CN205776239U - A kind of Retaining Structure with Double-row Piles - Google Patents

A kind of Retaining Structure with Double-row Piles Download PDF

Info

Publication number
CN205776239U
CN205776239U CN201520765842.6U CN201520765842U CN205776239U CN 205776239 U CN205776239 U CN 205776239U CN 201520765842 U CN201520765842 U CN 201520765842U CN 205776239 U CN205776239 U CN 205776239U
Authority
CN
China
Prior art keywords
campshed
double
linking beam
pile body
retaining structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520765842.6U
Other languages
Chinese (zh)
Inventor
沈志平
杨振杰
付君宜
罗会军
姚亮
吴斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Zhengye Engineering & Investment Inc Ltd
Original Assignee
Guizhou Zhengye Engineering & Investment Inc Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Zhengye Engineering & Investment Inc Ltd filed Critical Guizhou Zhengye Engineering & Investment Inc Ltd
Priority to CN201520765842.6U priority Critical patent/CN205776239U/en
Application granted granted Critical
Publication of CN205776239U publication Critical patent/CN205776239U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of Retaining Structure with Double-row Piles, supporting construction is made up of front campshed (1), rear campshed (2), front-seat dowel crown beam (3), heel row dowel crown beam (4), stake top linking beam (5) and pile body linking beam (6), between forward and backward campshed (1), (2) in addition to linking beam is set on stake top, also linking beam is set at pile body.This utility model is due to being reliably connected of linking beam between forward and backward campshed (1), (2) so that the overall lateral rigidity of double-row pile has obtained great lifting.Simultaneously as the coverage of the Construction on Environment of this structure is less, municipal works decrease the problem that affects of the underground piping on close to buildings, pipeline etc., therefore there is the process characteristics such as the most applicable, easily operated.

Description

A kind of Retaining Structure with Double-row Piles
Technical field
This utility model relates to the pile body of a kind of Retaining Structure with Double-row Piles, particularly double-row pile.
Background technology
Gradually expansion and development along with project scale in the present age, traditional single friction pile technology can not better meet the requirement of engineering the most, its basic reason is that single bank protection cantilever pile effect in terms of controlling Horizontal Displacement is not satisfactory, is especially more restricted in the engineer applied stricter to Pull-out test.And Retaining Structure with Double-row Piles is as a kind of retaining structure being suitable for large-scale engineering, become support form conventional in base pit engineering, slope project.Traditional Retaining Structure with Double-row Piles is typically to arrange Guan Liang at front two rows stake pile body, and only arranges one space structure pushing up the similar door frame of coupling beam composition between campshed front and back, and this can play the cooperative bearing effect of before and after campshed to a certain extent jointly.But, when some situation stake is long or geological condition change is complex, owing to double-row pile only has one connection on stake top so that front and back the line of deflection change between campshed may be not consistent, this bending resistance leveraging double-row pile and overall lateral rigidity.As solved this problem by the way of adding anchor, then need to consider that anchor pole, anchor cable etc. affect problem to the underground piping of close to buildings, pipeline etc..Therefore, how on the premise of less on close to buildings impact, improved the overall lateral rigidity of double-row pile by corresponding strengthening measure, be the problem needing in civil engineering to consider.
Summary of the invention
The technical problems to be solved in the utility model: provide a kind of Retaining Structure with Double-row Piles, to solve the overall lateral insufficient rigidity when double-row pile, and uses and adds problem encountered when the measures such as anchor affect the underground piping of close to buildings, underground utilities.
Technical solutions of the utility model are: a kind of Retaining Structure with Double-row Piles, including front campshed and rear campshed, be provided with stake top linking beam, be provided with pile body linking beam between the pile body of forward and backward campshed between the stake top of forward and backward campshed.
Front campshed, rear campshed, longitudinally in being arranged in parallel, the most rectangular are arranged in juxtaposition.
For strengthening the globality between every campshed, front campshed, rear campshed are respectively provided with Guan Liang on stake top.
Connect at stake very useful stake top linking beam between front campshed, rear campshed.
For cooperative bearing effect between campshed before and after playing and improve its bending resistance and overall lateral rigidity, it is reliably connected with pile body linking beam between pile body of row pile front and back, the vertical distribution spacing of pile body linking beam is 1~3 meter, is arranged at above pile body part at the bottom of Foundation Pit.
Steel used by pile body linking beam include reinforcing bar, rail or I-steel.
This utility model forms a redundant structure by linking beam between front campshed, rear campshed, front-seat dowel crown beam, heel row dowel crown beam and multiple tracks stake, and this structure can make double-row pile preferably coordinate and stress, substantially increases the overall lateral rigidity of double-row pile.Meanwhile, with traditional add the methods such as anchor compared with, this structure need not consider the to construct pipeline on close to buildings, pipeline etc. affects problem, and the coverage of construction is less.Slope body to some strict control deformation requirements, this structure also has the fabulous suitability.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation plane graph.
Fig. 2 is this utility model structural representation profile.
Detailed description of the invention
Seeing accompanying drawing 1~accompanying drawing 2, this utility model is a kind of Retaining Structure with Double-row Piles arranging linking beam at pile body, including front campshed 1, rear campshed 2, front-seat dowel crown beam 3, heel row dowel crown beam 4, stake top linking beam 5 and pile body linking beam 6.
The stake position of double-row pile is arranged according to design pile-type, stake footpath and pilespacing etc., the most front campshed 1, rear campshed 2 are longitudinally in being arranged in parallel (as shown in Figure 1, campshed 2 after the corresponding a line of campshed 1 before a line), the most rectangular it is arranged in juxtaposition (as shown in Figure 2, in terms of cross-sectional direction, the rectangular frame-shaped of campshed 2 after a front campshed 1 and).The complete excavation i.e. carrying out hole stake of pile layout, hole stake is artificial digging pile or mechanical hole building stake, and construction and excavation process must be by related specifications strict implement.After hole stake excavation, lay steel reinforcement cage and pour into a mould concrete and maintenance.Steel reinforcement cage must reserve the position of pile body linking beam 6 when colligation, in order to the construction in later stage and operation, and the vertical interval of pile body linking beam 6 is 1~3 meter, and pile body linking beam 6 is arranged at above pile body part at the bottom of Foundation Pit.
Determine front-seat dowel crown beam 3, heel row dowel crown beam 4, sectional dimension, arrangement of reinforcement and the connection of stake top linking beam 5 and construct.
Be drilled with the connecting hole of pile body linking beam 6 from foundation ditch side, boring direction is level, 130 millimeters~150 millimeters of aperture, and boring controlling depth is advisable with the pile center slightly above rear campshed.Holing and complete put into pile body connecting material and with M30 cement mortar slip casting, connecting material can use reinforcing bar, rail or I-steel etc., and before and after it is a length of, the centre distance between campshed is long.

Claims (5)

1. a Retaining Structure with Double-row Piles, including front campshed (1) and rear campshed (2), it is characterized in that: front campshed (1), rear campshed (2) stake top between be provided with stake top linking beam (5), front campshed (1), rear campshed (2) pile body between be provided with pile body linking beam (6).
A kind of Retaining Structure with Double-row Piles the most according to claim 1, it is characterised in that: front campshed (1) and rear campshed (2) longitudinal direction, in being arranged in parallel, the most rectangular are arranged in juxtaposition.
A kind of Retaining Structure with Double-row Piles the most according to claim 1, it is characterised in that: front campshed (1), rear campshed (2) all arrange Guan Liang on stake top.
A kind of Retaining Structure with Double-row Piles the most according to claim 1, it is characterised in that: pile body linking beam (6) is arranged at above pile body part at the bottom of Foundation Pit, and its vertical distribution spacing is 1~3 meter.
5. according to a kind of Retaining Structure with Double-row Piles described in claim 1 or 4, it is characterised in that: steel used by pile body linking beam (6) include reinforcing bar, rail or I-steel.
CN201520765842.6U 2015-09-30 2015-09-30 A kind of Retaining Structure with Double-row Piles Active CN205776239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520765842.6U CN205776239U (en) 2015-09-30 2015-09-30 A kind of Retaining Structure with Double-row Piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520765842.6U CN205776239U (en) 2015-09-30 2015-09-30 A kind of Retaining Structure with Double-row Piles

Publications (1)

Publication Number Publication Date
CN205776239U true CN205776239U (en) 2016-12-07

Family

ID=57413075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520765842.6U Active CN205776239U (en) 2015-09-30 2015-09-30 A kind of Retaining Structure with Double-row Piles

Country Status (1)

Country Link
CN (1) CN205776239U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301419A (en) * 2018-03-18 2018-07-20 中铁十九局集团第三工程有限公司 The Double-row Piles Support system and construction method of the local soft soil property of foundation pit can be overcome
CN109113074A (en) * 2018-09-29 2019-01-01 浙江理工大学 Pit Bracing in Soft Soil method without inner support
CN110700292A (en) * 2019-11-08 2020-01-17 中国建筑第四工程局有限公司 Double friction pile supporting construction of style of calligraphy

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301419A (en) * 2018-03-18 2018-07-20 中铁十九局集团第三工程有限公司 The Double-row Piles Support system and construction method of the local soft soil property of foundation pit can be overcome
CN109113074A (en) * 2018-09-29 2019-01-01 浙江理工大学 Pit Bracing in Soft Soil method without inner support
CN110700292A (en) * 2019-11-08 2020-01-17 中国建筑第四工程局有限公司 Double friction pile supporting construction of style of calligraphy

Similar Documents

Publication Publication Date Title
CN105133624A (en) Double-row pile support structure
Zhang et al. Geotechnical influence on existing subway tunnels induced by multiline tunneling in Shanghai soft soil
CN203768912U (en) Double-row prestressing high-strength concrete rectangular pile foundation pit supporting structure
CN205776239U (en) A kind of Retaining Structure with Double-row Piles
CN102691302B (en) Concrete structure for supporting deep foundation pit
CN105155548B (en) A kind of drag-line double-row pile (wall) supporting construction
Han et al. A Comprehensive Review of the Mechanical Behavior of Suspension Bridge Tunnel‐Type Anchorage
CN103410522A (en) Continuous close-range underpass railway bridge construction method employing shallow tunneling method
CN207092107U (en) A kind of anti-subsidence structure using diaphram wall
CN105089023A (en) Improving method for concrete floor of hydropower house and structure of concrete floor
CN110245426B (en) Finite element refined simulation method for pipe gallery structure pipe jacking construction
Ni et al. Field investigation of the influence of basement excavation and dewatering on ground and structure responses
Ye et al. Effect of inclination angle on the response of double-row retaining piles: experimental and numerical investigation
Guo et al. Study on the stability of a large-span subway station constructed by combining with the shaft and arch cover method
CN104196035A (en) Pipe foundation pit predeformation support method
CN204283440U (en) Shallow-depth-excavation tunnel supporting status monitoring structure
CN208105276U (en) A kind of support system of active control foundation pit displacement
Zhou et al. Review of the deformation mechanism and earth pressure research on the double-row pile support structure
CN202610823U (en) Dam foundation deep groove processing structure
Xia et al. Investigation of three-dimensional deformation behavior due to long and large excavation in soft clays
Sousa et al. Effect of the construction of a Lisbon Metro Tunnel in an old railway tunnel
Chen et al. Study on Seismic Properties of Assembled Monolithic Metro Station Based on Response Deformation Method
CN102619234A (en) Dam foundation deep groove processing structure and construction method thereof
CN202718103U (en) Special-shaped bored concrete pile
CN202577314U (en) Concrete structure for deep foundation pit supporting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant