CN202422650U - Eight-board two-map conventionalized structure device for construction site - Google Patents
Eight-board two-map conventionalized structure device for construction site Download PDFInfo
- Publication number
- CN202422650U CN202422650U CN2012200482903U CN201220048290U CN202422650U CN 202422650 U CN202422650 U CN 202422650U CN 2012200482903 U CN2012200482903 U CN 2012200482903U CN 201220048290 U CN201220048290 U CN 201220048290U CN 202422650 U CN202422650 U CN 202422650U
- Authority
- CN
- China
- Prior art keywords
- conventionalized
- board
- map
- boards
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses an eight-board two-map conventionalized structure device for a construction site. The eight-board two-map conventionalized structure device comprises a conventionalized structural frame and a standard board arranged on the conventionalized structural frame, wherein the conventionalized structural frame comprises vertical supports respectively arranged on three steel plate bases, and transverse supports are arranged at the upper ends and the lower ends of the vertical supports. The eight-board two-map conventionalized structure device has the advantages that users only need to connect standard boards with the conventionalized structure frame through bolts, and the connection boards are also connected through bolts, so that working strength of workers is greatly reduced, and efficiency in installing of eight boards and two maps is effectively improved. When one project is finished, the eight-board two-map conventionalized structure device can be demounted and conveyed to another project for installation and using, and safety management level and comprehensive benefit for construction are improved. The eight-board two-map conventionalized structure device for the construction site is firm, reliable, economical, applicable, fast and convenient to mount and demount, can be recycled in a plurality of projects and facilitates promotion and application in construction sites.
Description
Technical field
The utility model relates to a kind of regularization constructional device, more specifically says, it relates to a kind of construction site eight boards two figure regularization constructional devices.
Background technology
The installation of construction site eight boards two figure does not also form the structural system of regularization, tool.Eight boards, two figure are important carriers of project outpost display, also are the important symbols of project construction site safety civilized construction simultaneously, so the quality of eight boards, two figure will directly have influence on this project to the first impression of visitor to project evaluation.And original eight boards, two figure mounting meanss do not satisfy the requirement of safety management and green construction; For making the maximization of project benefit, prevent the wasting of resources, improve resource utilization; Making construction site eight boards two figure regularization constructional device materials repeat turnover uses; Lighten one's labor personnel's labour intensity satisfies and builds the requirement that working-yard eight boards, two figure install, and carries out green construction.Construction site eight boards two figure installation costs are high at present, benefit is low and can not have enough to meet the need use, and waste of material is serious.
Construction site eight boards two figure install most of mode that adopts steel tube fastener formula scaffold building at present; Security performance is low, and the occupied ground area is big, and the area of eight boards, two figure is big; The corresponding increase of front face area; There is bigger potential safety hazard in the influence of wind load to eight boards, the two figure support systems that adopt fastener type framing scaffold form, not only can not play the effect of security protection and display scene safety construction image, brings bigger security risk to construction enterprises on the contrary.
Summary of the invention
The purpose of the utility model is to overcome deficiency of the prior art, provides a kind of rational in infrastructure, reduces cost, and improves the prefabricated assembled horizontal member fittable slackening device of stability.
This construction site eight boards two figure regularization constructional devices; Comprise the regularization structure-steel framing and be located at the on-gauge plate on the regularization structure-steel framing; Said regularization structure-steel framing comprises is located at the vertical support of being located at respectively on three steel plate bases, vertically supports top and bottom and is provided with cross-brace.
As preferably: said on-gauge plate is that rectangle frame and steel plate are formed.
As preferably: also be provided with ribbed stiffener between said vertical support and the steel plate base.
As preferably: said vertical support is provided with some angle steel that have bolt hole.
The beneficial effect of the utility model is: can realize the installation regularization of construction site eight boards two figure; Only needing to adopt bolt to be connected on-gauge plate and regularization structure-steel framing gets final product; On-gauge plate adopts bolt to connect with being connected of on-gauge plate equally; Effectively improve the benefit that eight boards, two figure install when reducing labor strength greatly, helped promoting and improving the safety management and the civilized construction of working-yard.After an engineering is accomplished, dismountable next project installation use, the safety management level and the comprehensive benefit of raising building operation of being transported to.These construction site eight boards two figure regularization constructional devices are solid and reliable, economic and practical, flexible, and peace is torn open quick, can in a plurality of engineerings, reuse, and is convenient to enterprise in charge of construction and applies widely.
Description of drawings
Fig. 1 is a regularization structure-steel framing structural representation;
Fig. 2 is a regularization structure-steel framing structural representation;
Fig. 3 is the on-gauge plate structural representation;
Fig. 4 is the utility model structural representation;
Reference numeral: regularization structure-steel framing 1, on-gauge plate 2, embedded foundation 3, vertically support 4, cross-brace 5, steel plate base 6, ribbed stiffener 7, rectangle frame 8, steel plate 9, angle steel 10.
Embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is done and to be further described.Though the utility model will combine preferred embodiment to describe, and should know, do not represent that the utility model is limited among the said embodiment.On the contrary, the utility model will be contained interior alternative, modified and the equivalent of scope of the utility model that can be included in attached claims qualification.
To shown in Figure 4, construction site eight boards two figure regularization constructional devices mainly are made up of members such as regularization structure-steel framing 1, on-gauge plates 2, before installation, regularization structure-steel framing 1, on-gauge plate 2 are processed referring to Fig. 1.Regularization structure-steel framing 1 adopts 2 rectangular steel of 4760mm or shaped steel and 1 long square steel or the shaped steel of 4760mm to support 4 as vertical; Square steel or the shaped steel long with 4 3950mm are welded to connect formation cross-brace 5 with vertical support 4; Be made into the door type structure frame of 8300mm * 4760mm; The welding steel base 6 in the structure-steel framing bottom, and steel plate base 6 is placed on the embedded foundation 3.Welding ribbed stiffener 7 on steel plate base 6,4 of Xian φ 18 bolts hole on steel plate base 6 adopt the bolt of M16 to be connected with embedded foundation 3; At 1100mm place welding angle steel 10 apart from the bottom; And on angle steel 10 bolt hole of 1 φ 10 of Xian; Adopt the bolt of M8 to be connected,, weld 8 angle steel 10 from beginning to carry out apart from middle 500mm and 400mm spacing intersection apart from first angle steel 10 welding center lines with on-gauge plate 2; The total frame welds 32 altogether, forms the regularization structure-steel framing 1 of construction site eight boards two figure.On-gauge plate 2 is to adopt the square steel of the long square steel of 2 1600mm or shaped steel and 2 900mm length or the rectangle frame 8 that shaped steel is welded into 900mm * 1600mm; At minor face midline weldering square steel or shaped steel; Form the on-gauge plate framework apart from 3 square steel of every 400mm place, long limit welding or shaped steel; The bolt hole of 1 φ 10 of Xian respectively on square steel or the shaped steel of long side direction apart from edge 300mm place and short side direction apart from edge 200mm place, the steel plate 9 that welding 2mm is thick on rectangle frame 8 forms on-gauge plates 2.After above component processing is good, adopt M8 bolt, on-gauge plate 2 is connected, during installation, adopt the bolt of M16 to be connected regularization structure-steel framing 1 with embedded foundation 3, after the correction bolt of on-gauge plate 2 with regularization structure-steel framing 1 employing M8 is connected.
Claims (4)
1. construction site eight boards two are schemed the regularization constructional devices; It is characterized in that: comprise regularization structure-steel framing (1) and be located at the on-gauge plate (2) on the regularization structure-steel framing (1); Said regularization structure-steel framing (1) comprises is located at the vertical support of being located at respectively on three steel plate bases (6) (4), and vertical (4) top and bottom of supporting are provided with cross-brace (5).
2. construction site eight boards two figure regularization constructional devices according to claim 1, it is characterized in that: said on-gauge plate (2) is rectangle frame (8) and steel plate (9) composition.
3. construction site eight boards two figure regularization constructional devices according to claim 1 is characterized in that: also be provided with ribbed stiffener (7) between said vertical support (4) and the steel plate base (6).
4. construction site eight boards two figure regularization constructional devices according to claim 1, it is characterized in that: said vertical support (4) is provided with some angle steel (10) that have bolt hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200482903U CN202422650U (en) | 2012-02-15 | 2012-02-15 | Eight-board two-map conventionalized structure device for construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200482903U CN202422650U (en) | 2012-02-15 | 2012-02-15 | Eight-board two-map conventionalized structure device for construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202422650U true CN202422650U (en) | 2012-09-05 |
Family
ID=46747388
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200482903U Expired - Fee Related CN202422650U (en) | 2012-02-15 | 2012-02-15 | Eight-board two-map conventionalized structure device for construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202422650U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103544906A (en) * | 2013-11-04 | 2014-01-29 | 广西金雨伞防水科技有限公司 | Waterproof construction comprehensive display frame |
CN111081174A (en) * | 2020-03-03 | 2020-04-28 | 山东理工职业学院 | Steel structure billboard and construction method |
-
2012
- 2012-02-15 CN CN2012200482903U patent/CN202422650U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103544906A (en) * | 2013-11-04 | 2014-01-29 | 广西金雨伞防水科技有限公司 | Waterproof construction comprehensive display frame |
CN111081174A (en) * | 2020-03-03 | 2020-04-28 | 山东理工职业学院 | Steel structure billboard and construction method |
CN111081174B (en) * | 2020-03-03 | 2021-09-24 | 山东理工职业学院 | Steel structure billboard and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103075020B (en) | A kind of steel tray supports actuating system | |
CN202441119U (en) | Tool type retaining board foundation pit edge enclosure structure | |
CN211143305U (en) | Steel structure building | |
CN202227701U (en) | Spliced type horizontal channel device | |
CN202422650U (en) | Eight-board two-map conventionalized structure device for construction site | |
CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
CN202945798U (en) | Overhanging type scaffold corner device | |
CN211993513U (en) | Steel bench for beam slab prefabricating field | |
CN203334298U (en) | Connecting cover plate used for connecting angle brace and opposite bracing standard component | |
CN203213137U (en) | Steel raft foundation for installing steel structure roof | |
CN213710353U (en) | Early-dismantling supporting device for beam slab | |
CN202899639U (en) | Concrete column structure | |
CN210684349U (en) | Assembled gantry crane track foundation | |
CN210151938U (en) | Column top supporting device for low-position jacking formwork system | |
CN203361170U (en) | Supporting upright column pile for building foundation pit support | |
CN113684766A (en) | Construction platform for bracket of main tower of bridge and construction method thereof | |
CN209874185U (en) | A piece together formula angle steel lattice keel bearing structure for stone material curtain | |
CN202913716U (en) | Temporary support structure for truss integral lifting | |
CN111424917A (en) | Prefabricated assembly type integrated ground and process method | |
CN206046267U (en) | A kind of wet electrical dust precipitator anode module support | |
CN203558672U (en) | Connecting structure for reinforced concrete wall and construction elevator attachment rack | |
CN203334297U (en) | Connecting cover plate | |
CN212404828U (en) | Simple auxiliary device for connecting stay cable fork lug with anchor cup | |
CN209774616U (en) | Turnover type straight bar steel bar stacking rack | |
CN218117146U (en) | Assembled building outer wall protection frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120905 Termination date: 20130215 |