CN102991925A - Piler of frames for excavator production - Google Patents

Piler of frames for excavator production Download PDF

Info

Publication number
CN102991925A
CN102991925A CN2012105499604A CN201210549960A CN102991925A CN 102991925 A CN102991925 A CN 102991925A CN 2012105499604 A CN2012105499604 A CN 2012105499604A CN 201210549960 A CN201210549960 A CN 201210549960A CN 102991925 A CN102991925 A CN 102991925A
Authority
CN
China
Prior art keywords
line
vehicle frame
workpiece
piler
travel line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105499604A
Other languages
Chinese (zh)
Inventor
郑卫星
苏兵
黄国强
王光福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SUSHENG AUTOMATION EQUIPMENT CO Ltd
Original Assignee
JIANGSU SUSHENG AUTOMATION EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SUSHENG AUTOMATION EQUIPMENT CO Ltd filed Critical JIANGSU SUSHENG AUTOMATION EQUIPMENT CO Ltd
Priority to CN2012105499604A priority Critical patent/CN102991925A/en
Publication of CN102991925A publication Critical patent/CN102991925A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The invention provides a piler of frames for excavator production. The piler is characterized by comprising a transport trolley, a piling trolley and a tray elevator, wherein the tray elevator used for elevating trays to the set height is installed on the piling trolley; travelling mechanisms for enabling the transport trolley to run along the line body transport direction and a linear guide way for enabling the piling trolley to pile the frames on racks are installed on the transport trolley; the piling trolley is installed on an intra-warehouse transport line via the linear guide way; the piler of the frames is integrally installed at the upper part of the intra-warehouse transport line; the racks are installed on one or two sides of the intra-warehouse transport line; and an elevator for elevating the trays onto the tray elevator is installed on the intra-warehouse transport line. The piler has the advantage that the problem of workpiece overstock generated in the upper and lower frame production process can be effectively solved via a stereoscopic warehouse.

Description

A kind of vehicle frame piler for excavating machine production
Technical field
What the present invention relates to is a kind of vehicle frame piler of producing for excavating machine, belongs to excavating machine production line technology field.
Background technology
The excavating machine workshop is divided into the paint shop of paint shop, excavating machine composing room, swing arm and the dipper of the welding shop of vehicle frame and lower vehicle frame, upper vehicle frame and lower vehicle frame, the upper vehicle frame of welding shop and lower vehicle frame productive temp be vehicle frame or lower vehicle frame on 2 minutes/platform approximately, and paint shop's productive temp approximately vehicle frame or lower vehicle frame on 4 minutes/platform, paint does not catch up with beat.Therefore, paint shop need to carry out two classes of tasks of finishing the work.Need to there be this moment equipment to coordinate conveying and the storage problem of completing unvarnished upper vehicle frame and lower vehicle frame.
Summary of the invention
The present invention proposes is a kind of vehicle frame piler of producing for excavating machine, and its purpose is intended to overcome the technical matters that on excavating machine, the class in vehicle frame and lower vehicle frame Paint Production produces.
technical solution of the present invention: its structure is to comprise transport trolley, the stacking dolly, the tray lift machine, wherein be equipped with on the stacking dolly for the tray lift machine of tray lift to setting height, be equipped with on transport trolley and make transport trolley along the traveling gear of line body throughput direction operation and make the line slideway of stacking dolly stacking on the shelf, the stacking dolly is arranged in the storehouse on travel line by line slideway, vehicle frame piler integral installation travel line top in the storehouse, shelf are arranged on the one or both sides of travel line in the storehouse, the elevator to the tray lift machine with tray lift is installed on travel line in the storehouse.
Advantage of the present invention: solved by tiered warehouse facility and can effectively solve the overstocked problem of the workpiece that produces in get on the bus frame and lower vehicle frame production process.
Description of drawings
Fig. 1 is the travel line integral layout figure of a kind of upper vehicle frame for the excavating machine production process and lower vehicle frame.
Fig. 2 is upper travel line layout.
Fig. 3 is a kind of for the upper vehicle frame of excavating machine production process and the conveying diagram of circuit of lower vehicle frame.
Fig. 4 is the view that the vehicle frame piler moves in tiered warehouse facility.
Fig. 5 is the view of vehicle frame piler stacking in tiered warehouse facility.
In figure 1 is upper travel line, the 2nd, workpiece travel line, the 3rd, painted line, the 4th, line interface, the 5th on paint, the lower line interface, the 6th of paint, tiered warehouse facility, the 7th, lower travel line, the 8th, the line of return, the 9th, upper elevator, the 10th, interface elevator, the 11st, shelf, the 12nd, line slideway, the 13rd, traveling gear, the 14th, travel line, the 15th in the storehouse, transport trolley, the 16th, stacking dolly, the 17th, workpiece, the 18th, pallet, the 19th, elevator, the 20th, tray lift machine.
The specific embodiment
Workpiece of the present invention is upper vehicle frame or lower vehicle frame, and what carry vehicle frame or lower vehicle frame in travel line can be pallet, fixture or suspender etc.
as Fig. 4, shown in Figure 5, a kind of vehicle frame piler for excavating machine production, its structure comprises transport trolley 15, stacking dolly 16, tray lift machine 20, wherein be equipped with on stacking dolly 16 for pallet 18 being promoted to the tray lift machine 20 of setting height, be equipped with on transport trolley 15 and make transport trolley 15 along the traveling gear 13 of line body throughput direction operation and make the line slideway 12 of stacking dolly 16 stacking on the shelf 11, stacking dolly 16 is arranged in the storehouse on travel line 14 by line slideway 12, the integral installation of vehicle frame piler is travel line 14 tops in the storehouse, shelf 11 are arranged on the one or both sides of travel line 14 in the storehouse, be equipped with on travel line 14 in the storehouse pallet 18 is promoted to elevator 19 on tray lift machine 20.
As shown in Figure 1, 2, a kind of for the upper vehicle frame of excavating machine production process and the travel line of lower vehicle frame, its structure comprises line interface 4 on a travel line 1, workpiece travel line 2, painted line 3, paint, the lower line interface 5 of paint, tiered warehouse facility 6, lower travel line 7, the line of return 8; Wherein an end of an end of workpiece travel line 2 and the line of return 8 is connected, upper travel line 1 is arranged on the junction of workpiece travel line 2 and the line of return 8, in storehouse in one end of the other end of workpiece travel line 2 and tiered warehouse facility 6, travel line 14 is connected, painted line 3 has two joints with workpiece travel line 2, one of them joint is the upper line interface 4 of paint, another joint is the lower line interface 5 of paint, the other end of tiered warehouse facility 6 is connected with an end of part travel line 7 under two respectively, and the other end of part travel line 7 is connected with the other end of the line of return 8 respectively under two.
Described upper travel line 1, workpiece travel line 2, lower travel line 7 and the line of return 8 are mounted in underground.
Described upper travel line 1 is used for upper vehicle frame and lower vehicle frame are sent on trunk main and received empty pallet or the fixture that returns; Described workpiece travel line 2 is used for upper vehicle frame and lower vehicle frame are transported in upper line interface 4 stations of paint or tiered warehouse facility; On described paint, line interface 4 is used for upper vehicle frame and lower vehicle frame are hung on painted line 3 and paints; Upper vehicle frame and lower vehicle frame after under described paint, line interface 5 is used for painting are placed into workpiece travel line 2; Described tiered warehouse facility 6 is used for depositing upper vehicle frame and the lower vehicle frame that painted or do not paint; Upper vehicle frame and lower vehicle frame that described lower travel line 7 is used for painting are transported to assembling line; The described line of return 8 is used for empty pallet or carries the upper vehicle frame that do not paint and lower vehicle frame being transported to upper travel line 1 place.
Described upper travel line 1 is divided into that the up and down is two-layer, and two ends are respectively an elevator 9 and interface elevator 10, and be connected with the line of return 8 with workpiece travel line 2 interface of position of upper travel line 1 is interface elevator 10, as shown in Figure 2.
This travel line can be placed in it underground, namely go up part travel line 1, workpiece travel line 2, lower travel line 7 and the line of return 8 and be arranged on undergroundly, carry out underground conveying, and with cover plate, it is sealed, matrix section can be by the vehicle of dealing, and whole workshop is comparatively clean and tidy.Described upper travel line, workpiece travel line, lower travel line, the line of return can adopt roller conveyor; Painted line can adopt Stacking Type Hang Conveyer.
Whole excavating machine manufacturing line is divided into welding shop, paint shop, fitter's shop, welding shop is positioned at the right side of a travel line 1, paint shop is positioned at the position of line interface 4 on painted line 3, paint and the lower line interface 5 of paint, and fitter's shop is positioned at the left side of lower travel line 7, as shown in Figure 1.
During work, welding shop, fitter's shop adopt one class of system, and beat is vehicle frame or lower vehicle frame on 2 minutes/platform approximately, and paint shop adopts double shift, and beat is vehicle frame or lower vehicle frame on 4 minutes/platform approximately, and idiographic flow is as follows:
As shown in Figure 3, a kind of conveying flow process of upper vehicle frame and the lower vehicle frame for the excavating machine production process comprises following operation:
1) upper part operation is used for workpiece is placed on fixture or pallet and fixing, namely go up part elevator 9 with empty pallet be promoted to upper locate, workpiece is placed on pallet fixes;
2) A carries operation, is used for workpiece and pallet are transported to the painted line place, and namely pallet carries workpiece through interface elevator 10, workpiece travel line 2, and workpiece is transported to upper line interface 4 stations of paint;
3) paint judgement operation, be used for judging whether workpiece needs to paint, if need paint, carry out upper part paint operation 4), if run into the workpiece that has little time to paint, carry out storage judgement operation 9), pallet carries unvarnished workpiece and continues to be fed forward to tiered warehouse facility;
4) upper part paint operation is used for workpiece transfer being about to workpiece and separating with pallet to painted line, and workpiece is hung on suspender on painted line, and empty pallet is along with workpiece travel line 2, and through painting lower line interface 5, and good workpiece continues to be fed forward to carry paint;
5) paint operation is used for workpiece is carried out the painting area reason on painted line 3;
6) paint down line process, the workpiece transfer pallet after being used for paint namely after workpiece paint, is placed on paint with workpiece and judges operation 3) on described empty pallet;
Whether 7) assembling judgement operation is used for judgement paint workpiece later and assembles, and needs assembling, carries out assembly process 8), if fitter's shop has little time assembling, carry out storage judgement operation 9);
8) assembly process is used for workpiece transfer to assembling line, and namely after workpiece paint, the workpiece after pallet and paint is transported in fitter's shop with the travel line 7 that rolls off the production line and assembles;
9) storage judgement operation is used for judging whether workpiece, comprise painted with do not paint, store, if need storage, carry out storage operation 10), if do not need storage, the workpiece that namely painted is not stored, and carries out assembling judgement operation 7);
10) storage operation is used for storing the workpiece that did not paint and the workpiece that has little time to assemble, and namely piler is placed on workpiece in tiered warehouse facility;
11) pickup operation is used for the workpiece of tiered warehouse facility is taken out, and namely piler takes out workpiece from tiered warehouse facility;
12) B carries operation, is used for returning from the workpiece that tiered warehouse facility takes out carrying out painting judgement operation 3), namely pallet carries unvarnished workpiece and passes through successively the line of return 8, interface elevator 10, workpiece travel line 2, returns and carries out paint judgement operation 3).
As Fig. 4, shown in Figure 5, a kind of vehicle frame tiered warehouse facility for excavating machine production, its structure comprises travel line 14 in shelf 11, vehicle frame piler, storehouse, wherein shelf 11 are arranged on the one or both sides of travel line 14 in the storehouse, in the storehouse, travel line 14 is positioned at underground and is connected with travel line 2, the integral installation of vehicle frame tiered warehouse facility is between the end of workpiece travel line 2 and lower travel line 7, connect with elevator 19, elevator 19 is promoted to the pallet 18 on travel line in the storehouse 14 on tray lift machine 20, and the centre of both racks 11 is equipped with the vehicle frame piler; Described vehicle frame piler comprises: transport trolley 15, stacking dolly 16, tray lift machine 20, wherein be equipped with on stacking dolly 16 for pallet 18 being promoted to the tray lift machine 20 of setting height, be equipped with on transport trolley 15 and make transport trolley 15 along the traveling gear 13 of line body throughput direction operation and make the line slideway 12 of stacking dolly 16 stacking on the shelf 11, stacking dolly 16 is arranged in the storehouse on travel line 14 by line slideway 12, and the integral installation of vehicle frame piler is travel line 14 tops in the storehouse.
When workpiece need to be stored in a warehouse, pallet 18 carries workpiece from painting lower line interface 5 stations, through travel line in the storehouse 14, be transported in tiered warehouse facility, elevator 19 is promoted to pallet 18 and workpiece 17 height of tray lift machine 20 and its handing-over, then tray lift machine 20 is promoted to pre-set shelf height with pallet 18, meanwhile, piler moves to the position of storing goods shelf, stacking dolly 16 is placed on pallet and workpiece on shelf along line slideway 12, as shown in Figure 5, at this moment, complete stacking storage task.The workpiece pickup, process is opposite therewith.

Claims (1)

1. one kind is used for the vehicle frame piler that excavating machine is produced, it is characterized in that comprising transport trolley, the stacking dolly, the tray lift machine, wherein be equipped with on the stacking dolly for the tray lift machine of tray lift to setting height, be equipped with on transport trolley and make transport trolley along the traveling gear of line body throughput direction operation and make the line slideway of stacking dolly stacking on the shelf, the stacking dolly is arranged in the storehouse on travel line by line slideway, vehicle frame piler integral installation travel line top in the storehouse, shelf are arranged on the one or both sides of travel line in the storehouse, the elevator to the tray lift machine with tray lift is installed on travel line in the storehouse.
CN2012105499604A 2012-12-18 2012-12-18 Piler of frames for excavator production Pending CN102991925A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105499604A CN102991925A (en) 2012-12-18 2012-12-18 Piler of frames for excavator production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105499604A CN102991925A (en) 2012-12-18 2012-12-18 Piler of frames for excavator production

Publications (1)

Publication Number Publication Date
CN102991925A true CN102991925A (en) 2013-03-27

Family

ID=47921149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105499604A Pending CN102991925A (en) 2012-12-18 2012-12-18 Piler of frames for excavator production

Country Status (1)

Country Link
CN (1) CN102991925A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103385136A (en) * 2013-07-05 2013-11-13 宋世荣 Agricultural greenhouse type three-dimensional cultivation system
CN113104462A (en) * 2021-04-02 2021-07-13 一汽解放汽车有限公司 Work piece dispensing apparatus for joining machining and assembly and dispensing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1516149A (en) * 1974-09-06 1978-06-28 Elevateurs Lateraux Load handling installation and vehicle therefor
JPS61267603A (en) * 1985-05-20 1986-11-27 Nippon Steel Corp Automatic multi-tier storehouse for coils
JPH10279021A (en) * 1997-04-10 1998-10-20 Daifuku Co Ltd Truck handling facility
CN102173334A (en) * 2011-02-09 2011-09-07 广运机电(苏州)有限公司 Automatic storing and fetching system of stereoscopic warehouse
CN202988043U (en) * 2012-12-18 2013-06-12 江苏速升自动化装备股份有限公司 Vehicle frame piler for excavator production

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1516149A (en) * 1974-09-06 1978-06-28 Elevateurs Lateraux Load handling installation and vehicle therefor
JPS61267603A (en) * 1985-05-20 1986-11-27 Nippon Steel Corp Automatic multi-tier storehouse for coils
JPH10279021A (en) * 1997-04-10 1998-10-20 Daifuku Co Ltd Truck handling facility
CN102173334A (en) * 2011-02-09 2011-09-07 广运机电(苏州)有限公司 Automatic storing and fetching system of stereoscopic warehouse
CN202988043U (en) * 2012-12-18 2013-06-12 江苏速升自动化装备股份有限公司 Vehicle frame piler for excavator production

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103385136A (en) * 2013-07-05 2013-11-13 宋世荣 Agricultural greenhouse type three-dimensional cultivation system
CN113104462A (en) * 2021-04-02 2021-07-13 一汽解放汽车有限公司 Work piece dispensing apparatus for joining machining and assembly and dispensing method
CN113104462B (en) * 2021-04-02 2022-03-01 一汽解放汽车有限公司 Work piece dispensing apparatus for joining machining and assembly and dispensing method

Similar Documents

Publication Publication Date Title
CN202988158U (en) Conveyor line for upper vehicle frame and lower vehicle frame during excavator producing process
JP7419361B2 (en) Product picking system and method
CN205471677U (en) Tray formula automatic feed equipment of closing
CN105600252B (en) Intelligent warehouse sorting system based on robot
CN105692096B (en) A kind of car body coating auxiliary mould automatic conveying system and its carrying method
CN210162598U (en) Storage letter sorting system
US9227786B2 (en) Part mounting facility and part mounting method
CN106743288B (en) Automatic loading and cleaning system for trolley wheels and using method of automatic loading and cleaning system
KR20170129924A (en) Automatic warehouse and hanging type stacker crane
CN109607168A (en) A kind of intelligent machine arm system picked and placed for goods and materials
CN102020099A (en) Workpiece conveying equipment
CN209758208U (en) Online letter sorting lifting machine in storehouse is shuttled back and forth to many dense types
CN104355027A (en) Special-specification vertical goods storing warehouse
CN111232680A (en) Cantilever type loading and unloading conveyor
CN108249146A (en) Material intelligent handling system
CN102991984B (en) Transport line of upper and lower frames used in excavator production process
CN102991925A (en) Piler of frames for excavator production
CN202988043U (en) Vehicle frame piler for excavator production
CN211846424U (en) Cantilever type loading and unloading conveyor
CN102991926B (en) Stereoscopic warehouse of frames for excavator production
CN102992031B (en) Transport flow of upper and lower frames used in excavator production process
CN206425711U (en) Multi-vehicle-type shares welding and assembling production lines structure
CN202988042U (en) Vehicle frame stereoscopic warehouse for excavator production
CN211392593U (en) Packing box picking system
CN103395600B (en) Chain circulation conveyer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130327