CN202988158U - Conveyor line for upper vehicle frame and lower vehicle frame during excavator producing process - Google Patents
Conveyor line for upper vehicle frame and lower vehicle frame during excavator producing process Download PDFInfo
- Publication number
- CN202988158U CN202988158U CN 201220700109 CN201220700109U CN202988158U CN 202988158 U CN202988158 U CN 202988158U CN 201220700109 CN201220700109 CN 201220700109 CN 201220700109 U CN201220700109 U CN 201220700109U CN 202988158 U CN202988158 U CN 202988158U
- Authority
- CN
- China
- Prior art keywords
- line
- vehicle frame
- paint
- travel line
- workpiece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Warehouses Or Storage Devices (AREA)
Abstract
The utility model provides a conveyor line for upper vehicle frames and lower vehicle frames during an excavator producing process, which comprises an upper workpiece conveyor line, a worpiece conveyor line, a paint line, a paint upper line joint, a paint lower line joint, a stereoscopic warehouse, a lower workpiece conveyor line, and a return line. One end of the workpiece conveyor line is connected to one end of the return line, and the upper workpiece conveyor line is disposed at the connection part of the workpiece conveyor line and the return line. The other end of the workpiece conveyor line is connected to a conveyor line in a warehouse at one end of the stereoscopic warehouse. Two joints are disposed between the paint line and the workpiece conveyor line, wherein one joint is a paint upper line joint, and the other joint is a paint lower line joint. The other end of the stereoscopic warehouse is respectively connected to one end of two lower workpiece conveyor lines, and the other end of the two lower workpiece conveyor lines is respectively connected to the other end of the return line. The conveyor line for upper vehicle frames and lower vehicle frames during an excavator producing process is advantageous in that the workpiece overstocking problem during the producing process of upper vehicle frames and lower vehicle frames can be effectively resolved through the stereoscopic warehouse.
Description
Technical field
The utility model relates to a kind ofly for the upper vehicle frame of excavating machine production process and the travel line of lower vehicle frame, belong to excavating machine production line technology field.
Background technology
The excavating machine workshop is divided into the paint shop of paint shop, excavating machine composing room, swing arm and the dipper of the welding shop of vehicle frame and lower vehicle frame, upper vehicle frame and lower vehicle frame, the upper vehicle frame of welding shop and lower vehicle frame productive temp be vehicle frame or lower vehicle frame on 2 minutes/platform approximately, and paint shop's productive temp approximately vehicle frame or lower vehicle frame on 4 minutes/platform, paint does not catch up with beat.Therefore, paint shop need to carry out two classes of tasks of finishing the work.Need to there be this moment equipment to coordinate conveying and the storage problem of completing unvarnished upper vehicle frame and lower vehicle frame.
Summary of the invention
The utility model proposes a kind ofly for the upper vehicle frame of excavating machine production process and the travel line of lower vehicle frame, its purpose is intended to overcome the technical matters that on excavating machine, the class in vehicle frame and lower vehicle frame Paint Production produces.
technical solution of the present utility model: its structure comprises for upper vehicle frame and lower vehicle frame being sent on trunk main and being received the empty pallet that returns or upper travel line of fixture, be used for upper vehicle frame and lower vehicle frame are transported to the workpiece travel line that paints in reach the standard grade interface station or tiered warehouse facility, painted line, be used for upper vehicle frame and lower vehicle frame are hung line interface on the paint that paints on painted line, upper vehicle frame after being used for paint and lower vehicle frame are placed into line interface under paint on the workpiece travel line, be used for depositing the upper vehicle frame that painted or do not paint and the tiered warehouse facility of lower vehicle frame, be used for the upper vehicle frame that to paint and lower vehicle frame and be transported to lower travel line on assembling line, be used for empty pallet or carry the upper vehicle frame that do not paint and lower vehicle frame is transported to the line of return at upper travel line place, wherein an end of an end of workpiece travel line and the line of return is connected, upper travel line is arranged on the junction of workpiece travel line and the line of return, in storehouse in one end of the other end of workpiece travel line and tiered warehouse facility, travel line is connected, painted line and workpiece travel line have two joints, one of them joint is the upper line interface of paint, another joint is the lower line interface of paint, the other end of tiered warehouse facility is connected with an end of part travel line under two respectively, and the other end of part travel line is connected with the other end of the line of return respectively under two.
Advantage of the present utility model: solved by tiered warehouse facility and can effectively solve the overstocked problem of the workpiece that produces in get on the bus frame and lower vehicle frame production process.
Description of drawings
Fig. 1 is the travel line integral layout figure of a kind of upper vehicle frame for the excavating machine production process and lower vehicle frame.
Fig. 2 is upper travel line layout.
Fig. 3 is a kind of for the upper vehicle frame of excavating machine production process and the conveying diagram of circuit of lower vehicle frame.
Fig. 4 is the view that the vehicle frame piler moves in tiered warehouse facility.
Fig. 5 is the view of vehicle frame piler stacking in tiered warehouse facility.
In figure 1 is upper travel line, the 2nd, workpiece travel line, the 3rd, painted line, the 4th, line interface, the 5th on paint, the lower line interface, the 6th of paint, tiered warehouse facility, the 7th, lower travel line, the 8th, the line of return, the 9th, upper elevator, the 10th, interface elevator, the 11st, shelf, the 12nd, line slideway, the 13rd, traveling gear, the 14th, travel line, the 15th in the storehouse, transport trolley, the 16th, stacking dolly, the 17th, workpiece, the 18th, pallet, the 19th, elevator, the 20th, tray lift machine.
The specific embodiment
Workpiece described in the utility model is upper vehicle frame or lower vehicle frame, and what carry vehicle frame or lower vehicle frame in travel line can be pallet, fixture or suspender etc.
As shown in Figure 1, 2, a kind of for the upper vehicle frame of excavating machine production process and the travel line of lower vehicle frame, its structure comprises line interface 4 on a travel line 1, workpiece travel line 2, painted line 3, paint, the lower line interface 5 of paint, tiered warehouse facility 6, lower travel line 7, the line of return 8; Wherein an end of an end of workpiece travel line 2 and the line of return 8 is connected, upper travel line 1 is arranged on the junction of workpiece travel line 2 and the line of return 8, in storehouse in one end of the other end of workpiece travel line 2 and tiered warehouse facility 6, travel line 14 is connected, painted line 3 has two joints with workpiece travel line 2, one of them joint is the upper line interface 4 of paint, another joint is the lower line interface 5 of paint, the other end of tiered warehouse facility 6 is connected with an end of part travel line 7 under two respectively, and the other end of part travel line 7 is connected with the other end of the line of return 8 respectively under two.
Described upper travel line 1, workpiece travel line 2, lower travel line 7 and the line of return 8 are mounted in underground.
Described upper travel line 1 is used for upper vehicle frame and lower vehicle frame are sent on trunk main and received empty pallet or the fixture that returns; Described workpiece travel line 2 is used for upper vehicle frame and lower vehicle frame are transported in upper line interface 4 stations of paint or tiered warehouse facility; On described paint, line interface 4 is used for upper vehicle frame and lower vehicle frame are hung on painted line 3 and paints; Upper vehicle frame and lower vehicle frame after under described paint, line interface 5 is used for painting are placed into workpiece travel line 2; Described tiered warehouse facility 6 is used for depositing upper vehicle frame and the lower vehicle frame that painted or do not paint; Upper vehicle frame and lower vehicle frame that described lower travel line 7 is used for painting are transported to assembling line; The described line of return 8 is used for empty pallet or carries the upper vehicle frame that do not paint and lower vehicle frame being transported to upper travel line 1 place.
Described upper travel line 1 is divided into that the up and down is two-layer, and two ends are respectively an elevator 9 and interface elevator 10, and be connected with the line of return 8 with workpiece travel line 2 interface of position of upper travel line 1 is interface elevator 10, as shown in Figure 2.
This travel line can be placed in it underground, namely go up part travel line 1, workpiece travel line 2, lower travel line 7 and the line of return 8 and be arranged on undergroundly, carry out underground conveying, and with cover plate, it is sealed, matrix section can be by the vehicle of dealing, and whole workshop is comparatively clean and tidy.Described upper travel line, workpiece travel line, lower travel line, the line of return can adopt roller conveyor; Painted line can adopt Stacking Type Hang Conveyer.
Whole excavating machine manufacturing line is divided into welding shop, paint shop, fitter's shop, welding shop is positioned at the right side of a travel line 1, paint shop is positioned at the position of line interface 4 on painted line 3, paint and the lower line interface 5 of paint, and fitter's shop is positioned at the left side of lower travel line 7, as shown in Figure 1.
During work, welding shop, fitter's shop adopt one class of system, and beat is vehicle frame or lower vehicle frame on 2 minutes/platform approximately, and paint shop adopts double shift, and beat is vehicle frame or lower vehicle frame on 4 minutes/platform approximately, and idiographic flow is as follows:
As shown in Figure 3, a kind of conveying flow process of upper vehicle frame and the lower vehicle frame for the excavating machine production process comprises following operation:
1) upper part operation is used for workpiece is placed on fixture or pallet and fixing, namely go up part elevator 9 with empty pallet be promoted to upper locate, workpiece is placed on pallet fixes;
2) A carries operation, is used for workpiece and pallet are transported to the painted line place, and namely pallet carries workpiece through interface elevator 10, workpiece travel line 2, and workpiece is transported to upper line interface 4 stations of paint;
3) paint judgement operation, be used for judging whether workpiece needs to paint, if need paint, carry out upper part paint operation 4), if run into the workpiece that has little time to paint, carry out storage judgement operation 9), pallet carries unvarnished workpiece and continues to be fed forward to tiered warehouse facility;
4) upper part paint operation is used for workpiece transfer being about to workpiece and separating with pallet to painted line, and workpiece is hung on suspender on painted line, and empty pallet is along with workpiece travel line 2, and through painting lower line interface 5, and good workpiece continues to be fed forward to carry paint;
5) paint operation is used for workpiece is carried out the painting area reason on painted line 3;
6) paint down line process, the workpiece transfer pallet after being used for paint namely after workpiece paint, is placed on paint with workpiece and judges operation 3) on described empty pallet;
Whether 7) assembling judgement operation is used for judgement paint workpiece later and assembles, and needs assembling, carries out assembly process 8), if fitter's shop has little time assembling, carry out storage judgement operation 9);
8) assembly process is used for workpiece transfer to assembling line, and namely after workpiece paint, the workpiece after pallet and paint is transported in fitter's shop with the travel line 7 that rolls off the production line and assembles;
9) storage judgement operation is used for judging whether workpiece, comprise painted with do not paint, store, if need storage, carry out storage operation 10), if do not need storage, the workpiece that namely painted is not stored, and carries out assembling judgement operation 7);
10) storage operation is used for storing the workpiece that did not paint and the workpiece that has little time to assemble, and namely piler is placed on workpiece in tiered warehouse facility;
11) pickup operation is used for the workpiece of tiered warehouse facility is taken out, and namely piler takes out workpiece from tiered warehouse facility;
12) B carries operation, is used for returning from the workpiece that tiered warehouse facility takes out carrying out painting judgement operation 3), namely pallet carries unvarnished workpiece and passes through successively the line of return 8, interface elevator 10, workpiece travel line 2, returns and carries out paint judgement operation 3).
as Fig. 4, shown in Figure 5, a kind of vehicle frame piler for excavating machine production, its structure comprises transport trolley 15, stacking dolly 16, tray lift machine 20, wherein be equipped with on stacking dolly 16 for pallet 18 being promoted to the tray lift machine 20 of setting height, be equipped with on transport trolley 15 and make transport trolley 15 along the traveling gear 13 of line body throughput direction operation and make the line slideway 12 of stacking dolly 16 stacking on the shelf 11, stacking dolly 16 is arranged in the storehouse on travel line 14 by line slideway 12, the integral installation of vehicle frame piler is travel line 14 tops in the storehouse, shelf 11 are arranged on the one or both sides of travel line 14 in the storehouse, be equipped with on travel line 14 in the storehouse pallet 18 is promoted to elevator 19 on tray lift machine 20.
As Fig. 4, shown in Figure 5, a kind of vehicle frame tiered warehouse facility for excavating machine production, its structure comprises travel line 14 in shelf 11, vehicle frame piler, storehouse, wherein shelf 11 are arranged on the one or both sides of travel line 14 in the storehouse, in the storehouse, travel line 14 is positioned at underground and is connected with travel line 2, the integral installation of vehicle frame tiered warehouse facility is between the end of workpiece travel line 2 and lower travel line 7, connect with elevator 19, elevator 19 is promoted to the pallet 18 on travel line in the storehouse 14 on tray lift machine 20, and the centre of both racks 11 is equipped with the vehicle frame piler; Described vehicle frame piler comprises: transport trolley 15, stacking dolly 16, tray lift machine 20, wherein be equipped with on stacking dolly 16 for pallet 18 being promoted to the tray lift machine 20 of setting height, be equipped with on transport trolley 15 and make transport trolley 15 along the traveling gear 13 of line body throughput direction operation and make the line slideway 12 of stacking dolly 16 stacking on the shelf 11, stacking dolly 16 is arranged in the storehouse on travel line 14 by line slideway 12, and the integral installation of vehicle frame piler is travel line 14 tops in the storehouse.
When workpiece need to be stored in a warehouse, pallet 18 carries workpiece from painting lower line interface 5 stations, through travel line in the storehouse 14, be transported in tiered warehouse facility, elevator 19 is promoted to pallet 18 and workpiece 17 height of tray lift machine 20 and its handing-over, then tray lift machine 20 is promoted to pre-set shelf height with pallet 18, meanwhile, piler moves to the position of storing goods shelf, stacking dolly 16 is placed on pallet and workpiece on shelf along line slideway 12, as shown in Figure 5, at this moment, complete stacking storage task.The workpiece pickup, process is opposite therewith.
Claims (4)
1. one kind is used for the upper vehicle frame of excavating machine production process and the travel line of lower vehicle frame, it is characterized in that comprising for sending into upper vehicle frame and lower vehicle frame on trunk main and receiving the empty pallet that returns or upper travel line of fixture, be used for upper vehicle frame and lower vehicle frame are transported to the workpiece travel line that paints in reach the standard grade interface station or tiered warehouse facility, painted line, be used for upper vehicle frame and lower vehicle frame are hung line interface on the paint that paints on painted line, upper vehicle frame after being used for paint and lower vehicle frame are placed into line interface under paint on the workpiece travel line, be used for depositing the upper vehicle frame that painted or do not paint and the tiered warehouse facility of lower vehicle frame, be used for the upper vehicle frame that to paint and lower vehicle frame and be transported to lower travel line on assembling line, be used for empty pallet or carry the upper vehicle frame that do not paint and lower vehicle frame is transported to the line of return at upper travel line place, wherein an end of an end of workpiece travel line and the line of return is connected, upper travel line is arranged on the junction of workpiece travel line and the line of return, in storehouse in one end of the other end of workpiece travel line and tiered warehouse facility, travel line is connected, painted line and workpiece travel line have two joints, one of them joint is the upper line interface of paint, another joint is the lower line interface of paint, the other end of tiered warehouse facility is connected with an end of part travel line under two respectively, and the other end of part travel line is connected with the other end of the line of return respectively under two.
2. according to claim 1 a kind of for the upper vehicle frame of excavating machine production process and the travel line of lower vehicle frame, it is characterized in that described upper travel line, workpiece travel line, lower travel line and the line of return are mounted in underground.
3. according to claim 1 a kind of for the upper vehicle frame of excavating machine production process and the travel line of lower vehicle frame, it is characterized in that described upper travel line is divided into the up and down two-layer, two ends are respectively an elevator and interface elevator, and be connected with the line of return with the workpiece travel line interface of position of upper travel line is the interface elevator.
4. according to claim 1 a kind of for the upper vehicle frame of excavating machine production process and the travel line of lower vehicle frame, the right side that it is characterized in that a travel line is divided into welding shop, paint shop, fitter's shop and welding shop, wherein paint shop is positioned at the position of line interface on painted line, paint and the lower line interface of paint, and fitter's shop is positioned at the left side of lower travel line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220700109 CN202988158U (en) | 2012-12-18 | 2012-12-18 | Conveyor line for upper vehicle frame and lower vehicle frame during excavator producing process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220700109 CN202988158U (en) | 2012-12-18 | 2012-12-18 | Conveyor line for upper vehicle frame and lower vehicle frame during excavator producing process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202988158U true CN202988158U (en) | 2013-06-12 |
Family
ID=48559359
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220700109 Expired - Fee Related CN202988158U (en) | 2012-12-18 | 2012-12-18 | Conveyor line for upper vehicle frame and lower vehicle frame during excavator producing process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202988158U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102991984A (en) * | 2012-12-18 | 2013-03-27 | 江苏速升自动化装备股份有限公司 | Transport line of upper and lower frames used in excavator production process |
CN106476933A (en) * | 2016-11-18 | 2017-03-08 | 江苏金坛汽车工业有限公司 | Automobile chassis package system and automobile chassis assemble method |
CN106477264A (en) * | 2016-11-18 | 2017-03-08 | 江苏三能动力总成有限公司 | Automobile power assembly transporter and the conveyer method of automobile power assembly |
CN106895663A (en) * | 2017-04-20 | 2017-06-27 | 广州番中电气设备有限公司 | High vacuum intelligent tunnel formula toasts line |
CN107285049A (en) * | 2017-07-06 | 2017-10-24 | 格力电器(郑州)有限公司 | Wai Ji material allocations mechanism |
CN115009398A (en) * | 2022-07-08 | 2022-09-06 | 江西工业工程职业技术学院 | Automobile assembling system and assembling method thereof |
-
2012
- 2012-12-18 CN CN 201220700109 patent/CN202988158U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102991984A (en) * | 2012-12-18 | 2013-03-27 | 江苏速升自动化装备股份有限公司 | Transport line of upper and lower frames used in excavator production process |
CN106476933A (en) * | 2016-11-18 | 2017-03-08 | 江苏金坛汽车工业有限公司 | Automobile chassis package system and automobile chassis assemble method |
CN106477264A (en) * | 2016-11-18 | 2017-03-08 | 江苏三能动力总成有限公司 | Automobile power assembly transporter and the conveyer method of automobile power assembly |
CN106477264B (en) * | 2016-11-18 | 2019-04-26 | 江苏三能动力总成有限公司 | The conveyer method of automobile power assembly transfer device and automobile power assembly |
CN106895663A (en) * | 2017-04-20 | 2017-06-27 | 广州番中电气设备有限公司 | High vacuum intelligent tunnel formula toasts line |
CN107285049A (en) * | 2017-07-06 | 2017-10-24 | 格力电器(郑州)有限公司 | Wai Ji material allocations mechanism |
CN107285049B (en) * | 2017-07-06 | 2020-01-17 | 格力电器(郑州)有限公司 | Outer quick-witted material delivery mechanism |
CN115009398A (en) * | 2022-07-08 | 2022-09-06 | 江西工业工程职业技术学院 | Automobile assembling system and assembling method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202988158U (en) | Conveyor line for upper vehicle frame and lower vehicle frame during excavator producing process | |
CN105600252B (en) | Intelligent warehouse sorting system based on robot | |
CN207810399U (en) | Cache library, buffer storage, sorting wire and tiered warehouse facility | |
CN105692096B (en) | A kind of car body coating auxiliary mould automatic conveying system and its carrying method | |
CN105731012A (en) | Full-automatic battery stack dismounting and conveying system for joining storage with production | |
CN107428480A (en) | For the counter in counter warehouse being put in storage and the method for export and counter transport facility | |
CN209758208U (en) | Online letter sorting lifting machine in storehouse is shuttled back and forth to many dense types | |
CN207827129U (en) | A kind of goods of Almightiness type sorts logistics device to people | |
CN104986401A (en) | Glass tube product conveying and packaging line and conveying method | |
IT8322469A1 (en) | POWER SYSTEM FOR A PROCESSING MACHINE | |
CN107973041A (en) | A kind of goods of Almightiness type sorts logistics device to people | |
CN104355027A (en) | Special-specification vertical goods storing warehouse | |
CN106743288B (en) | Automatic loading and cleaning system for trolley wheels and using method of automatic loading and cleaning system | |
CN113697453A (en) | Polar plate conveying system | |
CN102991984B (en) | Transport line of upper and lower frames used in excavator production process | |
CN210306358U (en) | Flexible welding production line of automobile body based on three-dimensional storehouse | |
CN102991925A (en) | Piler of frames for excavator production | |
CN202988043U (en) | Vehicle frame piler for excavator production | |
CN102992031B (en) | Transport flow of upper and lower frames used in excavator production process | |
CN102991926B (en) | Stereoscopic warehouse of frames for excavator production | |
CN202988042U (en) | Vehicle frame stereoscopic warehouse for excavator production | |
CN206425711U (en) | Multi-vehicle-type shares welding and assembling production lines structure | |
CN111283355A (en) | Vehicle body lower assembly splicing system, vehicle type switching method and splicing process | |
CN209352096U (en) | A kind of AGV trolley automatic handing system | |
CN208603162U (en) | A kind of transport mobile device for industrial robot production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130612 Termination date: 20151218 |
|
EXPY | Termination of patent right or utility model |