CN206635768U CN201720086263.8U CN201720086263U CN206635768U CN 206635768 U CN206635768 U CN 206635768U CN 201720086263 U CN201720086263 U CN 201720086263U CN 206635768 U CN206635768 U CN 206635768U
Authority
CN
China
Prior art keywords
pile
anchor
soil nailing
composite
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720086263.8U
Other languages
Chinese (zh)
Inventor
张娇
孙剑
李强
李芳�
屈正
杨波
于元峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Aidi Geological Engineering Technology Co ltd
Original Assignee
BEIJING AIDI GEOLOGICAL PROSPECTING FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AIDI GEOLOGICAL PROSPECTING FOUNDATION ENGINEERING Co Ltd filed Critical BEIJING AIDI GEOLOGICAL PROSPECTING FOUNDATION ENGINEERING Co Ltd
Priority to CN201720086263.8U priority Critical patent/CN206635768U/en
Application granted granted Critical
Publication of CN206635768U publication Critical patent/CN206635768U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of composite soil nailing wall and pile-anchor retaining composite supporting construction are disclosed in the utility model, composite soil nailing wall and pile-anchor retaining are used in combination, wherein, composite soil nailing wall makes full use of in foundation ditch and carries out appropriate slope using space, so as to reduce the density of the slope protection pile in pile-anchor retaining, construction cost is reduced, while an appropriate number of steel-pipe pile is inserted as auxiliary between slope protection pile, pattern foundation pit supporting structure is carried out with the theory of advance support.It is meanwhile soft for deep backfill, soil property, in order that pile-anchor retaining can play actual supporting effect with composite soil nailing wall, Guan Liang is locked close to the prestressed anchor one end on top on foundation ditch, other end wide-angle oblique cutting enters the boulder bed under backfill stratum, is acted on to form reliable tensioning;Steel pipe is set up between the end of the prestressed anchor of slope section and slope protection pile, so that the stretching force of prestressed anchor is transferred in slope protection pile, and the bad slope boss of not return loss.

Description

Composite soil nailing wall and pile-anchor retaining composite supporting construction
Technical field
Pattern foundation pit supporting structure field is the utility model is related to, more particularly to a kind of composite soil nailing wall and pile-anchor retaining composite support knot Structure.
Background technology
Base pit engineering is that protection underground space open-cut is smoothed out without prejudice with surrounding enviroment and taken interim Supporting and soil stabilization engineering.Two kinds of common support forms of pattern foundation pit supporting structure field are pile-anchor retaining and Composition Soil Nailing Walls. In pattern foundation pit supporting structure, when space meets slope condition, preferred pair foundation pit side-wall carries out slope, is coordinated with less sloping coefficient Composite soil nailing wall carries out supporting.But slope needs to take the space on foundation ditch and periphery, the field being limited for construction space in itself Close, must just increase sloping coefficient or upright excavation, and carry out the pile-anchor retaining of foundation pit side-wall, i.e., coordinated with reinforced concrete pile The form of prestressed anchor carries out side wall supporting.
For above two support form, the support capacity of composite soil nailing wall is limited, and cost is relatively low;Pile-anchor retaining Earth-retaining ability it is strong, but to reach expected retaining support effect, it is necessary to use more slope protection piles, and inserted in inter-pile soil Prestressed anchor, construction cost are higher.Therefore, in work progress, often two kinds of supportings are used in combination, form composite soil nailing Wall and piled anchor composite support system.
But during foundation pit construction, often occur that artificial earth fill's thickness degree is larger in foundation ditch and slope space is smaller Complex working condition, due to the poor mechanical property of back fill course, in stretch-draw prestressing force anchor pole, pre- on composite soil nailing wall should The rod end of power anchor pole can destroy slope boss for the pressure of the soil body, and this not only results in the supporting of composite soil nailing wall by shadow Ring, it is also possible to cause the stress of prestressed anchor to fail.
Utility model content
The purpose of this utility model is to provide the composite support system that a kind of piled anchor is used in conjunction with composite soil nailing wall, and it passes through Stress transferring structure is set between prestressed anchor and slope protection pile so that the stretching force of prestressed anchor can be transmitted effectively To slope protection pile, and slope boss is not destroyed.
Above-mentioned purpose of the present utility model technical scheme is that:A kind of composite soil nailing wall and piled anchor Supporting composite supporting construction, applied on the foundation pit side-wall between ground and bottom of foundation ditch, wrapped successively from ground to bottom of foundation ditch Include the vertical supporting section of at least row's slope protection pile formation, and the slope section that soil nailing face wall is formed, the vertical supporting Duan Yufang Some prestressed anchors are provided with the section of slope, the prestressed anchor of same longitudinal height is all connected to one in slope section Along along the horizontally disposed channel-section steel of prestressed anchor distribution arrangement, steel pipe is provided between channel-section steel and slope protection pile, the two of the steel pipe End contradicts channel-section steel close to the face of soil nailing face wall and the side wall of slope protection pile respectively.
By using above-mentioned technical proposal, the end of prestressed anchor tenses channel-section steel, and power is transferred on channel-section steel, channel-section steel with Steel pipe is set between slope protection pile, and the power that channel-section steel is born finally is transferred to slope protection pile by steel pipe, in the prestressed anchor of slope section A kind of effective force structure is formed by this form between bar and slope protection pile, prevents prestressed anchor in stretching process by soil Soil body crimp between nail face wall and slope protection pile causes slope boss to deform.
Preferably, it is provided with a soil nailing along between longitudinally and/or laterally adjacent prestressed anchor.
By using above-mentioned technical proposal, the supporting effect of prestressed anchor is good, but corresponding cost is high, and work progress It is relatively complicated;And soil nailing low cost supporting effect is not good enough, both are used in combination, interleaves setting, can meet that supporting will While asking, the cost of construction is reduced as far as possible.
Preferably, prestressed anchor passes through the U-shaped bottom of the channel-section steel, and pad is provided with one between prestressed anchor and channel-section steel Billet.
By using above-mentioned technical proposal, billet can increase the resistance surface between the end of prestressed anchor and channel-section steel Product, so that prestressed anchor is relatively reliable to be transferred to channel-section steel by power, and then is transferred to steel pipe and slope protection pile.
Preferably, the slope protection pile is reinforced concrete pile, is all connected at the top of the slope protection pile by Guan Liang.
By using above-mentioned technical proposal, the shear resistance and support capacity of reinforced concrete pile are preferable, and bank protection is used as using it Stake can be very good to play the effect of foundation pit side-wall supporting, and using Guan Liang as slope protection pile at the top of attachment structure, can make entirely Portion's slope protection pile forms an entirety.
Preferably, an at least steel-pipe pile is provided between the adjacent slope protection pile.
By using above-mentioned technical proposal, the supporting effect of reinforced concrete pile is good, but cost is of a relatively high, is made with steel-pipe pile For the auxiliary of adjacent slope protection pile, it is possible to reduce the density of setting of slope protection pile, so as to further reduce construction costs.Also, steel pipe The earth-retaining effect of stake is good, and supporting construction can be made to have the more preferably anti-collapse effect of earth-retaining.
Preferably, at least a line prestressed anchor boom end close to ground locks Guan Liang, and prestressed anchor stretches into the soil body End oblique cutting to pebble layer.
By using above-mentioned technical proposal, prestressed anchor enters the soil body with wide-angle oblique cutting, can make prestressed anchor Anchoring section enters pebble layer through deep backfill stratum, reliably to anchor;And the other end of prestressed anchor locks Guan Liang, So that prestressed anchor can energetically, anchoring section and tensioning section coordinate for tensioning in backfill stratum, prestressed anchor can be with Play the effect of soil body anchoring.
Preferably, the cement mortar filled with solidification in the steel pipe.
By using above-mentioned technical proposal, cement mortar is injected in steel pipe, the power transmission effect of steel pipe in itself can be increased, simultaneously Steel pipe is set to be connected as a single entity with reinforced concrete pile.
In summary, composite soil nailing wall and pile-anchor retaining are used in combination, wherein, composite soil nailing wall is made full use of in foundation ditch Carry out appropriate slope using space, so as to reduce the density of the slope protection pile in pile-anchor retaining, reduce construction cost, at the same An appropriate number of steel-pipe pile is inserted between slope protection pile as auxiliary, pattern foundation pit supporting structure is carried out with the theory of advance support.Meanwhile for Deep backfill, soil property is soft, in order that pile-anchor retaining can play actual supporting effect with composite soil nailing wall, close to foundation ditch Guan Liang is locked in the prestressed anchor one end on top, and other end wide-angle oblique cutting enters the boulder bed under backfill stratum, with shape Acted on into reliable tensioning;Steel pipe is set up between the end of the prestressed anchor of slope section and slope protection pile, with prestressed anchor Stretching force be transferred in slope protection pile, and the bad slope boss of not return loss.
Brief description of the drawings
Fig. 1 is the composite supporting construction view suitable for backfill sloping timbering;
The A portions zoomed-in view that Fig. 2 does for the end construction of display prestressed anchor;
Fig. 3 is the top view of position relationship between display steel-pipe pile and slope protection pile;
Fig. 4 is the topology view of prestressed anchor and the support system of slope protection pile composition at seven meters of underground;
The B portions zoomed-in view that Fig. 5 does for display channel-section steel with steel pipe position relationship;
Fig. 6 is the topology view of steel pipe;
In figure, 1, ground;11st, back fill course;12nd, pebble layer;2nd, slope protection pile;3rd, steel-pipe pile, 4, composite soil nailing wall; 41st, soil nailing face wall;5th, Guan Liang;6th, soil nailing;7th, prestressed anchor;71st, anchoring section;72nd, tensioning section;73rd, billet;8th, steel pipe; 9th, channel-section steel.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment 1
A kind of composite soil nailing wall suitable for backfill and pile-anchor retaining composite supporting construction, as shown in figure 1, applied to ground Foundation pit side-wall under face 1, that there is deep back fill course 11, including steel-pipe pile 3, slope protection pile 2, soil nailing face wall 41, prestressing force Anchor pole 7.
As shown in figure 3, slope protection pile 2 is reinforced concrete pile, in order to increase the earth-retaining ability of support system, and increase not too much Add the cost of support system, two steel-pipe piles 3 are inserted between adjacent slope protection pile 2, slope protection pile 2 is collectively forming gear with steel-pipe pile 3 Soil structure.The cost of steel-pipe pile 3 is less than the slope protection pile 2 that reinforced concrete pile is done, and its earth-retaining ability can substantially meet phase Earth-retaining between adjacent slope protection pile 2 needs.Stake spacing between adjacent slope protection pile 2 is determined by the geological condition fed back during geological prospecting It is fixed.Meanwhile Guan Liang 5 is done in the top of slope protection pile 2 according to existing stake top, by the slope protection pile 2 of supporting on foundation pit side-wall and Steel-pipe pile 3 connects into an entirety, prevents vertical side slope top of the slope from deforming.
With reference to Fig. 1, there are embedded slope protection pile 2 and steel-pipe pile 3, steel-pipe pile 3 and steel pipe in ground 1 is arranged below on foundation pit side-wall The prestressed anchor 7 of inter-pile soil between stake 3, meanwhile, prestressed anchor 7 is along more slope protection piles 2 and the arrangement side of steel-pipe pile 3 To being uniformly distributed.Because the back fill course 11 of the lower section of ground 1 is relatively deep, in order to ensure the anchoring of the prestressed anchor 7 close to ground 1 Power is enough, and the end of prestressed anchor 7 needs guiding through the bottom of back fill course 11, so that the anchoring section 71 of prestressed anchor 7 stretches into Pebble layer 12 under back fill course 11, therefore, the one of upper end drains into a few row's prestressed anchors 7 passes through backfill with wide-angle Layer 11, pebble layer 12 of the end anchorage to back fill course below 11, and stretching force is transferred to the soil body from tensioning section.Wherein, Extending for anchoring section 71, anchoring section 71 to the direction of Guan Liang 5 for the top of pebble layer 12 and the bottom of back fill course 11 is inserted, directly It is tensioning section 72 to the part of Guan Liang 5 is locked.Meanwhile spacing is smaller between adjacent prestressed anchor 7, prestressed anchor 7 can To provide enough pulling force, ensure the stability of the slopes of back fill course 11.
With reference to Fig. 1, according to 1 in the seven meters of sections to bottom of foundation ditch below 1 of ground:0.6 gradient carries out slope, and certainly The domatic soil body interpolation to after domatic enters soil nailing 6, and carries out spraying mixed supporting to domatic, forms soil nailing face wall 41, soil nailing face wall 41 With forming composite soil nailing wall 4, i.e. composite soil nailed wall together with soil nailing 6.
Along the orientation of more slope protection piles 2, soil nailing 6 interleaves distribution with prestressed anchor 7;Along the height side of foundation pit side-wall To soil nailing 6 also interleaves distribution with prestressed anchor 7.Prestressed anchor is replaced by equivalent to by the part soil nailing 6 in soil nailing face wall 41 Bar 7, while the cost of pure pile-anchor retaining is reduced, retain the support capacity of prestressed anchor 7, make itself and soil nailing 6 one Rise and form supporting.
With reference to Fig. 2 and Fig. 4, on foundation pit side-wall, the prestressed anchor 7 of the top is locked in Guan Liang 5, and several rows of lower section in advance should Power anchor pole 7 is lock onto on foundation pit side-wall by one along the horizontally disposed channel-section steel 9 of foundation pit side-wall.Prestressed anchor 7 passes through channel-section steel 9 Bottom wall enter the soil body, between rod end and the bottom land of channel-section steel 9 pad be provided with a billet 73, the end of prestressed anchor 7 passes through steel Backing plate 73 is compacted to the bottom land of channel-section steel 9, then is compacted to by the outer bottom of channel-section steel 9 on foundation pit side-wall.
In order to prevent prestressed anchor 7 into the soil body during tensioning, the outer bottom of the end of prestressed anchor 7 or channel-section steel 9 will The slope boss of composite soil nailing wall 4 damages by pressure, and ensures that the stretching force of prestressed anchor 7 can be effectively transferred in slope protection pile 2, base In the slope section for cheating side wall, more steel pipes 8 are provided between the outer bottom of channel-section steel 9 and slope protection pile 2, steel pipe 8 is uniformly by slope protection pile 2 Support.Meanwhile the casting concrete into steel pipe 8, after concrete final set, composite soil nailing wall 4 is organically combined with slope protection pile 2, To strengthen the effect of the transmission power between composite soil nailing wall 4 and slope protection pile 2, strengthen supporting effect.
With reference to Fig. 5 and Fig. 6, steel pipe 8 sets arc tips 81, the shape and bank protection of arc tips 81 close to one end of slope protection pile 2 The outer wall shape adaptation of stake 2, so that prestressed anchor 7 can effective stress.In order that 7 effective stress of prestressed anchor and transmitting Power is not limited to the end of steel pipe 8 making arc tips 81 to slope protection pile 2, can also be directly by the side wall of slope protection pile 2 with air drill A plane is processed, is reliably contradicted with the end with steel pipe 8.
Embodiment 2
A kind of construction method of composite support suitable for deep backfill foundation ditch, its step are as follows:
S1:Earth excavation is to operation side absolute altitude, and the foundation depth designed according to initial stage and distance are vertical from ground 1 Drilling downwards, forms some stake holes, according to stake holes diameter banding steel cage, transfers to stake holes, and pours into a mould, and forms reinforced concrete Native stake;
S2:Regard soil layer situation between adjacent reinforced concrete stake, the at most root steel-pipe pile 3 of insertion one, and to steel-pipe pile 3 Interior injection cement mortar;
S3:Guan Liang 5 is done at the top of the reinforced concrete pile of whole, the top of the slope protection pile 2 of whole is connected as a single entity, is passed through Cross at steel-pipe pile 3, can be connected with the mode of bar planting;
S4:To inserting soil nailing 6 and prestressed anchor 7 between slope protection pile 2 and steel-pipe pile 3, steel-pipe pile 3 and steel-pipe pile 3, It is also, close along the arragement direction and top of the slope of slope protection pile 2 to bottom of slope direction, soil nailing 6 and the alternate arrangement of prestressed anchor 7 The prestressed anchor 7 on ground 1 locks Guan Liang 5, and inserts the soil body with wide-angle, ensures that the anchoring section 71 of prestressed anchor 7 stretches into In pebble layer 12;
S5:In the bearing of prestressed anchor 7, fixed steel pipe 8, at this point it is possible to select to contradict steel pipe 8 to slope protection pile 2 Arc tips 81 are done in end, or process hole in slope protection pile 2 with pneumatic pick, and steel pipe 8 and slope protection pile 2 is tentatively fixed;
S6:One end that the other end and prestressed anchor 7 of steel pipe 8 expose composite soil nailing wall 4 is fixedly connected with channel-section steel 9, and The end of prestressed anchor 7 is pushed against by channel-section steel 9 by nut and anchor-rod tray, is allowed to possess enough stretching forces;
S7:Slope section it is domatic on, be that fixing point hangs reinforced mesh in the end of soil nailing 6, and gunite concrete, formed Overall soil nailing face wall 41.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.

Claims (7)

1. a kind of composite soil nailing wall and pile-anchor retaining composite supporting construction, applied to the foundation pit side-wall between ground and bottom of foundation ditch On, from ground to bottom of foundation ditch successively include at least row's slope protection pile formed vertical supporting section, and soil nailing face wall formed Slope section, it is characterized in that:The vertical supporting section is same in slope section with being provided with some prestressed anchors in slope section The prestressed anchor of longitudinal height is all connected to one along the horizontally disposed channel-section steel of prestressed anchor distribution arrangement, channel-section steel with Steel pipe is provided between slope protection pile, the both ends of the steel pipe contradict channel-section steel close to the face of soil nailing face wall and the side of slope protection pile respectively Wall.
2. composite soil nailing wall according to claim 1 and pile-anchor retaining composite supporting construction, it is characterized in that:Along longitudinal direction and/ Or a soil nailing is provided between laterally adjacent prestressed anchor.
3. composite soil nailing wall according to claim 2 and pile-anchor retaining composite supporting construction, it is characterized in that:Prestressed anchor Through the U-shaped bottom of the channel-section steel, and pad is provided with a billet between prestressed anchor and channel-section steel.
4. composite soil nailing wall according to claim 1 and pile-anchor retaining composite supporting construction, it is characterized in that:The slope protection pile For reinforced concrete pile, all connected at the top of the slope protection pile by Guan Liang.
5. composite soil nailing wall according to claim 4 and pile-anchor retaining composite supporting construction, it is characterized in that:The adjacent shield An at least steel-pipe pile is provided between the stake of slope.
6. composite soil nailing wall according to claim 5 and pile-anchor retaining composite supporting construction, it is characterized in that:Close to ground At least a line prestressed anchor boom end locks Guan Liang, and prestressed anchor stretches into the end oblique cutting of the soil body to pebble layer.
7. composite soil nailing wall according to claim 1 and pile-anchor retaining composite supporting construction, it is characterized in that:In the steel pipe Cement mortar filled with solidification.
CN201720086263.8U 2017-01-22 2017-01-22 Composite soil nailing wall and pile-anchor retaining composite supporting construction Withdrawn - After Issue CN206635768U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720086263.8U CN206635768U (en) 2017-01-22 2017-01-22 Composite soil nailing wall and pile-anchor retaining composite supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720086263.8U CN206635768U (en) 2017-01-22 2017-01-22 Composite soil nailing wall and pile-anchor retaining composite supporting construction

Publications (1)

Publication Number Publication Date
CN206635768U true CN206635768U (en) 2017-11-14

Family

ID=60260359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720086263.8U Withdrawn - After Issue CN206635768U (en) 2017-01-22 2017-01-22 Composite soil nailing wall and pile-anchor retaining composite supporting construction

Country Status (1)

Country Link
CN (1) CN206635768U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343068A (en) * 2017-01-22 2018-07-31 北京爱地地质勘察基础工程公司 Composite soil nailing wall and pile-anchor retaining composite supporting construction and construction method
CN111519485A (en) * 2020-04-30 2020-08-11 中国建筑第八工程局有限公司 Connecting channel between foundation pits and construction method thereof
CN111535335A (en) * 2020-05-27 2020-08-14 平煤神马建工集团有限公司 Railway near-edge deep foundation pit supporting method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343068A (en) * 2017-01-22 2018-07-31 北京爱地地质勘察基础工程公司 Composite soil nailing wall and pile-anchor retaining composite supporting construction and construction method
CN108343068B (en) * 2017-01-22 2023-08-29 北京爱地地质工程技术有限公司 Composite soil nailing wall and pile anchor supporting composite supporting structure and construction method
CN111519485A (en) * 2020-04-30 2020-08-11 中国建筑第八工程局有限公司 Connecting channel between foundation pits and construction method thereof
CN111535335A (en) * 2020-05-27 2020-08-14 平煤神马建工集团有限公司 Railway near-edge deep foundation pit supporting method

Similar Documents

Publication Publication Date Title
CN108343068A (en) Composite soil nailing wall and pile-anchor retaining composite supporting construction and construction method
CN102021911B (en) Side slope reinforcing method and structure
CN102828518B (en) Construction method for manual hole digging support pile prestress anchor cable anchoring structure
CN105525627B (en) A kind of two-way anchor fixed board retaining wall and its construction method
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN206635768U (en) Composite soil nailing wall and pile-anchor retaining composite supporting construction
CN103352477A (en) Vertical pres-stressed anchor rod gravity-type composite retaining wall and method for designing and constructing retaining wall
CN106677192A (en) Row pile anchoring cement soil pile continuous wall supporting structure and construction process thereof
CN211898463U (en) Reinforcing device combining micro-steel pipe pile and anchor rod
CN205382507U (en) Two -way anchored retaining wall by tie rods
CN104863177A (en) Composite retaining wall structure and construction method thereof
CN205225280U (en) A combined supporting structure that is used for steel -pipe pile bar planting tunnel composite lining of soft base
CN112982431A (en) Construction method of foundation pit supporting structure
CN104631432A (en) Flexible supporting system for prestress anchor supporting plate of sheet-pile retaining wall and construction method
CN205954638U (en) Half semi -rigid flexible supporting construction of deep basal pit lateral wall
CN109322313B (en) Foundation pit enclosure structure system and its construction method
CN112681347A (en) Combined supporting structure for treating dangerous rock mass and construction method thereof
CN212077981U (en) Combined slope supporting structure
CN101793027B (en) Core-grouted static pressure anchor rod pile
PT788572E (en) PROCESS FOR THE CALCULATION OF BUILDINGS
CN201908313U (en) Side slope reinforcement structure
CN108914947A (en) Foundation pit anchor wall draws the construction method of anchor supporting and its supporting construction of drilling tool and formation
CN107630706A (en) A kind of tunnel bottom structure and construction method for eliminating highland nip tunnel inverted arch protuberance
CN114032932A (en) Construction method of mixed retaining structure
CN208996052U (en) The drilling tool of supporting construction and use that foundation pit anchor wall draws anchor supporting to be formed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 23 Jinyuanzhuang Road, Shijingshan District, Beijing, 100144

Patentee after: Beijing Aidi Geological Engineering Technology Co.,Ltd.

Address before: 23 Jinyuanzhuang Road, Shijingshan District, Beijing, 100144

Patentee before: BEIJING AIDI GEOLOGICAL INVESTIGATION & FOUNDATION CONSTRUCTION CO.

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20171114

Effective date of abandoning: 20230829

AV01 Patent right actively abandoned

Granted publication date: 20171114

Effective date of abandoning: 20230829