CN108316309A - The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system - Google Patents

The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system Download PDF

Info

Publication number
CN108316309A
CN108316309A CN201810123369.XA CN201810123369A CN108316309A CN 108316309 A CN108316309 A CN 108316309A CN 201810123369 A CN201810123369 A CN 201810123369A CN 108316309 A CN108316309 A CN 108316309A
Authority
CN
China
Prior art keywords
pile
guan liang
row
deep basal
prestress anchorage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810123369.XA
Other languages
Chinese (zh)
Inventor
王凤梅
张领帅
陈枝东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Hongyeji Geotechnical Technology Co Ltd
Original Assignee
Shenzhen Hongyeji Geotechnical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Hongyeji Geotechnical Technology Co Ltd filed Critical Shenzhen Hongyeji Geotechnical Technology Co Ltd
Priority to CN201810123369.XA priority Critical patent/CN108316309A/en
Publication of CN108316309A publication Critical patent/CN108316309A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to the technical fields of deep basal pit retaining structure, disclose the double-row pile composite construction and its construction method of deep basal pit supporting and retaining system, it is arranged in the soil body in deep basal pit sideline, including the preceding pile pile in the multiple in a row-shaped arrangement and embedded soil body and the rear pile pile in the multiple in a row-shaped arrangement and embedded soil body;The stake top of pile pile is connected by rear Guan Liang after multiple, and the stake top of multiple preceding pile piles is connected by preceding Guan Liang;It is connected by multiple linking beams between preceding Guan Liang and rear Guan Liang;Multiple prestress anchorage cables are equipped in Guan Liang afterwards, the upper end of prestress anchorage cable is fixed in rear Guan Liang, and along the length direction of rear pile pile, the lower end of prestress anchorage cable passes through rear Guan Liang, extends downward into the inside of the soil body.Under the action of prestress anchorage cable, reduce the suffered internal force of rear Guan Liang and linking beam, rigidity with bigger and intensity enhance the resistance to capsizing of Double-row-piles Structure, to which the deep basal pit for ensureing poor more than the deep basal pit of 8m or geological conditions to depth carries out supporting.

Description

The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system
Technical field
The present invention relates to the technical fields of deep basal pit retaining structure, more particularly to the double-row pile composite construction of deep basal pit supporting and retaining system And its construction method.
Background technology
Currently, in foundation pit supporting project, since anchor cable cannot exceed land red-line, double-row pile knot is mostly used greatly Structure supporting and retaining system, to play the role of pattern foundation pit supporting structure.
Double-row pile retaining structure is that front-seat deposited reinforced concrete pile and heel row armored concrete is arranged along foundation pit sideline Armored concrete Guan Liang and coupling beam is arranged in bored concrete pile, stake top, and each preceding campshed spacing is generally 1.5~3d (d is stake diameter), heel row Stake spacing is generally 1.5~6d, and double-row pile array pitch is generally 3~5d;Supporting construction within general depth 8m foundation pit or The preferable foundation pit of soil condition have supporting effect, double-row pile retaining structure have the advantages that control deformability by force etc. have.
But for the depth deep basal pit poor more than the deep basal pit of 8m or geological conditions, double-row pile retaining structure resists Ability of toppling is limited, is not sufficient to ensure that the supporting of foundation pit.
Invention content
The purpose of the present invention is to provide the double-row pile composite constructions and its construction method of deep basal pit supporting and retaining system, it is intended to solve existing Have in technology, it is insufficient in the resistance to capsizing of the deep basal pit that depth is poor more than the deep basal pit of 8m or geological conditions, supporting construction The problem of.
The invention is realized in this way the double-row pile composite construction and its construction method of deep basal pit supporting and retaining system, are arranged in deep base Preceding pile pile in the soil body for cheating sideline, including in the multiple in a row-shaped arrangement and embedded soil body and multiple in a row-shaped arrangement and insertion Rear pile pile in the soil body;It is multiple it is described after the stake tops of pile piles connected by rear Guan Liang, before the stake tops of multiple preceding pile piles passes through Guan Liang connects;It is connected by multiple linking beams between the preceding Guan Liang and rear Guan Liang;Multiple pre- answer is equipped with after described in Guan Liang Power anchor cable, the upper end of the prestress anchorage cable are fixed in Guan Liang in the rear, the length direction of pile pile after described, described pre- to answer The lower end of power anchor cable passes through the rear Guan Liang, extends downward into the inside of the soil body.
Further, the rear Guan Liang has away from the upper surface of the foundation pit, and the upper end of the prestress anchorage cable is fixed In anchor pier, the anchor pier compresses the upper surface of Guan Liang in the rear.
Further, the prestress anchorage cable is arranged between the rear pile pile of adjacent two.
Further, the lower end of the prestress anchorage cable extends downward into the lower section of the rear pile pile.
Further, the lower end of the prestress anchorage cable is equipped with reinforcing strip, along the insertion side for deviating from the prestress anchorage cable To the reinforcing strip is in tilted layout.
Further, the reinforcing strip is located at the lower section of the rear pile pile.
Further, the peripheral surface of the reinforcing strip is equipped with multiple barb items distracted upward.
Further, multiple barb items are in a row-shaped arrangement along the axial direction of the reinforcing strip, form barb row;Described in The peripheral surface of the circumferential direction of reinforcing strip, the reinforcing strip is provided with multiple rows of barb row separately arranged;Adjacent barb arranges it Between in dislocation arrangement.
The present invention also provides the double-row pile composite construction of deep basal pit supporting and retaining system and its construction method of construction method, construction parties Method is as follows:
(1) it using static pressure or hammer mode, after multiple preceding pile piles of first constructing along the soil body in foundation pit sideline, then constructs Multiple rear pile piles;
(2) in the stake top of the multiple preceding pile piles construction preceding Guan Liang, in the stake top construction institute of multiple rear pile piles State rear Guan Liang;Pass through multiple linking beams between the preceding Guan Liang and the rear Guan Liang to connect;And to the preceding Guan Liang, described Guan Liang and the linking beam are conserved afterwards;
(3) when the rear Guan Liang of constructing, multiple anchor cable holes are reserved, what is be vertically arranged in order to which construction in later period is multiple is described pre- Stress anchor cable;
(4) Guan Liang is constructed the prestress anchorage cable in the rear, waits for carrying out tensioning after the completion of the prestress anchorage cable maintenance Locking;
(5) and then stage excavation pit earthwork, until bottom of foundation ditch.
Compared with prior art, the double-row pile composite construction and its construction method of deep basal pit supporting and retaining system provided by the invention, cloth The preceding pile pile in the soil body in deep basal pit sideline and rear pile pile are set, under the action of rear Guan Liang and linking beam, is realized to base The supporting in hole;Guan Liang is equipped with multiple prestress anchorage cables afterwards, and prestress anchorage cable extends downward into the inside of foundation pit, prestress anchorage cable this Sample is arranged without departing from firmly red line, under the action of prestress anchorage cable, reduces the suffered internal force of rear Guan Liang and linking beam, Therefore common Retaining Structure with Double-row Piles is compared, rigidity and intensity with bigger, also, prestress anchorage cable substantially increases The resistance to capsizing of Double-row-piles Structure, to which the deep basal pit for ensureing poor more than the deep basal pit of 8m or geological conditions to depth carries out Supporting.
Description of the drawings
Fig. 1 is the double-row pile composite construction of deep basal pit supporting and retaining system provided in an embodiment of the present invention and its section of construction method Figure;
Fig. 2 is the double-row pile composite construction of deep basal pit supporting and retaining system provided in an embodiment of the present invention and its plane of construction method Figure.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
The same or similar label correspond to the same or similar components in the attached drawing of the present embodiment;In description of the invention In, it is to be understood that if there is the orientation or positional relationship of the instructions such as term "upper", "lower", "left", "right" for based on attached drawing institute The orientation or positional relationship shown, is merely for convenience of description of the present invention and simplification of the description, and does not indicate or imply the indicated dress It sets or element must have a particular orientation, with specific azimuth configuration and operation, therefore the use of position relationship described in attached drawing Language only for illustration, should not be understood as the limitation to this patent, for the ordinary skill in the art, can be with The concrete meaning of above-mentioned term is understood as the case may be.
The realization of the present invention is described in detail below in conjunction with specific embodiment.
Referring to Fig.1 shown in -2, preferred embodiment is provided for the present invention.
The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system provided by the invention are more than for solving in depth The poor deep basal pit of the deep basal pit or geological conditions of 8m, the problem of the resistance to capsizing deficiency of supporting construction.
The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system, are arranged in the soil body in deep basal pit sideline, including Multiple preceding pile piles 10 and multiple pile piles 20 afterwards, multiple preceding pile piles 10 are in a row-shaped arrangement and are embedded in the soil body, multiple rear pile piles 20 In the in a row-shaped arrangement and embedded soil body;The stake top of pile pile 20 is connected by rear Guan Liang 40 after multiple, the stake top of multiple preceding pile piles 10 It is connected by preceding Guan Liang 30;It is connected by multiple linking beams 50 between preceding Guan Liang 30 and rear Guan Liang 40;It is equipped in Guan Liang 40 afterwards The upper end of multiple prestress anchorage cables 70, prestress anchorage cable 70 is fixed in rear Guan Liang 40, along the length direction of rear pile pile 20, is answered in advance The lower end of power anchor cable 70 passes through rear Guan Liang 40, extends downward into the inside of the soil body.
The double-row pile composite construction and its construction method of above-mentioned deep basal pit supporting and retaining system, are arranged in the soil body in deep basal pit sideline Preceding pile pile 10 and rear pile pile 20 realize the supporting to foundation pit under the action of rear Guan Liang 40 and linking beam 50;Guan Liang afterwards 40 are equipped with multiple prestress anchorage cables 70, and prestress anchorage cable 70 extends downward into the inside of foundation pit, and prestress anchorage cable 70 is arranged in this way Without departing from firmly red line, under the action of prestress anchorage cable 70, the suffered internal force of rear Guan Liang 40 and linking beam 50 is reduced, Therefore common Retaining Structure with Double-row Piles is compared, rigidity and intensity with bigger, also, prestress anchorage cable 70 greatly increases The resistance to capsizing of Double-row-piles Structure, to ensure the deep basal pit poor more than the deep basal pit of 8m or geological conditions to depth into Row supporting.
In the present embodiment, rear Guan Liang 40 has away from the upper surface of foundation pit, and the upper end of prestress anchorage cable 70 is fixed on anchor pier In 60, anchor pier 60 is pressed on the upper surface of rear Guan Liang, and the lower end of prestress anchorage cable 70 extends downward into the inside of foundation pit;In anchor pier Under the action of 60, increase the bonding rubbing action of prestress anchorage cable 70 and soil layer, the pressure-bearing to enhance prestress anchorage cable 70 is made With.
Furthermore the upper surface of anchor pier 60 is vertical with the axis of prestress anchorage cable 70, the advantages of this arrangement are as follows, anchor pier 60 It is more chimeric with the cooperation of prestress anchorage cable 70, in addition, the inside for the insertion foundation pit that prestress anchorage cable 70 can be more vertical, to ensure The support capacity of prestress anchorage cable 70.
Specifically, prestress anchorage cable 70 is arranged in after adjacent two between pile pile 20;Prestress anchorage cable 70 is with after in this way Pile pile 20 carries out supporting to foundation pit jointly, ensures the double-row pile composite construction of deep basal pit supporting and retaining system and its supporting effect of construction method Fruit;Each prestress anchorage cable 70 carries out supporting to foundation pit jointly, to ensure the integer support to foundation pit
The stake top of each preceding pile pile 10 by preceding Guan Liang 30 connect, 50 both ends of linking beam be separately connected before Guan Liang 30 and after Guan Liang 40;Preceding pile pile 10, rear pile pile 20 and linking beam 50 form entirety, to enhance preceding pile pile 10, rear pile pile 20 and link The support capacity to foundation pit of beam 50;Also, under the action of preceding Guan Liang 30 and rear Guan Liang 40, enhance linking beam 50 and front tube The stable connection of stake 10 and rear pile pile 20, to enhance the double-row pile composite construction and its construction method of deep basal pit supporting and retaining system Integer support ability.
The lower end of prestress anchorage cable extends downward into the lower section of rear pile pile;In this way, the supporting depth model of prestress anchorage cable 70 Enclose the supporting depth bounds more than rear pile pile 20;To meet the supporting requirement to foundation pit, in addition, contributing to sufficient profit in this way With the anchoring ability of prestress anchorage cable 70, to ensure double-row pile composite construction and its supporting of construction method of deep basal pit supporting and retaining system Ability.
In the present embodiment, rear Guan Liang 40 is equipped with multiple anchor cable holes, and prestress anchorage cable 70 is embedded in by anchor cable hole in foundation pit Portion;Under the action of anchor cable hole, convenient for installing for prestress anchorage cable 70, greatly shorten the construction duration of engineering.
Furthermore anchor cable hole is equipped with after two between pile pile 20, along the length direction of rear Guan Liang 40, multiple anchor cable holes are in interval Distribution;Prestress anchorage cable 70 is arranged according to the mode that anchor cable hole is arranged, multiple prestress anchorage cables 70 can be compared with to the supporting power of foundation pit To be uniform, in this way, enhancing the support capacity of multiple prestress anchorage cables 70 to the greatest extent.
The lower end of prestress anchorage cable 70 is equipped with reinforcing strip 71, along the insertion direction for deviating from prestress anchorage cable 70, reinforcing strip 71 Extend and is in tilted layout;In this way, when 70 stress of prestress anchorage cable, under the action of reinforcing strip 71, prestress anchorage cable 70 is not easy Towards embedded direction movement, to enhance the endurance of prestress anchorage cable 70.
Preceding pile pile 10 is respectively PRC hybrid reinforcement prestressed concrete pipe piles, PRC hybrid reinforcement prestressing force with rear pile pile 20 Concrete tubular pile has great antidetonation and bending resistance, and the pile strength of PRC hybrid reinforcement prestressed concrete pipe piles is very high, And be relatively large in diameter, convenient for install and support capacity more preferably.
PRC hybrid reinforcement prestressed concrete pipe piles are constructed using hammering or static pressure mode, are filled compared to holing with slurry wall protection Stake is noted, mud off is not present, avoids place mud contamination, is conducive to construction site civilized construction and environmental protection.
PRC hybrid reinforcement prestressed concrete pipe piles are constructed using hammering or static pressure mode, compare cast-in-situ bored pile, construction Speed is exceedingly fast, and the duration is shorter.
PRC hybrid reinforcement prestressed concrete pipe piles belong to prefabricated pile, are processed in batch in factory, and transport to scene is applied again Work, therefore drilling pouring stake is compared, cost is very low.
Specifically, reinforcing strip 71 is located at the lower section of rear pile pile 20;In this way, reinforcing strip 71 can be to playing branch below rear pile pile Shield ability, to enhance deep basal pit supporting and retaining system double-row pile composite construction integer support ability.
Furthermore the peripheral surface of reinforcing strip 71 is equipped with multiple barb items distracted upward;Under the action of barb item, answer in advance Power anchor cable 70 is not easy towards embedded direction movement, to enhance the anchoring effect of prestress anchorage cable 70.
The double-row pile composite construction of deep basal pit supporting and retaining system and its construction method of construction method, construction method are as follows:
(1) it using static pressure or hammer mode, after multiple preceding pile piles 10 of first constructing along the soil body in foundation pit sideline, then constructs more Pile pile 20 after a;
(2) Guan Liang 30 before the stake top of multiple preceding pile piles 10 is constructed, the Guan Liang 40 after the stake top construction of multiple rear pile piles 20; It is connected by multiple linking beams 50 between preceding Guan Liang 30 and rear Guan Liang 40;And to preceding Guan Liang 30, rear Guan Liang 40 and linking beam 50 It is conserved;
(3) after constructing when Guan Liang, multiple anchor cable holes, the prestress anchorage cable being vertically arranged in order to which construction in later period is multiple are reserved 70;
(4) it in rear Guan Liang construction prestress anchorage cable 70, waits for carrying out tensioning fixation after the completion of the maintenance of prestress anchorage cable 70;
(5) and then stage excavation pit earthwork, until bottom of foundation ditch.
Due to being additionally arranged row's prestress anchorage cable 70 in the stake top of rear pile pile 20, prestress anchorage cable 70 be it is vertically arranged, because This, prestress anchorage cable 70 but substantially increases the resistance to capsizing of Double-row-piles Structure not departing from land red-line.
Also, under the action of prestress anchorage cable 70, preceding Guan Liang 30, rear Guan Liang 40 and linking beam are reduced in terms of stress 50 internal force, therefore common Retaining Structure with Double-row Piles is compared, rigidity and intensity with bigger can be adapted for depth in 8m The very poor stratum of above deep basal pit and geological conditions.
The above is merely preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and All any modification, equivalent and improvement made by within principle etc., should all be included in the protection scope of the present invention.

Claims (9)

1. the double-row pile composite construction and its construction method of deep basal pit supporting and retaining system, which is characterized in that be arranged in the soil in deep basal pit sideline In vivo, after including in the preceding pile pile in the multiple in a row-shaped arrangement and embedded soil body and the multiple in a row-shaped arrangement and embedded soil body Pile pile;The stake top of multiple rear pile piles is connected by rear Guan Liang, and the stake top of multiple preceding pile piles is connected by preceding Guan Liang;Institute It states and is connected by multiple linking beams between preceding Guan Liang and rear Guan Liang;Multiple prestress anchorage cables are equipped in Guan Liang after described, it is described The upper end of prestress anchorage cable is fixed in Guan Liang in the rear, under the length direction of the rear pile pile, the prestress anchorage cable End extends downward into the inside of the soil body across the rear Guan Liang.
2. the double-row pile composite construction and its construction method of deep basal pit supporting and retaining system as described in claim 1, which is characterized in that described Guan Liang has away from the upper surface of the foundation pit afterwards, and the upper end of the prestress anchorage cable is fixed in anchor pier, and the anchor pier compresses The upper surface of Guan Liang in the rear.
3. the double-row pile composite construction and its construction method of deep basal pit supporting and retaining system as claimed in claim 2, which is characterized in that described Prestress anchorage cable is arranged between the rear pile pile of adjacent two.
4. the double-row pile composite construction and its construction method of the deep basal pit supporting and retaining system as described in claim 1-3 any one, special Sign is that the lower end of the prestress anchorage cable extends downward into the lower section of the rear pile pile.
5. the double-row pile composite construction and its construction method of the deep basal pit supporting and retaining system as described in claim 1-3 any one, special Sign is that the lower end of the prestress anchorage cable is equipped with reinforcing strip, along the insertion direction for deviating from the prestress anchorage cable, the reinforcing Item is in tilted layout.
6. the double-row pile composite construction and its construction method of deep basal pit supporting and retaining system as claimed in claim 5, which is characterized in that described Reinforcing strip is located at the lower section of the rear pile pile.
7. such as the double-row pile composite construction and its construction method of the deep basal pit supporting and retaining system that claim 5 is stated, which is characterized in that described to add Gu the peripheral surface of item is equipped with multiple barb items distracted upward.
8. the double-row pile composite construction and its construction method of deep basal pit supporting and retaining system as claimed in claim 7, which is characterized in that multiple The barb item is in a row-shaped arrangement along the axial direction of the reinforcing strip, forms barb row;Along the circumferential direction of the reinforcing strip, the reinforcing The peripheral surface of item is provided with multiple rows of barb row separately arranged;In dislocation arrangement between adjacent barb row.
9. the double-row pile composite construction of deep basal pit supporting and retaining system as described in claim 1 and its construction method of construction method, feature It is, including following construction procedure:
(1), it using static pressure or hammer mode, after multiple preceding pile piles of first constructing along the soil body in foundation pit sideline, then constructs more A rear pile pile;
(2) in the stake top of the multiple preceding pile piles construction preceding Guan Liang, after the stake top construction of multiple rear pile piles is described Guan Liang;Pass through multiple linking beams between the preceding Guan Liang and the rear Guan Liang to connect;And to the preceding Guan Liang, the rear hat Beam and the linking beam are conserved;
(3) when the rear Guan Liang of constructing, multiple anchor cable holes, the prestressing force being vertically arranged in order to which construction in later period is multiple are reserved Anchor cable;
(4) Guan Liang is constructed the prestress anchorage cable in the rear, waits for carrying out tensioning fixation after the completion of the prestress anchorage cable maintenance;
(5) and then stage excavation pit earthwork, until bottom of foundation ditch.
CN201810123369.XA 2018-02-07 2018-02-07 The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system Pending CN108316309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810123369.XA CN108316309A (en) 2018-02-07 2018-02-07 The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810123369.XA CN108316309A (en) 2018-02-07 2018-02-07 The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system

Publications (1)

Publication Number Publication Date
CN108316309A true CN108316309A (en) 2018-07-24

Family

ID=62903083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810123369.XA Pending CN108316309A (en) 2018-02-07 2018-02-07 The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system

Country Status (1)

Country Link
CN (1) CN108316309A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113069A (en) * 2018-08-08 2019-01-01 武岳 Precipitous section tunnel immediately adjacent to bridge foundation pit support device and construction method
CN110093933A (en) * 2019-05-10 2019-08-06 吴永红 A kind of foundation pit vertically draws anchor support system and its construction method
CN110205914A (en) * 2019-06-10 2019-09-06 上海勘测设计研究院有限公司 A kind of anti-selection structure for arch bridge base
CN111021369A (en) * 2019-12-31 2020-04-17 深圳宏业基岩土科技股份有限公司 Chair type double-row pile anchor construction method
CN113356239A (en) * 2021-05-25 2021-09-07 深圳市工勘岩土集团有限公司 Slope double-row pile and anchor cable supporting structure
CN113802573A (en) * 2021-09-28 2021-12-17 天津中勘天泽建筑工程设计有限公司 Foundation pit prestress pressing plate type multi-row supporting structure and method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202936798U (en) * 2012-12-05 2013-05-15 昆明理工大学 Double-row pile structure with prestress vertical anchor cables

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202936798U (en) * 2012-12-05 2013-05-15 昆明理工大学 Double-row pile structure with prestress vertical anchor cables

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113069A (en) * 2018-08-08 2019-01-01 武岳 Precipitous section tunnel immediately adjacent to bridge foundation pit support device and construction method
CN110093933A (en) * 2019-05-10 2019-08-06 吴永红 A kind of foundation pit vertically draws anchor support system and its construction method
CN110205914A (en) * 2019-06-10 2019-09-06 上海勘测设计研究院有限公司 A kind of anti-selection structure for arch bridge base
CN111021369A (en) * 2019-12-31 2020-04-17 深圳宏业基岩土科技股份有限公司 Chair type double-row pile anchor construction method
CN113356239A (en) * 2021-05-25 2021-09-07 深圳市工勘岩土集团有限公司 Slope double-row pile and anchor cable supporting structure
CN113356239B (en) * 2021-05-25 2022-11-18 深圳市工勘岩土集团有限公司 Slope double-row pile and anchor cable supporting structure
CN113802573A (en) * 2021-09-28 2021-12-17 天津中勘天泽建筑工程设计有限公司 Foundation pit prestress pressing plate type multi-row supporting structure and method

Similar Documents

Publication Publication Date Title
CN108316309A (en) The double-row pile composite construction and its construction method of deep basal pit supporting and retaining system
CN106522242B (en) For soft stratum close to underground structure foundation pit supporting system construction method
CN102605792B (en) Multi-row mini-pile enclosing structure for blocking soil and construction process
CN105155548B (en) A kind of drag-line double-row pile (wall) supporting construction
CN106759376B (en) For closing on the construction method of the Anchored Sheet Pile Wall for Excavation system of existing underground structure
CN108343068B (en) Composite soil nailing wall and pile anchor supporting composite supporting structure and construction method
CN210598987U (en) Subway station based on single-layer four-guide-hole and middle-guide-hole inner pile foundation
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN109235490B (en) Retaining wall and construction method thereof
CN102561384A (en) Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN101718098B (en) Micro-pile combined dug composite foundation and construction method thereof
CN212052843U (en) Pile foundation structure suitable for soft soil layer
CN106193071A (en) The multiple structure Ecological Slope protection system of a kind of band diaphragm plate and construction method thereof
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN206635768U (en) Composite soil nailing wall and pile-anchor retaining composite supporting construction
KR20120102480A (en) Phc pile with improved end bearing capacity and piling method of phc pile using the same
CN111236278A (en) Slope soft land foundation pile-cable reinforcing structure, reinforcing system and construction method
CN114032932B (en) Construction method of hybrid retaining structure
CN103147443A (en) Foundation pit supporting structure and construction method thereof
CN209907410U (en) Slope reinforcement supporting structure and pile plate retaining wall
CN214497537U (en) Double-row pile supporting system
CN212506313U (en) Combined foundation pit supporting structure
KR20080039020A (en) Phc pile
CN210288408U (en) Foundation pit supporting structure
CN208201886U (en) A kind of supporting construction of foundation pit composite pile wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180724

RJ01 Rejection of invention patent application after publication