Double-row pile structure with prestress vertical anchor cables Download PDFInfo
- Publication number
- CN202936798U CN202936798U CN201220661114.7U CN201220661114U CN202936798U CN 202936798 U CN202936798 U CN 202936798U CN 201220661114 U CN201220661114 U CN 201220661114U CN 202936798 U CN202936798 U CN 202936798U
- Authority
- CN
- China
- Prior art keywords
- vertical anchor
- prestressing force
- row
- anchor cable
- campshed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004873 anchoring Methods 0.000 claims description 12
- 239000002689 soil Substances 0.000 claims description 8
- 238000006073 displacement reaction Methods 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 9
- 238000009412 basement excavation Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010205 computational analysis Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The utility model relates to a double-row pile structure with prestress vertical anchor cables, and belongs to the technical field of building foundation pit projects and slope projects. The double-row pile structure comprises a plurality of groups of front-row piles, a plurality of groups of back-row piles, top beams I, top beams II, connecting beams and the prestress vertical anchor cables, wherein the front-row piles and the back-row piles are arranged in a parallel mode. The top beams I are arranged at the tops of the front-row piles, the top beams II are arranged at the tops of the back-row piles, the top beams I and the top beams II are connected through the connecting beams, and the prestress vertical anchor cables are arranged between each two adjacent back-row piles at equal intervals or at unequal intervals. According to the double-row pile structure, after the prestress vertical anchor cables are additionally arranged between each two adjacent back-row piles, antidumping capacity of a supporting structure can be effectively improved, displacement of the supporting structure is reduced, meanwhile the lengths of the back-row piles can be reduced, and accordingly manufacture cost is saved.
Description
Technical field
The utility model relates to
OnePlant the Double-row-piles Structure that is provided with the vertical anchor cable of prestressing force, belong to architecture Foundation Pit Engineering and slope project technical field.
Background technology
Along with the quickening of expanding economy and urbanization process, the building of inner city is more and more intensive, and particularly high-rise, super highrise building is newly-built in a large number, and the basement of building is towards larger, Shenzhen Development Bank more.At present, the normal supporting scheme that adopts of China has: put slope excavation, soil-nail wall support, pile-anchor retaining, cement-soil gravity type retaining wall, campshed add the support patterns such as inner supporting structure, double-row pile.Put slope excavation, soil-nail wall support, the pile-anchor retaining construction will inevitably exceed building line, but because the soil beyond building line is subject to the national policy restriction, perhaps needs the license through relevant departments, this has brought great inconvenience for smooth construction of building basement; Campshed adds that the inner supporting structure cost is high, long construction period and the basement structure construction scope of operation few; Retaining Structure with Double-row Piles in the past has the characteristics of its good integrity, but overturning or slip resistance analysis and distortion are difficult to satisfy existing design specifications requirement.Therefore, existing conventional supporting and protection structure has certain limitation.
Summary of the invention
The purpose of this utility model is to provide a kind of resistance to capsizing that improves can reduce the Retaining Structure with Double-row Piles of displacement again.
The technical solution of the utility model is: a kind of Double-row-piles Structure that is provided with the vertical anchor cable of prestressing force comprises front campshed 1 and rear campshed 2 that many groups are arranged in parallel, hat beam I 3, hat beam II 4, linking beam 5 and the vertical anchor cable 6 of prestressing force.The top of front campshed 1 and rear campshed 2 is respectively equipped with hat beam I 3 and hat beam II 4, is connected by linking beam 5 between hat beam I 3 and hat beam II 4, the rear campshed 2 of each group between equidistant or unequal-interval be provided with the vertical anchor cable 6 of prestressing force.
The anchor head of the vertical anchor cable 6 of described prestressing force is fixed on the hat beam II 4 on rear campshed 2 tops, and the anchoring section 7 of the vertical anchor cable 6 of prestressing force is positioned at following soil layer at the bottom of 1 of front campshed.
The length of the anchoring section 7 of the vertical anchor cable 6 of described prestressing force is greater than 6m.
The rectangular array arrangement of pile body layout and the each interval of described front campshed 1 and rear campshed 2 are arranged.
Use step of the present utility model is:
(1) according to the requirement of Geological condition and the computational analysis of foundation ditch safety and stability, determine diameter (cross-sectional sizes), pile spacing and the array pitch of forward and backward campshed; Determine anchoring section, freedom length and the anchor cable spacing of the vertical anchor cable of prestressing force; Long, the pile body cross-sectional strength of stake and Reinforcement Design to forward and backward campshed; Determine the stake apical cap beam section size of forward and backward campshed and carry out arrangement of reinforcement and calculate; Determine sectional dimension, spacing and the quantity of reinforcement of linking beam; Determine the excavation operation.
(2) campshed 2 after the construction; The stake type is determined by design.
(3) campshed 1 before the construction; The stake type is determined by design.
(4) the vertical anchor cable of construction prestressing force.
(5) stake apical cap beam and the linking beam of the forward and backward campshed of construction make whole support system form an integral body, each several part cooperative bearing, distortion.
(6) anchor cable is applied prestressing force; After adding prestress anchorage cable between the stake of rear campshed, can effectively improve the resistance to capsizing of supporting and protection structure, reduce the displacement of supporting and protection structure.
(7) soil excavation and transportation.
The beneficial effects of the utility model are: add the vertical anchor cable of prestressing force between the stake of rear campshed after, can effectively improve the resistance to capsizing of supporting and protection structure, reduce the displacement of supporting and protection structure, also can reduce simultaneously the length of rear campshed with saving construction cost.
Description of drawings
Fig. 1 is the utility model layout schematic diagram;
Fig. 2 is the utility model horizontal section schematic diagram;
Fig. 3 is the utility model longitudinal profile schematic diagram;
In figure, each label is: 1: front campshed, 2: rear campshed, 3: hat beam I, 4: hat beam II, 5: linking beam, 6: the vertical anchor cable of prestressing force, 7: anchoring section.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail, but content of the present utility model is not limited to described scope.
Embodiment 1: as Figure 1-3, a kind of Double-row-piles Structure that is provided with the vertical anchor cable of prestressing force comprises 6 groups of front campsheds 1 that are arranged in parallel and rear campshed 2, hat beam I 3, hat beam II 4, linking beam 5 and the vertical anchor cable 6 of prestressing force.The top of front campshed 1 and rear campshed 2 is respectively equipped with hat beam I 3 and hat beam II 4, is connected by linking beam 5 between hat beam I 3 and hat beam II 4, each organize rear campshed 2 between spaced set the vertical anchor cable 6 of prestressing force is arranged.The anchor head of the vertical anchor cable 6 of prestressing force is fixed on the hat beam II 4 on rear campshed 2 tops, and the anchoring section 7 of the vertical anchor cable 6 of prestressing force is positioned at following soil layer at the bottom of 1 of front campshed.The length of the anchoring section 7 of the vertical anchor cable 6 of prestressing force is 6.5m.The rectangular array arrangement of pile body layout and the each interval of front campshed 1 and rear campshed 2 are arranged.
Embodiment 2: as Figure 1-3, a kind of Double-row-piles Structure that is provided with the vertical anchor cable of prestressing force comprises 10 groups of front campsheds 1 that are arranged in parallel and rear campshed 2, hat beam I 3, hat beam II 4, linking beam 5 and the vertical anchor cable 6 of prestressing force.The top of front campshed 1 and rear campshed 2 is respectively equipped with hat beam I 3 and hat beam II 4, is connected by linking beam 5 between hat beam I 3 and hat beam II 4, each organize rear campshed 2 between unequal-interval be provided with the vertical anchor cable 6 of prestressing force.The anchor head of the vertical anchor cable 6 of prestressing force is fixed on the hat beam II 4 on rear campshed 2 tops, and the anchoring section 7 of the vertical anchor cable 6 of prestressing force is positioned at following soil layer at the bottom of 1 of front campshed.The length of the anchoring section 7 of the vertical anchor cable 6 of prestressing force is 7m.The rectangular array arrangement of pile body layout and the each interval of front campshed 1 and rear campshed 2 are arranged.
Embodiment 3: as Figure 1-3, a kind of Double-row-piles Structure that is provided with the vertical anchor cable of prestressing force comprises 9 groups of front campsheds 1 that are arranged in parallel and rear campshed 2, hat beam I 3, hat beam II 4, linking beam 5 and the vertical anchor cable 6 of prestressing force.The top of front campshed 1 and rear campshed 2 is respectively equipped with hat beam I 3 and hat beam II 4, is connected by linking beam 5 between hat beam I 3 and hat beam II 4, each organize rear campshed 2 between spaced set the vertical anchor cable 6 of prestressing force is arranged.The anchor head of the vertical anchor cable 6 of prestressing force is fixed on the hat beam II 4 on rear campshed 2 tops, and the anchoring section 7 of the vertical anchor cable 6 of prestressing force is positioned at following soil layer at the bottom of 1 of front campshed.The length of the anchoring section 7 of the vertical anchor cable 6 of prestressing force is 8m.
Claims (4)
1. a Double-row-piles Structure that is provided with the vertical anchor cable of prestressing force, is characterized in that: comprise front campshed (1) and rear campshed (2) that many groups are arranged in parallel, hat beam I (3), hat beam II (4), linking beam (5) and the vertical anchor cable of prestressing force (6); The top of front campshed (1) and rear campshed (2) is respectively equipped with hat beam I (3) and hat beam II (4), is connected by linking beam (5) between hat beam I (3) and hat beam II (4), the rear campshed (2) of each group between equidistant or unequal-interval be provided with the vertical anchor cable of prestressing force (6).
2. the Double-row-piles Structure that is provided with the vertical anchor cable of prestressing force according to claim 1, it is characterized in that: the anchor head of the vertical anchor cable of described prestressing force (6) is fixed on the hat beam II (4) on rear campshed (2) top, and the anchoring section (7) of the vertical anchor cable of prestressing force (6) is positioned at front campshed (1) the following soil layer in the stake end.
3. the Double-row-piles Structure that is provided with the vertical anchor cable of prestressing force according to claim 2, it is characterized in that: the length of the anchoring section (7) of the vertical anchor cable of described prestressing force (6) is greater than 6m.
4. the Double-row-piles Structure that is provided with the vertical anchor cable of prestressing force according to claim 1, it is characterized in that: the rectangular array arrangement of pile body layout and the each interval of described front campshed (1) and rear campshed (2) are arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220661114.7U CN202936798U (en) | 2012-12-05 | 2012-12-05 | Double-row pile structure with prestress vertical anchor cables |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220661114.7U CN202936798U (en) | 2012-12-05 | 2012-12-05 | Double-row pile structure with prestress vertical anchor cables |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202936798U true CN202936798U (en) | 2013-05-15 |
Family
ID=48321044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201220661114.7U Expired - Fee Related CN202936798U (en) | 2012-12-05 | 2012-12-05 | Double-row pile structure with prestress vertical anchor cables |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202936798U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103469803A (en) * | 2013-09-30 | 2013-12-25 | 中国建筑股份有限公司 | Pile beam vertical anchor support system used for supporting foundation pit and construction method of pile beam vertical anchor support system |
CN103590408A (en) * | 2013-11-25 | 2014-02-19 | 中国建筑股份有限公司 | Novel double-row pile beam vertical anchor supporting system and construction method thereof |
CN103774675A (en) * | 2014-01-24 | 2014-05-07 | 中国建筑股份有限公司 | Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof |
CN108316309A (en) * | 2018-02-07 | 2018-07-24 | 深圳宏业基岩土科技股份有限公司 | The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system |
CN109723063A (en) * | 2018-12-21 | 2019-05-07 | 中冶集团武汉勘察研究院有限公司 | A kind of boundling stake pile supporting construction and its calculation method for pattern foundation pit supporting structure |
CN110565658A (en) * | 2019-08-27 | 2019-12-13 | 江苏省地质矿产局第三地质大队 | Double-row bottom-expanding long-short combined anti-slide pile for slope support |
CN111197312A (en) * | 2019-12-24 | 2020-05-26 | 上海建工集团股份有限公司 | L-shaped prestress pulling-anchoring engaged double-row pile foundation pit supporting structure and construction method thereof |
-
2012
- 2012-12-05 CN CN201220661114.7U patent/CN202936798U/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103469803A (en) * | 2013-09-30 | 2013-12-25 | 中国建筑股份有限公司 | Pile beam vertical anchor support system used for supporting foundation pit and construction method of pile beam vertical anchor support system |
CN103590408A (en) * | 2013-11-25 | 2014-02-19 | 中国建筑股份有限公司 | Novel double-row pile beam vertical anchor supporting system and construction method thereof |
CN103590408B (en) * | 2013-11-25 | 2016-06-15 | 中国建筑股份有限公司 | The perpendicular anchor support system of a kind of double-row pile beam and constructional method thereof |
CN103774675A (en) * | 2014-01-24 | 2014-05-07 | 中国建筑股份有限公司 | Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof |
CN103774675B (en) * | 2014-01-24 | 2015-06-24 | 中国建筑股份有限公司 | Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof |
CN108316309A (en) * | 2018-02-07 | 2018-07-24 | 深圳宏业基岩土科技股份有限公司 | The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system |
CN109723063A (en) * | 2018-12-21 | 2019-05-07 | 中冶集团武汉勘察研究院有限公司 | A kind of boundling stake pile supporting construction and its calculation method for pattern foundation pit supporting structure |
CN109723063B (en) * | 2018-12-21 | 2023-10-27 | 中冶集团武汉勘察研究院有限公司 | Bundling pile stack supporting structure for foundation pit supporting and calculating method thereof |
CN110565658A (en) * | 2019-08-27 | 2019-12-13 | 江苏省地质矿产局第三地质大队 | Double-row bottom-expanding long-short combined anti-slide pile for slope support |
CN111197312A (en) * | 2019-12-24 | 2020-05-26 | 上海建工集团股份有限公司 | L-shaped prestress pulling-anchoring engaged double-row pile foundation pit supporting structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202936798U (en) | Double-row pile structure with prestress vertical anchor cables | |
CN202989937U (en) | Grille-type double-row pile supporting structure | |
CN202936797U (en) | Double-row pile supporting structure with inclined struts | |
CN202989932U (en) | H-shaped double-row pile structure with large inclined angle prestressed anchor cables | |
CN203307817U (en) | Double-row pile structure provided with steel tube prestressed concrete for connection between front-row piles and rear-row piles | |
CN202644541U (en) | Steel support structure for ultra-deep foundation pit construction in narrow field | |
CN203684230U (en) | Prefabricated double-row pile structure | |
CN202117068U (en) | Micropile plate-type composite foundation | |
CN203179406U (en) | Wind shielding wall and advertisement board | |
CN202627000U (en) | Anchor-pulling type foundation pit supporting structure with double rows of piles | |
CN202851078U (en) | High water material filling column bag body | |
CN203684229U (en) | Connected double-row pile support structure | |
CN204780938U (en) | Novel recoverable anchor formula double row pile supporting construction that draws | |
CN205205833U (en) | Soil nail and stock combined type double row pile underground structure | |
CN104594360A (en) | Composite double-row pile foundation pit supporting structure | |
CN210216444U (en) | Foundation pit supporting structure of section steel micro pile combined cast-in-place pile | |
CN109404019B (en) | Cave surrounding rock pre-supporting system and cave structure | |
CN103981799B (en) | A kind of concrete filled steel tube opens string stiff beam and construction method thereof | |
CN203795435U (en) | Diagonal bracing reinforcing structure | |
CN202108055U (en) | Reinforcement cantilever type retaining wall structure | |
CN203320541U (en) | Guyed flanged multi-pile and bucket foundation composite structure | |
CN105756077A (en) | Foundation ring rock anchor rod foundation | |
CN203238625U (en) | Multi-section squeeze-expansion supporting disk uplift pile distributing ribs in segmented mode | |
CN206109965U (en) | Steel plank road in water and electricity building site | |
CN210395840U (en) | Prefabricated shear wall with grooves |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130515 Termination date: 20141205 |
|
EXPY | Termination of patent right or utility model |