 2013-04-09 CN CN 201320174122 patent/CN203213147U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107558501A (en) * | 2017-07-26 | 2018-01-09 | 上海市政工程设计研究总院(集团)有限公司 | A kind of underpass spare interface construction method excavated from the later stage |
CN107604952A (en) * | 2017-07-26 | 2018-01-19 | 上海市政工程设计研究总院(集团)有限公司 | A kind of underpass spare interface construction excavated from the later stage |
CN114059459A (en) * | 2021-11-26 | 2022-02-18 | 华蓝设计(集团)有限公司 | Connecting method for waterproof settlement joints at joints of new box culvert and old box culvert |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104099942B (en) | A kind of underground reinforced concrete box culvert structure temporary plugging wall construction method | |
CN201650310U (en) | Medium-bury type water stop mounting structure used in tunnel | |
CN107605507A (en) | Service channel shield-tunneling construction receives structure and construction method | |
CN103132690B (en) | Basement exterior wall unilateral template and method for supporting template thereof | |
CN107119901A (en) | The cast-in-place system of formwork structure and shear wall and construction method of shear wall angle node | |
CN203213147U (en) | Temporary plugging wall for underground reinforced concrete box culvert structure | |
CN103422674A (en) | Cast-in-place section concrete construction method of assembling-type concrete structure | |
CN205296388U (en) | Apron is sealed to garage wall post -cast strip | |
CN106285725A (en) | A kind of stopper structure being arranged between formwork jumbo and country rock and installation method thereof | |
CN107780437A (en) | The prefabricated assembled tube coupling of pipe gallery | |
CN206157764U (en) | Steel concrete combination formula corrugated sheet steel additional strengthening | |
CN203684458U (en) | Flexibly-connected concrete prefabricated panel structure | |
CN206888506U (en) | The cast-in-place system of formwork structure and shear wall of shear wall angle node | |
CN203685208U (en) | End-shaping steel template for double-lining trolley for tunnel | |
CN105114100A (en) | Corner reinforcing member of shield tunnel duct piece and application method thereof | |
CN107387092B (en) | A kind of multiple rectangular top pipes are connected in parallel on the engineering method of the formation underground space under complex environment | |
CN104594389A (en) | Post-cast strip external wall plugging structure with elastic water stoppers | |
CN105113416A (en) | Construction method for frame bridge main body adjacent to existing buildings | |
CN102140921A (en) | Novel tunnel waterproof structure | |
CN104314104B (en) | Deformation joint setting method for oblique crossing with underground box culvert | |
CN103422499A (en) | Inner and outer pile casing construction method for frozen soil area pile foundation | |
CN203247838U (en) | Fully-buried basement side wall post-pouring belt advance water stop formwork | |
CN206655313U (en) | A kind of vertical post-cast strip plugging structure of basement | |
CN202440852U (en) | Advance water-stop isolation structure of basement post-poured strip | |
CN206352508U (en) | A kind of stopper structure being arranged between formwork jumbo and country rock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130925 Termination date: 20210409 |
|