CN203112287U - Single-tower multi-cage cycle operation construction elevator - Google Patents

Single-tower multi-cage cycle operation construction elevator Download PDF

Info

Publication number
CN203112287U
CN203112287U CN 201320126267 CN201320126267U CN203112287U CN 203112287 U CN203112287 U CN 203112287U CN 201320126267 CN201320126267 CN 201320126267 CN 201320126267 U CN201320126267 U CN 201320126267U CN 203112287 U CN203112287 U CN 203112287U
Authority
CN
China
Prior art keywords
guide rail
construction elevator
swivel
construction
ladder cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201320126267
Other languages
Chinese (zh)
Inventor
张琨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN 201320126267 priority Critical patent/CN203112287U/en
Application granted granted Critical
Publication of CN203112287U publication Critical patent/CN203112287U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Abstract

A single-tower multi-cage cycle operation construction elevator comprises a single vertical guide rail frame and at least three construction elevator cages. An up-going guide rail is arranged on one side of the single vertical guide rail frame, and a down-going guide rail is arranged on the other side of the single vertical guide rail frame. The construction elevator cages can move along the up-going guide rail and the down-going guide rail. The single vertical guide rail frame is formed by standard knots and rotating knots in a split joint mode, and the construction elevator cages are further provided with identifying and automatic emergency braking control systems which can prevent the construction elevator cages from colliding with one another caused by misoperation in the operating process. According to the single-tower multi-cage cycle operation construction elevator, the difficult problem of vertical transportation of construction of existing buildings, especially high-rise buildings is solved, large construction planar positions are prevented from being occupied, construction reserving of outer walls and relevant procedures is reduced, meanwhile, the working amount of field equipment management is reduced, the construction period can well be shortened, and resources can be well saved.

Description

Single many cages of tower circular flow construction elevator
Technical field
The utility model belongs to the realm of building construction, specially refers to a kind of construction elevator that is used for vertical transport.
Background technology
The employed construction elevator of building operation can only move two elevator construction elevator ladder cages at most at present.When construction of super highrise building, for satisfying the needs of workmen and transport of materials, often need configuration multi-section construction elevator, so not only taken bigger construction planimetric position, the construction of the exterior wall of corresponding site and concerned process steps simultaneously need be treated to carry out after elevator is removed, and makes camp site process management complexity and has prolonged the construction period.
The utility model content
Need dispose the drawback that the multi-section construction elevator produces in order to overcome construction of super highrise building, the utility model provides a kind of single many cages of tower circular flow construction elevator, the swivel at top, bottom and other positions that need of this construction elevator by being arranged on single vertical guide rail frame, Rotate 180 ° conversion guide rail, realization utilize the function of single vertical guide rail frame circular flow multi-section construction elevator ladder cage.
In order to solve the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of single many cages of tower circular flow construction elevator, it is characterized in that: comprise that a side is provided with the single vertical guide rail frame that up guide rail, opposite side are provided with descending guide rail, and at least three construction elevators ladder cages that can move along up guide rail and descending guide rail; Described single vertical guide rail frame is spliced by standard knot and swivel, described construction elevator ladder cage is realized circular flow by up guide rail, descending guide rail and swivel, also is provided with on the described construction elevator ladder cage to prevent that construction elevator ladder cage from identification and the automatic emergency brake control system of collision mutually taking place because of maloperation in operational process.
Described swivel comprises that the made construction elevator ladder cage that the made construction elevator ladder cage on the top that is located at single vertical guide rail frame moves to the last swivel on the descending guide rail by up guide rail rotation transformation and is located at the bottom of single vertical guide rail frame moves to following swivel on the up guide rail by descending guide rail rotation transformation, and described construction elevator ladder cage is by up guide rail, descending guide rail, upward swivel and following swivel realization circular flow.
On the single vertical guide rail frame between last swivel and the following swivel, also be provided with and not only can make construction elevator ladder cage move on the descending guide rail, but also can make construction elevator ladder cage move to interlude swivel on the up guide rail by descending guide rail rotation transformation by up guide rail rotation transformation.
Described swivel can be to comprise the anchor shaft of captiveing joint with standard knot, and turning set is connected on the anchor shaft outside and can be by being connected and fixed the rotation support body that jig is connected with the terraced cage of construction elevator.
Described swivel also can be that swivel is provided with and can makes construction elevator ladder cage move to horizontal guide rail on the opposite side guide rail by a side rails rotation transformation.
Compared with prior art the utlity model has following characteristics and beneficial effect: the utility model is a kind of novel construction elevator, it has changed in the past the present situation that a construction elevator can only move two construction elevators ladder cages, has multi-section construction elevator ladder cage circular flow characteristics of (the guide rail operation that is single vertical guide rail frame both sides has multi-section construction elevator ladder cage) on the guide rail of single vertical guide rail frame both sides.
The utility model is by utilizing single vertical guide rail frame, circular flow multi-section construction elevator ladder cage, improved the frequency of transportation greatly, existing structure, the particularly difficult problem of construction of super highrise building vertical transport have been solved, avoid taking bigger construction planimetric position, reduced the construction of exterior wall and concerned process steps and reserved, reduced the work capacity of field apparatus management simultaneously, be conducive to the reduction of erection time and economize on resources.
Description of drawings
Fig. 1 is that structure master of the present utility model looks scheme drawing.
Fig. 2 is the schematic top plan view of Fig. 1.
Swivel, 1d-interlude swivel under the single vertical guide rail frame of Reference numeral: 1-, 1a-standard knot, the last swivel of 1b-, the 1c-; 2-construction elevator ladder cage; The 3-S. A.; 4-rotates support body; The up guide rail of 5-; The descending guide rail of 6-; 7-is connected and fixed jig.
The specific embodiment
Embodiment is referring to Fig. 1, Fig. 2, this single many cages of tower circular flow construction elevator, comprise that a side is provided with the single vertical guide rail frame 1 that up guide rail 5, opposite side are provided with descending guide rail 6, and operation there are at least three construction elevators ladder cages 2 at least three construction elevators ladder cage 2(that can move along up guide rail 5 and descending guide rail 6 guide rail that is single vertical guide rail frame both sides).
Described single vertical guide rail frame 1 is spliced by standard knot 1a and swivel, described swivel comprises that the made construction elevator ladder cage 2 that the made construction elevator ladder cage 2 on the top that is located at single vertical guide rail frame 1 moves to the last swivel 1b on the descending guide rail 6 by up guide rail 5 rotation transformations and is located at the bottom of single vertical guide rail frame 1 moves to following swivel 1c on the up guide rail 5 by descending guide rail 6 rotation transformations, and described construction elevator ladder cage 2 is by up guide rail 5, descending guide rail 6 and swivel (going up swivel 1b and following swivel 1c) realization circular flow.
In the present embodiment, also be provided with on the single vertical guide rail frame 1 between last swivel 1b and the following swivel 1c and not only can make construction elevator ladder cage 2 be moved on the descending guide rail 6, but also can be made construction elevator ladder cage 2 move to interlude swivel 1d on the up guide rail 5 by descending guide rail 6 rotation transformations by up guide rail 5 rotation transformations, the quantity of interlude swivel 1d and position can arrange with needs according to specific circumstances.
In the present embodiment, interlude swivel 1d has only a joint, in other embodiments, as required, can also be at interval more piece interlude swivel 1d to be set on the interlude of single vertical guide rail frame 1, also interlude swivel 1d can be set.
That is to say, single vertical guide rail frame 1 (is namely gone up swivel 1b and following swivel 1c by standard knot and swivel, sometimes also can comprise interlude swivel 1d) to form, swivel is arranged on top, bottom and other positions as required of single vertical guide rail frame.In the load that the single vertical guide rail frame of swivel (namely go up swivel 1b, down swivel 1c and interlude swivel 1d) above bearing construction elevator ladder cage 2 and construction elevator ladder cage transmits, 180 ° of rotations carrying out construction elevator ladder cage 2 switch tracks (being that construction elevator ladder cage can utilize swivel to be rotated 180 ° of conversion guide rails).
Also be provided with on the construction elevator ladder cage 2 and can prevent that construction elevator ladder cage from identification and the automatic emergency brake control system (also being safety control system) of collision mutually taking place because of maloperation in operational process.That is to say; be provided with in the utility model emergency case is carried out early warning and adopted the automatic emergency brake safety method; can prevent that multi-section construction elevator ladder cage from colliding mutually because of the maloperation generation, can guarantee the safe operation of multi-section construction elevator ladder cage in operational process.
In addition, in order to solve the transfer problem of supply cable when 2 rotations of construction elevator ladder cage switch tracks that 2 operations of construction elevator ladder cage are used, at each construction elevator ladder cage 2 the independently energy (as storage battery, diesel engine etc.) replacement cables power supply is set.
The mode (guide rail that transforms to opposite side from the guide rail of single vertical guide rail frame one side moves) that construction elevator ladder cage utilizes swivel to be rotated 180 ° of conversion guide rails can be following two kinds.
First kind: in the present embodiment, last swivel 1b, down swivel 1c is identical with the structure of interlude swivel 1d, includes with the anchor shaft 3 of standard knot 1a captive joint and turning set and is connected on anchor shaft 3 outsides and can be by being connected and fixed the rotation support body 4 that jig 7 is connected with the terraced cage 2 of construction elevator.After construction elevator ladder cage runs to the swivel position, in the time of need transforming to the guide rail operation of opposite side from the guide rail of single vertical guide rail frame one side, construction elevator ladder cage is connected (by being connected and fixed jig 7) with 4 lockings of rotation support body and forms an integral body, construction elevator ladder cage and rotation support body 4 together around anchor shaft 3 Rotate 180s °, are realized the conversion of guide rail thus then.
The concrete implementation step of present embodiment is as follows: one, single vertical guide rail frame 1 is installed on the construction elevator basis, single vertical guide rail frame 1 (is namely gone up swivel 1b and following swivel 1c by standard knot 1a and swivel, sometimes also can comprise interlude swivel 1d) to form, swivel is installed in to be needed to rotate on the position that switches tracks.After treating that single vertical guide rail frame fixedly finishes, multi-section construction elevator ladder cage 2 is installed thereon.Two, after 2 Installation and Debugging of construction elevator ladder cage finish, construction elevator ladder cage 2 is only upwards operation on the up guide rail 5 of single vertical guide rail frame 1 one sides, only operation downwards on the descending guide rail 6 of opposite side, by utilizing swivel to carry out the conversion of guide rail, going round and beginning again forms circulation, and then realizes the circular flow of multi-section construction elevator ladder cage.
Specifically: 1, when construction elevator ladder cage 2 upwards moves to swivel 1b position and need switch tracks, construction elevator ladder cage 2 is out of service, by being connected and fixed jig 7, locking construction elevator ladder cage 2 and last swivel 1b, open be connected (the rotating but make swivel 1b relative standard save 1a) of swivel 1b and standard knot 1a, construction elevator ladder cage 2 and rotation support body 4 are after S. A. 3 whole Rotate 180s ° enter preposition, fixing be connected (making swivel 1b relative standard save 1a can not rotate) of going up swivel 1b and standard knot 1a, open being connected of construction elevator ladder cage 2 and last swivel 1b, construction elevator ladder cage moves downwards then, finishes the conversion guide rail.2, when construction elevator ladder cage 2 moves to down swivel 1c position downwards and need switch tracks, construction elevator ladder cage 2 is out of service, by being connected and fixed jig 7, locking construction elevator ladder cage 2 and following swivel 1c, open down be connected (the rotating but make down swivel 1c relative standard save 1a) of swivel 1c and standard knot 1a, construction elevator ladder cage 2 and rotation support body 4 are after S. A. 3 whole Rotate 180s ° enter preposition, be connected (making down swivel 1c relative standard save 1a can not rotate) of fixing swivel 1c down and standard knot 1a, open being connected of construction elevator ladder cage 2 and following swivel 1c, the conversion guide rail is finished in upwards operation of construction elevator ladder cage then.3, go round and begin again, and then form the circular flow of construction elevator ladder cage 2.
Second kind: swivel is provided with and can makes construction elevator ladder cage 2 move to horizontal guide rail on the opposite side guide rail by a side rails rotation transformation.That is to say, be provided with at last swivel 1b and can make construction elevator ladder cage 2 move to horizontal guide rail on the descending guide rail 6 by up guide rail 5 rotation transformations, be provided with at following swivel 1c and can make construction elevator ladder cage 2 move to horizontal guide rail on the up guide rail 5 by descending guide rail 6 rotation transformations, be provided with at interlude swivel 1d and not only can make construction elevator ladder cage 2 move on the descending guide rail 6, but also can make construction elevator ladder cage 2 move to horizontal guide rail on the up guide rail 5 by descending guide rail 6 rotation transformations by up guide rail 5 rotation transformations.After construction elevator ladder cage 2 ran to the swivel position, construction elevator ladder cage 2 was along the horizontal guide rail operation that arranges on the swivel, and Rotate 180 ° is realized the conversion of guide rail separately.

Claims (5)

1. single many cages of tower circular flow construction elevator, it is characterized in that: comprise that a side is provided with up guide rail (5), opposite side is provided with the single vertical guide rail frame (1) of descending guide rail (6), and can be along up guide rail (5) and at least three mobile construction elevator ladder cages (2) of descending guide rail (6); Described single vertical guide rail frame (1) is spliced by standard knot (1a) and swivel, described construction elevator ladder cage (2) is realized circular flow by up guide rail (5), descending guide rail (6) and swivel, also is provided with on the described construction elevator ladder cage (2) to prevent that construction elevator ladder cage from identification and the automatic emergency brake control system of collision mutually taking place because of maloperation in operational process.
2. single many cages of tower circular flow construction elevator according to claim 1, it is characterized in that: described swivel comprises that the made construction elevator ladder cage (2) that the made construction elevator ladder cage (2) on the top that is located at single vertical guide rail frame (1) moves to the last swivel (1b) on the descending guide rail (6) by up guide rail (5) rotation transformation and is located at the bottom of single vertical guide rail frame (1) moves to following swivel (1c) on the up guide rail (5) by descending guide rail (6) rotation transformation, and the terraced cage of described construction elevator (2) passes through up guide rail (5), descending guide rail (6), last swivel (1b) and following swivel (1c) are realized circular flow.
3. single many cages of tower circular flow construction elevator according to claim 2 is characterized in that: also be provided with on the single vertical guide rail frame (1) between last swivel (1b) and the following swivel (1c) and not only can make construction elevator ladder cage (2) move to descending guide rail (6) by up guide rail (5) rotation transformation to go up, but also can make construction elevator ladder cage (2) move to interlude swivel (1d) on the up guide rail (5) by descending guide rail (6) rotation transformation.
4. according to claim 2 or 3 described single many cages of tower circular flow construction elevators, it is characterized in that: described swivel comprises the anchor shaft (3) of captiveing joint with standard knot (1a), and turning set is connected on anchor shaft (3) outside and can be by being connected and fixed the rotation support body (4) that jig (7) is connected with the terraced cage of construction elevator (2).
5. according to claim 2 or 3 described single many cages of tower circular flow construction elevators, it is characterized in that: described swivel is provided with and can makes construction elevator ladder cage (2) move to horizontal guide rail on the opposite side guide rail by a side rails rotation transformation.
CN 201320126267 2013-03-20 2013-03-20 Single-tower multi-cage cycle operation construction elevator Withdrawn - After Issue CN203112287U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320126267 CN203112287U (en) 2013-03-20 2013-03-20 Single-tower multi-cage cycle operation construction elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320126267 CN203112287U (en) 2013-03-20 2013-03-20 Single-tower multi-cage cycle operation construction elevator

Publications (1)

Publication Number Publication Date
CN203112287U true CN203112287U (en) 2013-08-07

Family

ID=48892656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320126267 Withdrawn - After Issue CN203112287U (en) 2013-03-20 2013-03-20 Single-tower multi-cage cycle operation construction elevator

Country Status (1)

Country Link
CN (1) CN203112287U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103145019A (en) * 2013-03-20 2013-06-12 中建三局建设工程股份有限公司 Single-tower multiple-cage circularly operated construction elevator
CN104671037A (en) * 2015-03-20 2015-06-03 中建三局集团有限公司 Intelligent rotary rail exchanging control system and method
CN105293225A (en) * 2015-12-07 2016-02-03 中建三局集团有限公司 Intelligent over-rotation-prevention positioning device and embodiment method
CN105523451A (en) * 2015-12-16 2016-04-27 中冶南方(武汉)自动化有限公司 Control method and control system for rotary joint system in multiple-car construction elevator
CN109812087A (en) * 2019-03-12 2019-05-28 大连海事大学 A kind of polyhedron rotating device
CN109812100A (en) * 2019-03-12 2019-05-28 大连海事大学 A kind of stereo automatization bicycle access method
CN112607557A (en) * 2020-12-23 2021-04-06 上海建工四建集团有限公司 Intelligent circulating type goods elevator system and use method
CN112623910A (en) * 2020-12-23 2021-04-09 上海建工四建集团有限公司 Intelligent people and goods elevator system and use method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103145019B (en) * 2013-03-20 2015-07-08 中建三局集团有限公司 Single-tower multiple-cage circularly operated construction elevator
CN103145019A (en) * 2013-03-20 2013-06-12 中建三局建设工程股份有限公司 Single-tower multiple-cage circularly operated construction elevator
CN104671037B (en) * 2015-03-20 2017-03-15 中建三局集团有限公司 Intelligent rotating switches tracks control system and method
CN104671037A (en) * 2015-03-20 2015-06-03 中建三局集团有限公司 Intelligent rotary rail exchanging control system and method
CN105293225B (en) * 2015-12-07 2017-03-22 中建三局集团有限公司 Intelligent over-rotation-prevention positioning device and embodiment method
CN105293225A (en) * 2015-12-07 2016-02-03 中建三局集团有限公司 Intelligent over-rotation-prevention positioning device and embodiment method
CN105523451A (en) * 2015-12-16 2016-04-27 中冶南方(武汉)自动化有限公司 Control method and control system for rotary joint system in multiple-car construction elevator
CN109812087A (en) * 2019-03-12 2019-05-28 大连海事大学 A kind of polyhedron rotating device
CN109812100A (en) * 2019-03-12 2019-05-28 大连海事大学 A kind of stereo automatization bicycle access method
CN112607557A (en) * 2020-12-23 2021-04-06 上海建工四建集团有限公司 Intelligent circulating type goods elevator system and use method
CN112623910A (en) * 2020-12-23 2021-04-09 上海建工四建集团有限公司 Intelligent people and goods elevator system and use method
CN112607557B (en) * 2020-12-23 2022-08-30 上海建工四建集团有限公司 Intelligent circulating type goods elevator system and use method
CN112623910B (en) * 2020-12-23 2023-05-26 上海建工四建集团有限公司 Intelligent personal cargo elevator system and use method

Similar Documents

Publication Publication Date Title
CN203112287U (en) Single-tower multi-cage cycle operation construction elevator
CN103145019B (en) Single-tower multiple-cage circularly operated construction elevator
CN204552050U (en) A kind of anchor ear bearing frame and scaffolding platform assembly
CN104709785A (en) Intelligent group control dispatch and safety control system and implementation method
CN111490485A (en) Prefabricated offshore booster station upper module and construction method thereof
CN206395349U (en) A kind of Semi-automatic aerating cabinet produces transfer device
CN204370861U (en) The long-range accurate control automatic access of a kind of compact car is parked building
CN201129052Y (en) Dual-row mechanical parking system
CN108049666A (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN107415903A (en) For electric automobile in multi-storied garage battery replacement device and change method for electrically
CN104032966A (en) Partitioning, hoisting, overhead closing and mounting method for arc-shaped double-layer net racks
CN203129580U (en) Formwork system
CN102116100A (en) Method for designing underground mechanical garage by utilizing urban track traffic engineering construction shaft
CN205874987U (en) Simply put up bridge crane
CN203112386U (en) Tower type truss mounting structure without assistance of high altitude hoisting equipment
CN206219993U (en) A kind of portable gate assembly device suitable for single-track railway steel truss bridge
CN101858165B (en) Tower mast structural segmented sheathing and piercing drawout integral installation technology
CN103831014B (en) A kind of installation method of SCR denitration catalyst in reactor module
CN201802098U (en) Automatic going-out and coming-in type three-dimensional garage
CN208267114U (en) A kind of frame or half inverted construction structure of cylinder load-bearing high level modular architectural
CN205998895U (en) The tower crane of unmanned plane airplane parking area is installed
CN111962738A (en) Wing-unfolding type retractable roof structure
CN210262965U (en) Arrangement structure between main engine and installation room of hydropower house
CN204057304U (en) For the conveying arrangement of hydroelectric project seat ring parts
CN212506983U (en) Wing-unfolding type retractable roof structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130807

Effective date of abandoning: 20150708

RGAV Abandon patent right to avoid regrant