CN206233262U - The prefabricated assembled tube coupling of pipe gallery - Google Patents
The prefabricated assembled tube coupling of pipe gallery Download PDFInfo
- Publication number
- CN206233262U CN206233262U CN201620931571.1U CN201620931571U CN206233262U CN 206233262 U CN206233262 U CN 206233262U CN 201620931571 U CN201620931571 U CN 201620931571U CN 206233262 U CN206233262 U CN 206233262U
- Authority
- CN
- China
- Prior art keywords
- tunnel segment
- segment structure
- tang
- trapezoid
- mounting groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
A kind of prefabricated assembled tube coupling of pipe gallery, including trapezoid tunnel segment structure and inverted trapezoidal tunnel segment structure;The fracture surrounding of the trapezoid tunnel segment structure is formed with tang, and tang surrounding is formed with waterproof adhesive tape mounting groove, and both sides mounting groove is located at tang front, and upper and lower mounting groove is located at the top surface of tang, and lifting bolt hole is reserved at the top of the both sides side wall of trapezoid tunnel segment structure;The surrounding of the inverted trapezoidal tunnel segment structure is recess;The tang of the trapezoid tunnel segment structure and the recess of inverted trapezoidal tunnel segment structure realize that " Z " font tongue and groove is connected in installation process.The utility model directly can produce the extruding force of lateral compression power and vertical direction to extrude waterproof adhesive tape using structure shape in itself and dead load during right angle setting, to reach the purpose of sealing, waterproof.Meanwhile, waterproof adhesive tape can at once be installed after the completion of engineering is prefabricated, so as to improve installation effectiveness, reduce field installation procedure, reduce construction cost.
Description
Technical field:
The utility model belongs to Urban Buried Pipeline Network Systems construction device, more particularly to a kind of pipe gallery prefabrication and assembly construction
Formula tube coupling.
Background technology:
As country's propulsion Urban Underground pipe gallery is built, city piping lane engineering project rapid growth, piping lane construction skill
Art is also fast-developing, in the case where the thoughts such as green, efficient, environmental protection, energy-conservation are leading, using prefabricated assembled pipe gallery construction technology
Project it is also more and more, it is that one kind is prefabricated in the factory tube coupling, the assembled emerging pipe gallery construction method in job site.
Using the connection mode of reinforced concrete structure annular socket joint tongue and groove more than existing prefabricated assembled city integrated piping lane.
Prefabricated pipe section structure rise re-mount when, first be vertically hoisted to designed elevation, then under the assistance of manpower, horizontal counterpart insert
Connect, wear prestress wire or bolt finally by preformed hole and apply certain horizontal stress extruding waterproof adhesive tape, make waterproof
There is certain deformation in adhesive tape, be fitted tightly on mounted two adjacent tube couplings to reach the effect of sealing, waterproof.It is this
Structure construction operation is more, installation effectiveness is relatively low, the construction period is long, and construction cost is high.
The content of the invention:
The purpose of this utility model is that and overcomes above-mentioned the deficiencies in the prior art, and provides a kind of pipe gallery
Prefabricated assembled tube coupling, the tube coupling directly can produce side using structure shape in itself and dead load during right angle setting
Waterproof adhesive tape is extruded to the extruding force of extruding force and vertical direction, to reach the purpose of sealing, waterproof.Meanwhile, waterproof adhesive tape
Can at once be installed after the completion of engineering is prefabricated, so as to improve installation effectiveness, reduce field installation procedure, reduce and be constructed into
This.
As above conceive, the technical solution of the utility model is:A kind of prefabricated assembled tube coupling of pipe gallery, its feature exists
In:Including trapezoid tunnel segment structure and inverted trapezoidal tunnel segment structure;The fracture surrounding of the trapezoid tunnel segment structure is formed with tang, convex
Mouth surrounding is formed with waterproof adhesive tape mounting groove, and both sides mounting groove is located at tang front, and upper and lower mounting groove is located at the top surface of tang,
The reserved lifting bolt hole in both sides side wall top of trapezoid tunnel segment structure;The surrounding of the inverted trapezoidal tunnel segment structure is recess;
The tang of the trapezoid tunnel segment structure and the recess of inverted trapezoidal tunnel segment structure realize that " Z " font tongue and groove connects in installation process
Connect.
Above-mentioned trapezoid tunnel segment structure base opening 2.5m~3.0m wide, 1.5~2.0m wide suitable for reading.
Above-mentioned trapezoid tunnel segment structure both sides mounting groove sets rounding bottom land with upper and lower mounting groove connecting part.
Above-mentioned inverted trapezoidal tunnel segment structure 2.5m~3.0m wide suitable for reading, lower mouth 1.5~2.0m wide.
The utility model can save prestress wire or bolt is pre- compared with traditional prefabricated pipe gallery construction technology
The working procedure of tight pressurization, directly can be produced lateral crowded using structure shape in itself and dead load during right angle setting
The extruding force of pressure and vertical direction extrudes waterproof adhesive tape, reaching the purpose of sealing, waterproof.Meanwhile, waterproof adhesive tape can be
Installed at once after the completion of engineering is prefabricated, so as to improve installation effectiveness, reduce field installation procedure, reduce construction cost.
Brief description of the drawings:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of trapezoid tunnel segment structure;
Fig. 3 is the structural representation of inverted trapezoidal tunnel segment structure;
Fig. 4 is the enlarged drawing of rounding bottom land in trapezoid tunnel segment structure.
In figure:1-- trapezoid tunnel segment structures;2-- inverted trapezoidals section of jurisdiction;3-- tongue and grooves;31-- tangs;32-- recesses;4-- pacifies
Tankage;5-- rounding bottom lands;6-reserved lifting bolt hole.
Specific embodiment:
As shown in Figure 1:A kind of prefabricated assembled tube coupling of pipe gallery, by trapezoid tunnel segment structure and inverted trapezoidal tunnel segment structure
Composition.
As shown in Figure 2:Trapezoid tunnel segment structure 1, base opening 2.5m~3.0m wide (standard fragmentation width, according to actual conditions
Can suitably adjust), 1.5~2.0m wide suitable for reading, the surrounding of fracture is formed with tang 31, and waterproof adhesive tape mounting groove 4 is formed with tang 31,
Both sides mounting groove 4 is located at the front of tang 31, and upper and lower mounting groove 4 is located at the top surface of tang 31.As shown in Figure 4:In both sides mounting groove
4 set rounding bottom land 5 with the connecting part of upper and lower mounting groove 4 carries out transition processing.It is pre- at the top of the both sides side wall of trapezoid part
Lifting bolt hole 6 is stayed, lifting installation is carried out using special hanger in later stage installation process.
Fig. 3 be inverted trapezoidal tunnel segment structure 2,2.5m~3.0m wide suitable for reading, (standard fragmentation width can be fitted according to actual conditions
When adjustment), lower mouth 1.5~2.0m wide, front and rear both sides surrounding is recess 32, tongue and groove company is carried out with tang 31 in installation process
Connect.
As shown in Figure 1:The utility model first installs trapezoid tunnel segment structure 1 one by one, after inverted trapezoidal section of jurisdiction knot is installed one by one
Structure 2, is connected between adjacent tunnel segment structure using " Z " font tongue and groove 3, adjacent because each tunnel segment structure is from weighing more than 20 tons
Tunnel segment structure carries out prefabricated pipe gallery assembly under gravity, while gravity of the waterproof adhesive tape in inverted trapezoidal tunnel segment structure 1
Effect is lower to be clamped, and forms good waterproof effect.
Work progress of the present utility model is:
A. after excavation of foundation pit to designed elevation, concrete cushion of constructing, laying water-proof coiled material, then the pea gravel concreten guarantor that constructs
Sheath, the flatness of protective layer should meet the requirement of installation accuracy.
B. the installation site of measurement and positioning pipe gallery trapezoid tunnel segment structure 1 and inverted trapezoidal tunnel segment structure 2, certainty of measurement
Meet construction requirement.
C. haulage vehicle loads tunnel segment structure and marches into the arena, and absolute altitude and plan-position lifting trapezoid section of jurisdiction are first pressed with lifting appliance
Structure 1 is in place one by one, then lifts inverted trapezoidal tunnel segment structure 2.
D. the pressing rubber strip under the Action of Gravity Field of inverted trapezoidal tunnel segment structure 2, after adhesive tape deformation reaches construction requirement, inverted trapezoidal
Tunnel segment structure 2 is dropped down onto on protective layer.
E. as tunnel segment structure installs in place, it is necessary to be managed in time with double-component polysulfide sealant high using cement mortar
The jointing and closure for saving seam crossing are processed.
F. after the completion of structure protective layer construction, both sides must symmetrically backfill.
Wherein, the lifting of tunnel segment structure is constructed by the way of vertical lifting in the step (c).
Claims (4)
1. the prefabricated assembled tube coupling of a kind of pipe gallery, it is characterised in that:Tied including trapezoid tunnel segment structure and inverted trapezoidal section of jurisdiction
Structure;The fracture surrounding of the trapezoid tunnel segment structure is formed with tang, and tang surrounding is formed with waterproof adhesive tape mounting groove, both sides mounting groove
Positioned at tang front, upper and lower mounting groove is located at the top surface of tang, and lifting is reserved at the top of the both sides side wall of trapezoid tunnel segment structure
Bolt hole;The surrounding of the inverted trapezoidal tunnel segment structure is recess;The tang of the trapezoid tunnel segment structure and inverted trapezoidal section of jurisdiction
The recess of structure realizes that " Z " font tongue and groove is connected in installation process.
2. the prefabricated assembled tube coupling of pipe gallery according to claim 1, it is characterised in that:Above-mentioned trapezoid tunnel segment structure
Base opening 2.5m~3.0m wide, 1.5~2.0m wide suitable for reading.
3. the prefabricated assembled tube coupling of pipe gallery according to claim 1, it is characterised in that:Above-mentioned trapezoid tunnel segment structure
Both sides mounting groove sets rounding bottom land with upper and lower mounting groove connecting part.
4. the prefabricated assembled tube coupling of pipe gallery according to claim 1, it is characterised in that:Above-mentioned inverted trapezoidal tunnel segment structure
2.5m~3.0m wide suitable for reading, lower mouth 1.5~2.0m wide.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620931571.1U CN206233262U (en) | 2016-08-24 | 2016-08-24 | The prefabricated assembled tube coupling of pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620931571.1U CN206233262U (en) | 2016-08-24 | 2016-08-24 | The prefabricated assembled tube coupling of pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206233262U true CN206233262U (en) | 2017-06-09 |
Family
ID=58989208
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620931571.1U Active CN206233262U (en) | 2016-08-24 | 2016-08-24 | The prefabricated assembled tube coupling of pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206233262U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107780437A (en) * | 2016-08-24 | 2018-03-09 | 中冶天工集团有限公司 | Prefabricated assembled pipe joint of utility tunnel |
CN108411939A (en) * | 2018-03-16 | 2018-08-17 | 通号建设集团有限公司 | The spliced prefabricated pipe gallery of one kind and its construction method |
-
2016
- 2016-08-24 CN CN201620931571.1U patent/CN206233262U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107780437A (en) * | 2016-08-24 | 2018-03-09 | 中冶天工集团有限公司 | Prefabricated assembled pipe joint of utility tunnel |
CN108411939A (en) * | 2018-03-16 | 2018-08-17 | 通号建设集团有限公司 | The spliced prefabricated pipe gallery of one kind and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107780437A (en) | Prefabricated assembled pipe joint of utility tunnel | |
CN111411971B (en) | Settlement control construction method for water-rich silt stratum shield underpass building group | |
CN110617083A (en) | Real-time intelligent monitoring and alarming construction method for tunnel lining concrete compactness | |
CN110029599B (en) | Prefabricated culvert steel connection structure and construction method | |
CN204098065U (en) | A kind of can the precast assembly pipe gallery of stretch-draw in body | |
CN202170515U (en) | Prefabricated assembling composite pipe line with U-shaped section | |
CN111810715B (en) | Trenchless pipeline updating method and construction system | |
CN204040062U (en) | Prefabricated wedge shape flexible interface assembling piping lane | |
CN109914474A (en) | A kind of pipe gallery U-type groove, which is excavated, presses push construction method | |
CN206233262U (en) | The prefabricated assembled tube coupling of pipe gallery | |
CN105863673B (en) | Pusher fuselage can return to formula pipe jacking construction method and constructing structure | |
CN102518129B (en) | Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof | |
CN208136954U (en) | Precast splice type Pipe rack | |
CN108521097A (en) | A kind of prefabricated tunnel of electric power and its installation method | |
CN206338075U (en) | A kind of anti-internal water pressure composite shield section of jurisdiction | |
CN206189456U (en) | Three cabin piping lanes | |
CN205714225U (en) | A kind of railway culvert, tunnel defect wavy metal culvert pipe liner bracing means | |
CN104314104A (en) | Setting method for deformation joint obliquely crossed with underground box culvert | |
CN209025706U (en) | A kind of reinforced concrete cable tunnel component | |
CN203546754U (en) | Prefabricated reinforced concrete manhole for communication pipeline | |
CN103469766B (en) | Method for connecting rigid body and flexible body of dam foundation of reservoir | |
CN109763862B (en) | Dam body of underground reservoir and construction method thereof | |
CN207739410U (en) | The unstressed composite water-proof cover board of external labeling type is stitched in ground modification | |
CN107460798B (en) | A kind of steel plate runway device and construction method | |
CN112482435A (en) | Underground excavation construction method for underground multi-cabin pipe gallery through building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |