CN107780437A - The prefabricated assembled tube coupling of pipe gallery - Google Patents

The prefabricated assembled tube coupling of pipe gallery Download PDF

Info

Publication number
CN107780437A
CN107780437A CN201610714504.9A CN201610714504A CN107780437A CN 107780437 A CN107780437 A CN 107780437A CN 201610714504 A CN201610714504 A CN 201610714504A CN 107780437 A CN107780437 A CN 107780437A
Authority
CN
China
Prior art keywords
tunnel segment
segment structure
tang
mounting groove
trapezoid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610714504.9A
Other languages
Chinese (zh)
Inventor
张健
刘槐刚
褚丝绪
姜云龙
徐国梁
刘泽华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201610714504.9A priority Critical patent/CN107780437A/en
Publication of CN107780437A publication Critical patent/CN107780437A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Abstract

A kind of prefabricated assembled tube coupling of pipe gallery, including trapezoid tunnel segment structure and inverted trapezoidal tunnel segment structure;The fracture surrounding of the trapezoid tunnel segment structure is formed with tang, and tang surrounding is formed with waterproof adhesive tape mounting groove, and both sides mounting groove is located at tang front, and upper and lower mounting groove is located at the top surface of tang, and lifting bolt hole is reserved at the top of the both sides side wall of trapezoid tunnel segment structure;The surrounding of the inverted trapezoidal tunnel segment structure is recess;The tang of the trapezoid tunnel segment structure realizes that " Z " font tongue and groove connects with the recess of inverted trapezoidal tunnel segment structure in installation process.The present invention directly can produce the extruding force of lateral compression power and vertical direction to extrude waterproof adhesive tape using structure shape in itself and dead load during right angle setting, with reach sealing, waterproof purpose.Meanwhile waterproof adhesive tape can be installed at once after the completion of engineering is prefabricated, so as to improve installation effectiveness, reduce field installation procedure, construction cost is reduced.

Description

The prefabricated assembled tube coupling of pipe gallery
Technical field:
The invention belongs to Urban Buried Pipeline Network Systems construction device, more particularly to a kind of prefabricated assembled pipe of pipe gallery Section.
Background technology:
As country promotes Urban Underground pipe gallery construction, the rapid growth of city piping lane engineering project, piping lane construction skill Art is also fast-developing, in the case where the thought such as green, efficient, environmental protection, energy-conservation is leading, using prefabricated assembled pipe gallery construction technology Project it is also more and more, it is that one kind is prefabricated in the factory tube coupling, the assembled emerging pipe gallery construction method in job site.
Existing prefabricated assembled city integrated piping lane uses the connection mode of reinforced concrete structure annular socket joint tongue and groove more. Prefabricated pipe section structure rise re-mount when, first be vertically hoisted to designed elevation, then under the assistance of manpower, horizontal counterpart is inserted Connect, wear prestress wire or bolt finally by preformed hole and apply certain horizontal stress extruding waterproof adhesive tape, make waterproof Certain deformation occurs for adhesive tape, be fitted tightly on mounted two adjacent tube couplings reach sealing, waterproof effect.It is this Structure construction process is more, installation effectiveness is relatively low, construction period length, and construction cost is high.
The content of the invention:
The purpose of the present invention, which is that, overcomes above-mentioned the deficiencies in the prior art, and it is prefabricated to provide a kind of pipe gallery Assembled tube coupling, the tube coupling directly can be produced lateral crowded using structure shape in itself and dead load during right angle setting The extruding force of pressure and vertical direction extrudes waterproof adhesive tape, with reach sealing, waterproof purpose.Meanwhile waterproof adhesive tape can be Installed at once after the completion of engineering is prefabricated, so as to improve installation effectiveness, reduce field installation procedure, reduce construction cost.
As above conceive, the technical scheme is that:A kind of prefabricated assembled tube coupling of pipe gallery, it is characterised in that:Bag Include trapezoid tunnel segment structure and inverted trapezoidal tunnel segment structure;The fracture surrounding of the trapezoid tunnel segment structure is formed with tang, tang four It is formed with waterproof adhesive tape mounting groove week, both sides mounting groove is located at tang front, and upper and lower mounting groove is located at the top surface of tang, in positive ladder Reserved lifting bolt hole at the top of the both sides side wall of shape tunnel segment structure;The surrounding of the inverted trapezoidal tunnel segment structure is recess;It is described The tang of trapezoid tunnel segment structure realizes that " Z " font tongue and groove connects with the recess of inverted trapezoidal tunnel segment structure in installation process.
Wide 2.5m~the 3.0m of above-mentioned trapezoid tunnel segment structure base opening, wide 1.5~2.0m suitable for reading.
Above-mentioned trapezoid tunnel segment structure both sides mounting groove sets rounding bottom land with upper and lower mounting groove connecting part.
Above-mentioned inverted trapezoidal tunnel segment structure wide 2.5m~3.0m suitable for reading, the wide 1.5~2.0m of lower mouth.
The present invention can save prestress wire or tools for bolts ' pretension adds compared with the prefabricated pipe gallery construction technology of tradition The working procedure of pressure, lateral compression power directly can be produced during right angle setting using structure shape in itself and dead load Extrude waterproof adhesive tape with the extruding force of vertical direction, with reach sealing, waterproof purpose.Meanwhile waterproof adhesive tape can be in engineering Installed at once after the completion of prefabricated, so as to improve installation effectiveness, reduce field installation procedure, reduce construction cost.
Brief description of the drawings:
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation of trapezoid tunnel segment structure;
Fig. 3 is the structural representation of inverted trapezoidal tunnel segment structure;
Fig. 4 is the enlarged drawing of rounding bottom land in trapezoid tunnel segment structure.
In figure:1-- trapezoid tunnel segment structures;2-- inverted trapezoidals section of jurisdiction;3-- tongue and grooves;31-- tangs;32-- recesses;4-- pacifies Tankage;5-- rounding bottom lands;6-reserve lifting bolt hole.
Embodiment:
As shown in Figure 1:A kind of prefabricated assembled tube coupling of pipe gallery, by trapezoid tunnel segment structure and inverted trapezoidal tunnel segment structure Composition.
As shown in Figure 2:Trapezoid tunnel segment structure 1, base opening wide 2.5m~3.0m (standard fragmentation width, according to actual conditions Can suitably adjust), wide 1.5~2.0m suitable for reading, the surrounding of fracture is formed with tang 31, and waterproof adhesive tape mounting groove 4 is formed with tang 31, Both sides mounting groove 4 is located at the front of tang 31, and upper and lower mounting groove 4 is located at the top surface of tang 31.As shown in Figure 4:In both sides mounting groove 4 set rounding bottom land 5 to carry out transition processing with the upper and lower connecting part of mounting groove 4.It is pre- at the top of the both sides side wall of trapezoid part Lifting bolt hole 6 is stayed, lifting installation is carried out using special hanger in later stage installation process.
Fig. 3 is inverted trapezoidal tunnel segment structure 2, wide 2.5m~3.0m suitable for reading, (standard fragmentation width, can be fitted according to actual conditions When adjustment), the lower wide 1.5~2.0m of mouth, front and rear sides surrounding is recess 32, and tongue and groove company is carried out with tang 31 in installation process Connect.
As shown in Figure 1:It is of the invention that trapezoid tunnel segment structure 1 is first installed one by one, after inverted trapezoidal tunnel segment structure 2 is installed one by one, Connected between adjacent tunnel segment structure using " Z " font tongue and groove 3, because each tunnel segment structure weighs more than 20 tons certainly, adjacent section of jurisdiction Structure carries out prefabricated pipe gallery assembly under gravity, while waterproof adhesive tape is in the Action of Gravity Field of inverted trapezoidal tunnel segment structure 1 Lower clamping, forms good waterproof effect.
The present invention work progress be:
A. after excavation of foundation pit to designed elevation, concrete cushion of constructing, laying water-proof coiled material, then the pea gravel concreten guarantor that constructs Sheath, the flatness of protective layer should meet the requirement of installation accuracy.
B. the installation site of measurement and positioning pipe gallery trapezoid tunnel segment structure 1 and inverted trapezoidal tunnel segment structure 2, measurement accuracy Meet construction requirement.
C. haulage vehicle loads tunnel segment structure and marched into the arena, and first trapezoid section of jurisdiction is lifted by absolute altitude and plan-position with lifting appliance Structure 1 is in place one by one, then lifts inverted trapezoidal tunnel segment structure 2.
D. the pressing rubber strip under the Action of Gravity Field of inverted trapezoidal tunnel segment structure 2, after adhesive tape deformation reaches construction requirement, inverted trapezoidal Tunnel segment structure 2 is dropped down onto on protective layer.
E. as tunnel segment structure is installed in place, it is necessary to carry out pipe in time using cement mortar and high two-component polysulfide sealant The jointing and closure for saving seam crossing are handled.
F. after the completion of structure protective layer construction, both sides must symmetrically backfill.
Wherein, the lifting of tunnel segment structure is constructed by the way of vertical lifting in the step (c).

Claims (4)

  1. A kind of 1. prefabricated assembled tube coupling of pipe gallery, it is characterised in that:Tied including trapezoid tunnel segment structure and inverted trapezoidal section of jurisdiction Structure;The fracture surrounding of the trapezoid tunnel segment structure is formed with tang, and tang surrounding is formed with waterproof adhesive tape mounting groove, both sides mounting groove Positioned at tang front, upper and lower mounting groove is located at the top surface of tang, and lifting is reserved at the top of the both sides side wall of trapezoid tunnel segment structure Bolt hole;The surrounding of the inverted trapezoidal tunnel segment structure is recess;The tang of the trapezoid tunnel segment structure and inverted trapezoidal section of jurisdiction The recess of structure realizes that " Z " font tongue and groove connects in installation process.
  2. 2. the prefabricated assembled tube coupling of pipe gallery according to claim 1, it is characterised in that:Above-mentioned trapezoid tunnel segment structure Wide 2.5m~the 3.0m of base opening, wide 1.5~2.0m suitable for reading.
  3. 3. the prefabricated assembled tube coupling of pipe gallery according to claim 1, it is characterised in that:Above-mentioned trapezoid tunnel segment structure Both sides mounting groove sets rounding bottom land with upper and lower mounting groove connecting part.
  4. 4. the prefabricated assembled tube coupling of pipe gallery according to claim 1, it is characterised in that:Above-mentioned inverted trapezoidal tunnel segment structure Wide 2.5m~3.0m suitable for reading, the wide 1.5~2.0m of lower mouth.
CN201610714504.9A 2016-08-24 2016-08-24 The prefabricated assembled tube coupling of pipe gallery Pending CN107780437A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610714504.9A CN107780437A (en) 2016-08-24 2016-08-24 The prefabricated assembled tube coupling of pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610714504.9A CN107780437A (en) 2016-08-24 2016-08-24 The prefabricated assembled tube coupling of pipe gallery

Publications (1)

Publication Number Publication Date
CN107780437A true CN107780437A (en) 2018-03-09

Family

ID=61388189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610714504.9A Pending CN107780437A (en) 2016-08-24 2016-08-24 The prefabricated assembled tube coupling of pipe gallery

Country Status (1)

Country Link
CN (1) CN107780437A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999241A (en) * 2018-08-02 2018-12-14 王运章 Adopt the installation method of the diversion pond for inhaling seawater device, water-supply-pipe tube coupling and tube coupling
CN109403378A (en) * 2018-12-12 2019-03-01 中国建筑土木建设有限公司 A kind of piping lane interface structure and its construction method
CN109594586A (en) * 2018-12-12 2019-04-09 中国建筑土木建设有限公司 A kind of inclined chute-and-self-locking type piping lane interface structure and its construction method
CN110616636A (en) * 2019-08-12 2019-12-27 中交二航局第二工程有限公司 Closure structure of hybrid beam rigid frame bridge under strong surge condition and method for lifting staggered closure
CN110616635A (en) * 2019-08-12 2019-12-27 中交二航局第二工程有限公司 Closure structure and lowering dislocation closure method of hybrid beam rigid frame bridge under strong surge condition
CN110700327A (en) * 2018-07-09 2020-01-17 青岛中科坤泰管廊有限公司 Waterproof rubber strip for prefabricated comprehensive pipe gallery rabbet
CN111305094A (en) * 2020-03-24 2020-06-19 河南省交通规划设计研究院股份有限公司 Construction method for prefabricated assembly type trapezoidal staggered box culvert structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000031225A (en) * 1998-11-04 2000-06-05 이계철 Assembly-type concrete underlying block having trapezoid shape
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN105421489A (en) * 2015-11-11 2016-03-23 东南大学 Mortise type prefabricated comprehensive pipe gallery longitudinal connector
CN206233262U (en) * 2016-08-24 2017-06-09 中冶天工集团有限公司 The prefabricated assembled tube coupling of pipe gallery

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000031225A (en) * 1998-11-04 2000-06-05 이계철 Assembly-type concrete underlying block having trapezoid shape
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN105421489A (en) * 2015-11-11 2016-03-23 东南大学 Mortise type prefabricated comprehensive pipe gallery longitudinal connector
CN206233262U (en) * 2016-08-24 2017-06-09 中冶天工集团有限公司 The prefabricated assembled tube coupling of pipe gallery

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孔祥臣: "预制拼装综合管廊接头防水性能研究", 《中国建设信息》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700327A (en) * 2018-07-09 2020-01-17 青岛中科坤泰管廊有限公司 Waterproof rubber strip for prefabricated comprehensive pipe gallery rabbet
CN108999241A (en) * 2018-08-02 2018-12-14 王运章 Adopt the installation method of the diversion pond for inhaling seawater device, water-supply-pipe tube coupling and tube coupling
CN109403378A (en) * 2018-12-12 2019-03-01 中国建筑土木建设有限公司 A kind of piping lane interface structure and its construction method
CN109594586A (en) * 2018-12-12 2019-04-09 中国建筑土木建设有限公司 A kind of inclined chute-and-self-locking type piping lane interface structure and its construction method
CN110616636A (en) * 2019-08-12 2019-12-27 中交二航局第二工程有限公司 Closure structure of hybrid beam rigid frame bridge under strong surge condition and method for lifting staggered closure
CN110616635A (en) * 2019-08-12 2019-12-27 中交二航局第二工程有限公司 Closure structure and lowering dislocation closure method of hybrid beam rigid frame bridge under strong surge condition
CN110616635B (en) * 2019-08-12 2020-12-25 中交二航局第二工程有限公司 Closure structure and lowering dislocation closure method of hybrid beam rigid frame bridge under strong surge condition
CN110616636B (en) * 2019-08-12 2020-12-25 中交二航局第二工程有限公司 Closure structure of hybrid beam rigid frame bridge under strong surge condition and method for lifting staggered closure
CN111305094A (en) * 2020-03-24 2020-06-19 河南省交通规划设计研究院股份有限公司 Construction method for prefabricated assembly type trapezoidal staggered box culvert structure

Similar Documents

Publication Publication Date Title
CN107780437A (en) The prefabricated assembled tube coupling of pipe gallery
CN111411971B (en) Settlement control construction method for water-rich silt stratum shield underpass building group
CN110617083A (en) Real-time intelligent monitoring and alarming construction method for tunnel lining concrete compactness
CN204098065U (en) A kind of can the precast assembly pipe gallery of stretch-draw in body
CN105041337B (en) The seam splicing construction and waterproof method of a kind of Tunnel Boring tunnel lining segment
CN103334422A (en) Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof
CN110029599B (en) Prefabricated culvert steel connection structure and construction method
CN103061782A (en) Large-section earth pressure balancing rectangular jacking pipe joint of motor vehicle tunnel and method for constructing large-section earth pressure balancing rectangular jacking pipe
CN108832563A (en) A kind of pre-fabricated electric cables comb and its construction method
CN106677132A (en) Shape fixing channel and field all-angle seamless connection method thereof
CN109881705A (en) A kind of prefabricated assembled concrete pipe gallery consolidates water-tight device and method
CN206233262U (en) The prefabricated assembled tube coupling of pipe gallery
CN109914474A (en) A kind of pipe gallery U-type groove, which is excavated, presses push construction method
CN204040062U (en) Prefabricated wedge shape flexible interface assembling piping lane
CN203050729U (en) Earth pressure balance rectangular jacking pipe joint for large-section motor vehicle tunnel
CN203546759U (en) Plugging structure for post-cast strip of underground building
CN203334270U (en) Mountable buried type prefabricated hollow underground diaphragm wall
CN108443612A (en) RC pipejacking tube coupling connector
CN102518129B (en) Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof
CN110185061A (en) A kind of assembled integral underground space retaining wall and construction method
CN203050736U (en) Waterproof earth pressure balance rectangular jacking pipe joint for large-section motor vehicle tunnel
CN206338075U (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN108521097A (en) A kind of prefabricated tunnel of electric power and its installation method
CN206189456U (en) Three cabin piping lanes
CN112943314B (en) Ground fracture stratum tunnel deformation joint seepage prevention device and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination