CN202936798U - Double-row pile structure with prestress vertical anchor cables - Google Patents

Double-row pile structure with prestress vertical anchor cables Download PDF

Info

Publication number
CN202936798U
CN202936798U CN201220661114.7U CN201220661114U CN202936798U CN 202936798 U CN202936798 U CN 202936798U CN 201220661114 U CN201220661114 U CN 201220661114U CN 202936798 U CN202936798 U CN 202936798U
Authority
CN
China
Prior art keywords
piles
row
vertical anchor
prestressed vertical
crown beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201220661114.7U
Other languages
Chinese (zh)
Inventor
曹净
刘甜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201220661114.7U priority Critical patent/CN202936798U/en
Application granted granted Critical
Publication of CN202936798U publication Critical patent/CN202936798U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

本实用新型涉及一种设有预应力竖向锚索的双排桩结构,属于建筑基坑工程及边坡工程技术领域。本实用新型包括多组平行排列的前排桩和后排桩,冠梁Ⅰ、冠梁Ⅱ、连系梁和预应力竖向锚索。前排桩和后排桩的顶端分别设有冠梁Ⅰ和冠梁Ⅱ,冠梁Ⅰ与冠梁Ⅱ之间通过连系梁连接,各组后排桩的桩间等间距或不等间距设置有预应力竖向锚索。本实用新型在后排桩的桩间加入预应力竖向锚索之后,能有效地提高支护结构的抗倾覆能力,减少支护结构的位移,同时还可减少后排桩的长度以节约造价。

Figure 201220661114

The utility model relates to a double-row pile structure provided with prestressed vertical anchor cables, which belongs to the technical field of building foundation pit engineering and slope engineering. The utility model comprises a plurality of groups of front row piles and rear row piles arranged in parallel, crown beams I, crown beams II, connecting beams and prestressed vertical anchor cables. The top of the front row of piles and the rear row of piles are respectively equipped with crown beam I and crown beam II, and the crown beam I and crown beam II are connected by connecting beams. There are prestressed vertical anchor cables. After the utility model adds prestressed vertical anchor cables between the piles of the rear row of piles, it can effectively improve the anti-overturning ability of the support structure, reduce the displacement of the support structure, and at the same time reduce the length of the rear row of piles to save the cost .

Figure 201220661114

Description

一种设有预应力竖向锚索的双排桩结构A double-row pile structure with prestressed vertical anchor cables

技术领域 technical field

本实用新型涉及种设有预应力竖向锚索的双排桩结构,属于建筑基坑工程及边坡工程技术领域。 The utility model relates to a double-row pile structure provided with prestressed vertical anchor cables, which belongs to the technical field of building foundation pit engineering and slope engineering.

背景技术 Background technique

随着经济的发展和城市化进程的加快,中心城区的建筑越来越密集,特别是高层、超高层建筑的大量新建,建筑物的地下室向着更大、更深发展。目前,我国常采用的支护方案有:放坡开挖、土钉墙支护、桩锚支护,水泥土重力式挡墙、排桩加内支撑结构、双排桩等支护方式。放坡开挖、土钉墙支护、桩锚支护施工必然会超出建筑红线,但因建筑红线以外的土地受到国家政策限制,或者需要经相关部门许可,这给建筑地下室的顺利施工带来了极大的不便;排桩加内支撑结构造价高、施工周期长、而且地下室结构施工作业面少;以往的双排桩支护结构有其整体性好的特点,但抗倾覆及变形很难满足现有设计规范要求。因此,现有常规的支护结构有一定的局限性。 With the development of the economy and the acceleration of the urbanization process, the buildings in the central urban area are becoming more and more dense, especially a large number of new high-rise and super high-rise buildings, and the basements of the buildings are becoming larger and deeper. At present, the support schemes commonly used in my country include: sloping excavation, soil nail wall support, pile anchor support, cement-soil gravity retaining wall, row piles plus inner support structure, double row piles and other support methods. Slope excavation, soil nail wall support, and pile-anchor support construction will inevitably exceed the building red line, but because the land outside the building red line is restricted by national policies or requires permission from relevant departments, this will bring difficulties to the smooth construction of the building basement. It caused great inconvenience; row piles plus inner support structure cost a lot, construction period is long, and the basement structure construction work area is less; the previous double-row pile support structure has the characteristics of good integrity, but it is difficult to resist overturning and deformation Meet the requirements of existing design specifications. Therefore, existing conventional support structures have certain limitations.

发明内容 Contents of the invention

本实用新型的目的在于提供一种提高抗倾覆能力又能减少位移的双排桩支护结构。 The purpose of the utility model is to provide a double-row pile support structure which improves the anti-overturning ability and can reduce the displacement.

本实用新型的技术方案是:一种设有预应力竖向锚索的双排桩结构,包括多组平行排列的前排桩1和后排桩2,冠梁Ⅰ3、冠梁Ⅱ4、连系梁5和预应力竖向锚索6。前排桩1和后排桩2的顶端分别设有冠梁Ⅰ3和冠梁Ⅱ4,冠梁Ⅰ3与冠梁Ⅱ4之间通过连系梁5连接,各组后排桩2的桩间等间距或不等间距设置有预应力竖向锚索6。 The technical scheme of the utility model is: a double-row pile structure provided with prestressed vertical anchor cables, including multiple groups of front row piles 1 and rear row piles 2 arranged in parallel, crown beam I3, crown beam II4, connection Beam 5 and prestressed vertical anchor cable 6. The tops of the front row of piles 1 and the rear row of piles 2 are respectively provided with crown beams I3 and crown beams II4, and the crown beams I3 and crown beams II4 are connected by connecting beams 5. Prestressed vertical anchor cables 6 are arranged at unequal intervals.

所述预应力竖向锚索6的锚头固定在后排桩2顶端的冠梁Ⅱ4上,预应力竖向锚索6的锚固段7位于前排桩1桩底以下土层内。 The anchor head of the prestressed vertical anchor cable 6 is fixed on the crown beam II4 at the top of the rear row of piles 2, and the anchor section 7 of the prestressed vertical anchor cable 6 is located in the soil layer below the bottom of the front row of piles 1.

所述预应力竖向锚索6的锚固段7的长度大于6m。 The length of the anchoring section 7 of the prestressed vertical anchor cable 6 is greater than 6m.

所述前排桩1和后排桩2的桩体平面布置呈矩形阵列排布且彼此间隔排布。 The pile bodies of the front row of piles 1 and the rear row of piles 2 are arranged in a rectangular array and arranged at intervals.

本实用新型的使用步骤是: The use steps of the present utility model are:

(1)根据场地地质条件和基坑安全稳定计算分析的要求,确定前、后排桩的直径(截面大小)、桩间距及排距;确定预应力竖向锚索的锚固段、自由段长度及锚索间距;对前、后排桩的桩长、桩身截面强度及配筋设计;确定前、后排桩的桩顶冠梁截面尺寸并进行配筋计算;确定连系梁的截面尺寸、间距及配筋量;确定基坑开挖施工工序。 (1) Determine the diameter (section size), pile spacing and row spacing of the front and rear rows of piles according to the geological conditions of the site and the requirements for the calculation and analysis of the safety and stability of the foundation pit; determine the length of the anchorage section and free section of the prestressed vertical anchor cable and anchor cable spacing; design the pile length, pile body section strength and reinforcement of the front and rear piles; determine the cross-sectional size of the pile crown beam of the front and rear piles and perform reinforcement calculation; determine the cross-sectional size of the connecting beam , spacing and reinforcement amount; determine the construction process of foundation pit excavation.

(2)施工后排桩2;桩型由设计确定。 (2) Row of piles 2 after construction; pile type is determined by design.

(3)施工前排桩1;桩型由设计确定。 (3) Row of piles 1 before construction; pile type is determined by design.

(4)施工预应力竖向锚索。  (4) Construction of prestressed vertical anchor cables. the

(5)施工前、后排桩的桩顶冠梁及连系梁,使整个支护体系形成一个整体,各部分协同受力、变形。 (5) The top crown beams and connecting beams of the piles before and after the construction make the entire support system form a whole, and all parts are stressed and deformed in coordination.

(6)对锚索施加预应力;后排桩的桩间加入预应力锚索之后,能有效地提高支护结构的抗倾覆能力,减少支护结构的位移。 (6) Apply prestress to the anchor cable; after the prestressed anchor cable is added between the piles of the rear row of piles, the anti-overturning ability of the support structure can be effectively improved and the displacement of the support structure can be reduced.

(7)土方开挖及运输。 (7) Earth excavation and transportation.

本实用新型的有益效果是:在后排桩的桩间加入预应力竖向锚索之后,能有效地提高支护结构的抗倾覆能力,减少支护结构的位移,同时还可减少后排桩的长度以节约造价。 The beneficial effects of the utility model are: after the prestressed vertical anchor cable is added between the piles of the rear row of piles, the anti-overturning ability of the support structure can be effectively improved, the displacement of the support structure can be reduced, and the rear row of piles can also be reduced. length to save cost.

附图说明 Description of drawings

图1为本实用新型平面布置示意图; Fig. 1 is a schematic diagram of the layout of the utility model;

图2为本实用新型横向剖面示意图; Fig. 2 is a schematic diagram of a transverse section of the utility model;

图3为本实用新型纵向剖面示意图; Fig. 3 is a schematic diagram of a longitudinal section of the utility model;

图中各标号为:1:前排桩,2:后排桩,3:冠梁Ⅰ,4:冠梁Ⅱ,5:连系梁,6:预应力竖向锚索,7:锚固段。 The labels in the figure are: 1: front row of piles, 2: rear row of piles, 3: crown beam I, 4: crown beam II, 5: connecting beam, 6: prestressed vertical anchor cable, 7: anchoring section.

具体实施方式 Detailed ways

下面结合附图和实施例,对本实用新型作进一步说明,但本实用新型的内容并不限于所述范围。 Below in conjunction with accompanying drawing and embodiment, the utility model will be further described, but the content of the utility model is not limited to said range.

实施例1:如图1-3所示,一种设有预应力竖向锚索的双排桩结构,包括6组平行排列的前排桩1和后排桩2,冠梁Ⅰ3、冠梁Ⅱ4、连系梁5和预应力竖向锚索6。前排桩1和后排桩2的顶端分别设有冠梁Ⅰ3和冠梁Ⅱ4,冠梁Ⅰ3与冠梁Ⅱ4之间通过连系梁5连接,各组后排桩2的桩间等间距设置有预应力竖向锚索6。预应力竖向锚索6的锚头固定在后排桩2顶端的冠梁Ⅱ4上,预应力竖向锚索6的锚固段7位于前排桩1桩底以下土层内。预应力竖向锚索6的锚固段7的长度为6.5m。前排桩1和后排桩2的桩体平面布置呈矩形阵列排布且彼此间隔排布。 Example 1: As shown in Figure 1-3, a double-row pile structure with prestressed vertical anchor cables, including 6 groups of front row piles 1 and rear row piles 2 arranged in parallel, crown beam I3, crown beam Ⅱ4. Connecting beam 5 and prestressed vertical anchor cable 6. The tops of the front row of piles 1 and the rear row of piles 2 are respectively provided with crown beams I3 and crown beams II4. Prestressed vertical anchor cable 6 is arranged. The anchor head of the prestressed vertical anchor cable 6 is fixed on the crown beam II4 at the top of the rear row of piles 2, and the anchor section 7 of the prestressed vertical anchor cable 6 is located in the soil layer below the bottom of the front row of piles 1. The length of the anchoring section 7 of the prestressed vertical anchor cable 6 is 6.5m. The pile bodies of the front row of piles 1 and the rear row of piles 2 are arranged in a rectangular array and arranged at intervals.

实施例2:如图1-3所示,一种设有预应力竖向锚索的双排桩结构,包括10组平行排列的前排桩1和后排桩2,冠梁Ⅰ3、冠梁Ⅱ4、连系梁5和预应力竖向锚索6。前排桩1和后排桩2的顶端分别设有冠梁Ⅰ3和冠梁Ⅱ4,冠梁Ⅰ3与冠梁Ⅱ4之间通过连系梁5连接,各组后排桩2的桩间不等间距设置有预应力竖向锚索6。预应力竖向锚索6的锚头固定在后排桩2顶端的冠梁Ⅱ4上,预应力竖向锚索6的锚固段7位于前排桩1桩底以下土层内。预应力竖向锚索6的锚固段7的长度为7m。前排桩1和后排桩2的桩体平面布置呈矩形阵列排布且彼此间隔排布。 Embodiment 2: As shown in Figure 1-3, a double-row pile structure with prestressed vertical anchor cables, including 10 groups of front row piles 1 and rear row piles 2 arranged in parallel, crown beam I3, crown beam Ⅱ4. Connecting beam 5 and prestressed vertical anchor cable 6. The tops of the front row of piles 1 and the rear row of piles 2 are respectively provided with crown beams I3 and crown beams II4, and the crown beams I3 and crown beams II4 are connected by connecting beams 5, and the distance between the piles of each group of rear row piles 2 is not equal Prestressed vertical anchor cables 6 are provided. The anchor head of the prestressed vertical anchor cable 6 is fixed on the crown beam II4 at the top of the rear row of piles 2, and the anchor section 7 of the prestressed vertical anchor cable 6 is located in the soil layer below the bottom of the front row of piles 1. The anchoring section 7 of the prestressed vertical anchor cable 6 has a length of 7 m. The pile bodies of the front row of piles 1 and the rear row of piles 2 are arranged in a rectangular array and arranged at intervals.

实施例3:如图1-3所示,一种设有预应力竖向锚索的双排桩结构,包括9组平行排列的前排桩1和后排桩2,冠梁Ⅰ3、冠梁Ⅱ4、连系梁5和预应力竖向锚索6。前排桩1和后排桩2的顶端分别设有冠梁Ⅰ3和冠梁Ⅱ4,冠梁Ⅰ3与冠梁Ⅱ4之间通过连系梁5连接,各组后排桩2的桩间等间距设置有预应力竖向锚索6。预应力竖向锚索6的锚头固定在后排桩2顶端的冠梁Ⅱ4上,预应力竖向锚索6的锚固段7位于前排桩1桩底以下土层内。预应力竖向锚索6的锚固段7的长度为8m。 Embodiment 3: As shown in Figure 1-3, a double-row pile structure with prestressed vertical anchor cables, including 9 groups of front row piles 1 and rear row piles 2 arranged in parallel, crown beam I3, crown beam Ⅱ4. Connecting beam 5 and prestressed vertical anchor cable 6. The tops of the front row of piles 1 and the rear row of piles 2 are respectively provided with crown beams I3 and crown beams II4. Prestressed vertical anchor cable 6 is arranged. The anchor head of the prestressed vertical anchor cable 6 is fixed on the crown beam II4 at the top of the rear row of piles 2, and the anchor section 7 of the prestressed vertical anchor cable 6 is located in the soil layer below the bottom of the front row of piles 1. The anchoring section 7 of the prestressed vertical anchor cable 6 has a length of 8 m.

Claims (4)

1.一种设有预应力竖向锚索的双排桩结构,其特征在于:包括多组平行排列的前排桩(1)和后排桩(2),冠梁Ⅰ(3)、冠梁Ⅱ(4)、连系梁(5)和预应力竖向锚索(6);前排桩(1)和后排桩(2)的顶端分别设有冠梁Ⅰ(3)和冠梁Ⅱ(4),冠梁Ⅰ(3)与冠梁Ⅱ(4)之间通过连系梁(5)连接,各组后排桩(2)的桩间等间距或不等间距设置有预应力竖向锚索(6)。 1. A double-row pile structure with prestressed vertical anchor cables, characterized in that: it includes multiple groups of parallel-arranged front row piles (1) and rear row piles (2), crown beam I (3), crown Beam II (4), connecting beam (5) and prestressed vertical anchor cable (6); the top of the front row of piles (1) and the rear row of piles (2) are respectively equipped with crown beam I (3) and crown beam Ⅱ (4), crown beam Ⅰ (3) and crown beam Ⅱ (4) are connected by connecting beams (5), and the piles of each group of rear rows of piles (2) are equidistantly or unequally spaced with prestressed Vertical anchor cable (6). 2.根据权利要求1所述的设有预应力竖向锚索的双排桩结构,其特征在于:所述预应力竖向锚索(6)的锚头固定在后排桩(2)顶端的冠梁Ⅱ(4)上,预应力竖向锚索(6)的锚固段(7)位于前排桩(1)桩底以下土层内。 2. The double-row pile structure with prestressed vertical anchor cables according to claim 1, characterized in that: the anchor head of the prestressed vertical anchor cables (6) is fixed on the top of the rear row of piles (2) On the crown beam II (4), the anchoring section (7) of the prestressed vertical anchor cable (6) is located in the soil layer below the pile bottom of the front row of piles (1). 3.根据权利要求2所述的设有预应力竖向锚索的双排桩结构,其特征在于:所述预应力竖向锚索(6)的锚固段(7)的长度大于6m。 3. The double-row pile structure provided with prestressed vertical anchor cables according to claim 2, characterized in that: the length of the anchor section (7) of the prestressed vertical anchor cables (6) is greater than 6m. 4.根据权利要求1所述的设有预应力竖向锚索的双排桩结构,其特征在于:所述前排桩(1)和后排桩(2)的桩体平面布置呈矩形阵列排布且彼此间隔排布。 4. The double-row pile structure with prestressed vertical anchor cables according to claim 1, characterized in that: the pile bodies of the front row of piles (1) and the rear row of piles (2) are arranged in a rectangular array arranged and spaced apart from each other.
CN201220661114.7U 2012-12-05 2012-12-05 Double-row pile structure with prestress vertical anchor cables Expired - Fee Related CN202936798U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220661114.7U CN202936798U (en) 2012-12-05 2012-12-05 Double-row pile structure with prestress vertical anchor cables

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220661114.7U CN202936798U (en) 2012-12-05 2012-12-05 Double-row pile structure with prestress vertical anchor cables

Publications (1)

Publication Number Publication Date
CN202936798U true CN202936798U (en) 2013-05-15

Family

ID=48321044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220661114.7U Expired - Fee Related CN202936798U (en) 2012-12-05 2012-12-05 Double-row pile structure with prestress vertical anchor cables

Country Status (1)

Country Link
CN (1) CN202936798U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469803A (en) * 2013-09-30 2013-12-25 中国建筑股份有限公司 Pile beam vertical anchor support system used for supporting foundation pit and construction method of pile beam vertical anchor support system
CN103590408A (en) * 2013-11-25 2014-02-19 中国建筑股份有限公司 Novel double-row pile beam vertical anchor supporting system and construction method thereof
CN103774675A (en) * 2014-01-24 2014-05-07 中国建筑股份有限公司 Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN108316309A (en) * 2018-02-07 2018-07-24 深圳宏业基岩土科技股份有限公司 The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system
CN109723063A (en) * 2018-12-21 2019-05-07 中冶集团武汉勘察研究院有限公司 A kind of boundling stake pile supporting construction and its calculation method for pattern foundation pit supporting structure
CN110565658A (en) * 2019-08-27 2019-12-13 江苏省地质矿产局第三地质大队 Double-row bottom-expanding long-short combined anti-slide pile for slope support
CN111197312A (en) * 2019-12-24 2020-05-26 上海建工集团股份有限公司 L-shaped prestressed anchorage occlusal double-row pile foundation pit supporting structure and its construction method
CN112796326A (en) * 2021-01-22 2021-05-14 浙江华展工程研究设计院有限公司 Gantry type double-row pile system with rear row pile anchor and construction method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469803A (en) * 2013-09-30 2013-12-25 中国建筑股份有限公司 Pile beam vertical anchor support system used for supporting foundation pit and construction method of pile beam vertical anchor support system
CN103590408A (en) * 2013-11-25 2014-02-19 中国建筑股份有限公司 Novel double-row pile beam vertical anchor supporting system and construction method thereof
CN103590408B (en) * 2013-11-25 2016-06-15 中国建筑股份有限公司 The perpendicular anchor support system of a kind of double-row pile beam and constructional method thereof
CN103774675A (en) * 2014-01-24 2014-05-07 中国建筑股份有限公司 Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN103774675B (en) * 2014-01-24 2015-06-24 中国建筑股份有限公司 Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN108316309A (en) * 2018-02-07 2018-07-24 深圳宏业基岩土科技股份有限公司 The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system
CN109723063A (en) * 2018-12-21 2019-05-07 中冶集团武汉勘察研究院有限公司 A kind of boundling stake pile supporting construction and its calculation method for pattern foundation pit supporting structure
CN109723063B (en) * 2018-12-21 2023-10-27 中冶集团武汉勘察研究院有限公司 Bundling pile stack supporting structure for foundation pit supporting and calculating method thereof
CN110565658A (en) * 2019-08-27 2019-12-13 江苏省地质矿产局第三地质大队 Double-row bottom-expanding long-short combined anti-slide pile for slope support
CN111197312A (en) * 2019-12-24 2020-05-26 上海建工集团股份有限公司 L-shaped prestressed anchorage occlusal double-row pile foundation pit supporting structure and its construction method
CN112796326A (en) * 2021-01-22 2021-05-14 浙江华展工程研究设计院有限公司 Gantry type double-row pile system with rear row pile anchor and construction method thereof

Similar Documents

Publication Publication Date Title
CN202936798U (en) Double-row pile structure with prestress vertical anchor cables
CN202989937U (en) Grille-type double-row pile supporting structure
CN204418187U (en) Subway protection region soil nail wall is in conjunction with double-row pile deep foundation ditch composite supporting construction
CN204738302U (en) Multi -storey frame formula double row pile supporting construction
CN203307817U (en) Double-row pile structure provided with steel tube prestressed concrete for connection between front-row piles and rear-row piles
CN103590408B (en) The perpendicular anchor support system of a kind of double-row pile beam and constructional method thereof
CN204510467U (en) A kind of cap node for basement flat slab structure
CN203684230U (en) Prefabricated double-row pile structure
CN202989932U (en) H-shaped double-row pile structure with large inclined angle prestressed anchor cables
CN203768912U (en) Double prestressing force high-strength concrete rectangular pile foundation ditch supporting construction
CN104213717B (en) Multi-storey building integration transformation method of construction
CN202273242U (en) Base of union type mini type pile rod tower
CN204959766U (en) Double-portal supporting structure suitable for large-scale excavation foundation pit
CN203684229U (en) Connected double-row pile support structure
CN203034478U (en) Anchor rod/ cable cantilever type retaining wall
CN205077499U (en) Double row pile supporting construction with transverse connection component
CN204370417U (en) A kind of for base pit engineering external corner or the road place of going along with sb. to guard him to drawing cable bolting structure
CN107476316B (en) Building foundation pit internal and external support structure and construction method
CN203498841U (en) Inclined pile vertical anchor rod supporting structure used for foundation pit supporting
CN102828616B (en) High-formwork support system for roof
CN204266216U (en) Bamboo beam anchoring and supporting structure of side slope
CN205171532U (en) Permanent side slope supporting construction
CN215594044U (en) A double row pile support system
CN201512803U (en) Structural layer used for preventing building from sinking and bottom layer structure in transformer substation
CN201554033U (en) Tower crane foundation for deep foundation ditch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130515

Termination date: 20141205

EXPY Termination of patent right or utility model