CN107630706A - A kind of tunnel bottom structure and construction method for eliminating highland nip tunnel inverted arch protuberance - Google Patents

A kind of tunnel bottom structure and construction method for eliminating highland nip tunnel inverted arch protuberance Download PDF

Info

Publication number
CN107630706A
CN107630706A CN201711002734.3A CN201711002734A CN107630706A CN 107630706 A CN107630706 A CN 107630706A CN 201711002734 A CN201711002734 A CN 201711002734A CN 107630706 A CN107630706 A CN 107630706A
Authority
CN
China
Prior art keywords
tunnel
steel pipe
inverted arch
backbreaking
relief hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711002734.3A
Other languages
Chinese (zh)
Other versions
CN107630706B (en
Inventor
胡义新
吴启
徐庭
熊天祥
丁力
高俊
陈林尧
刘亮
李世彪
何海清
陈波
凌明
刘杰
方向
周永鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201711002734.3A priority Critical patent/CN107630706B/en
Publication of CN107630706A publication Critical patent/CN107630706A/en
Application granted granted Critical
Publication of CN107630706B publication Critical patent/CN107630706B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to Curing of Tunnel Diseases technical pattern field, in particular to a kind of tunnel bottom structure and construction method for eliminating highland nip tunnel inverted arch protuberance.Including inverted arch and backfill layer of backbreaking;Backbreak backfill layer interior edge tunnel lateral direction direction interval be drilled with multigroup relief hole, every group of relief hole includes multiple relief holes along the longitudinally spaced arrangement in tunnel;Relief hole lower end is extend into country rock square under tunnel;Offered on inverted arch a plurality of along the spaced apart gutter in tunnel lateral direction direction;One group of steel pipe is disposed with gutter;Rubble, steel pipe, the porosity communication backbreak in backfill layer and relief hole are filled with steel pipe.The tunnel bottom structure arrangement of the present invention is orderly, and working procedure is convenient compact, economic and environment-friendly significant effect.When preventing inverted arch because of high stress generation bulge fracture straight up, this method can effectively discharge crustal stress and discharge high water level underground water, so as to eliminate the potential safety hazard of tunnel later stage operation, reached prevention inverted arch and swelled the effect effected a permanent cure.

Description

A kind of tunnel bottom structure and construction method for eliminating highland nip tunnel inverted arch protuberance
Technical field
The present invention relates to Curing of Tunnel Diseases technical pattern field, and it is grand to eliminate highland nip tunnel inverted arch in particular to one kind The tunnel bottom structure and construction method risen.
Background technology
Under the nip environment of highland, due to the collective effect of high stress sum, the tunnel built changes over time, under inverted arch Inverted arch bulge fracture phenomenon occurs in crustal stress slow release.In order to ensure that the tunnel later stage runs the good condition being open to traffic, in tunnel Road applies man-hour requirement and takes certain technological means to prevent inverted arch protuberance, and existing technical method typically has three kinds:Tunnel bottom surface Injection overlength underground anchor rod, uplift pile, grouting and reinforcing.These three technical methods are to be clicked through using resisting upward crustal stress to set out Row site operation, the effect for preventing that inverted arch from swelling, but accumulation over time, surrouding rock stress are served within the regular hour Slow release causes the upward crustal stress increase of inverted arch lower vertical, and so as to produce inverted arch bulge fracture, existing technical method is only The effect taken stopgap measures and can not effected a permanent cure can be played.
Have entitled " a kind of tunnel bottom structure for reducing existing tunnel inverted arch water pressure " of Patent No. " CN206092002U " Chinese utility model patent describe a kind of tunnel bottom structure, by tunnel bottom arrange inverted arch packed layer, in inverted arch The longitudinally disposed Central drain in heart position, relief hole is drilled with Central drain and inverted arch packed layer, by being installed in relief hole Pressure release steel pipe, the underground water in country rock is discharged in Central drain using steel pipe, so as to discharge groundwater pressure, avoids country rock Interior hydraulic pressure is too high to produce destruction to tunnel bottom.Although the tunnel bottom structure is relatively easy, actually due to pacifying in relief hole Dress pressure release steel pipe is unfavorable for the discharge of underground water, and because steel pipe only has bottom and sidepiece to be provided with outlet, underground water can only lead to Cross steel pipe sidepiece and bottom is entered in steel pipe, drainage rates are too low, and the steel pipe for offering apopore is drilled into country rock in addition It is interior, difficulty of construction is virtually improved, its intensity significantly declines after steel pipe perforate, is unfavorable for piling construction.And actually Steel pipe is unfavorable for the dissipation of crustal stress, easily causes inverted arch protuberance, do not reach dissipation crustal stress as a rigid member Purpose.
The content of the invention
Present invention aim to the tunnel bottom structure for the prior art for solving to mention in above-mentioned background technology to be unfavorable for ground Lower water discharge, also it is unfavorable for the problem of crustal stress dissipates, there is provided a kind of tunnel bottom structure for eliminating highland nip tunnel inverted arch protuberance And construction method.
The technical scheme is that:A kind of tunnel bottom structure for eliminating highland nip tunnel inverted arch protuberance, including positioned at tunnel The inverted arch of road bottom, it is characterised in that:Also include the backfill layer of backbreaking below inverted arch;Described backfill layer of backbreaking is rubble The pore structure of filling, backbreaking to backfill is drilled with multiple relief holes in country rock below layer, multiple relief holes installations are laterally in a row, vertical Side under tunnel is arranged in array pattern in column;Described relief hole lower end is extend into country rock square under tunnel, its upper end Maintain an equal level with the lower end for backfill layer of backbreaking, rubble is filled with relief hole;Described inverted arch is to pour in mixed on backfill layer of backbreaking Soil layer is coagulated, is offered on inverted arch a plurality of along the spaced apart gutter in tunnel lateral direction direction;Described gutter is to be indulged along tunnel To the water leg of arrangement, one group of steel pipe is disposed with gutter, every group of steel pipe includes the steel more along the longitudinally spaced arrangement in tunnel Pipe;Rubble is filled with described steel pipe, steel pipe lower end, which is extend into, backbreaks in backfill layer, steel pipe, backbreak backfill layer and relief hole Interior porosity communication.
Further described steel pipe vertically penetrates gutter, and lower end extend into backfill layer of backbreaking, and its upper end is high It is less than the upper surface of inverted arch in gutter bottom surface.
Every further described steel pipe is in a lateral direction between two neighboring relief hole, steel pipe and relief hole In the vertical direction is not overlapping.
Further described diameter of steel tube is 20~40cm, and length is 1~2m, along between the adjacent steel pipe in tunnel lateral direction direction Every 4~5m, the adjacent 10~15m of steel pipe interval being in along tunnel longitudinal direction in same gutter.
Further described steel pipe lower end extend into 20~40cm in backfill layer of backbreaking, and gutter bottom surface is stretched out in its upper end 10~20cm.
A kind of construction method for eliminating highland nip tunnel inverted arch protuberance, it is characterised in that:Treat that Tunnel is completed Afterwards, tunnel bottom is carried out excavating formation and backbreak filling region, the country rock below filling region of backbreaking is drilled with relief hole, to letting out Backfill rubble forms backfill layer of backbreaking in pressure hole and filling region of backbreaking, and steel pipe lower end is embedded in the rubble for backfill layer of backbreaking It is interior, and steel pipe upper end is exposed gutter bottom surface to be poured, steel pipe is pre-buried to be completed to fill rubble to upper pipes in backward steel pipe Mouthful, then form the inverted arch with a plurality of gutter in casting concrete on backfill layer of backbreaking.
Further tunnel bottom excavate and form the method for filling region of backbreaking and be:To under inverted arch design section Fang Jinhang is excavated, and excavating 40~60cm downwards along the lower end of inverted arch design section forms filling region of backbreaking.
The method that further country rock below filling region of backbreaking is drilled with relief hole is:Along tunnel lateral direction direction interval 2~4m, 5~8m of longitudinal direction interval are drilled with a diameter of 10~30cm, lower end vertically to the country rock below filling region of backbreaking It extend into the relief hole of 20~30m in country rock, the relief hole of first symmetrical construction tunnel lateral direction both sides, according still further to from tunnel lateral direction side Direction among portion to tunnel carries out pressure release hole drill and plays construction successively.
Rubble is further backfilled in filling region to relief hole and backbreaking form the method for backfill layer of backbreaking and be:Drill Cheng Hou, the rubble that particle diameter is 3~5cm is backfilled into relief hole and filling region of backbreaking, make the rubble in relief hole and backbreak back Porosity communication between rubble in packing course.
Further comprise the following steps:1), after the completion of Tunnel, along the lower end of inverted arch design section downwards Excavate 40~60cm and form backfill region of backbreaking;
2), vertically it is extend into 20 in country rock to 10~30cm of country rock construction diameter below backfill region of backbreaking, lower end ~30m relief hole, form the relief hole hole group along 2~4m of tunnel lateral direction interval, 5~8m of longitudinal direction interval;
3), backfill the rubble that particle diameter is 3~5cm into relief hole and backfill region of backbreaking and form backfill layer of backbreaking;
4) it is, the vertical of 1~2m in backbreak pre-buried a diameter of 20~40cm, length on backfill layer along gutter design attitude Steel pipe, the pre-buried finger in 20~40cm of steel pipe lower end part is backbreak in backfill layer, 3~5cm rubble is filled into steel pipe to steel The upper end of pipe;
5) inverted arch with a plurality of gutter, is formed in casting concrete on backfill layer of backbreaking, row is exposed into steel pipe upper end 10~20cm of ditch bottom surface, after inverted arch coagulation soil stabilization, complete the construction of tunnel bottom structure.
Advantages of the present invention has:1st, by setting relief hole and rubble being filled into relief hole, soil layer below inverted arch is made Crustal stress can effectively be discharged, and the underground water in country rock can also be discharged by relief hole, with effectively reducing country rock Destruction of the stress to inverted arch;
2nd, by setting steel pipe connection backfill layer of backbreaking effectively can to draw underground water, and steel pipe can also ensure that and face upward Arch has good intensity, will not cause the damage of inverted arch structure because of excavating to drill;
3rd, by the way that the rubble in relief hole, the rubble in the backbreak rubble and steel pipe that backfill layer are carried out into porosity communication, make Underground water carries out rapid osmotic discharge by capillarity, effectively reduces destruction of the crustal stress to inverted arch.
The tunnel bottom structure arrangement of the present invention is orderly, and working procedure is convenient compact, economic and environment-friendly significant effect.In prevention inverted arch Because when high stress produces bulge fracture straight up, this method can effectively discharge crustal stress and discharge high water level underground Water, so as to eliminate the potential safety hazard of tunnel later stage operation, the effect that prevention inverted arch protuberance effects a permanent cure is reached.
Brief description of the drawings
Fig. 1:Backbreak and backfill filling crushed stone schematic diagram in layer and relief hole;
Fig. 2:The structural representation of embedded steel tube;
Fig. 3:The constructing structure schematic diagram of the present invention;
Wherein:1-preliminary bracing;2-inverted arch;3-backfill layer of backbreaking;4-gutter;5-steel pipe;6-relief hole.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1~3, a kind of tunnel bottom structure for eliminating highland nip tunnel inverted arch protuberance, the preliminary bracing 1 in tunnel is completed Afterwards, excavated in the lower section of the design section of inverted arch 2, excavate 40~60cm downwards and form backfill region of backbreaking, this part is backbreak backfill Region be used for backfill rubble formed backbreak backfill layer 3, by rubble filling can the ready-made supporting layer with many holes, hole Structure can effectively be dissipated crustal stress, and pore structure can be discharged underground water by capillarity in addition, avoid hydraulic pressure excessive, Destruction to inverted arch 2.
In order to quickly come out the underground water discharge in country rock square under tunnel, the present embodiment is in backfill layer 3 of backbreaking The country rock internal drilling of lower section, as shown in Figures 1 to 3, the present embodiment bores relief hole 6 on country rock, along tunnel lateral direction direction interval 2~ 4m, 5~8m of longitudinal direction interval are drilled with a diameter of 10~30cm, lower end to the country rock below filling region of backbreaking and vertically stretched into 20~30m relief hole 6 in country rock, be filled with rubble in relief hole 6, and rubble in relief hole 6 and backbreaking is backfilled in layer 3 Rubble is connection on hole, and underground water can be discharged by the space between rubble, in addition filled with broken in relief hole 6 Stone, is effectively equivalent to a flexible strain relief, and crustal stress can be released by extruding rubble hole.
The inverted arch 2 of the present embodiment is concrete layer, is offered on inverted arch 2 a plurality of along the spaced apart row in tunnel lateral direction direction Ditch 4, gutter 4 are the water leg being longitudinally arranged along tunnel, and one group of steel pipe 5, every group of steel pipe 5 are disposed with every gutter 4 Including the steel pipe 5 more along the longitudinally spaced arrangement in tunnel, rubble is filled with steel pipe 5.The steel pipe 5 of the present embodiment is conduit knot Structure, for discharging underground water, steel pipe 5 vertically penetrates gutter 4, and lower end extend into backfill layer 3 of backbreaking, and its upper end is higher than The bottom surface of gutter 4 is less than the upper surface of inverted arch 2.Every steel pipe 5 is in a lateral direction between two neighboring relief hole 6, steel Pipe 5 and the in the vertical direction of relief hole 6 be not overlapping.5 a diameter of 20~40cm of steel pipe, length is 1~2m, along tunnel lateral direction direction Adjacent steel pipe 5 is spaced 4~5m, and the adjacent steel pipe 5 being in along tunnel longitudinal direction in same gutter is spaced 10~15m.Steel pipe 5 Lower end extend into 20~40cm in backfill layer 3 of backbreaking, and the 10~20cm of bottom surface of gutter 4 is stretched out in its upper end.Steel pipe 5, backfill of backbreaking Porosity communication in layer 3 and relief hole 6.Underground water is discharged in gutter 4 by capillarity.
During practice of construction:1st, after the completion of Tunnel 1,40 are excavated downwards along the lower end of the design section of inverted arch 2~ 60cm forms backfill region of backbreaking;
2nd, vertically extend into 20 in country rock to 10~30cm of country rock construction diameter below backfill region of backbreaking, lower end~ 30m relief hole 6, form the hole group of relief hole 6 along 2~4m of tunnel lateral direction interval, 5~8m of longitudinal direction interval;
3rd, backfill the rubble that particle diameter is 3~5cm into relief hole 6 and backfill region of backbreaking and form backfill layer 3 of backbreaking, such as scheme Shown in 1;
4th, it is the perpendicular of 1~2m in backbreak pre-buried a diameter of 20~40cm, length on backfill layer 3 along the design attitude of gutter 4 To steel pipe 5, the pre-buried finger in the 20~40cm of lower end of steel pipe 5 part is backbreak in backfill layer 3, as shown in Fig. 2 filling 3 into steel pipe 5 ~5cm rubble is to the upper end of steel pipe 5;
5th, the inverted arch 2 with a plurality of gutter 4 is formed in casting concrete on backfill layer 3 of backbreaking, the upper end of steel pipe 5 is exposed 10~the 20cm of bottom surface of gutter 4, as shown in figure 3, after the coagulation soil stabilization of inverted arch 2, complete the construction of tunnel bottom structure.
The rubble of the present embodiment is 3~5cm grain-size grade rubble.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The principle of invention, various changes and modifications of the present invention are possible without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent defines.

Claims (10)

1. a kind of tunnel bottom structure for eliminating highland nip tunnel inverted arch protuberance, including the inverted arch (2) positioned at tunnel bottom, its feature It is:Also include the backfill layer (3) of backbreaking below inverted arch (2);The described hole that backfill layer (3) is rubble filling of backbreaking Structure, backbreaking to backfill is drilled with multiple relief holes (6) in country rock below layer (3), multiple relief holes (6) are according to laterally in a row, vertical Side under tunnel is arranged in array pattern in column;Described relief hole (6) lower end is extend into country rock square under tunnel, thereon Hold and the backbreak lower end of backfill layer (3) maintains an equal level, and is filled with rubble in relief hole (6);Described inverted arch (2) is pours in backbreaking back Concrete layer on packing course (3), offer on inverted arch (2) a plurality of along the spaced apart gutter in tunnel lateral direction direction (4);It is described Gutter (4) be the water leg that is longitudinally arranged along tunnel, is disposed with one group of steel pipe (5), every group of steel pipe in every gutter (4) (5) steel pipe (5) more along the longitudinally spaced arrangement in tunnel is included;Rubble, steel pipe (5) lower end are filled with described steel pipe (5) It extend into and backbreaks in backfill layer (3), steel pipe (5), the porosity communication backbreak in backfill layer (3) and relief hole (6).
A kind of 2. tunnel bottom structure for eliminating highland nip tunnel inverted arch protuberance as claimed in claim 1, it is characterised in that:It is described Steel pipe (5) vertically penetrate gutter (4), lower end extend into backfill layer (3) of backbreaking, and its upper end is higher than gutter (4) Bottom surface is less than the upper surface of inverted arch (2).
A kind of 3. tunnel bottom structure for eliminating highland nip tunnel inverted arch protuberance as claimed in claim 2, it is characterised in that:It is described Every steel pipe (5) in a lateral direction between two neighboring relief hole (6), steel pipe (5) is with relief hole (6) in vertical side It is not overlapping upwards.
A kind of 4. tunnel bottom structure for eliminating highland nip tunnel inverted arch protuberance as claimed in claim 3, it is characterised in that:It is described Steel pipe (5) a diameter of 20~40cm, length is 1~2m, along the adjacent steel pipe in tunnel lateral direction direction (5) be spaced 4~5m, along tunnel The adjacent steel pipe (5) that longitudinal direction is in same gutter is spaced 10~15m.
A kind of 5. tunnel bottom structure for eliminating highland nip tunnel inverted arch protuberance as claimed in claim 4, it is characterised in that:It is described Steel pipe (5) lower end extend into 20~40cm in backfill layer (3) of backbreaking, gutter (4) 10~20cm of bottom surface is stretched out in its upper end.
A kind of 6. construction method for eliminating highland nip tunnel inverted arch protuberance, it is characterised in that:Treat that Tunnel (1) is completed Afterwards, tunnel bottom being carried out excavating formation and backbreak filling region, the country rock below filling region of backbreaking is drilled with relief hole (6), Into relief hole (6) and filling region of backbreaking, backfill rubble forms backfill layer (3) of backbreaking, and steel pipe (5) lower end is embedded in and backbreak In the rubble for backfilling layer (3), and steel pipe (5) upper end is set to expose gutter to be poured (4) bottom surface, after the completion of steel pipe (5) is pre-buried Rubble is filled in steel pipe (5) to upper end tube nozzle, then being formed in casting concrete on backfill layer (3) of backbreaking has a plurality of draining The inverted arch (2) of ditch (4).
A kind of 7. construction method for eliminating highland nip tunnel inverted arch protuberance as claimed in claim 6, it is characterised in that:To tunnel Road bottom carries out excavating the method for forming filling region of backbreaking:To being excavated below inverted arch (2) design section, along inverted arch (2) lower end of design section excavates 40~60cm and forms filling region of backbreaking downwards.
A kind of 8. construction method for eliminating highland nip tunnel inverted arch protuberance as claimed in claim 6, it is characterised in that:Super The country rock dug below filling region is drilled with the method for relief hole (6):Along between tunnel lateral direction direction 2~4m of interval, longitudinal direction Every 5~8m to the country rock below filling region of backbreaking be drilled with a diameter of 10~30cm, lower end vertically extend into 20 in country rock~ 30m relief hole (6), the relief hole (6) of first symmetrical construction tunnel lateral direction both sides, in from tunnel lateral direction both sides to tunnel Between direction carry out successively relief hole (6) bore play construction.
A kind of 9. construction method for eliminating highland nip tunnel inverted arch protuberance as claimed in claim 6, it is characterised in that:To letting out Pressure hole (6) and backfill rubble in filling region of backbreaking form to backbreak and backfill the method for layer (3) and be:After the completion of drilling, to relief hole (6) and in filling region of backbreaking backfill particle diameter is 3~5cm rubble, makes the rubble in relief hole (6) and backbreak to backfill layer (3) Porosity communication between interior rubble.
A kind of 10. construction method for eliminating highland nip tunnel inverted arch protuberance as claimed in claim 6, it is characterised in that:Bag Include following steps:1), after the completion of Tunnel (1), 40~60cm is excavated downwards along the lower end of inverted arch (2) design section Formation, which is backbreak, backfills region;
2), vertically it extend into 20~30m in country rock to 10~30cm of country rock construction diameter below backfill region of backbreaking, lower end Relief hole (6), form relief hole (6) Kong Qun along 2~4m of tunnel lateral direction interval, 5~8m of longitudinal direction interval;
3), backfill the rubble that particle diameter is 3~5cm into relief hole (6) and backfill region of backbreaking and form backfill layer (3) of backbreaking;
4) it is, the perpendicular of 1~2m in backbreak pre-buried a diameter of 20~40cm on backfill layer (3), length along gutter (4) design attitude To steel pipe (5), the pre-buried finger in steel pipe (5) 20~40cm of lower end part is backbreak in backfill layer (3), to steel pipe (5) in filling 3~ 5cm rubble to steel pipe (5) upper end;
5) inverted arch (2) with a plurality of gutter (4), is formed in casting concrete on backfill layer (3) of backbreaking, by steel pipe (5) Gutter (4) 10~20cm of bottom surface is exposed at end, after inverted arch (2) coagulation soil stabilization, completes the construction of tunnel bottom structure.
CN201711002734.3A 2017-10-24 2017-10-24 Tunnel bottom structure for eliminating tunnel inverted arch bulge in high-earth-pressure area and construction method Active CN107630706B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711002734.3A CN107630706B (en) 2017-10-24 2017-10-24 Tunnel bottom structure for eliminating tunnel inverted arch bulge in high-earth-pressure area and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711002734.3A CN107630706B (en) 2017-10-24 2017-10-24 Tunnel bottom structure for eliminating tunnel inverted arch bulge in high-earth-pressure area and construction method

Publications (2)

Publication Number Publication Date
CN107630706A true CN107630706A (en) 2018-01-26
CN107630706B CN107630706B (en) 2023-05-26

Family

ID=61106238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711002734.3A Active CN107630706B (en) 2017-10-24 2017-10-24 Tunnel bottom structure for eliminating tunnel inverted arch bulge in high-earth-pressure area and construction method

Country Status (1)

Country Link
CN (1) CN107630706B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316062A (en) * 2018-02-11 2018-07-24 中铁二院工程集团有限责任公司 A kind of control device and its construction method of non-fragment orbit tunnel arching of bottom
CN111779500A (en) * 2020-06-29 2020-10-16 中铁第一勘察设计院集团有限公司 Method for constructing tunnel structure

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0673997A (en) * 1992-08-25 1994-03-15 Shimizu Corp Construction of waterway tunnel
JPH11303592A (en) * 1998-04-17 1999-11-02 Shimizu Corp Multiple timbering construction method
CN101644160A (en) * 2009-06-05 2010-02-10 中国科学院武汉岩土力学研究所 High ground stress soft rock stress-relief construction method
CN102787849A (en) * 2012-08-28 2012-11-21 江苏建筑职业技术学院 Deep coal mine tunnel with pressure yielding function
CN104612698A (en) * 2015-01-24 2015-05-13 杭州天恒投资建设管理有限公司 Method for constructing upper step middle partition wall of shallow-buried excavation tunnel
CN204552818U (en) * 2014-12-11 2015-08-12 中铁十一局集团第五工程有限公司 The drainage system of ditch, side, anti-tunnel bottom leaky
JP2015155626A (en) * 2014-02-21 2015-08-27 大成建設株式会社 Tunnel structure and lining back water pressure adjustment method
CN105178981A (en) * 2015-09-30 2015-12-23 中国矿业大学 Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway
WO2016095629A1 (en) * 2014-12-15 2016-06-23 中铁第四勘察设计院集团有限公司 Advanced support structure for oversized variable-cross-section tunnel
CN106014446A (en) * 2016-05-27 2016-10-12 中铁隧道集团有限公司 Strengthening method for improving stability of high-ground-stress soft rock tunnel inverted arch structure
CN106121675A (en) * 2016-08-22 2016-11-16 北京市市政工程研究院 Small-sized solution cavity is positioned at tunnel excavation and karst cave treatment method time at the bottom of tunneling inverted arch
CN206092002U (en) * 2016-10-12 2017-04-12 中铁西南科学研究院有限公司 Tunnel bear building -up that reduces existing tunnel invert water pressure constructs
CN206233951U (en) * 2016-11-11 2017-06-09 中铁十二局集团第三工程有限公司 Depressurize drainage system in a kind of high-speed railway double track tunnel base
CN106968690A (en) * 2017-04-20 2017-07-21 中冶建工集团有限公司 The method for tunnel construction for soil property of caving in
CN106979013A (en) * 2017-04-07 2017-07-25 中交第二航务工程局有限公司 A kind of excavation construction method for the large section tunnel for biasing Shallow-Buried Soft Rock
CN107191223A (en) * 2017-07-18 2017-09-22 中交第二航务工程局有限公司 A kind of water discharge method for passing through rich water crushed zone small-clear-distance tunnel construction
CN107201908A (en) * 2017-06-16 2017-09-26 中铁五局集团有限公司 A kind of construction method of the regional buried Central drain in tunnel of bitter cold
CN107201913A (en) * 2016-03-16 2017-09-26 中交公局厦门工程有限公司 A kind of fine vibration-reducing blasting construction method of cross-over tunnel

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0673997A (en) * 1992-08-25 1994-03-15 Shimizu Corp Construction of waterway tunnel
JPH11303592A (en) * 1998-04-17 1999-11-02 Shimizu Corp Multiple timbering construction method
CN101644160A (en) * 2009-06-05 2010-02-10 中国科学院武汉岩土力学研究所 High ground stress soft rock stress-relief construction method
CN102787849A (en) * 2012-08-28 2012-11-21 江苏建筑职业技术学院 Deep coal mine tunnel with pressure yielding function
JP2015155626A (en) * 2014-02-21 2015-08-27 大成建設株式会社 Tunnel structure and lining back water pressure adjustment method
CN204552818U (en) * 2014-12-11 2015-08-12 中铁十一局集团第五工程有限公司 The drainage system of ditch, side, anti-tunnel bottom leaky
WO2016095629A1 (en) * 2014-12-15 2016-06-23 中铁第四勘察设计院集团有限公司 Advanced support structure for oversized variable-cross-section tunnel
CN104612698A (en) * 2015-01-24 2015-05-13 杭州天恒投资建设管理有限公司 Method for constructing upper step middle partition wall of shallow-buried excavation tunnel
CN105178981A (en) * 2015-09-30 2015-12-23 中国矿业大学 Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway
CN107201913A (en) * 2016-03-16 2017-09-26 中交公局厦门工程有限公司 A kind of fine vibration-reducing blasting construction method of cross-over tunnel
CN106014446A (en) * 2016-05-27 2016-10-12 中铁隧道集团有限公司 Strengthening method for improving stability of high-ground-stress soft rock tunnel inverted arch structure
CN106121675A (en) * 2016-08-22 2016-11-16 北京市市政工程研究院 Small-sized solution cavity is positioned at tunnel excavation and karst cave treatment method time at the bottom of tunneling inverted arch
CN206092002U (en) * 2016-10-12 2017-04-12 中铁西南科学研究院有限公司 Tunnel bear building -up that reduces existing tunnel invert water pressure constructs
CN206233951U (en) * 2016-11-11 2017-06-09 中铁十二局集团第三工程有限公司 Depressurize drainage system in a kind of high-speed railway double track tunnel base
CN106979013A (en) * 2017-04-07 2017-07-25 中交第二航务工程局有限公司 A kind of excavation construction method for the large section tunnel for biasing Shallow-Buried Soft Rock
CN106968690A (en) * 2017-04-20 2017-07-21 中冶建工集团有限公司 The method for tunnel construction for soil property of caving in
CN107201908A (en) * 2017-06-16 2017-09-26 中铁五局集团有限公司 A kind of construction method of the regional buried Central drain in tunnel of bitter cold
CN107191223A (en) * 2017-07-18 2017-09-22 中交第二航务工程局有限公司 A kind of water discharge method for passing through rich water crushed zone small-clear-distance tunnel construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316062A (en) * 2018-02-11 2018-07-24 中铁二院工程集团有限责任公司 A kind of control device and its construction method of non-fragment orbit tunnel arching of bottom
CN108316062B (en) * 2018-02-11 2020-04-21 中铁二院工程集团有限责任公司 Construction method of control device for tunnel bottom upper arch of ballastless track
CN111779500A (en) * 2020-06-29 2020-10-16 中铁第一勘察设计院集团有限公司 Method for constructing tunnel structure

Also Published As

Publication number Publication date
CN107630706B (en) 2023-05-26

Similar Documents

Publication Publication Date Title
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN105201001B (en) Composite seepage preventing structure for large karst cave in karst region and construction method thereof
CN103758134A (en) Combined double-row pile supporting system and construction method thereof
CN111485901B (en) Method for building side-span non-filling type long and narrow shallow bottom karst cave section tunnel
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN103774675A (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN211340827U (en) Structure for newly building bridge by passing through existing bridge piles in subway tunnel
CN111364486B (en) Remediation and reinforcement device and method for emergency rescue of slide-resistant pile side slope
CN110284885A (en) Shield inspection-pit construction method
CN105735345A (en) Composite type supporting and retaining structure and construction method adopting supporting and retaining structure
CN110397050A (en) A kind of light-duty draining barricade of novel beam anchor formula and its construction method
CN108343068A (en) Composite soil nailing wall and pile-anchor retaining composite supporting construction and construction method
CN106869147A (en) One kind is in marine site ultra-deep without support fore shaft collar tie beam
CN106758890B (en) Campshed box culvert structure and its construction method
CN115539048A (en) Construction method for shallow-buried bias tunnel portal
CN107630706A (en) A kind of tunnel bottom structure and construction method for eliminating highland nip tunnel inverted arch protuberance
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN206635768U (en) Composite soil nailing wall and pile-anchor retaining composite supporting construction
CN106087996B (en) Manual digging pile construction method based on self leveling backpressure device
CN105926637B (en) The prestressing force support system and design of a kind of existing subway of protection
CN108915705B (en) A kind of baffle grouting construction method blocked for shield export & import leak
CN208502786U (en) Multilevel hierarchy suspension device for rich water sandy gravel stratum tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant