CN105113416A - Construction method for frame bridge main body adjacent to existing buildings - Google Patents
Construction method for frame bridge main body adjacent to existing buildings Download PDFInfo
- Publication number
- CN105113416A CN105113416A CN201510582031.7A CN201510582031A CN105113416A CN 105113416 A CN105113416 A CN 105113416A CN 201510582031 A CN201510582031 A CN 201510582031A CN 105113416 A CN105113416 A CN 105113416A
- Authority
- CN
- China
- Prior art keywords
- frame bridge
- main body
- bridge main
- construction
- existing building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention provides a construction method for a frame bridge main body adjacent to existing buildings. The method comprises the following steps of determining a contour line of the frame bridge main body between the existing buildings without considering the operation side of construction personnel; determining the position of a protection pile at the external side edge part of the contour line of the frame bridge main body; finishing constructions of the protection pile and a crown beam; carrying out excavation operation of a foundation pit on the internal side of the protection pile; mounting a circle of extrude plastic board on the internal side of the protection pile as an external side template; and carrying out mounting of an internal side template, banding of reinforcing bars and pouring of concrete so as to finish the construction of the whole frame bridge main body. The construction method for the frame bridge main body adjacent to the existing building, provided by the invention, is advantaged in that the distances between the foundation pit and the existing buildings are increased; and the safeties of the existing buildings are preferably protected on the basis of finishing the protection of the foundation pit. As the extrude plastic board is mounted on the internal side of the protection pile as the external side template of a frame bridge, the construction effect of the method has no difference from that of the traditional template. As the area of the foundation pit is reduced, the earth excavation volume and filling volume are reduced, the disturbance to subsurface soil is reduced and the land is preferably protected while the construction cost is reduced.
Description
Technical field
The invention belongs to brick or concrete duct field, particularly relate to a kind of frame bridge main body construction method of being close to existing building.
Background technology
Along with the develop rapidly of infrastructure construction, the recoverable amount of automobile increases year by year, so batchs of city intersection work items is carried out successively, meanwhile, the difficult problem run in construction also gets more and more, and wherein needs the planning road passed through in the middle of two existing buildings also occurring successively.The protection will faced existing building during construction in this case, needs the ability relying on planning and designing department on the one hand, the road of design is avoided existing structure as best one can; Need on the other hand to rely on the construction ability of unit in charge of construction to protect existing structure.But construction effect is often not ideal, especially easily cause being discontented with of neighbouring resident.If the frame bridge on planning road is just between existing building, as Fig. 1, shown in Fig. 2, construction method conventional is at present original position excavation pit method, first the method determines the position of fender pile 2 between existing building 1 according to the needs of constructor's scope of operation, then the construction of a circle fender pile 2 and Guan Liang is completed, the excavation operation of foundation ditch 3 is carried out afterwards inside fender pile 2, finally complete template support, reinforcing bar binding, the construction of concreting, operation is carried out traditionally in this stage on the work plane giving constructor's indwelling, template adopts steel form or wooden form, and then complete the construction of whole frame bridge 4 main body.Wherein be faced with the perturbed problem to existing building 1 basis when fender pile 2 and Guan Liang construction, during foundation ditch 3 excavation construction, then may cause damage to existing building 1.But there is no good measure at present to control these problems.
Summary of the invention
In order to solve the problem, the object of the present invention is to provide a kind of frame bridge main body construction method of being close to existing building.
In order to achieve the above object, the frame bridge main body construction method of contiguous existing building provided by the invention comprises the following step carried out in order:
1) carrying out surveying setting-out work according to frame bridge design drawing, between existing building, determining the outline line of frame bridge main body when not considering constructor's scope of operation;
2) position of fender pile is determined at frame bridge body profile line outer ledge position;
3) a circle fender pile and Guan Liang construction is completed;
4) the excavation operation of foundation ditch is carried out in the inner side of fender pile;
5), after excavation of foundation pit completes, a circle extruded sheet is installed as outboard template in the inner side of fender pile;
6) carry out the construction of inner side template installation, reinforcing bar binding, concreting, and then complete the construction of whole frame bridge main body.
Described inner side template adopts steel form or wooden form.
The frame bridge main body construction method of contiguous existing building provided by the invention has following beneficial effect:
(1) this method increases the distance of foundation ditch and existing building, and the basis completing foundation ditch protection protects the safety of existing building well.
(2) extruded sheet is installed inside fender pile as frame bridge outboard template, construction effect and conventional template indifference.
(3) reducing due to foundation ditch area, decreases soil excavation and backfill consumption, decreases the disturbance to underground soil, while reduction construction cost, protect soil better.
(4) reducing due to foundation ditch area, decreases the reinforcing bar of fender pile and Guan Liang, concrete amount, reduces construction cost, and economic benefit is given prominence to.
(5) eliminate the work of the departments such as planning and designing, while guarantee building safety, reduce cost, Social benefit and economic benefit is given prominence to.
Accompanying drawing explanation
Fig. 1 is the frame bridge main body construction method work progress elevation of the contiguous existing building of prior art.
Fig. 2 is the frame bridge main body construction method work progress top view of the contiguous existing building of prior art.
Fig. 3 is the frame bridge main body construction method work progress elevation of contiguous existing building provided by the invention.
Fig. 4 is the frame bridge main body construction method work progress top view of contiguous existing building provided by the invention.
Detailed description of the invention
Be described in detail below in conjunction with the frame bridge main body construction method of the drawings and specific embodiments to contiguous existing building provided by the invention.The parts identical with prior art adopt identical drawing reference numeral.
As shown in Figure 3, Figure 4, the frame bridge main body construction method of contiguous existing building provided by the invention comprises the following step carried out in order:
1) carrying out surveying setting-out work according to frame bridge design drawing, between existing building 1, determining the outline line of frame bridge main body 4 when not considering constructor's scope of operation;
2) position of fender pile 2 is determined at frame bridge main body 4 outline line outer ledge position;
3) a circle fender pile 2 and Guan Liang construction is completed;
4) the excavation operation of foundation ditch 5 is carried out in the inner side of fender pile 2, because foundation ditch 5 is distant compared with existing building 1, therefore, it is possible to reduce the disturbance to existing building 1 basis;
5), after foundation ditch 5 has excavated, a circle extruded sheet 6 is installed as outboard template in the inner side of fender pile 2;
6) carry out the construction of inner side template installation, reinforcing bar binding, concreting, and then complete the construction of whole frame bridge main body 4.
Described inner side template adopts steel form or wooden form.
Claims (2)
1. be close to a frame bridge main body construction method for existing building, it is characterized in that: the frame bridge main body construction method of described contiguous existing building comprises the following step carried out in order:
1) carrying out surveying setting-out work according to frame bridge design drawing, between existing building (1), determining the outline line of frame bridge main body (4) when not considering constructor's scope of operation;
2) position of fender pile (2) is determined at frame bridge main body (4) outline line outer ledge position;
3) a circle fender pile (2) and Guan Liang construction is completed;
4) the excavation operation of foundation ditch (5) is carried out in the inner side of fender pile (2), due to foundation ditch (5), comparatively existing building (1) is distant, therefore, it is possible to reduce the disturbance to existing building (1) basis;
5), after foundation ditch (5) has excavated, circle extruded sheet (6) is installed as outboard template in the inner side of fender pile (2);
6) carry out the construction of inner side template installation, reinforcing bar binding, concreting, and then complete the construction of whole frame bridge main body (4).
2. the frame bridge main body construction method of contiguous existing building according to claim 1, is characterized in that: described inner side template adopts steel form or wooden form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510582031.7A CN105113416A (en) | 2015-09-14 | 2015-09-14 | Construction method for frame bridge main body adjacent to existing buildings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510582031.7A CN105113416A (en) | 2015-09-14 | 2015-09-14 | Construction method for frame bridge main body adjacent to existing buildings |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105113416A true CN105113416A (en) | 2015-12-02 |
Family
ID=54661510
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510582031.7A Pending CN105113416A (en) | 2015-09-14 | 2015-09-14 | Construction method for frame bridge main body adjacent to existing buildings |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105113416A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120853A (en) * | 2016-06-30 | 2016-11-16 | 中铁第四勘察设计院集团有限公司 | A kind of inverted construction method of frame bridge |
CN108222530A (en) * | 2018-01-10 | 2018-06-29 | 谢晓辉 | A kind of safety device excavated for deep foundation pit of construction |
CN109537418A (en) * | 2018-12-10 | 2019-03-29 | 鄂宇 | It crosses and wears construction of the highway building method for supporting |
CN110468744A (en) * | 2019-08-26 | 2019-11-19 | 北京奥科瑞检测技术开发有限公司 | A kind of channel bridge reinforced construction method |
-
2015
- 2015-09-14 CN CN201510582031.7A patent/CN105113416A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120853A (en) * | 2016-06-30 | 2016-11-16 | 中铁第四勘察设计院集团有限公司 | A kind of inverted construction method of frame bridge |
CN108222530A (en) * | 2018-01-10 | 2018-06-29 | 谢晓辉 | A kind of safety device excavated for deep foundation pit of construction |
CN109537418A (en) * | 2018-12-10 | 2019-03-29 | 鄂宇 | It crosses and wears construction of the highway building method for supporting |
CN110468744A (en) * | 2019-08-26 | 2019-11-19 | 北京奥科瑞检测技术开发有限公司 | A kind of channel bridge reinforced construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101864959B (en) | Method for tunneling construction of main structure of underground station | |
CN102747750B (en) | Construction method for post-pouring settlement belt protective measures of basement top plates | |
CN105113416A (en) | Construction method for frame bridge main body adjacent to existing buildings | |
CN201650310U (en) | Medium-bury type water stop mounting structure used in tunnel | |
CN205024731U (en) | A prefabricated plate component for basement outer wall post -cast strip | |
CN103437791B (en) | The mounting method of buried water stop in a kind of tunnel lining trolley termination | |
CN104278993A (en) | Construction method of unsymmetrical loading tunnel heterotropic hole | |
CN103374880B (en) | The connecting structure of a kind of precast pier and cushion cap and dock construction method thereof | |
CN205296388U (en) | Apron is sealed to garage wall post -cast strip | |
CN101949226B (en) | Cross construction method for large pool body | |
CN103556553A (en) | Method of increasing multilane by utilizing roadbed | |
CN104195913A (en) | Movable temporary road structure | |
CN205712204U (en) | A kind of multiple waterstop and waterproof construction thereof | |
CN106223354A (en) | The construction method of shallow foundation stay in place form | |
CN105821908A (en) | Multiple water stop belt, waterproof structure and construction method of waterproof structure | |
CN205242437U (en) | A redundant formula vertical braces structure for protection of 220kV cable normal position | |
CN201756705U (en) | Cracking control and seepage prevention structure for basement shear wall under construction | |
CN104532849B (en) | A kind of foundation ditch on top of underground railway tunnel excavation method | |
CN207934055U (en) | A kind of prefabricated cushion cap template and prefabricated cushion cap loose tool | |
CN202672194U (en) | Construction structure for protection measures of settled post-cast strips of basement roof-plates | |
CN203213147U (en) | Temporary plugging wall for underground reinforced concrete box culvert structure | |
CN203440814U (en) | Manually excavated pile structure | |
CN202560234U (en) | Astylar long-span underground space structure | |
CN203685271U (en) | Subway underground excavation interval tunnel reserved passage protection structure | |
CN103397661A (en) | Construction technology of underground combined profile steel-concrete outer wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151202 |
|
WD01 | Invention patent application deemed withdrawn after publication |