CN209790657U - Balcony edge high-altitude operation safety belt fastening point device - Google Patents

Balcony edge high-altitude operation safety belt fastening point device Download PDF

Info

Publication number
CN209790657U
CN209790657U CN201920479114.7U CN201920479114U CN209790657U CN 209790657 U CN209790657 U CN 209790657U CN 201920479114 U CN201920479114 U CN 201920479114U CN 209790657 U CN209790657 U CN 209790657U
Authority
CN
China
Prior art keywords
safety belt
balcony
point device
horizontal support
hanging ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920479114.7U
Other languages
Chinese (zh)
Inventor
詹少强
李大军
曾劲松
吴涛
张黎
刘庆伟
彭守磊
舒鸿威
邱超
叶宝亮
吴磊勇
冯家强
叶琳
鲁成银
范钦坤
李德阳
台德重
张明鹏
马红涛
蒋远勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN WUJIAN SECOND CONSTRUCTION CO Ltd
Original Assignee
HENAN WUJIAN SECOND CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN WUJIAN SECOND CONSTRUCTION CO Ltd filed Critical HENAN WUJIAN SECOND CONSTRUCTION CO Ltd
Priority to CN201920479114.7U priority Critical patent/CN209790657U/en
Application granted granted Critical
Publication of CN209790657U publication Critical patent/CN209790657U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a balcony faces limit high altitude construction safety belt and ties hanging point device, including being used for the horizontal support pole that the hole top was reserved to the overlap joint at the balcony, horizontal support pole links to each other respectively through parallel arrangement's articulated shaft and the handheld barre of stereoplasm, safety belt link, the plane at the equal perpendicular to horizontal support pole of articulated shaft and the handheld barre place of stereoplasm. The utility model discloses it is small, light in weight, high durability and convenient carrying, easily make and use, under the prerequisite of guaranteeing safety, can reduce the construction management degree of difficulty that the balcony faces limit high altitude construction in a large number, it rational utilization floor balcony department pipe in the water in the pit reserve the hole, need not set up the balcony again and face limit safety belt tie-in point, construction progress has been accelerated, the construction flow has been simplified, constructor's operation burden has been alleviateed, the time limit for a project has been practiced thrift effectively, the balcony has been reduced and has been faced casualty accidents such as limit high altitude fall, and better economic benefits, managerial benefits and social have.

Description

Balcony edge high-altitude operation safety belt fastening point device
Technical Field
The utility model belongs to the technical field of high altitude construction safety equipment technique and specifically relates to a balcony faces limit high altitude construction safety belt and ties hanging point device.
Background
With the development of economy and society, buildings such as houses and the like are nearly high-rise at present, the heights of the buildings are continuously refreshed, and high-altitude operation of the buildings such as high-rise houses and the like is more dangerous. In recent years, accidents of falling and casualties of adjacent high-altitude operation of floors frequently occur, and heavy injuries are brought to related departments of the country, the society and the government, related units, individuals and families, so that the requirements on safety protection and management work of construction sites are more and more strict. At present, national and industry relevant standards, regulations, safety operation regulations and various regulations require that aerial workers wear safety belts, and the safety belts are hung on safety nodes to ensure the safety of the workers.
For high-altitude work on balcony sides of a building site, the arrangement of the safety belt hanging points generally comprises the following modes: firstly, hanging a safety belt on an adjacent edge protection rail; secondly, pre-embedding or later additionally arranging rigid hanging points on the balcony adjacent edge shear wall and the balcony adjacent edge column; thirdly, holes are drilled on the balcony adjacent edge beams, plates, columns or shear walls through electric drills, and safety belts are hung by arranging steel wire ropes and the like. The above-mentioned hitching means are all deficient, specifically: the first method is that the setting standard and field management requirements for the edge protection are high, the material of the protective barrier must have enough strength and rigidity, the setting and fixing must be firm, the impact load of constructors in high-altitude falling can be guaranteed under extreme conditions, meanwhile, the field is required to have higher management level, the edge guardrail must be monitored and checked in real time, a large amount of manpower and material resources are spent to prevent the condition that the edge protection is damaged artificially and the like, and the protection failure is avoided; secondly, pre-embedding and additionally arranging tie hanging points in the later period not only increase the workload, but also consume a large amount of materials and labor; thirdly, the steel wire rope fastening hanging points are additionally arranged at the beam plate and the like, so that a large amount of materials and labor are consumed, and when the safety belt is fastened and moved away, an ascending ladder needs to be additionally carried due to the fact that the hanging points are high, and the workload and the operation burden of constructors are increased.
Disclosure of Invention
The utility model discloses face the limit to balcony and floor and be provided with the condition that pipe in the water/permeability cell reserved the entrance to a cave, provide a balcony and face limit high altitude construction safety belt tie hanging point device.
In order to achieve the above purpose, the utility model can adopt the following technical proposal:
Balcony face limit high altitude construction safety belt and tie hanging point device, including being used for the overlap joint to reserve the horizontal support pole of hole top at the balcony, horizontal support pole links to each other respectively with handheld barre of stereoplasm, safety belt link through parallel arrangement's articulated shaft, the plane at the equal perpendicular to horizontal support pole of articulated shaft and the handheld barre place of stereoplasm.
The safety belt hanging ring is connected with the horizontal supporting rod through a connecting rod.
The rotation direction of the safety belt hanging ring is perpendicular to the plane where the safety belt hanging ring is located.
The distance between the hinged shafts is smaller than the inner diameter of the reserved holes of the balcony.
The safety belt hanging ring is of a circular ring structure, and the diameter of the safety belt hanging ring is smaller than the inner diameter of the reserved hole of the balcony.
The safety belt hanging ring is an oval ring structure.
The utility model provides a balcony faces limit high altitude construction safety belt tie hanging point device, small in size, light in weight, high durability and convenient carrying, easily make and use, under the prerequisite of guaranteeing safety, can reduce the balcony in a large number and face the limit high altitude construction's the construction management degree of difficulty, it has rationally utilized floor balcony department pipe in water reservation hole, need not set up the balcony again and face limit safety belt hanging point, practice thrift and subtract and saved protective material and the manual work of a considerable amount, the setting process of facing limit safety belt hanging point at the balcony has been saved, construction progress has been accelerated, construction process has been simplified, constructor's operation burden has been alleviateed, the time limit is practiced thrift effectively, the balcony has been reduced and has been faced casualties such as limit high altitude fall, and has better economic benefits, and management benefit and social.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of the usage state of the present invention.
Fig. 3 is a schematic view of the present invention in a folded state.
Detailed Description
As shown in fig. 1 and 2, the fastening point device for the safety belt for the edge high-altitude operation of the balcony comprises a horizontal support rod 1 made of steel bars, wherein the horizontal support rod 1 is lapped above a reserved hole Q of the balcony, and a connecting column 1a and a connecting column 1b are welded at the position corresponding to the reserved hole Q of the balcony at intervals; the connecting column 1a is connected with a safety belt hanging ring 4 with a connecting rod 3 through a hinge shaft 2.1, and the connecting column 1b is connected with a hard hand-held handle bar 5 through a hinge shaft 2.2; the articulated shafts 2.1 and 2.2 are both perpendicular to the plane where the horizontal support rod 1 and the hard handheld handle bar 5 are located, so that the horizontal support rod 1 can be folded together with the safety belt hanging ring 4 and the hard handheld handle bar 5 when the horizontal support rod 1 is in lap joint with the reserved hole Q of the balcony (see figure 3). In order to further reduce the folded volume, the direction of rotation of the belt loop 4 is perpendicular to the plane of the belt loop 4. In order to realize stable support and smooth movement, the distance between the hinge shafts 2.1 and 2.2 is smaller than the inner diameter of the reserved balcony hole Q. The safety belt hanging ring 4 is of a circular ring structure or an elliptical ring structure, when the hand-held hard hand-held handle rod 5 moves upwards along the reserved balcony hole Q, if the safety belt hanging ring 4 is clamped in the reserved balcony hole Q, the length of the connecting rod 3 connected with the safety belt hanging ring 4 at least ensures that the horizontal supporting rod 1 can be folded smoothly and moves along the reserved balcony hole Q; or the safety belt hanging ring 4 is small and can directly penetrate through the reserved balcony hole Q, so that the horizontal support rod 1 can be turned over and moved in the reserved balcony hole Q.
When the safety belt hanging ring is used, when an operator arrives below the reserved hole Q of the balcony of an operation floor, the body part of the safety belt is worn, then one end of a rope L of the safety belt is hung on the safety belt hanging ring 4 and is firmly clamped, the hard handheld handle rod 5 is held by a hand to move upwards, and meanwhile, the self weight of the safety belt hanging ring 4 is large, the horizontal support rod 1 is pulled to be turned downwards along the articulated shafts 2.1 and 2.2, so that the device can smoothly pass through the reserved hole Q of the balcony; when the 1 end of horizontal support bar reachs more than the balcony reservation hole Q, hold handheld barre 5 of handheld stereoplasm and remove to 1 one side of horizontal support bar, make horizontal support bar 1 be located the balcony reservation hole Q week on the floor M of week side, simultaneously, the handheld barre 5 of pull-down stereoplasm makes 1 upset of horizontal support bar and overlap joint on the balcony reservation hole Q, forms the roof and the utility model discloses the device bears the system that the atress was hung to the safety belt jointly, and then protects the high altitude and faces limit operation personnel's safety. After the operation is finished, the hard hand-held handle rod 5 is continuously moved upwards to fold the device again, and then the device is pulled downwards to penetrate out of the reserved hole Q of the balcony, and when the device reaches the next balcony edge operation, the operation is repeated.
The utility model can ensure the safety of the safety belt, ensure the safety belt to bear the impact load brought by personnel under the extreme falling condition, and ensure the personnel not to fall off at high altitude; the movable type multifunctional combined tool is convenient and quick to tie, fix, detach and move, simple and convenient to operate, small in size, convenient to carry, free of excessive occupation of tool space of operating personnel, and extremely suitable for site operation, and the workload of the operating personnel is not increased additionally.
The utility model discloses a balcony and floor face limit high altitude construction (like brickwork, secondary structure, whitewash, interior wall coating, door and window and guardrail installation etc.) personnel provide effectual safety belt and tie the point, under the prerequisite that accords with relevant standard, standard and safe operation regulation, can effectively reduce the management degree of difficulty, reduce the high altitude construction risk of falling, furthest ensures that the floor balcony faces limit high altitude construction personnel's personal safety.

Claims (6)

1. The utility model provides a balcony faces limit high altitude construction safety belt and ties hanging point device which characterized in that: including being used for the horizontal support pole of overlap joint above the balcony reservation hole, horizontal support pole links to each other respectively with handheld barre of stereoplasm, safety belt link through parallel arrangement's articulated shaft, the equal perpendicular to horizontal support pole of articulated shaft and the plane at the handheld barre place of stereoplasm.
2. The balcony edge aloft work safety belt tie-point device according to claim 1, characterized in that: the safety belt hanging ring is connected with the horizontal supporting rod through a connecting rod.
3. the balcony edge aloft work safety belt tie-point device according to claim 1, characterized in that: the rotation direction of the safety belt hanging ring is perpendicular to the plane where the safety belt hanging ring is located.
4. The balcony edge aloft work safety belt tie-point device according to claim 1, characterized in that: the distance between the hinged shafts is smaller than the inner diameter of the reserved holes of the balcony.
5. The balcony edge aloft work safety belt tie-point device according to claim 1, characterized in that: the safety belt hanging ring is of a circular ring structure, and the diameter of the safety belt hanging ring is smaller than the inner diameter of the reserved hole of the balcony.
6. The balcony edge aloft work safety belt tie-point device according to claim 1, characterized in that: the safety belt hanging ring is an oval ring structure.
CN201920479114.7U 2019-04-10 2019-04-10 Balcony edge high-altitude operation safety belt fastening point device Active CN209790657U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920479114.7U CN209790657U (en) 2019-04-10 2019-04-10 Balcony edge high-altitude operation safety belt fastening point device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920479114.7U CN209790657U (en) 2019-04-10 2019-04-10 Balcony edge high-altitude operation safety belt fastening point device

Publications (1)

Publication Number Publication Date
CN209790657U true CN209790657U (en) 2019-12-17

Family

ID=68828784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920479114.7U Active CN209790657U (en) 2019-04-10 2019-04-10 Balcony edge high-altitude operation safety belt fastening point device

Country Status (1)

Country Link
CN (1) CN209790657U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114425131A (en) * 2021-12-27 2022-05-03 大连橡胶塑料机械有限公司 High altitude construction hangs some frocks
CN114432609A (en) * 2022-02-10 2022-05-06 四川省第六建筑有限公司 Safety belt hanging device
CN115162759A (en) * 2022-05-23 2022-10-11 中国十七冶集团有限公司 Safety belt fastening device for limb operation and use method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114425131A (en) * 2021-12-27 2022-05-03 大连橡胶塑料机械有限公司 High altitude construction hangs some frocks
CN114432609A (en) * 2022-02-10 2022-05-06 四川省第六建筑有限公司 Safety belt hanging device
CN115162759A (en) * 2022-05-23 2022-10-11 中国十七冶集团有限公司 Safety belt fastening device for limb operation and use method thereof

Similar Documents

Publication Publication Date Title
CN209790657U (en) Balcony edge high-altitude operation safety belt fastening point device
CN202324571U (en) Overhanging type double-row scaffold
CN110528891B (en) Integral hoisting method for large-span spherical net rack
CN210236926U (en) Folding type tower crane pedestrian safety passage
CN205637541U (en) Balanced automatic hanging flower basket
CN106013750A (en) Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof
CN104763109A (en) Quick construction method for pressed bottom tile of large-span steel structure factory building roof
CN107761961A (en) A kind of electronic climbing frame monolithic construction method of high-rise building
CN102337782B (en) Lift system for constructing truss platform on top of tall and large space
CN106906908A (en) Colored steel room construction method of installation
KR100777937B1 (en) Construcion safety working cage with scaffold
CN107165281A (en) A kind of high-altitude long-span overhung steel platform mould bases construction
CN110259088B (en) Method for erecting external protection scaffold of building with twisted vertical face
CN104261232A (en) Lifting device attaching to special-shaped section and mounting method of lifting device
CN105088979B (en) Demolition blasting method for large bridge
CN210239090U (en) Movable operating platform
CN205171979U (en) Integrated form all steel lift platform
CN203430066U (en) Closed protective platform for core tube
CN210683010U (en) Stair climbing machine device
CN210289065U (en) Scaffold frame of encorbelmenting convenient to transport material
CN205955164U (en) Portable steel truss operation platform
CN112049462A (en) Mechanical dismantling process for high-altitude building
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN211499876U (en) Super high-rise overhanging safe hard protection shed
CN219671100U (en) Construction platform of cable bridge guy cable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant