CN206233262U - The prefabricated assembled tube coupling of pipe gallery - Google Patents

The prefabricated assembled tube coupling of pipe gallery Download PDF

Info

Publication number
CN206233262U
CN206233262U CN201620931571.1U CN201620931571U CN206233262U CN 206233262 U CN206233262 U CN 206233262U CN 201620931571 U CN201620931571 U CN 201620931571U CN 206233262 U CN206233262 U CN 206233262U
Authority
CN
China
Prior art keywords
tunnel segment
segment structure
tang
trapezoid
mounting groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620931571.1U
Other languages
Chinese (zh)
Inventor
张健
刘槐刚
褚丝绪
姜云龙
徐国梁
刘泽华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201620931571.1U priority Critical patent/CN206233262U/en
Application granted granted Critical
Publication of CN206233262U publication Critical patent/CN206233262U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of prefabricated assembled tube coupling of pipe gallery, including trapezoid tunnel segment structure and inverted trapezoidal tunnel segment structure;The fracture surrounding of the trapezoid tunnel segment structure is formed with tang, and tang surrounding is formed with waterproof adhesive tape mounting groove, and both sides mounting groove is located at tang front, and upper and lower mounting groove is located at the top surface of tang, and lifting bolt hole is reserved at the top of the both sides side wall of trapezoid tunnel segment structure;The surrounding of the inverted trapezoidal tunnel segment structure is recess;The tang of the trapezoid tunnel segment structure and the recess of inverted trapezoidal tunnel segment structure realize that " Z " font tongue and groove is connected in installation process.The utility model directly can produce the extruding force of lateral compression power and vertical direction to extrude waterproof adhesive tape using structure shape in itself and dead load during right angle setting, to reach the purpose of sealing, waterproof.Meanwhile, waterproof adhesive tape can at once be installed after the completion of engineering is prefabricated, so as to improve installation effectiveness, reduce field installation procedure, reduce construction cost.

Description

The prefabricated assembled tube coupling of pipe gallery
Technical field:
The utility model belongs to Urban Buried Pipeline Network Systems construction device, more particularly to a kind of pipe gallery prefabrication and assembly construction Formula tube coupling.
Background technology:
As country's propulsion Urban Underground pipe gallery is built, city piping lane engineering project rapid growth, piping lane construction skill Art is also fast-developing, in the case where the thoughts such as green, efficient, environmental protection, energy-conservation are leading, using prefabricated assembled pipe gallery construction technology Project it is also more and more, it is that one kind is prefabricated in the factory tube coupling, the assembled emerging pipe gallery construction method in job site.
Using the connection mode of reinforced concrete structure annular socket joint tongue and groove more than existing prefabricated assembled city integrated piping lane. Prefabricated pipe section structure rise re-mount when, first be vertically hoisted to designed elevation, then under the assistance of manpower, horizontal counterpart insert Connect, wear prestress wire or bolt finally by preformed hole and apply certain horizontal stress extruding waterproof adhesive tape, make waterproof There is certain deformation in adhesive tape, be fitted tightly on mounted two adjacent tube couplings to reach the effect of sealing, waterproof.It is this Structure construction operation is more, installation effectiveness is relatively low, the construction period is long, and construction cost is high.
The content of the invention:
The purpose of this utility model is that and overcomes above-mentioned the deficiencies in the prior art, and provides a kind of pipe gallery Prefabricated assembled tube coupling, the tube coupling directly can produce side using structure shape in itself and dead load during right angle setting Waterproof adhesive tape is extruded to the extruding force of extruding force and vertical direction, to reach the purpose of sealing, waterproof.Meanwhile, waterproof adhesive tape Can at once be installed after the completion of engineering is prefabricated, so as to improve installation effectiveness, reduce field installation procedure, reduce and be constructed into This.
As above conceive, the technical solution of the utility model is:A kind of prefabricated assembled tube coupling of pipe gallery, its feature exists In:Including trapezoid tunnel segment structure and inverted trapezoidal tunnel segment structure;The fracture surrounding of the trapezoid tunnel segment structure is formed with tang, convex Mouth surrounding is formed with waterproof adhesive tape mounting groove, and both sides mounting groove is located at tang front, and upper and lower mounting groove is located at the top surface of tang, The reserved lifting bolt hole in both sides side wall top of trapezoid tunnel segment structure;The surrounding of the inverted trapezoidal tunnel segment structure is recess; The tang of the trapezoid tunnel segment structure and the recess of inverted trapezoidal tunnel segment structure realize that " Z " font tongue and groove connects in installation process Connect.
Above-mentioned trapezoid tunnel segment structure base opening 2.5m~3.0m wide, 1.5~2.0m wide suitable for reading.
Above-mentioned trapezoid tunnel segment structure both sides mounting groove sets rounding bottom land with upper and lower mounting groove connecting part.
Above-mentioned inverted trapezoidal tunnel segment structure 2.5m~3.0m wide suitable for reading, lower mouth 1.5~2.0m wide.
The utility model can save prestress wire or bolt is pre- compared with traditional prefabricated pipe gallery construction technology The working procedure of tight pressurization, directly can be produced lateral crowded using structure shape in itself and dead load during right angle setting The extruding force of pressure and vertical direction extrudes waterproof adhesive tape, reaching the purpose of sealing, waterproof.Meanwhile, waterproof adhesive tape can be Installed at once after the completion of engineering is prefabricated, so as to improve installation effectiveness, reduce field installation procedure, reduce construction cost.
Brief description of the drawings:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of trapezoid tunnel segment structure;
Fig. 3 is the structural representation of inverted trapezoidal tunnel segment structure;
Fig. 4 is the enlarged drawing of rounding bottom land in trapezoid tunnel segment structure.
In figure:1-- trapezoid tunnel segment structures;2-- inverted trapezoidals section of jurisdiction;3-- tongue and grooves;31-- tangs;32-- recesses;4-- pacifies Tankage;5-- rounding bottom lands;6-reserved lifting bolt hole.
Specific embodiment:
As shown in Figure 1:A kind of prefabricated assembled tube coupling of pipe gallery, by trapezoid tunnel segment structure and inverted trapezoidal tunnel segment structure Composition.
As shown in Figure 2:Trapezoid tunnel segment structure 1, base opening 2.5m~3.0m wide (standard fragmentation width, according to actual conditions Can suitably adjust), 1.5~2.0m wide suitable for reading, the surrounding of fracture is formed with tang 31, and waterproof adhesive tape mounting groove 4 is formed with tang 31, Both sides mounting groove 4 is located at the front of tang 31, and upper and lower mounting groove 4 is located at the top surface of tang 31.As shown in Figure 4:In both sides mounting groove 4 set rounding bottom land 5 with the connecting part of upper and lower mounting groove 4 carries out transition processing.It is pre- at the top of the both sides side wall of trapezoid part Lifting bolt hole 6 is stayed, lifting installation is carried out using special hanger in later stage installation process.
Fig. 3 be inverted trapezoidal tunnel segment structure 2,2.5m~3.0m wide suitable for reading, (standard fragmentation width can be fitted according to actual conditions When adjustment), lower mouth 1.5~2.0m wide, front and rear both sides surrounding is recess 32, tongue and groove company is carried out with tang 31 in installation process Connect.
As shown in Figure 1:The utility model first installs trapezoid tunnel segment structure 1 one by one, after inverted trapezoidal section of jurisdiction knot is installed one by one Structure 2, is connected between adjacent tunnel segment structure using " Z " font tongue and groove 3, adjacent because each tunnel segment structure is from weighing more than 20 tons Tunnel segment structure carries out prefabricated pipe gallery assembly under gravity, while gravity of the waterproof adhesive tape in inverted trapezoidal tunnel segment structure 1 Effect is lower to be clamped, and forms good waterproof effect.
Work progress of the present utility model is:
A. after excavation of foundation pit to designed elevation, concrete cushion of constructing, laying water-proof coiled material, then the pea gravel concreten guarantor that constructs Sheath, the flatness of protective layer should meet the requirement of installation accuracy.
B. the installation site of measurement and positioning pipe gallery trapezoid tunnel segment structure 1 and inverted trapezoidal tunnel segment structure 2, certainty of measurement Meet construction requirement.
C. haulage vehicle loads tunnel segment structure and marches into the arena, and absolute altitude and plan-position lifting trapezoid section of jurisdiction are first pressed with lifting appliance Structure 1 is in place one by one, then lifts inverted trapezoidal tunnel segment structure 2.
D. the pressing rubber strip under the Action of Gravity Field of inverted trapezoidal tunnel segment structure 2, after adhesive tape deformation reaches construction requirement, inverted trapezoidal Tunnel segment structure 2 is dropped down onto on protective layer.
E. as tunnel segment structure installs in place, it is necessary to be managed in time with double-component polysulfide sealant high using cement mortar The jointing and closure for saving seam crossing are processed.
F. after the completion of structure protective layer construction, both sides must symmetrically backfill.
Wherein, the lifting of tunnel segment structure is constructed by the way of vertical lifting in the step (c).

Claims (4)

1. the prefabricated assembled tube coupling of a kind of pipe gallery, it is characterised in that:Tied including trapezoid tunnel segment structure and inverted trapezoidal section of jurisdiction Structure;The fracture surrounding of the trapezoid tunnel segment structure is formed with tang, and tang surrounding is formed with waterproof adhesive tape mounting groove, both sides mounting groove Positioned at tang front, upper and lower mounting groove is located at the top surface of tang, and lifting is reserved at the top of the both sides side wall of trapezoid tunnel segment structure Bolt hole;The surrounding of the inverted trapezoidal tunnel segment structure is recess;The tang of the trapezoid tunnel segment structure and inverted trapezoidal section of jurisdiction The recess of structure realizes that " Z " font tongue and groove is connected in installation process.
2. the prefabricated assembled tube coupling of pipe gallery according to claim 1, it is characterised in that:Above-mentioned trapezoid tunnel segment structure Base opening 2.5m~3.0m wide, 1.5~2.0m wide suitable for reading.
3. the prefabricated assembled tube coupling of pipe gallery according to claim 1, it is characterised in that:Above-mentioned trapezoid tunnel segment structure Both sides mounting groove sets rounding bottom land with upper and lower mounting groove connecting part.
4. the prefabricated assembled tube coupling of pipe gallery according to claim 1, it is characterised in that:Above-mentioned inverted trapezoidal tunnel segment structure 2.5m~3.0m wide suitable for reading, lower mouth 1.5~2.0m wide.
CN201620931571.1U 2016-08-24 2016-08-24 The prefabricated assembled tube coupling of pipe gallery Active CN206233262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620931571.1U CN206233262U (en) 2016-08-24 2016-08-24 The prefabricated assembled tube coupling of pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620931571.1U CN206233262U (en) 2016-08-24 2016-08-24 The prefabricated assembled tube coupling of pipe gallery

Publications (1)

Publication Number Publication Date
CN206233262U true CN206233262U (en) 2017-06-09

Family

ID=58989208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620931571.1U Active CN206233262U (en) 2016-08-24 2016-08-24 The prefabricated assembled tube coupling of pipe gallery

Country Status (1)

Country Link
CN (1) CN206233262U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780437A (en) * 2016-08-24 2018-03-09 中冶天工集团有限公司 Prefabricated assembled pipe joint of utility tunnel
CN108411939A (en) * 2018-03-16 2018-08-17 通号建设集团有限公司 The spliced prefabricated pipe gallery of one kind and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780437A (en) * 2016-08-24 2018-03-09 中冶天工集团有限公司 Prefabricated assembled pipe joint of utility tunnel
CN108411939A (en) * 2018-03-16 2018-08-17 通号建设集团有限公司 The spliced prefabricated pipe gallery of one kind and its construction method

Similar Documents

Publication Publication Date Title
CN107780437A (en) Prefabricated assembled pipe joint of utility tunnel
CN111411971B (en) Settlement control construction method for water-rich silt stratum shield underpass building group
CN110617083A (en) Real-time intelligent monitoring and alarming construction method for tunnel lining concrete compactness
CN110029599B (en) Prefabricated culvert steel connection structure and construction method
CN204098065U (en) A kind of can the precast assembly pipe gallery of stretch-draw in body
CN202170515U (en) Prefabricated assembling composite pipe line with U-shaped section
CN111810715B (en) Trenchless pipeline updating method and construction system
CN204040062U (en) Prefabricated wedge shape flexible interface assembling piping lane
CN109914474A (en) A kind of pipe gallery U-type groove, which is excavated, presses push construction method
CN206233262U (en) The prefabricated assembled tube coupling of pipe gallery
CN105863673B (en) Pusher fuselage can return to formula pipe jacking construction method and constructing structure
CN102518129B (en) Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof
CN208136954U (en) Precast splice type Pipe rack
CN108521097A (en) A kind of prefabricated tunnel of electric power and its installation method
CN206338075U (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN206189456U (en) Three cabin piping lanes
CN205714225U (en) A kind of railway culvert, tunnel defect wavy metal culvert pipe liner bracing means
CN104314104A (en) Setting method for deformation joint obliquely crossed with underground box culvert
CN209025706U (en) A kind of reinforced concrete cable tunnel component
CN203546754U (en) Prefabricated reinforced concrete manhole for communication pipeline
CN103469766B (en) Method for connecting rigid body and flexible body of dam foundation of reservoir
CN109763862B (en) Dam body of underground reservoir and construction method thereof
CN207739410U (en) The unstressed composite water-proof cover board of external labeling type is stitched in ground modification
CN107460798B (en) A kind of steel plate runway device and construction method
CN112482435A (en) Underground excavation construction method for underground multi-cabin pipe gallery through building