CN106979013A - A kind of excavation construction method for the large section tunnel for biasing Shallow-Buried Soft Rock - Google Patents

A kind of excavation construction method for the large section tunnel for biasing Shallow-Buried Soft Rock Download PDF

Info

Publication number
CN106979013A
CN106979013A CN201710223968.4A CN201710223968A CN106979013A CN 106979013 A CN106979013 A CN 106979013A CN 201710223968 A CN201710223968 A CN 201710223968A CN 106979013 A CN106979013 A CN 106979013A
Authority
CN
China
Prior art keywords
excavation
right sides
shallow
steelframe
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710223968.4A
Other languages
Chinese (zh)
Inventor
肖伯强
黄成伟
胡义新
徐庭
周舒
李志成
李送根
王璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201710223968.4A priority Critical patent/CN106979013A/en
Publication of CN106979013A publication Critical patent/CN106979013A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/50Component parts or details of props
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings

Abstract

The invention discloses a kind of excavation construction method for the large section for biasing Shallow-Buried Soft Rock, face is divided into left and right two large divisions with interim median septum wall;Face or so two parts are excavated simultaneously by three step five-step approaches.The step excavating load of three step five of median septum designed by the present invention when geological conditions changes, can flexibly, change working procedure in time, adjust construction method, reduce the construction period.Excavation method step is simple, it is reliable to excavate, and the excavation in particular biasing the large section tunnel of Shallow-Buried Soft Rock provides important leverage, and fault rate is low, improves the project level of profitability.Traditional lock foot anchoring stock instead of using lock pin anchor tube, also improve the stability of structure, simultaneously so that passing through fastener for connection one entirety of formation between each steelframe by the way of steelframe is fixed steel pipe, improve system bearing load, it is more preferable to the fixed effect of steelframe, it is highly beneficial to control tunnel deformation.

Description

A kind of excavation construction method for the large section tunnel for biasing Shallow-Buried Soft Rock
Technical field
The present invention relates to technical field of tunnel construction, in particular to a kind of opening for large section for biasing Shallow-Buried Soft Rock Cut construction method.
Background technology
As western region highway construction extends to mountain area, road comfort level requires lifting, builds the substantial amounts of highway mountain ridge Tunnel turns into inevitable trend.When running into the poor tunnel of wall rock geology condition, CD methods, CRD methods etc. is typically taken to apply Work method.CD methods and CRD methods are to the overall section construction of country rock than advantageous, and the control especially to the settling amount of vault is more closed Reason.But when running into the large section tunnel of bias, shallow embedding, weak surrounding rock, because tunnel cross-section is too big, using CD methods and When CRD methods carry out overall section construction, cause progress slow, had a strong impact on the tunnel holing through time, the project of improving is put into This.
The content of the invention
Present invention aim to solve above-mentioned background technology it is not enough there is provided a kind of easy construction, progress it is fast, can be right A kind of excavation of the large section for bias Shallow-Buried Soft Rock that bias, shallow embedding and the weak surrounding rock in tunnel control effectively is applied Work method.
In order to achieve this, the excavation construction method of the large section for biasing Shallow-Buried Soft Rock designed by the present invention, It is characterized in that:It comprises the following steps:
1) tunnel initial excavation, is carried out using CRD methods, interim mid-board is set;
2) face of constructing tunnel, is divided into the left and right sides by boundary of interim mid-board, by the left and right sides of face Respectively by being manually divided into three layers of excavation portion of upper, middle and lower and tunnel bottom excavation portion;
3), apply after the advance support of arch, while excavating the upper excavation portion of the face left and right sides, reserve top core Soil, while excavating the middle excavation portion of the face left and right sides, reserves central core soil, central core soil is located at top Core Soil Front (using with excavating direction in opposite direction as front) simultaneously makes the soil layer that do not excavate of the native left and right sides of central core be excavated with upper The soil layer of the excavation formation step of the portion left and right sides, while excavating the lower excavation portion of the face left and right sides, reserves lower core Soil, makes lower core cubsoil be located at central core soil front (using with excavating direction in opposite direction as front) and make central core soil The soil layer of excavation for the not excavating soil layer and the upper excavation portion left and right sides formation step of the left and right sides;Face left and right sides it is upper in Lower three layers of excavation portion carries out just spray concrete operation in tunnel wall immediately after excavating, sprayed on just spray concrete, anchor, net supporting construction And steelframe is set up in spray, anchor, net supporting, steelframe both sides are close to more than the arch springing of steelframe and set up lock pin anchor tube, arch springing anchor tube After steelframe firm welding, on steelframe being sprayed concrete again operates to design thickness;
4), carry out applying performing for inverted arch preliminary bracing and secondary lining on multiple spray concrete, while to face or so two The tunnel bottom excavation portion of side is excavated;
5), face pushes ahead construction along tunnel direction, and applies interim mid-board, repeat step 2~4, until complete Into after the overall excavation in tunnel and inverted arch preliminary bracing, interim mid-board is removed, inverted arch is applied.
Further, the height ratio in three layers of excavation portion of upper, middle and lower is 1 in the step 2:2:3, the tunnel bottom excavation portion Top surface and the bottom surface in lower excavation portion are coplanar.
Further, in the step 2 the overall excavation portion that the upper excavation portion of the face left and right sides is formed mistake across Than being not more than 0.3.
Further, the excavation height in the middle excavation portion of the face left and right sides is 3-3.5 meters in the step 2, described The excavation height in the lower excavation portion of the face left and right sides is 3-4 meters.
Further, steelframe is I-steel bow member in the step 3, and three layers of the upper, middle and lower of the face left and right sides is opened The cyclic advance that excavates in digging portion determines that maximum must not exceed 1.5 meters all in accordance with the spacing between adjacent two I-steel bow members.
Further, more than the arch springing of steelframe at 30 cm heights, it is being close to steelframe both sides in the step 3 and is setting up lock pin The angle in anchor tube, lock pin anchor tube and Rock Joints Surrounding face is 90 °.
Further, the middle excavation portion of the face left and right sides is close close to the side ratio of tunnel wall in the step 3 Excavate fast 2-3 meters of progress in the side of interim mid-board;Side ratio of the lower excavation portion of the face left and right sides close to tunnel wall Fast 2-3 meters of progress is excavated close to the side of interim mid-board.Excavation progress refers to the depth along the construction direction excavation in tunnel.
It is preferred that, inverted arch preliminary bracing applies drilling depth length for 2-3 meters in the step 4.
It is preferred that, the section length of inverted arch is 4-6 meters in the step 5.
The beneficial effects of the invention are as follows:The step excavating load of three step five of median septum designed by the present invention is sent out in geological conditions During changing, can flexibly, change working procedure in time, adjust construction method, reduce the construction period.The letter of excavation method step Excavation that is single, excavating the large section tunnel for reliably in particular biasing Shallow-Buried Soft Rock provides important leverage, fault rate It is low, improve the project level of profitability.Traditional lock foot anchoring stock instead of using lock pin anchor tube, the stability of structure is also improved, Simultaneously so that by fastener for connection one entirety of formation between each steelframe, improving by the way of steelframe is fixed steel pipe System bearing load, it is more preferable to the fixed effect of steelframe, it is highly beneficial to control tunnel deformation.
Brief description of the drawings
Fig. 1 is the excavation plan of large section tunnel in the present invention;
Fig. 2 is the excavation stereogram of large section tunnel in the present invention;
Fig. 3 is the tunnel cross-section structural plan after completion tunnel excavation, surrounding rock consolidation and inverted arch lay-up operation in the present invention Figure;
Wherein, 1-interim mid-board, 2-upper arcuate excavation with guide pit part, 3-top Core Soil, 4-central core Soil, 5-lower core cubsoil, 6-spray, anchor, net supporting, 7-lock pin anchor tube, the preliminary bracing of 8-inverted arch, 9-secondary lining, 10- Excavate part on the left of inverted arch, 11-tunnel bottom excavation portion, 12-middle step, excavate part on the right side of 13-middle step, 14-get out of a predicament or an embarrassing situation Part is excavated in left side, and part is excavated on 15-right side of getting out of a predicament or an embarrassing situation, 16-spray concrete layer again, 17-just spray concrete layer, 18-steelframe.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As shown in Fig. 1-3, the excavation construction method of the large section of Shallow-Buried Soft Rock is biased, is comprised the following steps:
1) tunnel initial excavation, is carried out using CRD methods, interim mid-board 1 is set;
2) it is, that the face of constructing tunnel is divided into the left and right sides by boundary with interim mid-board 1, by the left and right sides of face Respectively by being manually divided into three excavation portions of upper, middle and lower and tunnel bottom excavation portion 11;
3), apply after the advance support of arch, while excavating the upper excavation portion of the face left and right sides, reserve top Core Soil 3, while excavating the middle excavation portion of the face left and right sides, central core soil 4 is reserved, central core soil 4 is located at top core The front of soil 3, while excavating the lower excavation portion of the face left and right sides, reserves lower core cubsoil 5, makes during lower core cubsoil 5 is located at The front of portion's Core Soil 4;Three excavation portions of upper, middle and lower of face left and right sides carry out just spray concrete operation, and entering in time immediately after excavating Row spray, anchor, the construction of net system supporting and erection steelframe construction, the both sides of steelframe 18 are close to more than the arch springing of steelframe 18 and set up lock pin After anchor tube 7, arch springing anchor tube 7 and the firm welding of steelframe 18, carry out spray concrete again and operate to design thickness;
Each excavation portion excavates cyclic advance and determined according to preliminary bracing steelframe spacing, and maximum must not exceed 1.5 meters, upper excavation The excavation in portion is lost across than being not more than 0.3, and lock pin anchor tube is set up more than steelframe arch springing at 30 cm heights, being close to the both sides of steelframe 18 7, lock pin anchor tube 7 is 90 ° with Rock Joints Surrounding face, and the excavation height in middle excavation portion is 3-3.5 meters, the excavation height in lower excavation portion For 3-4 meters, the middle excavation portion of the face left and right sides is close to the side of tunnel wall than being excavated close to the side of interim mid-board 1 Fast 2-3 meters of progress;The lower excavation portion of the face left and right sides is close to the side of tunnel wall than close to the side of interim mid-board 1 Fast 2-3 meters of excavation progress.
4) inverted arch preliminary bracing 8 and secondary lining 9, are applied, while entering to the tunnel bottom excavation portion 11 of the face left and right sides Row is excavated;The drilling depth length that applies of inverted arch preliminary bracing 8 is 2-3 meters.
5), face pushes ahead construction along tunnel direction, and applies interim mid-board 1, repeat step 2~4, until complete Into after the overall excavation in tunnel and inverted arch preliminary bracing 8, interim mid-board 1 is removed, inverted arch 10 is applied.The section length of inverted arch 10 For 4-6 meters.
The present invention large section excavate refer to bias, shallow embedding, weak surrounding rock and excavated section in 300 more than ㎡ The construction that carries out of large section tunnel, given full play to the self-stable ability of country rock, carried out at hole using double-deck steel tube shed Preliminary bracing, carries out supporting, it is ensured that the safety of construction at tunnel cutting using the advanced tubule of bilateral.Faced by setting When mid-board 1, tunnel cross-section is divided into two three bench excavation portions and two tunnel bottoms excavation portion 11, an excavation portion drilling depth is excavated After the completion of, form preliminary bracing and the permanent support in tunnel.Flexibly, efficiency of construction is high for the digging mode in each excavation portion, it is to avoid Construction complexity, the shortcoming of long construction period that overall section construction is present, with very high economic benefit.
The above described is only a preferred embodiment of the present invention, not doing any formal to the structure of the present invention Limitation.Any simple modification, equivalent variations and modification that every technical spirit according to the present invention is made to above example, In the range of still falling within technical scheme.

Claims (9)

1. a kind of excavation construction method for the large section for biasing Shallow-Buried Soft Rock, it is characterised in that:It comprises the following steps:
1) tunnel initial excavation, is carried out using CRD methods, interim mid-board (1) is set;
2) it is, that the face of constructing tunnel is divided into the left and right sides by boundary with interim mid-board (1), by the left and right sides of face point It is not divided into three layers of excavation portion of upper, middle and lower and tunnel bottom excavation portion (11);
3), apply after the advance support of arch, while excavating the upper excavation portion of the face left and right sides, reserve top Core Soil (3), The middle excavation portion of the face left and right sides is excavated simultaneously, central core soil (4) is reserved, and central core native (4) is located at upper core Cubsoil (3) front and the spoil for not excavating soil layer and the upper excavation portion left and right sides for making native (4) left and right sides of central core Layer formation step, while excavating the lower excavation portion of the face left and right sides, reserves lower core cubsoil (5), makes lower core cubsoil (5) In front of central core native (4) and make lower core cubsoil (5) left and right sides do not excavate soil layer and the middle excavation portion left and right sides The soil layer of excavation formation step;Three layers of excavation portion of upper, middle and lower of face left and right sides are carried out just in tunnel wall immediately after excavating Concrete operation is sprayed, sprayed on just spray concrete, anchor, the construction of net supporting (6) and set up steelframe on (6) in spray, anchor, net supporting (18), it is close to steelframe (18) both sides more than the arch springing of steelframe (18) and sets up lock pin anchor tube (7), arch springing anchor tube (7) and steelframe (18) after firm welding, on steelframe (18) being sprayed concrete again operates to design thickness;
4) performing for inverted arch preliminary bracing (8) and secondary lining (9), is carried out on multiple spray concrete, while to the face left and right sides Tunnel bottom excavation portion (11) excavated;
5), face pushes ahead construction along tunnel direction, and applies interim mid-board (1), repeat step 2~4, until completing After the overall excavation in tunnel and inverted arch preliminary bracing (8), interim mid-board (1) is removed, inverted arch (10) is applied.
2. a kind of excavation construction method of large section for biasing Shallow-Buried Soft Rock as claimed in claim 1, its feature exists In:The height ratio in three layers of excavation portion of the upper, middle and lower of the face left and right sides is 1 in the step 2:2:3, the tunnel bottom excavation portion (11) top surface and the bottom surface in lower excavation portion are coplanar.
3. a kind of excavation construction method of large section for biasing Shallow-Buried Soft Rock as claimed in claim 1, its feature exists In:The mistake in the overall excavation portion that the upper excavation portion of the face left and right sides is formed is across than being not more than 0.3 in the step 2.
4. a kind of excavation construction method of large section for biasing Shallow-Buried Soft Rock as claimed in claim 1, its feature exists In:The excavation height in the middle excavation portion of the face left and right sides is 3-3.5 meters, the face left and right sides in the step 2 Lower excavation portion excavation height be 3-4 meters.
5. a kind of excavation construction method of large section for biasing Shallow-Buried Soft Rock as claimed in claim 1, its feature exists In:Steelframe (18) is I-steel bow member, the excavation in three layers of excavation portion of upper, middle and lower of the face left and right sides in the step 3 Cyclic advance determines that maximum must not exceed 1.5 meters all in accordance with the spacing between adjacent two I-steel bow members.
6. a kind of excavation construction method of large section for biasing Shallow-Buried Soft Rock as claimed in claim 1, its feature exists In:In the step 3 more than the arch springing of steelframe (18) at 30 cm heights, be close to steelframe (18) both sides set up lock pin anchor tube (7), the angle in lock pin anchor tube (7) and Rock Joints Surrounding face is 90 °.
7. a kind of excavation construction method of large section for biasing Shallow-Buried Soft Rock as claimed in claim 1, its feature exists In:In the step 3 the middle excavation portion of the face left and right sides close to the side ratio of tunnel wall close to the one of interim mid-board (1) Excavate fast 2-3 meters of progress in side;The lower excavation portion of the face left and right sides close to tunnel wall side ratio close to interim mid-board (1) fast 2-3 meters of progress is excavated in side.
8. a kind of excavation construction method of large section for biasing Shallow-Buried Soft Rock as claimed in claim 1, its feature exists In:Inverted arch preliminary bracing (8) applies drilling depth length for 2-3 meters in the step 4.
9. a kind of excavation construction method of large section for biasing Shallow-Buried Soft Rock as claimed in claim 1, its feature exists In:The section length of inverted arch (10) is 4-6 meters in the step 5.
CN201710223968.4A 2017-04-07 2017-04-07 A kind of excavation construction method for the large section tunnel for biasing Shallow-Buried Soft Rock Pending CN106979013A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710223968.4A CN106979013A (en) 2017-04-07 2017-04-07 A kind of excavation construction method for the large section tunnel for biasing Shallow-Buried Soft Rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710223968.4A CN106979013A (en) 2017-04-07 2017-04-07 A kind of excavation construction method for the large section tunnel for biasing Shallow-Buried Soft Rock

Publications (1)

Publication Number Publication Date
CN106979013A true CN106979013A (en) 2017-07-25

Family

ID=59345000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710223968.4A Pending CN106979013A (en) 2017-04-07 2017-04-07 A kind of excavation construction method for the large section tunnel for biasing Shallow-Buried Soft Rock

Country Status (1)

Country Link
CN (1) CN106979013A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448205A (en) * 2017-09-05 2017-12-08 长安大学 The large deformation control method of chlorite quartz-schist aquifer water-bearing stratum longspan tunnel
CN107630706A (en) * 2017-10-24 2018-01-26 中交第二航务工程局有限公司 A kind of tunnel bottom structure and construction method for eliminating highland nip tunnel inverted arch protuberance
CN107643028A (en) * 2017-09-15 2018-01-30 中建隧道建设有限公司 House owed by a citizen weakness section blasting construction method is worn under shallow embedding railway tunnel
CN107905814A (en) * 2017-10-20 2018-04-13 长安大学 Large span loess tunnel top bar CD construction methods
CN108397205A (en) * 2018-03-05 2018-08-14 北京市政建设集团有限责任公司 A kind of shield well transverse passage-way CRD method construction methods
CN109630140A (en) * 2018-12-14 2019-04-16 广西大学 The dynamic partition pilot tunnel method on big cross section gradual change Soft Rock Tunnel stratum
CN110145314A (en) * 2019-05-10 2019-08-20 中建隧道建设有限公司 A kind of method that the tall and big Core Soil of extra-large cross-section bored tunnel is removed
CN110792449A (en) * 2019-10-29 2020-02-14 凌贤长 Rapid underground excavation construction method for large-span shallow tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6039509A (en) * 1991-09-25 2000-03-21 F. M. Locotos Equipment & Design Co. Mine roof support apparatus and method
JP2008121365A (en) * 2006-11-15 2008-05-29 Taisei Corp Method of constructing multi-connected arched tunnel, and connection structure between tunnel and connection body
CN101725358A (en) * 2008-10-31 2010-06-09 中铁四局集团有限公司 Excavation construction method of ultra-shallow buried uneven weathered stratum of tunnel
CN101769154A (en) * 2008-12-31 2010-07-07 中铁六局集团呼和浩特铁路建设有限公司 Excavation supporting method for tunnel construction
CN104832181A (en) * 2015-05-14 2015-08-12 中铁十九局集团第一工程有限公司 Dovetail section tunnel construction process
CN104847374A (en) * 2015-04-24 2015-08-19 长安大学 Soft rock large-deformation tunnel supporting system and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6039509A (en) * 1991-09-25 2000-03-21 F. M. Locotos Equipment & Design Co. Mine roof support apparatus and method
JP2008121365A (en) * 2006-11-15 2008-05-29 Taisei Corp Method of constructing multi-connected arched tunnel, and connection structure between tunnel and connection body
CN101725358A (en) * 2008-10-31 2010-06-09 中铁四局集团有限公司 Excavation construction method of ultra-shallow buried uneven weathered stratum of tunnel
CN101769154A (en) * 2008-12-31 2010-07-07 中铁六局集团呼和浩特铁路建设有限公司 Excavation supporting method for tunnel construction
CN104847374A (en) * 2015-04-24 2015-08-19 长安大学 Soft rock large-deformation tunnel supporting system and construction method thereof
CN104832181A (en) * 2015-05-14 2015-08-12 中铁十九局集团第一工程有限公司 Dovetail section tunnel construction process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李海波: "三台阶七步开挖法在大断面隧道施工中的应用", 《探矿工程》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448205A (en) * 2017-09-05 2017-12-08 长安大学 The large deformation control method of chlorite quartz-schist aquifer water-bearing stratum longspan tunnel
CN107643028A (en) * 2017-09-15 2018-01-30 中建隧道建设有限公司 House owed by a citizen weakness section blasting construction method is worn under shallow embedding railway tunnel
CN107643028B (en) * 2017-09-15 2019-06-14 中建隧道建设有限公司 Residential house weakness section blasting construction method is worn under shallow embedding railway tunnel
CN107905814A (en) * 2017-10-20 2018-04-13 长安大学 Large span loess tunnel top bar CD construction methods
CN107905814B (en) * 2017-10-20 2019-08-13 长安大学 Large span loess tunnel top bar CD construction method
CN107630706A (en) * 2017-10-24 2018-01-26 中交第二航务工程局有限公司 A kind of tunnel bottom structure and construction method for eliminating highland nip tunnel inverted arch protuberance
CN107630706B (en) * 2017-10-24 2023-05-26 中交第二航务工程局有限公司 Tunnel bottom structure for eliminating tunnel inverted arch bulge in high-earth-pressure area and construction method
CN108397205A (en) * 2018-03-05 2018-08-14 北京市政建设集团有限责任公司 A kind of shield well transverse passage-way CRD method construction methods
CN109630140A (en) * 2018-12-14 2019-04-16 广西大学 The dynamic partition pilot tunnel method on big cross section gradual change Soft Rock Tunnel stratum
CN110145314A (en) * 2019-05-10 2019-08-20 中建隧道建设有限公司 A kind of method that the tall and big Core Soil of extra-large cross-section bored tunnel is removed
CN110792449A (en) * 2019-10-29 2020-02-14 凌贤长 Rapid underground excavation construction method for large-span shallow tunnel
CN110792449B (en) * 2019-10-29 2021-07-02 凌贤长 Rapid underground excavation construction method for large-span shallow tunnel

Similar Documents

Publication Publication Date Title
CN106979013A (en) A kind of excavation construction method for the large section tunnel for biasing Shallow-Buried Soft Rock
CN104879131A (en) Large-span tunnel excavation method for upper soft and lower hard compound strata
CN103277106B (en) Highway tunnel three-step five-procedure excavation construction method
CN104653187B (en) Water-rich sand layer geology large cross-section tunnel excavation method
CN105888703B (en) Super Shallow Covered Metro Station construction method under lateral canopy lid is performed in micro- pilot tunnel
CN108487911A (en) The compound crossing method construction method of longspan tunnel bilateral wall under complex geological condition
CN103244133B (en) The milling of coal measure strata tunnel is dug and is combined construction with explosion
CN208220817U (en) Large section Shallow-Buried Soft Rock tunnel groined type double side wall support system
CN108035733B (en) A kind of perpendicular support partial excavation method of rock matter large section tunnel steelframe dike combination
CN110617072B (en) Tunnel excavation construction method for obliquely passing existing operation tunnel at minimum clear distance
CN102071947A (en) Construction method for soft surrounding rock section of large-span tunnel portal
CN104806251B (en) Subsidiary inverted excavation construction method for urban subway station under complex environment
CN104847362B (en) Ground consisting of hard rock construction method across underground digging in subway station greatly
CN104481546B (en) A kind of soft rock tunnel inclined shaft enters the construction method of the double curvature arch in positive hole
CN110439571A (en) Flat pilot tunnel leads to the adit construction method and transverse passage-way of main tunnel
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN109441456A (en) A kind of the tunnel structure and its construction method of weakness Facility-sliding strata
CN103775095A (en) Ridge soft-foundation tunnel advance double guide tunnel and construction method thereof
CN110700841A (en) Double-side-wall guide pit type excavation method for tunnel excavation
CN100513705C (en) Underground beam-pile frame construction for reinforcing side slope
CN206888992U (en) A kind of water-bed mine shield tunnel combination docking structure form
CN108222951A (en) Pass through fine sand layer tunnel portal weak surrounding rock section constructing method
CN108374674B (en) Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
CN107829748B (en) A kind of complementary cycle formula excavation method suitable for floating pebble layer large cross-section tunnel
CN207436073U (en) Close to the anchored frame formula cast-in-situ bored pile reinforcing construction of abutment bedding rock sloper

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170725