CN202898927U - Left-front-right cross overpass - Google Patents

Left-front-right cross overpass Download PDF

Info

Publication number
CN202898927U
CN202898927U CN 201220567473 CN201220567473U CN202898927U CN 202898927 U CN202898927 U CN 202898927U CN 201220567473 CN201220567473 CN 201220567473 CN 201220567473 U CN201220567473 U CN 201220567473U CN 202898927 U CN202898927 U CN 202898927U
Authority
CN
China
Prior art keywords
travelling
track
west
overpass
south
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220567473
Other languages
Chinese (zh)
Inventor
王大伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220567473 priority Critical patent/CN202898927U/en
Application granted granted Critical
Publication of CN202898927U publication Critical patent/CN202898927U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Traffic Control Systems (AREA)

Abstract

The utility model relates to a left-front-right cross overpass. The cross overpass comprises lanes in the four direction, wherein the lanes in the four directions are arranged in a cross mode. The cross overpass is characterized in that each lane is provided with a through lane capable of enabling vehicles to move forwards, a left turn ramp and a right turn ramp, wherein the left turn ramp and the right turn ramp enter the cross directions. The overpass provided by the utility model is simple in structure, and convenient to master by drivers. According to the cross overpass, the vehicles turning leftwards and rightwards and the vehicles moving forwards can be naturally, smoothly and rapidly separated without any collision. With the adoption of the structural design of the lanes, the passing efficiency of the traffic intersection is improved, the waiting of the vehicles caused by traffic lights at the intersection can be avoided, and the limitation according to license plate numbers of the vehicles and the like can be cancelled. The overpass provided by the utility model has the advantages of low cost, high practical applicability and favorable application value.

Description

Left front right cross type overpass bridge
Technical field
The utility model belongs to the Urban Transportation technical field, is specifically related to a kind of cross type overpass bridge of turning left, keep straight on, turning right, i.e. a kind of overpass bridge that makes things convenient for the vehicle conversion direction.
Background technology
Along with development and the progress of society, urban construction has obtained develop rapidly, and vehicle is also more and more, has also produced many problems when making things convenient for the human lives, for example serious traffic congestion.In order to solve in the urban traffic because of blocking up that the different directions Vehicle Driving Cycle produces, people have designed overpass bridge.But even to this day, the various overpass bridges that come into operation of having designed are all had to still continue to use traffic lights because of such or such influence factor or are adopted the modes such as restricteds driving to regulate the wagon flow direction, and traffic congestion is at all improvement.And, designed the many overpass bridges that build up, not that complex structure, difficulty of construction are large, many, the sandwich construction of occupation of land, can not take into account exactly the demand of travelling of all directions.For solving this contradiction, the design bridges is to make one of unimpeded, safe powerful measure of urban traffic.
Summary of the invention
The purpose of this invention is to provide a kind of cross type overpass bridge of turning left, keep straight on, turning right, namely the vehicle of the ingenious realization all directions of a kind of energy shifts, and is easy to that the driver grasps; Simultaneously possess again the overpass bridge that floor space is relatively little, building height is relatively low, construction cost is low and attractive in appearance, thereby remedy the deficiencies in the prior art.
Overpass bridge of the present utility model includes the track that is the four direction that right-angled intersection arranges, it is characterized in that, each direction be provided with make vehicle forward direct lane and enter crisscross left and right turning ring road.
The track of above-mentioned four direction includes the track 1 of travelling from east to west, the track 2 of travelling eastwards from the west, the track 3 of travelling from south orientation north and the track 4 of travelling from north orientation south.
The direct lane (13) that the track of travelling from east to west (1) is equipped with the turning ring road (11) that changes the track (3) of travelling from south orientation north over to, the turning ring road (12) that changes the track (4) of travelling from north orientation south over to and realizes travelling from east to west.
The direct lane (23) that the track of travelling eastwards from the west (2) is equipped with the turning ring road (21) that changes the track (4) of travelling from north orientation south over to, the turning ring road (22) that changes the track (3) of travelling from south orientation north over to and realizes travelling from west to east.
The direct lane (33) that the track (3) of travelling from south orientation north is equipped with the turning ring road (31) that changes the track (2) of travelling from the west over to eastwards, the turning ring road (32) that changes the track (1) of travelling from east to west over to and realizes travelling from south to north.
The direct lane (43) that the track (4) of travelling from north orientation south is equipped with the turning ring road (41) that changes the track (1) of travelling from east to west over to, the turning ring road (42) that changes the track (2) of travelling from the west over to eastwards and realizes being travelled by north orientation south.
Be that right-angled intersection is travelled for four-way, by four direction come the main direct lane that four direction goes (staggered one on the other when direct lane is staggered) and between can form for the turning ring road of turning from tangent isolated again tangent the crossing of direct lane, article four, there is the craspedodrome circuit in the track and interconnects the ring road that turns round that can supply right lateral, have simultaneously from tangent the isolating of direct lane and need the ring road that turns round of left-hand bend, like this for driving person, can realize that four direction ten No. two motor vehicles do not intersect continual operation.
Overpass bridge of the present utility model is convenient to driver's identification, is grasped.Left-hand rotation is turned right or vehicle to overtake all can natural, smooth and easy, quick realization shunting crosses and do not conflict, can increase the traffic efficiency of traffic intersection by the road of this structure design, can cancel the traffic lights of intersection and without parking waiting, can restrict driving and make vehicle seething.The utility model turns left to solve with a traditional difficult problem, and it is incorporated in the multidirectional turning dexterously.Overpass bridge construction cost of the present utility model is relatively low, and practicality is high, has good using value.
Description of drawings
Fig. 1: this decussation overpass general structure and direction of traffic schematic diagram.
Fig. 2: this decussation overpass totally segments the track schematic diagram.
Fig. 3: this decussation overpass sails the segmentation track schematic diagram of vehicle from east orientation.
Fig. 4: this decussation overpass is from the west to the segmentation track schematic diagram of sailing vehicle.
Fig. 5: this decussation overpass sails the segmentation track schematic diagram of vehicle from south orientation.
Fig. 6: this decussation overpass sails the segmentation track schematic diagram of vehicle from north orientation.
The specific embodiment
Below in conjunction with accompanying drawing overpass bridge of the present utility model is described in detail:
As shown in Figure 1, be that right-angled intersection is travelled for four-way, the main direct lane that comes four direction to go by the East, West, South, North four direction (is respectively the track 1 of travelling from east to west, the track 2 of travelling eastwards from the west, the track 3 of travelling from south orientation north and the track 4 of travelling from north orientation south) and between can form for the turning ring road of turning from tangent isolated again tangent the crossing of direct lane.Each direction lane of this overpass bridge has forward direct lane, interconnects and can for the turning ring road of right lateral, need the ring road that turns round of left-hand bend from tangent the isolating of direct lane simultaneously.
In Fig. 2, each direction of this decussation overpass has leads to three on the right side that other directions go and from totally six segmentation tracks, the left side three of other directions, travelling of each track do not intersect, and is independent of each other mutually, can realize like this that the whichever direction sails all can not intersect continual operation.
In Fig. 3, right side, the track of travelling from east to west (1) is equipped with the direct lane (13) that the right turn ramp (11), the centre that change the track (3) of travelling from south orientation north over to are equipped with the left turn ramp (12) that changes the track (4) of travelling from north orientation south over to and realize travelling from east to west.
In Fig. 4, the right side, track (2) of travelling eastwards from the west be equipped with the right turn ramp (21) that changes the track (4) of travelling from north orientation south over to, the direct lane (23) of paying one's respects and the left turn ramp (22) that changes the track (3) of travelling from south orientation north over to being housed and realizing travelling from west to east.
In Fig. 5, the right side, track (3) of travelling from south orientation north is equipped with the direct lane (33) that the right turn ramp (31), the centre that change the track (2) of travelling from the west over to eastwards are equipped with the left turn ramp (32) that changes the track (1) of travelling from east to west over to and realize travelling from south to north.
In Fig. 6, the right side, track (4) of travelling from north orientation south is equipped with the direct lane (43) that the right turn ramp (41), the centre that change the track (1) of travelling from east to west over to are equipped with the left turn ramp (42) that changes the track (2) of travelling from the west over to eastwards and realize being travelled by north orientation south.
About non-automotive vehicle, because the bicycle such as bicycle, tricycle has been difficult to see in the urban traffic arterial highway now, if set up special track to have the difficulty that loses more than gain in the intersection, so the utility model is not taken it into account, need to adopt other design schemes or take conventional means to realize passing through on the non-intersection of periphery thoroughfare if having in fact.
About the bridge road construction, the utility model all is adopted as on the ground, mainly consider and build the problem that beneath passage will be considered the aspects such as illumination, draining, ventilation, and the utility model construction is comparatively simple, builds on the ground and can realize purpose of design.If necessary, can consider the low highway section in the utility model is built under ground portion, the construction of other parts will be more easy so.
Visual concrete condition be set and arrange about the sidewalk, can be not for the utility model if be located under overpass bridge periphery or the viaduct track or on low track and set up overline bridge.
About the maximum utilization in space, can between overpass bridge bottom or each ring road, consider to establish parking lot, greenbelt etc. to reduce possible negative effect, the maximum using space.
The design is that optimization considers that craspedodrome keeps left, and right lateral is kept right, travel left and occupy middle, can be convenient to like this driver and grasp traveling lane, if left turn ramp is located at the most left, in the middle of direct lane is located at forward, right turn ramp is located at the rightest, other principles are identical, also are feasible, and namely travelling left keeps left, in the middle of walking to overtake, lean on the rightest to right travel.
The design will not turn around oppositely to take into account, need such as reality, can consider to add a runway on the track in every respect again, be dissolved in this Patent design.

Claims (7)

1. left front right cross type overpass bridge, include the track of the four direction of cross arrangement, it is characterized in that being provided with in each direction and making forward direct lane of vehicle, interconnecting for the turning ring road of right lateral, to need the ring road that turns round of left-hand bend from tangent the isolating of direct lane.
2. overpass bridge as claimed in claim 1 is characterized in that, has in each direction and leads to three on the right side that other directions go and from totally six segmentation tracks, the left side three of other directions.
3. overpass bridge as claimed in claim 1, the track that it is characterized in that described four direction, include the track (1) of travelling from east to west, the track of travelling from the west (2), the track (3) of travelling from south orientation north and the track (4) of travelling from north orientation south eastwards.
4. overpass bridge as claimed in claim 3 is characterized in that the direct lane (13) that described track of travelling from east to west (1) is equipped with the turning ring road (11) that changes the track (3) of travelling from south orientation north over to, the turning ring road (12) that changes the track (4) of travelling from north orientation south over to and realizes travelling from east to west.
5. overpass bridge as claimed in claim 3 is characterized in that the direct lane (23) that described track of travelling from the west (2) is equipped with the turning ring road (21) that changes the track (4) of travelling from north orientation south over to, the turning ring road (22) that changes the track (3) of travelling from south orientation north over to and realizes travelling from west to east eastwards.
6. overpass bridge as claimed in claim 3 is characterized in that the direct lane (33) that described track of travelling from south orientation north (3) is equipped with the turning ring road (31) that changes the track (2) of travelling from the west over to eastwards, the turning ring road (32) that changes the track (1) of travelling from east to west over to and realizes travelling from south to north.
7. overpass bridge as claimed in claim 3 is characterized in that the direct lane (43) that described track of travelling from north orientation south (4) is equipped with the turning ring road (41) that changes the track (1) of travelling from east to west over to, the turning ring road (42) that changes the track (2) of travelling from the west over to eastwards and realizes being travelled by north orientation south.
CN 201220567473 2012-10-25 2012-10-25 Left-front-right cross overpass Expired - Fee Related CN202898927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220567473 CN202898927U (en) 2012-10-25 2012-10-25 Left-front-right cross overpass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220567473 CN202898927U (en) 2012-10-25 2012-10-25 Left-front-right cross overpass

Publications (1)

Publication Number Publication Date
CN202898927U true CN202898927U (en) 2013-04-24

Family

ID=48119617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220567473 Expired - Fee Related CN202898927U (en) 2012-10-25 2012-10-25 Left-front-right cross overpass

Country Status (1)

Country Link
CN (1) CN202898927U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929007A (en) * 2014-03-21 2015-09-23 上海市政交通设计研究院有限公司 Alfalfa leaf type flyover crossing structure
CN105088910A (en) * 2015-08-18 2015-11-25 黄世崇 Road setting method
CN107034754A (en) * 2017-05-23 2017-08-11 大连交通大学 A kind of interchange viaduct
CN108342934A (en) * 2018-02-01 2018-07-31 冯阳 A kind of rotor viaduct
CN108677635A (en) * 2018-06-05 2018-10-19 山东科技大学 A kind of the interchange structure and construction method of the newly-built existing road of highway overlying

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929007A (en) * 2014-03-21 2015-09-23 上海市政交通设计研究院有限公司 Alfalfa leaf type flyover crossing structure
CN105088910A (en) * 2015-08-18 2015-11-25 黄世崇 Road setting method
CN107034754A (en) * 2017-05-23 2017-08-11 大连交通大学 A kind of interchange viaduct
CN108342934A (en) * 2018-02-01 2018-07-31 冯阳 A kind of rotor viaduct
CN108677635A (en) * 2018-06-05 2018-10-19 山东科技大学 A kind of the interchange structure and construction method of the newly-built existing road of highway overlying

Similar Documents

Publication Publication Date Title
CN202898927U (en) Left-front-right cross overpass
CN201634978U (en) Road intersection system of T-shaped junction
CN102646331A (en) Design method for cooperating street crossing of opposite-angle pedestrians and left turning of motor vehicles at intersection
CN202194041U (en) Flyover
CN102817295A (en) Stereoscopic crossroad parking multi-station through linkage hinge type pendulum flyover
CN201648898U (en) Traffic system with traffic light-free intersection
CN105648864A (en) Cross ring-type full-function interchange
CN102322005A (en) Flyover
CN102268852A (en) Two-phase implementation method of urban road transport system
CN201534946U (en) Overpass with platform bridge on junction of three roads
CN102747661B (en) Based on the structure and uses thereof of the torsional mode overpass bridge in urban road
CN102296505B (en) Curve-type ramp-free overpass
CN106522053A (en) Road intersection guiding device with public transportation stops
CN201095719Y (en) Lifting fast compact all-function viaduct
CN103572677B (en) Left-turn-free flyover
CN201144378Y (en) Non-interchanging intercommunicated lane road
CN202323598U (en) Multifunctional overpass
CN202865713U (en) Downtown overpass
CN101792994A (en) Multifunctional tunnel grade separation hub bridge
CN202202220U (en) Crossroad with disc
CN104195909A (en) Non-elevated tiny urban cross overpass
CN101487214A (en) Humanized multifunctional intersection for urban crossroad
TW201239155A (en) High-speed road hardware and car driving method thereof
CN102900000B (en) Comprehensive complete straight-through direct left-hand rotation right lateral viaduct
CN201473844U (en) Pedestrian-priority full interoperability cross highway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130424

Termination date: 20151025

EXPY Termination of patent right or utility model