CN202864622U - Construction elevator - Google Patents

Construction elevator Download PDF

Info

Publication number
CN202864622U
CN202864622U CN 201220504341 CN201220504341U CN202864622U CN 202864622 U CN202864622 U CN 202864622U CN 201220504341 CN201220504341 CN 201220504341 CN 201220504341 U CN201220504341 U CN 201220504341U CN 202864622 U CN202864622 U CN 202864622U
Authority
CN
China
Prior art keywords
cage
suspension bridge
construction
construction elevator
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220504341
Other languages
Chinese (zh)
Inventor
陈乃耕
侯光华
张超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Construction Engineering Group Co Ltd
Original Assignee
Shenzhen Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Construction Engineering Group Co Ltd filed Critical Shenzhen Construction Engineering Group Co Ltd
Priority to CN 201220504341 priority Critical patent/CN202864622U/en
Application granted granted Critical
Publication of CN202864622U publication Critical patent/CN202864622U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides a construction elevator which comprises a lifting cage. A suspension bridge which can be ascended and descended is installed on one side of the lifting cage, the one side of the lifting cage is close to a construction wall surface, and the suspension bridge comprises bridge boards and guardrails. When the suspension bridge is descended, two ends of the suspension bridge are respectively connected with the lifting cage and a storey platform which is under construction, and the suspension bridge moves along with the lifting cage when ascended. In the construction elevator, the suspension bridge provided with the guardrails is installed on the one side of the lifting cage, the construction elevator can be stopped on a storey where scaffolds are disassembled or a climbing frame is removed, the suspension bridge can be used for being connected with the storey and the lifting cage, and the construction elevator brings convenience to construction operation.

Description

A kind of construction elevator
Technical field
The utility model relates to and uses construction elevator in the building construction process.
Background technology
Construction elevator is comprised of several parts such as cage, driver train, standard knot, attached wall, chassis, fence, electric systems, it is the manned cargo-carrying construction machinery and equipment that often uses in the building, because its unique body structure makes it take not only comfortable but also safety, construction elevator normally cooperates tower crane to use on-site, general load carrying ability is at the 1-5 ton, and running velocity is 1-60M/min.At present; in carrying out the high-building construction process; need to use construction elevator to transport personnel and building materials, instrument etc.; the driver train of construction elevator takes cage to respective storey, opens the cage door, then enters this floor by the scaffold that is arranged on this floor; can directly workmen and building materials, instrument etc. be transported to predetermined floor from ground like this; can be time saving and energy saving, and because the scaffold protection of floor is arranged, convenient and safe.But remove or after climbing frame leaves this floor at the floor scaffold, enter platform in the floor owing to lacking from cage, just can not use such construction elevator to carry out operation, make troubles to construction.
The utility model content
For solving that present climbing frame has left or a full hall outrigger is removed when causing not having scaffold; the deficiency that the construction elevator cage will stop; the utility model provides a kind of construction elevator; the cage of this elevator itself can directly be entered the construction floor people of boarding or thing with the protection railing safely by balcony or windowsill model from the elevator cage.
Technical scheme of the present invention is: a kind of construction elevator, and comprise cage, but outside described cage, be provided with the suspension bridge of lifting near a side of construction metope, described suspension bridge comprises bridge plate and guardrail; Described suspension bridge two ends when putting down connect respectively the floor platform of cage and under construction, and described suspension bridge moves with described cage when rising.
Further, in the above-mentioned construction elevator: described bridge plate one end and described cage base plate are hinged by hinge.
Further, in the above-mentioned construction elevator: described guardrail wraps in the described cage outside at suspension bridge when rising.
Further, in the above-mentioned construction elevator: also comprise hoist cable, described hoist cable has the fixed end and the free end that extend into cage in fixing with described suspension bridge.
In the construction elevator of the present utility model, have the suspension bridge of guardrail in cage one side setting, can remove or the floor of climbing frame after leaving stops at scaffold, and can utilize suspension bridge to connect this floor and cage, the convenient construction operation.
Below in conjunction with specific embodiment the utility model is done comparatively detailed description.
Description of drawings
Fig. 1 is the utility model embodiment cage birds-eye view (A to).
Fig. 2 is the utility model embodiment cage lateral plan (B-B).
Fig. 3 is the utility model example structure figure.
Fig. 4 is the utility model embodiment working state figure (1).
Fig. 5 is the utility model embodiment working state figure (2).
Among the figure: 1, cage, 2, suspension bridge, 21, bridge plate, 22, guardrail, 3, hinge, 4, hoist cable, 5, building wall, 6, perpendicular rail, 7, the floor platform.
The specific embodiment
Embodiment 1, such as Fig. 1, Fig. 2, Fig. 3, Fig. 4 and shown in Figure 5, the present embodiment is exactly a kind ofly to remove the construction elevator that can also continue to use after scaffold or climbing frame leave, the same with all elevators, other position of elevator is not transformed, only at suspension bridge 2 of cage 1 outer increase such as Fig. 2, shown in 3, this suspension bridge 2 comprises two parts, the bridge plate 21 that wherein has personnel to walk, bridge plate 21 is made with an iron plate or other material that can support in work progress, one end is by the base plate hinged of hinge 3 with cage 1, after putting down in use, the two ends of bridge plate 21 are connected between the floor platform 7 and cage 1 of this floor, form one and connect bridge between cage 1 and the floor, when construction elevator need to leave floor, be recoverable to suspension bridge 2, make suspension bridge 2 along hinge 3 90-degree rotations, lean against cage 1 outside, cage 1 itself is not carried out any change.In order to use safety, also need to arrange guardrail 22 on the bridge plate 21 of suspension bridge 2, guardrail 22 can be to be welded on the railing that some reinforcing bars on the bridge plate 21 are done.When suspension bridge 2 puts down, in bridge plate 21 both sides the workmen of walking between cage 1 and floor platform 7 carried out safety guard-safeguard, after suspension bridge 2 rose, the guardrail 22 on bridge plate 21 both sides wrapped in the outside of cage 1.
In order to realize suspension bridge 2 lifting automations, also be for safety, the hoist cable 4 of a suspension bridge 2 need to be arranged, the fixed end of hoist cable 4 and suspension bridge 2 are fixing, and free end extend into the automation that utilizes motor equal power device drag-line in the cage or put 2 liftings of Suo Shixian suspension bridge.
The construction elevator of the present embodiment uses and the original few of difference of construction elevator, also can not destroy the safety device of original construction elevator, guarantees construction safety.Shown in Fig. 4,5, when underground, occupation mode is the same with other construction elevator, opens door and other safety facilities of cage one side, workmen and equipment enter in the cage, set safety measure, when cage runs to construction floor along perpendicular rail 6, put down suspension bridge 2, simultaneously, open the safety facilities in the cage 1, open at last in the cage 1 by construction building wall 5 one sides, the workmen just can come into the floor of under construction by suspension bridge 2 like this.

Claims (4)

1. a construction elevator comprises cage, it is characterized in that: at described cage (1) but outside be provided with the suspension bridge (2) of lifting near a side of construction metope, described suspension bridge (2) comprises bridge plate (21) and guardrail (22); Described suspension bridge (2) two ends when putting down connect respectively the floor platform (7) of cage (1) and under construction, and described suspension bridge (2) moves with described cage (1) when rising.
2. construction elevator according to claim 1 is characterized in that: described bridge plate (21) one ends and described cage (1) base plate are hinged by hinge (3).
3. construction elevator according to claim 1 is characterized in that: described guardrail (22) wraps in described cage (1) outside at suspension bridge (2) when rising.
4. arbitrary described construction elevator in 3 according to claim 1 is characterized in that: also comprise hoist cable (4), described hoist cable (4) has with the fixing fixed end of described suspension bridge (2) and extend into free end in the cage (1).
CN 201220504341 2012-09-29 2012-09-29 Construction elevator Expired - Fee Related CN202864622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220504341 CN202864622U (en) 2012-09-29 2012-09-29 Construction elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220504341 CN202864622U (en) 2012-09-29 2012-09-29 Construction elevator

Publications (1)

Publication Number Publication Date
CN202864622U true CN202864622U (en) 2013-04-10

Family

ID=48031362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220504341 Expired - Fee Related CN202864622U (en) 2012-09-29 2012-09-29 Construction elevator

Country Status (1)

Country Link
CN (1) CN202864622U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234402A (en) * 2014-07-18 2014-12-24 武汉天蝎建筑装备有限公司 Openable/closeable suspension bridge frame
CN104401838A (en) * 2014-11-27 2015-03-11 山东大汉建设机械有限公司 Special traveling platform device for construction elevator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234402A (en) * 2014-07-18 2014-12-24 武汉天蝎建筑装备有限公司 Openable/closeable suspension bridge frame
CN104401838A (en) * 2014-11-27 2015-03-11 山东大汉建设机械有限公司 Special traveling platform device for construction elevator

Similar Documents

Publication Publication Date Title
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN109779244A (en) A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction
CN102502378A (en) Climbing elevator for building construction
CN201334769Y (en) Attached type lifting scaffold with double guide rails
CN202509754U (en) High-altitude steel structure node construction working platform
CN207609153U (en) A kind of elevator liftable construction operation platform
CN202864622U (en) Construction elevator
CN101876209B (en) Supertall building core tube construction safety fire protection system and device
CN209790657U (en) Balcony edge high-altitude operation safety belt fastening point device
CN204124984U (en) Two cage building hoist
CN213418443U (en) Self-climbing type elevator shaft operation platform
CN103866985A (en) Butt joint method and device for construction elevator and creeping formwork frame body
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
CN106193621A (en) Fabricated construction superimposed sheet string hangs construction method
JP2008223317A (en) Gondola device and method of constructing exterior of building using the same
CN102807178A (en) Chamfered hanging basket device with slide rail
CN203257106U (en) Multifunctional power-driven walking type walking system
CN205275061U (en) Semi -portal crane
CN205894715U (en) Light steel structure is semi -automatic under enclosed construction constructs from hoisting machine that climbs
CN110593582A (en) High-rise curtain wall installation auxiliary assembly with safety facility
CN205531262U (en) Steel construction construction platform can rise automatically
CN202322082U (en) Small-sized gantry crane device
CN102733612B (en) Mounting method of electric hoist orbit
CN206338026U (en) A kind of ladder securing device
CN213356813U (en) High-rise building earthwork transportation device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130410

Termination date: 20190929