CN203188641U - Border protection sizing structure device in construction site - Google Patents

Border protection sizing structure device in construction site Download PDF

Info

Publication number
CN203188641U
CN203188641U CN 201320120709 CN201320120709U CN203188641U CN 203188641 U CN203188641 U CN 203188641U CN 201320120709 CN201320120709 CN 201320120709 CN 201320120709 U CN201320120709 U CN 201320120709U CN 203188641 U CN203188641 U CN 203188641U
Authority
CN
China
Prior art keywords
protection
construction site
vertical rod
protection vertical
frontier defense
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320120709
Other languages
Chinese (zh)
Inventor
高山林
许胜虎
李俊勇
肖闯
滕义民
张德恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Original Assignee
PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION filed Critical PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Priority to CN 201320120709 priority Critical patent/CN203188641U/en
Application granted granted Critical
Publication of CN203188641U publication Critical patent/CN203188641U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a border protection sizing structure device in a construction site. The problems that border protection erecting consumes labor and time, the firmness and the reliability are not good, recycling can not be achieved, mounting and dismounting are complex, labor intensity is large and cost is high can be effectively solved. According to the technical scheme, protection vertical poles, protection meshes and a base are included, the number of the protection vertical poles is two, the two protection vertical poles are the same, the protection vertical poles are installed on the base through first bolts, the protection meshes are installed between the two protection vertical poles, and a cross supporting bar is installed on the upper portions of the two protection vertical poles. The border protection sizing structure device in the construction site is novel and unique in structure, simple and reasonable, firm and reliable, economic and practical, capable of being recycled, convenient and swift to mount and dismount and capable of greatly lowering labor intensity, thereby being the innovation in border protection devices.

Description

A kind of construction site faces frontier defense and protects the regularization constructional device
Technical field
The utility model relates to and faces limit and floor for the job site foundation ditch and face a kind of construction site that frontier defense protects and face frontier defense and protect the regularization constructional device.
Background technology
In construction work, facing that frontier defense protects is key point in the production safety management process, and causing of most industrial accidents all is to protect set up not in place because face frontier defense.At present, face frontier defense for construction site and protect many setting up with steel pipe and face frontier defense and protect, because its structure, set up time-consumingly, fastness, reliability are not good, can not reuse, and the installing/dismounting complexity, labour intensity is big, the cost height.Therefore, the improvement innovation of facing the frontier defense protection unit is the problem of needs solution.
Summary of the invention
At above-mentioned situation, for overcoming the defective of prior art, the purpose of the utility model just provides a kind of construction site and faces frontier defense and protect the regularization constructional device, can effectively solve face frontier defense protect set up time-consuming, fastness, reliability are not good, can not reuse the installing/dismounting complexity, labour intensity is big, the problem that cost is high.
The technical scheme that the utility model solves is, comprise protection vertical rod, protection screen sheet and base, the protection vertical rod has identical 2, and the protection vertical rod is contained on the base through first bolt, between 2 protection vertical rods protection screen sheet is housed, horizontal support bar is equipped with on 2 protection vertical rod tops.
The utility model novel structure uniqueness, advantages of simple, solid and reliable, economical and practical, can reuse, peace is torn open convenient and swift, greatly reduces labour intensity, is the innovation of facing on the frontier defense protection unit.
Description of drawings
Fig. 1 is front view of the present utility model.
Fig. 2 is the structure chart of the utility model protection vertical rod.
Fig. 3 is the structure chart of the utility model protection screen sheet.
Fig. 4 is the structure chart of the utility model base.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described in further detail.
Provided by Fig. 1 to Fig. 4, the utility model comprises protection vertical rod, protection screen sheet and base, and the protection vertical rod has identical 2, and the protection vertical rod is contained on the base through the first bolt 7a, between 2 protection vertical rods protection screen sheet is housed, horizontal support bar 8 is equipped with on 2 protection vertical rod tops.
In order to guarantee result of use, described protection vertical rod is welded together by the first steel plate 4a of vertical square tube 1 and its lower end and constitutes, and the upper and lower of square tube 1 is equipped with first angle steel 3 of level respectively;
Described base is welded together by the vertical steel pipe 6 of the second steel plate 4b on top and bottom and constitutes, and the second steel plate 4b and the first steel plate 4a of protection vertical rod bottom are fixed together through the first bolt 7a;
Described steel pipe 6 bottoms are the inclined-plane tip;
Described protection screen sheet is made of second angle steel 2 square frame that constitutes and the expanded metal lath 5 that is contained in the square frame, and four bights, the second bolt 7b of square frame links to each other with first angle steel 3;
The two ends of described support bar 8 link to each other with the top of 2 protection vertical rods through the 3rd bolt 7c respectively.
Mode of occupation of the present utility model is, at first base is vertically pounded and buried in 9, adopt the first bolt 7a and the first steel plate 4a of protection vertical rod bottom to be connected firmly, with quadrat method the second root guard vertical rod is installed, protect afterwards and adopt the second bolt 7b that protection screen sheet is contained on first angle steel 3 of protection vertical rod upper and lower between the vertical rod, adopt the 3rd bolt 7c that the support bar 8 on protection vertical rod top is installed at last.
Result of use of the present utility model is: can realize that construction site faces the installation regularization that frontier defense is protected, only need the regularization base directly pounded and bury, directly be connected with bolt with the base plate of protection vertical rod again and get final product, connecting the same bolt that adopts between the protection vertical rod directly connects protection screen sheet, effectively improve the job site and faced frontier defense and protect installation effectiveness, reduced working strength of workers greatly.After the completion of engineering, dismountablely be transported to next engineering and continue to use, improved construction site security protection level and economic benefit comprehensively.This construction site faces frontier defense, and to protect the regularization constructional device solid and reliable, economical and practical, and peace is torn open convenient and swift, can reuse, and is convenient to apply widely in enterprise in charge of construction.

Claims (6)

1. a construction site faces frontier defense and protects the regularization constructional device, comprise protection vertical rod, protection screen sheet and base, it is characterized in that, the protection vertical rod has identical 2, the protection vertical rod is contained on the base through first bolt (7a), between 2 protection vertical rods protection screen sheet is housed, horizontal support bar (8) is equipped with on 2 protection vertical rod tops.
2. construction site according to claim 1 faces frontier defense and protects the regularization constructional device, it is characterized in that, described protection vertical rod welds together formation by first steel plate (4a) of vertical square tube (1) and its lower end, and the upper and lower of square tube (1) is equipped with first angle steel (3) of level respectively.
3. construction site according to claim 1 faces frontier defense and protects the regularization constructional device, it is characterized in that, described base welds together formation by second steel plate (4b) on top and the vertical steel pipe (6) of bottom, and second steel plate (4b) is fixed together through first bolt (7a) with first steel plate (4a) of protection vertical rod bottom.
4. construction site according to claim 3 faces frontier defense and protects the regularization constructional device, it is characterized in that described steel pipe (6) bottom is the inclined-plane tip.
5. construction site according to claim 1 faces frontier defense and protects the regularization constructional device, it is characterized in that, described protection screen sheet is made of second angle steel (2) square frame that constitutes and the expanded metal lath (5) that is contained in the square frame, and four bights, second bolts (7b) of square frame link to each other with first angle steel (3).
6. construction site according to claim 1 faces frontier defense and protects the regularization constructional device, it is characterized in that, the two ends of described support bar (8) link to each other through the tops of the 3rd bolt (7c) with 2 protection vertical rods respectively.
CN 201320120709 2013-03-18 2013-03-18 Border protection sizing structure device in construction site Expired - Fee Related CN203188641U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320120709 CN203188641U (en) 2013-03-18 2013-03-18 Border protection sizing structure device in construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320120709 CN203188641U (en) 2013-03-18 2013-03-18 Border protection sizing structure device in construction site

Publications (1)

Publication Number Publication Date
CN203188641U true CN203188641U (en) 2013-09-11

Family

ID=49105508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320120709 Expired - Fee Related CN203188641U (en) 2013-03-18 2013-03-18 Border protection sizing structure device in construction site

Country Status (1)

Country Link
CN (1) CN203188641U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196254A (en) * 2014-08-26 2014-12-10 四川金锋建设有限公司 Edge protection system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196254A (en) * 2014-08-26 2014-12-10 四川金锋建设有限公司 Edge protection system

Similar Documents

Publication Publication Date Title
CN103075020B (en) A kind of steel tray supports actuating system
CN204040435U (en) High-altitude steel structure welding Hanging Basket
CN204571384U (en) A kind of sizing chemoprevention pounds switchbox protection canopy
CN104179362A (en) Building site guardrail fast to mount and demount
CN203188641U (en) Border protection sizing structure device in construction site
CN211229458U (en) A operation platform for cylinder mound concrete placement construction
CN210315224U (en) High mound turns over mould construction safety passageway system
CN204940861U (en) Adjustable case beam side steel bracket
CN204139631U (en) The guard rail of building site fast demountable
CN202882454U (en) Temporary safe protective barrier
CN202430823U (en) Detachable steel bar processing protective shed
CN201344038Y (en) Mining survival active supporting net
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN202422650U (en) Eight-board two-map conventionalized structure device for construction site
CN203361170U (en) Supporting upright column pile for building foundation pit support
CN202214967U (en) Portable column construction hanging frame
CN208361754U (en) A kind of derrick crane base steel plinth suspension mounting structure
CN215760532U (en) Prestressed capping beam tensioning and grouting working platform
CN103758334A (en) Scaffold structure for constructing exterior wall of building
CN104060845A (en) Temporary fixing structure for steel column and construction method thereof
CN211666427U (en) Assembled face limit protective apparatus
CN211447956U (en) But reuse's reinforcing bar processing shed structure
CN203640245U (en) Scaffold structure for building exterior wall construction
CN103114712B (en) Buckle steel platform support system and construction method thereof
CN202831657U (en) Supporting bracket used for mounting steel members aloft

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130911

Termination date: 20140318