CN202936797U - Double-row pile supporting structure with inclined struts - Google Patents

Double-row pile supporting structure with inclined struts Download PDF

Info

Publication number
CN202936797U
CN202936797U CN201220661069.5U CN201220661069U CN202936797U CN 202936797 U CN202936797 U CN 202936797U CN 201220661069 U CN201220661069 U CN 201220661069U CN 202936797 U CN202936797 U CN 202936797U
Authority
CN
China
Prior art keywords
row
campshed
row piles
piles
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201220661069.5U
Other languages
Chinese (zh)
Inventor
刘甜
曹净
桂跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201220661069.5U priority Critical patent/CN202936797U/en
Application granted granted Critical
Publication of CN202936797U publication Critical patent/CN202936797U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model relates to a double-row pile supporting structure with inclined struts, and belongs to the technical field of foundation pit projects and slope projects. The double-row pile supporting structure comprises a plurality of groups of front-row piles, a plurality of groups of back-row piles, top beams I, top beams II, connecting beams and the inclined struts, wherein the front-row piles and the back-row piles are arranged in a parallel mode. The top beams I are arranged at the tops of the front-row piles, the top beams II are arranged at the tops of the back-row piles, the connecting beams connected with the back-row piles are horizontally arranged at the tops of the front-row piles, and the inclined struts are arranged between the tops of the front-row piles and the tops of the back-row piles. According to the double-row pile supporting structure, the connecting beams at the tops of the front-row piles connect the front-row piles with the back-row piles, and lateral resisting stiffness can be intensified; and the front-row piles are connected with the back-row piles through the inclined struts, rigidity of a cantilever section of the double-row pile structure can be improved, displacement of the pile tops is reduced, meanwhile reliability of connection between the piles and the top beams can be improved, the front-row piles become compression-flexure members, and the flexural capacity of the front-row piles is improved.

Description

A kind of Retaining Structure with Double-row Piles that is provided with diagonal brace
Technical field
The utility model relates to OnePlant the Retaining Structure with Double-row Piles that is provided with diagonal brace, belong to base pit engineering and slope project technical field.
Background technology
In the city of an inch of land is an inch of gold, foundation ditch digs darker and darker, geological conditions worse and worse, surrounding is built or construction structure is intensive or near municipal highway, this has brought certain difficulty for design of supporting and protection structure, construction.At present, the normal supporting scheme that adopts of China has: put slope excavation, soil-nail wall support, pile-anchor retaining, campshed and add the support patterns such as inner supporting structure, double-row pile.Put slope excavation, soil-nail wall support, the pile-anchor retaining construction will inevitably exceed building line, but because the soil beyond building line is subject to countries and regions' policy restriction, perhaps need to use through relevant departments' licensor, brought great inconvenience for the smooth construction of building basement; Campshed adds that the inner supporting structure cost is high, long construction period and the basement structure construction scope of operation few; Though Retaining Structure with Double-row Piles in the past has the characteristics of good integrity, displacement is difficult to satisfy existing design specifications requirement.Therefore, the existing conventional supporting and protection structure of using has certain limitation.
Summary of the invention
The purpose of this utility model is to provide a kind of and controls soldier pile stake top displacement and can improve the Retaining Structure with Double-row Piles that the supporting and protection structure stress performance also can improve the reliability of node connection, in order to solve the problems of the prior art.
The technical solution of the utility model is: a kind of Retaining Structure with Double-row Piles that is provided with diagonal brace comprises front campshed 1 and rear campshed 2 that many groups are arranged in parallel, hat beam I 3, hat beam II 4, linking beam 5 and diagonal brace 6.Front campshed 1 top is provided with hat beam I 3, and rear campshed 2 tops are provided with hat beam II 4, and front campshed 1 top is horizontally disposed with the linking beam 5 that is connected with rear campshed 2,1 of front campshed push up and rear campshed 2 tops between be provided with diagonal brace 6.
Described rear campshed 2 cantilever segment length are 2.5m~4m.
The rectangular array arrangement of pile body layout and the each interval of described front campshed 1 and rear campshed 2 are arranged, and resist by the length that increases front campshed 1 the pile body sedimentation that the vertical force component that transmitted by diagonal brace 6 causes.
The spacing of described diagonal brace 6 is determined according to the displacement of the stake required control in top.
Use step of the present utility model is:
(1) according to the requirement of Geological condition and the computational analysis of foundation ditch safety and stability, determine diameter (sectional dimension), pile spacing and the array pitch of forward and backward campshed; Long, the pile body cross-sectional strength of stake and Reinforcement Design to forward and backward campshed; Determine the stake apical cap beam section size of forward and backward campshed and carry out arrangement of reinforcement and calculate; Determine sectional dimension, spacing and the quantity of reinforcement of linking beam; Determine the spacing of diagonal brace and sectional dimension etc.; Determine the excavation operation.
(2) campshed 2 after the construction; The stake type is determined by design.
(3) campshed 1 before the construction; The stake type is determined by design.
(4) space segmentation is excavated to position, 1 top of front campshed, keeps at a certain distance away to establish and does not excavate soil layer as the back-pressure layer, construction front and rear row dowel crown beam and linking beam 5 between the back-pressure layer, and construction diagonal brace 6.After reaching design strength, excavation back-pressure layer, front and rear row dowel crown beam and the coupling beam of construction back-pressure interval, and construction raker beam.
(5) layer and section is excavated to the end, hole.
The beneficial effects of the utility model are: Double-row-piles Structure can increase its anti-side rigidity by the forward and backward campshed of front campshed stake top linking beam connection; Connect by diagonal brace and push up in forward and backward campshed stake, can increase the stiffness reduction stake top displacement of double-row pile cantilever segment, can also improve the reliability that stake is connected with Guan Liang simultaneously, make front campshed become bending component, improved the curved bearing capacity that is subjected to of front campshed.
Description of drawings
Fig. 1 is the utility model side direction generalized section;
Fig. 2 is the utility model schematic top plan view;
In figure, each label is: 1: front campshed, 2: rear campshed, 3: hat beam I, 4: hat beam II, 5: linking beam, 6: diagonal brace.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail, but content of the present utility model is not limited to described scope.
Embodiment 1: show as Fig. 1-2, a kind of Retaining Structure with Double-row Piles that is provided with diagonal brace comprises 6 groups of front campsheds 1 that are arranged in parallel and rear campshed 2, hat beam I 3, hat beam II 4, linking beam 5 and diagonal brace 6.Front campshed 1 top is provided with hat beam I 3, and rear campshed 2 tops are provided with hat beam II 4, and front campshed 1 top is horizontally disposed with the linking beam 5 that is connected with rear campshed 2,1 of front campshed push up and rear campshed 2 tops between be provided with diagonal brace 6.Rear campshed 2 cantilever segment length are 2.5m.The rectangular array arrangement of pile body layout and the each interval of front campshed 1 and rear campshed 2 are arranged.
Embodiment 2: show as Fig. 1-2, a kind of Retaining Structure with Double-row Piles that is provided with diagonal brace comprises 8 groups of front campsheds 1 that are arranged in parallel and rear campshed 2, hat beam I 3, hat beam II 4, linking beam 5 and diagonal brace 6.Front campshed 1 top is provided with hat beam I 3, and rear campshed 2 tops are provided with hat beam II 4, and front campshed 1 top is horizontally disposed with the linking beam 5 that is connected with rear campshed 2,1 of front campshed push up and rear campshed 2 tops between be provided with diagonal brace 6.Rear campshed 2 cantilever segment length are 4m.
Embodiment 3: show as Fig. 1-2, a kind of Retaining Structure with Double-row Piles that is provided with diagonal brace comprises 5 groups of front campsheds 1 that are arranged in parallel and rear campshed 2, hat beam I 3, hat beam II 4, linking beam 5 and diagonal brace 6.Front campshed 1 top is provided with hat beam I 3, and rear campshed 2 tops are provided with hat beam II 4, and front campshed 1 top is horizontally disposed with the linking beam 5 that is connected with rear campshed 2,1 of front campshed push up and rear campshed 2 tops between be provided with diagonal brace 6.Rear campshed 2 cantilever segment length are 3m.The rectangular array arrangement of pile body layout and the each interval of front campshed 1 and rear campshed 2 are arranged.

Claims (3)

1. a Retaining Structure with Double-row Piles that is provided with diagonal brace, is characterized in that: comprise front campshed (1) and rear campshed (2) that many groups are arranged in parallel, hat beam I (3), hat beam II (4), linking beam (5) and diagonal brace (6); Front campshed (1) top is provided with hat beam I (3), rear campshed (2) top is provided with hat beam II (4), front campshed (1) top is horizontally disposed with the linking beam (5) that is connected with rear campshed (2), and front campshed (1) stake top and rear campshed (2) stake are provided with diagonal brace (6) between pushing up.
2. the Retaining Structure with Double-row Piles that is provided with diagonal brace according to claim 1, it is characterized in that: described rear campshed (2) cantilever segment length is 2.5m~4m.
3. the Retaining Structure with Double-row Piles that is provided with diagonal brace according to claim 1, it is characterized in that: the rectangular array arrangement of pile body layout and the each interval of described front campshed (1) and rear campshed (2) are arranged.
CN201220661069.5U 2012-12-05 2012-12-05 Double-row pile supporting structure with inclined struts Expired - Fee Related CN202936797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220661069.5U CN202936797U (en) 2012-12-05 2012-12-05 Double-row pile supporting structure with inclined struts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220661069.5U CN202936797U (en) 2012-12-05 2012-12-05 Double-row pile supporting structure with inclined struts

Publications (1)

Publication Number Publication Date
CN202936797U true CN202936797U (en) 2013-05-15

Family

ID=48321043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220661069.5U Expired - Fee Related CN202936797U (en) 2012-12-05 2012-12-05 Double-row pile supporting structure with inclined struts

Country Status (1)

Country Link
CN (1) CN202936797U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328788A (en) * 2014-09-26 2015-02-04 安徽水利开发股份有限公司 Combined supporting construction method of two rows of grouting piles and pull anchoring and shotcreting layer
CN104912082A (en) * 2014-03-14 2015-09-16 江苏东合南岩土工程技术研究有限公司 Inclined assembled double-row steel sheet pile foundation pit supporting structure and construction method thereof
CN106013172A (en) * 2016-07-01 2016-10-12 杭州江润科技有限公司 Double row pile and diagonal brace combined soft soil deep foundation pit supporting structure and construction method
CN107419731A (en) * 2017-08-04 2017-12-01 广州市市政工程设计研究总院 A kind of board-like double-row pile foundation pit support structure of counterfort and its construction method
CN108951650A (en) * 2018-07-28 2018-12-07 江苏地基工程有限公司 Without support system of deep foundation pit support
CN109487748A (en) * 2018-06-02 2019-03-19 深圳市深水水务咨询有限公司 Nearby Structure depth riverbed quaywall supporting construction and construction method
CN109853587A (en) * 2019-03-29 2019-06-07 深圳宏业基岩土科技股份有限公司 The Row Piles Supporting Structure of foundation pit straightway
CN111074916A (en) * 2020-02-06 2020-04-28 贵州星隆迪岩土工程有限公司 Retaining structure of anti-slide pile and structural pile and construction method
CN111305237A (en) * 2020-03-05 2020-06-19 中煤科工集团重庆设计研究院有限公司 Slope supporting structure and construction method
CN112095632A (en) * 2020-08-21 2020-12-18 贵州大学 Pile-arch combined retaining structure and construction method thereof
CN112344983A (en) * 2020-09-25 2021-02-09 北京大成国测科技有限公司 Method and system for monitoring settlement construction level in soft soil base environment

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912082A (en) * 2014-03-14 2015-09-16 江苏东合南岩土工程技术研究有限公司 Inclined assembled double-row steel sheet pile foundation pit supporting structure and construction method thereof
CN104328788B (en) * 2014-09-26 2016-02-10 安徽水利开发股份有限公司 Double rows slip casting stake with draw shotcrete layer combined supporting construction method
CN104328788A (en) * 2014-09-26 2015-02-04 安徽水利开发股份有限公司 Combined supporting construction method of two rows of grouting piles and pull anchoring and shotcreting layer
CN106013172A (en) * 2016-07-01 2016-10-12 杭州江润科技有限公司 Double row pile and diagonal brace combined soft soil deep foundation pit supporting structure and construction method
CN106013172B (en) * 2016-07-01 2018-02-27 新宇建设有限公司 Double-row pile combines Deep Foundation Pit Support for Soft Soil structure and construction method with diagonal brace
CN107419731A (en) * 2017-08-04 2017-12-01 广州市市政工程设计研究总院 A kind of board-like double-row pile foundation pit support structure of counterfort and its construction method
CN109487748A (en) * 2018-06-02 2019-03-19 深圳市深水水务咨询有限公司 Nearby Structure depth riverbed quaywall supporting construction and construction method
CN108951650A (en) * 2018-07-28 2018-12-07 江苏地基工程有限公司 Without support system of deep foundation pit support
CN109853587A (en) * 2019-03-29 2019-06-07 深圳宏业基岩土科技股份有限公司 The Row Piles Supporting Structure of foundation pit straightway
CN109853587B (en) * 2019-03-29 2020-11-24 深圳宏业基岩土科技股份有限公司 Row pile supporting structure for straight line section of foundation pit
CN111074916A (en) * 2020-02-06 2020-04-28 贵州星隆迪岩土工程有限公司 Retaining structure of anti-slide pile and structural pile and construction method
CN111305237A (en) * 2020-03-05 2020-06-19 中煤科工集团重庆设计研究院有限公司 Slope supporting structure and construction method
CN112095632A (en) * 2020-08-21 2020-12-18 贵州大学 Pile-arch combined retaining structure and construction method thereof
CN112344983A (en) * 2020-09-25 2021-02-09 北京大成国测科技有限公司 Method and system for monitoring settlement construction level in soft soil base environment

Similar Documents

Publication Publication Date Title
CN202936797U (en) Double-row pile supporting structure with inclined struts
CN103711135B (en) Anti-slide pile of jointed arch structure
CN202559362U (en) Double-row steel sheet pile and H-steel section combined foundation pit supporting structure
CN203684230U (en) Prefabricated double-row pile structure
CN202936798U (en) Double-row pile structure with prestress vertical anchor cables
CN106284296A (en) The supporting construction of a kind of double steel sheet pile and construction method thereof
CN203768912U (en) Double-row prestressing high-strength concrete rectangular pile foundation pit supporting structure
CN201598642U (en) Double-row pile foundation pit support structure
CN102691302B (en) Concrete structure for supporting deep foundation pit
CN203022007U (en) Front-dense and rear-sparse double-row pile foundation pit supporting and protecting structure
CN203654295U (en) Single-leg inclined strut reinforced foundation pit supporting structure
CN102995643A (en) Underground-space steel truss foundation pit supporting structure and construction method thereof
CN101255699B (en) Novel structure inclined inserting digging hole pile foundation
CN203684229U (en) Connected double-row pile support structure
CN202273242U (en) Base of union type mini type pile rod tower
CN107476810B (en) Back wall structure of pushing device
CN201232180Y (en) Novel sheet-pile wall
CN204645058U (en) A kind ofly be provided with the H type Double-row-piles Structure adding core rotary churning pile
CN205776239U (en) A kind of Retaining Structure with Double-row Piles
CN205259193U (en) A splayed supporting construction for foundation ditch engineering
CN110374645A (en) A kind of super high seam big cross section thin coal pillar gob side entry Equivalent Support method
CN201151913Y (en) Novel structure obliquely inserted excavation pile base
CN202108055U (en) Reinforcement cantilever type retaining wall structure
CN204780939U (en) Masts type double row pile struts system
CN104762975B (en) A kind of H type Double-row-piles Structure that adds core rotary churning pile that is provided with

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130515

Termination date: 20141205

EXPY Termination of patent right or utility model