CN211447956U - But reuse's reinforcing bar processing shed structure - Google Patents

But reuse's reinforcing bar processing shed structure Download PDF

Info

Publication number
CN211447956U
CN211447956U CN201922017955.9U CN201922017955U CN211447956U CN 211447956 U CN211447956 U CN 211447956U CN 201922017955 U CN201922017955 U CN 201922017955U CN 211447956 U CN211447956 U CN 211447956U
Authority
CN
China
Prior art keywords
steel
bar processing
steel pipe
reinforcing bar
shed structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922017955.9U
Other languages
Chinese (zh)
Inventor
江林
环志勇
杨斯尧
隋华仁
沈世兵
王会
朱义林
冯狱建
苏继龙
徐费山
张亚民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongru Construction Group Co ltd
Original Assignee
Zhongru Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongru Construction Group Co ltd filed Critical Zhongru Construction Group Co ltd
Priority to CN201922017955.9U priority Critical patent/CN211447956U/en
Application granted granted Critical
Publication of CN211447956U publication Critical patent/CN211447956U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a but reuse's reinforcing bar processing shed structure, including base, steel pipe stand, otic placode and steel pipe truss. The utility model has the advantages that: the utility model discloses well reinforcing bar processing shed structure installation, dismantlement convenient operation to can make standardization and regularization, compare with current steel-pipe type reinforcing bar processing protection canopy, can process the preparation according to actual conditions at the job site, simple to operate, structural design is reasonable, and is whole pleasing to the eye, can used repeatedly, reduce cost, in the specially adapted engineering construction, but mainly repeatedly usable's reinforcing bar processing steel protection canopy.

Description

But reuse's reinforcing bar processing shed structure
Technical Field
The utility model belongs to the technical field of building engineering, especially, relate to a but reuse's reinforcing bar processing shed structure.
Background
At present, steel bar processing protective sheds used in the steel bar processing industry are all erected by adopting steel pipes, and the technical defects are that the distance between the steel pipes is small, the whole body is heavy, the area of a working area is too small due to the limitation of the strength of the steel pipes, the steel bar hoisting and the steel bar processing are inconvenient, and the operation is not easy for a worker when 9-meter or 12-meter raw steel bar materials are blanked. The requirement of reinforcing bar processing can't be satisfied to the reinforcing bar processing workman does not use basically in work, generally works outside reinforcing bar processing protection shed. The conventional reinforcing steel bar processing protective shed works, so that the operation efficiency and the production efficiency of processing workers are directly influenced, and reinforcing steel bars are inconvenient to carry and enter and exit the reinforcing steel bar processing protective shed before and after processing, especially when the reinforcing steel bar processing protective shed works in severe weather such as rain and the like and when reinforcing steel bars with larger processing size are processed; meanwhile, the conventional reinforcing steel bar processing protective shed is constructed by common construction materials, so that the cost is high and the safety is poor.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a can guarantee to add man-hour at the reinforcing bar, ensure personnel convenient operation to but provide a comfortable space's reinforcing bar processing shed structure for operating personnel.
In order to solve the technical problem, the utility model adopts the technical scheme that: the utility model provides a but reuse's steel bar processing shed structure, its innovation point lies in: comprises that
The foundation comprises a base, a plurality of supporting columns and a plurality of supporting columns, wherein the base is provided with a plurality of pieces which are arranged at equal intervals and poured on the ground, and a plurality of foundation bolts are pre-buried in the base;
the welding steel plate at the bottom end of the steel round pipe stand column is fixedly connected with the foundation bolt on the base; the top of the steel round pipe upright post is welded and blocked by adopting a steel plate;
the ear plate is welded on the side surface of the top end of the steel round tube upright post;
the steel pipe truss, the direction of steel pipe stand of steel pipe perpendicular to of steel pipe truss is fixed on the otic placode, set up mutually perpendicular and form the vertical and horizontal framed bent system of well style of calligraphy structure on the steel pipe truss, and laid square timber and various steel sheet and fix on the vertical and horizontal framed bent system in proper order.
Furthermore, the steel round pipe upright columns are reinforced through cross pull rods.
Further, the steel pipe truss extends 2-3 m to the side of the steel pipe stand.
Furthermore, a steel bar with the diameter of 18-20 mm is welded and supported between the steel pipe truss and the steel pipe upright column to form a triangular stabilizing system.
Furthermore, the steel pipe distance between the vertical and horizontal plane bent frame systems which are perpendicular to each other and form the # -shaped structure is not more than 30cm, and the outer side distance between the upper bent frame system and the lower bent frame system is 70-80 cm.
The utility model has the advantages that:
(1) the steel bar processing shed structure in the utility model is convenient to install, disassemble and operate, can be standardized and finalized, can be processed and manufactured according to actual conditions on a construction site compared with the prior steel pipe type steel bar processing protective shed, is convenient to install, reasonable in structural design, beautiful in whole, reusable and low in cost, is particularly suitable for engineering construction, and mainly is a steel bar processing steel protective shed which can be reused;
(2) the utility model discloses but reuse's steel bar processing shed structure, wherein, adopt phi 18 ~ 20 mm's reinforcing bar to weld between steel pipe truss and the steel pipe stand and support, form the stable system of triangle, make the overall structure more firm; in addition, the outer side distance of an upper row of bent frame system and a lower row of bent frame system of a vertical and horizontal plane bent frame system of a # -shaped structure erected on the steel pipe truss is controlled to be 70-80 cm, and the safety slogans are convenient to install.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Fig. 1 is the utility model discloses a but reuse's steel bar processing shed structure schematic diagram.
Detailed Description
The following examples are presented to enable those skilled in the art to more fully understand the present invention and are not intended to limit the scope of the present invention.
Examples
The reusable steel bar processing shed structure of the embodiment is shown in fig. 1 and comprises a base 1, a steel round tube upright post 2, an ear plate 3 and a steel tube truss 4.
The base 1 is provided with a plurality of foundation bolts which are arranged on the ground at equal intervals, and a plurality of foundation bolts are embedded in the base 1, in the embodiment, the number of the foundation bolts is one every 5 m; the bottom of the steel round tube upright post 2 is provided with a welding steel plate, the welding steel plate at the bottom of the steel round tube upright post 2 is fixedly connected with a foundation bolt on the base 1, armpit processing is carried out on the bottom of the steel round tube upright post 2, the top of the steel round tube upright post 2 is welded and plugged by a steel plate, and the steel round tube upright post 2 and the welding steel plate are subjected to armpit processing; by way of example, a more specific implementation mode is that the steel round tube columns 2 are reinforced through cross tie rods, so that the connection between the steel round tube columns 2 and the base 1 is more stable.
The ear plate 3 is welded on the side surface of the top end of the steel round tube upright post 2; the steel pipe truss 4 is fixed on the ear plate 3 in the direction perpendicular to the steel round pipe upright post 2, the upper chord and the lower chord of the steel pipe truss 4 are welded on the ear plate 3, the length of the upper chord and the lower chord is 3m, the inner side distance is 750mm, and the outer side distance is 700 mm; a longitudinal and transverse bent frame system which is mutually vertical to form a # -shaped structure is erected on the steel pipe truss 4, square timbers 5 are laid on and fixed to the transverse bent frame system, and color steel plates are fixed to the square timbers 5 on the upper layer of the # -shaped transverse bent frame system of the upper chord; the steel pipe truss 4 extends 3m to the side edge of the steel round pipe upright post; a steel bar with the diameter of phi 20mm is adopted between the steel pipe truss 4 and the steel round pipe upright post 2 for welding support to form a triangular stabilizing system; the steel pipe distance of the vertical and horizontal plane bent frame systems which are mutually perpendicular to form the # -shaped structure is not more than 30cm on the steel pipe truss 4, and the outer side distance of the upper and lower bent frame systems is 70cm, so that the safety slogans are convenient to install.
But this embodiment reuse's reinforcing bar processing shed structure, the installation, dismantle convenient operation to can make standardization and regularization, compare with current steel pipe formula reinforcing bar processing protection canopy, can process the preparation according to actual conditions at the job site, simple to operate, structural design is reasonable, and is whole pleasing to the eye, can used repeatedly, reduce cost, in the specially adapted engineering construction, but mainly reuse reinforcing bar processing steel protection canopy.
It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a but reuse's steel bar processing shed structure which characterized in that: comprises that
The foundation comprises a base, a plurality of supporting columns and a plurality of supporting columns, wherein the base is provided with a plurality of pieces which are arranged at equal intervals and poured on the ground, and a plurality of foundation bolts are pre-buried in the base;
the welding steel plate at the bottom end of the steel round pipe stand column is fixedly connected with the foundation bolt on the base; the top of the steel round pipe upright post is welded and blocked by adopting a steel plate;
the ear plate is welded on the side surface of the top end of the steel round tube upright post;
the steel pipe truss, the direction of steel pipe stand of steel pipe perpendicular to of steel pipe truss is fixed on the otic placode, set up mutually perpendicular and form the vertical and horizontal framed bent system of well style of calligraphy structure on the steel pipe truss, and laid square timber and various steel sheet and fix on the vertical and horizontal framed bent system in proper order.
2. A reusable steel bar processing shed structure according to claim 1, wherein: and the steel round pipe upright columns are reinforced through cross pull rods.
3. A reusable steel bar processing shed structure according to claim 1, wherein: the steel pipe truss extends 2-3 m to the side of the steel round pipe stand.
4. A reusable steel bar processing shed structure according to claim 1, wherein: and a steel bar with the diameter of 18-20 mm is adopted between the steel pipe truss and the steel round pipe upright post for welding support, so that a triangular stabilizing system is formed.
5. A reusable steel bar processing shed structure according to claim 1, wherein: the steel pipe truss is characterized in that the distance between steel pipes of vertical and horizontal plane bent frame systems which are perpendicular to each other to form a # -shaped structure is less than or equal to 30cm, and the distance between the outer sides of the upper bent frame system and the lower bent frame system is 70-80 cm.
CN201922017955.9U 2019-11-21 2019-11-21 But reuse's reinforcing bar processing shed structure Active CN211447956U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922017955.9U CN211447956U (en) 2019-11-21 2019-11-21 But reuse's reinforcing bar processing shed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922017955.9U CN211447956U (en) 2019-11-21 2019-11-21 But reuse's reinforcing bar processing shed structure

Publications (1)

Publication Number Publication Date
CN211447956U true CN211447956U (en) 2020-09-08

Family

ID=72304333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922017955.9U Active CN211447956U (en) 2019-11-21 2019-11-21 But reuse's reinforcing bar processing shed structure

Country Status (1)

Country Link
CN (1) CN211447956U (en)

Similar Documents

Publication Publication Date Title
CN202416184U (en) Construction device for formwork for longitudinal wet joint of box girder
CN212534174U (en) Raft foundation steel bar supporting tool
CN107419893A (en) A kind of elevator steel platform and preparation method thereof
CN211143305U (en) Steel structure building
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN211447956U (en) But reuse's reinforcing bar processing shed structure
CN109441101B (en) Construction platform for high-altitude operation concrete circular roof
CN107795133B (en) Integral protective frame platform and construction method thereof
CN102864746A (en) Bearing frame for bridge construction
CN206616765U (en) Large span is without depending on huge bandy truss pull bar
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN113482310A (en) Supporting scaffold of assembled steel beam and construction method for sectional erection of supporting scaffold
CN209874555U (en) Assembled steel bar processing shed
CN110952765A (en) Formwork supporting platform for shear wall high-altitude concrete cantilever structure and assembling method of formwork supporting platform
CN205742960U (en) A kind of vertical scaffold reinforcement assembly across Bars In Poured Concrete Slab
CN215907350U (en) Assembled steel beam supporting scaffold
CN213898323U (en) Standard reinforcing steel bar processing protective shed capable of being assembled in turnover mode
CN203334291U (en) High-rigidity monolithic pre-stressing assembled-type pull rod for foundation pit supporting inner-supporting system
CN211033658U (en) Interim strorage device of adjustable steel reinforcement cage
CN203393722U (en) Pair-supporting part
CN219864044U (en) Assembled template of sintering main building concrete column
CN210736044U (en) Tower crane attaches wall support installation, dismantles operation platform
CN214939173U (en) Assembled temporary construction passageway capable of being circulated
CN215055326U (en) Template support device for frame structure complicated special-shaped cornice

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant