CN105113416A - Construction method for frame bridge main body adjacent to existing buildings - Google Patents

Construction method for frame bridge main body adjacent to existing buildings Download PDF

Info

Publication number
CN105113416A
CN105113416A CN201510582031.7A CN201510582031A CN105113416A CN 105113416 A CN105113416 A CN 105113416A CN 201510582031 A CN201510582031 A CN 201510582031A CN 105113416 A CN105113416 A CN 105113416A
Authority
CN
China
Prior art keywords
frame bridge
main body
bridge main
construction
existing building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510582031.7A
Other languages
Chinese (zh)
Inventor
李辰
胡彬
王朝腾
王强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN201510582031.7A priority Critical patent/CN105113416A/en
Publication of CN105113416A publication Critical patent/CN105113416A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a construction method for a frame bridge main body adjacent to existing buildings. The method comprises the following steps of determining a contour line of the frame bridge main body between the existing buildings without considering the operation side of construction personnel; determining the position of a protection pile at the external side edge part of the contour line of the frame bridge main body; finishing constructions of the protection pile and a crown beam; carrying out excavation operation of a foundation pit on the internal side of the protection pile; mounting a circle of extrude plastic board on the internal side of the protection pile as an external side template; and carrying out mounting of an internal side template, banding of reinforcing bars and pouring of concrete so as to finish the construction of the whole frame bridge main body. The construction method for the frame bridge main body adjacent to the existing building, provided by the invention, is advantaged in that the distances between the foundation pit and the existing buildings are increased; and the safeties of the existing buildings are preferably protected on the basis of finishing the protection of the foundation pit. As the extrude plastic board is mounted on the internal side of the protection pile as the external side template of a frame bridge, the construction effect of the method has no difference from that of the traditional template. As the area of the foundation pit is reduced, the earth excavation volume and filling volume are reduced, the disturbance to subsurface soil is reduced and the land is preferably protected while the construction cost is reduced.

Description

A kind of frame bridge main body construction method of being close to existing building
Technical field
The invention belongs to brick or concrete duct field, particularly relate to a kind of frame bridge main body construction method of being close to existing building.
Background technology
Along with the develop rapidly of infrastructure construction, the recoverable amount of automobile increases year by year, so batchs of city intersection work items is carried out successively, meanwhile, the difficult problem run in construction also gets more and more, and wherein needs the planning road passed through in the middle of two existing buildings also occurring successively.The protection will faced existing building during construction in this case, needs the ability relying on planning and designing department on the one hand, the road of design is avoided existing structure as best one can; Need on the other hand to rely on the construction ability of unit in charge of construction to protect existing structure.But construction effect is often not ideal, especially easily cause being discontented with of neighbouring resident.If the frame bridge on planning road is just between existing building, as Fig. 1, shown in Fig. 2, construction method conventional is at present original position excavation pit method, first the method determines the position of fender pile 2 between existing building 1 according to the needs of constructor's scope of operation, then the construction of a circle fender pile 2 and Guan Liang is completed, the excavation operation of foundation ditch 3 is carried out afterwards inside fender pile 2, finally complete template support, reinforcing bar binding, the construction of concreting, operation is carried out traditionally in this stage on the work plane giving constructor's indwelling, template adopts steel form or wooden form, and then complete the construction of whole frame bridge 4 main body.Wherein be faced with the perturbed problem to existing building 1 basis when fender pile 2 and Guan Liang construction, during foundation ditch 3 excavation construction, then may cause damage to existing building 1.But there is no good measure at present to control these problems.
Summary of the invention
In order to solve the problem, the object of the present invention is to provide a kind of frame bridge main body construction method of being close to existing building.
In order to achieve the above object, the frame bridge main body construction method of contiguous existing building provided by the invention comprises the following step carried out in order:
1) carrying out surveying setting-out work according to frame bridge design drawing, between existing building, determining the outline line of frame bridge main body when not considering constructor's scope of operation;
2) position of fender pile is determined at frame bridge body profile line outer ledge position;
3) a circle fender pile and Guan Liang construction is completed;
4) the excavation operation of foundation ditch is carried out in the inner side of fender pile;
5), after excavation of foundation pit completes, a circle extruded sheet is installed as outboard template in the inner side of fender pile;
6) carry out the construction of inner side template installation, reinforcing bar binding, concreting, and then complete the construction of whole frame bridge main body.
Described inner side template adopts steel form or wooden form.
The frame bridge main body construction method of contiguous existing building provided by the invention has following beneficial effect:
(1) this method increases the distance of foundation ditch and existing building, and the basis completing foundation ditch protection protects the safety of existing building well.
(2) extruded sheet is installed inside fender pile as frame bridge outboard template, construction effect and conventional template indifference.
(3) reducing due to foundation ditch area, decreases soil excavation and backfill consumption, decreases the disturbance to underground soil, while reduction construction cost, protect soil better.
(4) reducing due to foundation ditch area, decreases the reinforcing bar of fender pile and Guan Liang, concrete amount, reduces construction cost, and economic benefit is given prominence to.
(5) eliminate the work of the departments such as planning and designing, while guarantee building safety, reduce cost, Social benefit and economic benefit is given prominence to.
Accompanying drawing explanation
Fig. 1 is the frame bridge main body construction method work progress elevation of the contiguous existing building of prior art.
Fig. 2 is the frame bridge main body construction method work progress top view of the contiguous existing building of prior art.
Fig. 3 is the frame bridge main body construction method work progress elevation of contiguous existing building provided by the invention.
Fig. 4 is the frame bridge main body construction method work progress top view of contiguous existing building provided by the invention.
Detailed description of the invention
Be described in detail below in conjunction with the frame bridge main body construction method of the drawings and specific embodiments to contiguous existing building provided by the invention.The parts identical with prior art adopt identical drawing reference numeral.
As shown in Figure 3, Figure 4, the frame bridge main body construction method of contiguous existing building provided by the invention comprises the following step carried out in order:
1) carrying out surveying setting-out work according to frame bridge design drawing, between existing building 1, determining the outline line of frame bridge main body 4 when not considering constructor's scope of operation;
2) position of fender pile 2 is determined at frame bridge main body 4 outline line outer ledge position;
3) a circle fender pile 2 and Guan Liang construction is completed;
4) the excavation operation of foundation ditch 5 is carried out in the inner side of fender pile 2, because foundation ditch 5 is distant compared with existing building 1, therefore, it is possible to reduce the disturbance to existing building 1 basis;
5), after foundation ditch 5 has excavated, a circle extruded sheet 6 is installed as outboard template in the inner side of fender pile 2;
6) carry out the construction of inner side template installation, reinforcing bar binding, concreting, and then complete the construction of whole frame bridge main body 4.
Described inner side template adopts steel form or wooden form.

Claims (2)

1. be close to a frame bridge main body construction method for existing building, it is characterized in that: the frame bridge main body construction method of described contiguous existing building comprises the following step carried out in order:
1) carrying out surveying setting-out work according to frame bridge design drawing, between existing building (1), determining the outline line of frame bridge main body (4) when not considering constructor's scope of operation;
2) position of fender pile (2) is determined at frame bridge main body (4) outline line outer ledge position;
3) a circle fender pile (2) and Guan Liang construction is completed;
4) the excavation operation of foundation ditch (5) is carried out in the inner side of fender pile (2), due to foundation ditch (5), comparatively existing building (1) is distant, therefore, it is possible to reduce the disturbance to existing building (1) basis;
5), after foundation ditch (5) has excavated, circle extruded sheet (6) is installed as outboard template in the inner side of fender pile (2);
6) carry out the construction of inner side template installation, reinforcing bar binding, concreting, and then complete the construction of whole frame bridge main body (4).
2. the frame bridge main body construction method of contiguous existing building according to claim 1, is characterized in that: described inner side template adopts steel form or wooden form.
CN201510582031.7A 2015-09-14 2015-09-14 Construction method for frame bridge main body adjacent to existing buildings Pending CN105113416A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510582031.7A CN105113416A (en) 2015-09-14 2015-09-14 Construction method for frame bridge main body adjacent to existing buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510582031.7A CN105113416A (en) 2015-09-14 2015-09-14 Construction method for frame bridge main body adjacent to existing buildings

Publications (1)

Publication Number Publication Date
CN105113416A true CN105113416A (en) 2015-12-02

Family

ID=54661510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510582031.7A Pending CN105113416A (en) 2015-09-14 2015-09-14 Construction method for frame bridge main body adjacent to existing buildings

Country Status (1)

Country Link
CN (1) CN105113416A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120853A (en) * 2016-06-30 2016-11-16 中铁第四勘察设计院集团有限公司 A kind of inverted construction method of frame bridge
CN108222530A (en) * 2018-01-10 2018-06-29 谢晓辉 A kind of safety device excavated for deep foundation pit of construction
CN109537418A (en) * 2018-12-10 2019-03-29 鄂宇 It crosses and wears construction of the highway building method for supporting
CN110468744A (en) * 2019-08-26 2019-11-19 北京奥科瑞检测技术开发有限公司 A kind of channel bridge reinforced construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120853A (en) * 2016-06-30 2016-11-16 中铁第四勘察设计院集团有限公司 A kind of inverted construction method of frame bridge
CN108222530A (en) * 2018-01-10 2018-06-29 谢晓辉 A kind of safety device excavated for deep foundation pit of construction
CN109537418A (en) * 2018-12-10 2019-03-29 鄂宇 It crosses and wears construction of the highway building method for supporting
CN110468744A (en) * 2019-08-26 2019-11-19 北京奥科瑞检测技术开发有限公司 A kind of channel bridge reinforced construction method

Similar Documents

Publication Publication Date Title
CN101864959B (en) Method for tunneling construction of main structure of underground station
CN102747750B (en) Construction method for post-pouring settlement belt protective measures of basement top plates
CN105113416A (en) Construction method for frame bridge main body adjacent to existing buildings
CN201650310U (en) Medium-bury type water stop mounting structure used in tunnel
CN205024731U (en) A prefabricated plate component for basement outer wall post -cast strip
CN103437791B (en) The mounting method of buried water stop in a kind of tunnel lining trolley termination
CN104278993A (en) Construction method of unsymmetrical loading tunnel heterotropic hole
CN103374880B (en) The connecting structure of a kind of precast pier and cushion cap and dock construction method thereof
CN205296388U (en) Apron is sealed to garage wall post -cast strip
CN101949226B (en) Cross construction method for large pool body
CN103556553A (en) Method of increasing multilane by utilizing roadbed
CN104195913A (en) Movable temporary road structure
CN205712204U (en) A kind of multiple waterstop and waterproof construction thereof
CN106223354A (en) The construction method of shallow foundation stay in place form
CN105821908A (en) Multiple water stop belt, waterproof structure and construction method of waterproof structure
CN205242437U (en) A redundant formula vertical braces structure for protection of 220kV cable normal position
CN201756705U (en) Cracking control and seepage prevention structure for basement shear wall under construction
CN104532849B (en) A kind of foundation ditch on top of underground railway tunnel excavation method
CN207934055U (en) A kind of prefabricated cushion cap template and prefabricated cushion cap loose tool
CN202672194U (en) Construction structure for protection measures of settled post-cast strips of basement roof-plates
CN203213147U (en) Temporary plugging wall for underground reinforced concrete box culvert structure
CN203440814U (en) Manually excavated pile structure
CN202560234U (en) Astylar long-span underground space structure
CN203685271U (en) Subway underground excavation interval tunnel reserved passage protection structure
CN103397661A (en) Construction technology of underground combined profile steel-concrete outer wall structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151202

WD01 Invention patent application deemed withdrawn after publication