CN202628119U - Tunnel second-lining trolley module unit docking combination device - Google Patents
Tunnel second-lining trolley module unit docking combination device Download PDFInfo
- Publication number
- CN202628119U CN202628119U CN 201220311422 CN201220311422U CN202628119U CN 202628119 U CN202628119 U CN 202628119U CN 201220311422 CN201220311422 CN 201220311422 CN 201220311422 U CN201220311422 U CN 201220311422U CN 202628119 U CN202628119 U CN 202628119U
- Authority
- CN
- China
- Prior art keywords
- chassis
- modular unit
- longeron
- flange
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a tunnel second-lining trolley module unit docking combination device. The tunnel second-lining trolley module unit docking combination device comprises a main trolley, a module unit trolley and an overall trolley docking combination structure, wherein the main trolley is formed by arranging a longitudinal roller, a top template of the trolley and a side template of the trolley on a portal frame; screw lifters, horizontal jacks and vertical jacks arranged on the upper surface of the beams of the main trolley and the module unit trolley are matched, so that the height and the axis position of the top template can be adjusted, and the docking combination of the main trolley and the module unit trolley is facilitated; and the module unit trolley can be moved to another channel to dock and lengthen other main trolleys through a transverse roller arranged on the module unit trolley and a shaft channel. By using the tunnel second-lining trolley module unit docking combination device, the problem that the construction progress is delayed because the conventional tunnel second-lining concrete structure template trolley cannot be docked and lengthened is solved. The tunnel second-lining trolley module unit docking combination device is simple in structure, convenient to operate, and an ideal tunnel second-lining pouring tool.
Description
Technical field
The utility model relates to the frock of tunnel double-lining concrete structure pouring construction, particularly relates to the tunnel double-lining chassis modular unit butt joint composite set that is used for the tunnel double-lining concrete structure.
Background technology
The big section two lining concrete structures in tunnel are built, and generally all adopt this mature technology of formwork jumbo to carry out.Formwork jumbo has multiple form of structure, and the length tradition formulating method of formwork jumbo all is according to construction experience, the engineering expection scheduling of similar engineering in the past, designs and makes.But; According to the result of tunnel structure and actual monitoring data, the situation that the formwork jumbo length of initial design falls short of be can often occur behind the commencement of works, daily work load and programming influenced; Then require the formwork jumbo structure of initial designs is carried out lengthening reform in order not influence construction progress; So that can construct as scheduled by the programming plan, but the formwork jumbo structure that is delivered for use finalizes the design, and design defect causes formwork jumbo can't add long process; Add the long process combination that but can't achieve a butt joint though perhaps realized formwork jumbo, give by the progress construction and cause a difficult problem.
The utility model content
The purpose of the utility model is that the deficiency to conventional art provides and a kind ofly can solve initial stage tunneling formwork chassis fault of construction; Realize the construction speed requirement; Formwork jumbo can freely dock combination lengthening and simple in structure, easy to operate tunnel double-lining chassis modular unit butt joint composite set.
The purpose of the utility model can realize.The utility model tunnel double-lining chassis modular unit butt joint composite set comprises the vertical roller that rolls and be connected with the tunnel ground rail is installed on the longeron below gantry pillar; The crossbeam top of portal frame is provided with the chassis top template; The both sides of portal frame are through plurality of side Form board tape beam; Some adjusters respectively are connected the main chassis that a chassis side template constitutes with some hydraulic jack; The utility model tunnel double-lining chassis modular unit butt joint composite set is characterised in that: said tunnel double-lining chassis modular unit butt joint composite set is by said main chassis; The modular unit chassis; The whole butt joint of chassis combining structure three parts constitute
Each symmetry of both sides screw rod lifter that is slidingly connected above the crossbeam of the portal frame of said main chassis; Said screw rod lifter bottom is inboard respectively to be connected with a level jack; Said screw rod lifter top is fixed in respectively on the backform longeron; Said every backform longeron two ends are equipped with top template longeron flange, affixed carrier bar above the said backform longeron, and said carrier bar and said chassis top template connect into integral body; Respectively establish a vertical jack of activity at said screw rod lifter place above the crossbeam of said portal frame; Said activity vertical jack top and said carrier bar are fitted and connected, and the following longeron two ends of said portal frame are equipped with down the longeron flange, and the longeron two ends are equipped with the longeron flange on the said portal frame; Said side form strip beam two ends are equipped with side form strip beam flange, and said chassis top template two ends are equipped with the template terminal port flange;
The structure of said modular unit chassis and said main chassis is basic identical; Its difference is that the two ends of two backform longerons of said modular unit chassis are equipped with top template longeron flange; The following longeron two ends of the said portal frame of said modular unit chassis are equipped with down the longeron flange; The longeron two ends are equipped with the longeron flange on the said portal frame of said modular unit chassis; The said side form strip beam two ends of the chassis side template of said modular unit chassis are equipped with side form strip beam flange, on the longeron below the said gantry pillar of said modular unit chassis horizontal roller are set also;
The top template longeron flange of said main chassis is connected fixing form top template butt joint combining structure with the template terminal port flange of said modular unit chassis through bolt with the top template longeron flange of said modular unit chassis and said main chassis; The following longeron flange of said main chassis is connected fixing form portal frame butt joint combining structure with the last longeron flange of said modular unit chassis through bolt with the last longeron flange of the following longeron flange of said modular unit chassis and said main chassis; The side form strip beam flange of said main chassis is connected fixing form side template with the template terminal port flange of said modular unit chassis through bolt with the side form strip beam flange of said modular unit chassis and said main chassis and docks combining structure, said top template butt joint combining structure, portal frame butt joint combining structure and the whole butt joint of the side template butt joint combining structure said chassis of common formation combining structure.
The utility model tunnel double-lining chassis modular unit butt joint composite set; Wherein said screw rod lifter has round sliding trace about through said level jack on said crossbeam, said chassis top template has an elevating movement track through said vertical jack and the said relatively crossbeam of screw rod lifter.
The utility model tunnel double-lining chassis modular unit butt joint composite set; Wherein said horizontal roller be installed in said modular unit chassis said longeron 90 the degree displacement apparatus on, said horizontal roller becomes the slip wheel set with the connection vertical shaft in parallel adjacent two tunnels or the horizontal ground rail of communication passage.
The utility model tunnel double-lining chassis modular unit butt joint composite set, wherein said modular unit chassis total length is 3m, template vertically branch block length is 1.5m, is linked to each other by bolt through flange between adjacent two blocks of branch plates.
The utility model tunnel double-lining chassis modular unit butt joint composite set difference from prior art is that the utility model tunnel double-lining chassis modular unit butt joint composite set has solved the problem that traditional tunnel double-lining concrete structure formwork chassis can't achieve a butt joint and extend and make up and cause the delay construction speed.The tunnel double-lining chassis modular unit butt joint composite set of the utility model adopts the modular unit method; Other chassis all are the form design that the whole butt joint of chassis combining structure is carried out on the basis with the modular unit, and modular unit can realize freely docking the lengthening combination according to task needs and other chassis.The utility model tunnel double-lining chassis modular unit butt joint composite set is simple in structure, easy to operate, is that a kind of desirable tunnel double-lining that is used for is built frock.
Below in conjunction with accompanying drawing this tunnel double-lining chassis modular unit butt joint composite set is further specified.
Description of drawings
Fig. 1 is the cross-sectional configuration sketch map of tunnel double-lining chassis modular unit butt joint composite set.
Fig. 2 vertically makes up sketch map for the structure of tunnel double-lining chassis modular unit butt joint composite set.
Fig. 3 is the butt joint floor map of main chassis and modular unit chassis in the utility model.
Fig. 4 is for adjuster goes up and down, the dynamic schematic diagram of the flexible state leave from office roof template of level jack.
Fig. 5 is the vertical or horizontal working state schematic representation when mobile of the utility model modular unit chassis.
The specific embodiment
Like Fig. 1, Fig. 2, shown in Figure 3; The utility model tunnel double-lining chassis modular unit butt joint composite set comprises on the longeron 1 below gantry pillar 2 the vertical roller that rolls and be connected with the tunnel ground rail is installed; Crossbeam 3 tops of portal frame are provided with chassis top template A, and the both sides of portal frame respectively are connected the main chassis I that a chassis side template B constitutes through plurality of side Form board tape beam 8, some adjusters 7 and some hydraulic jack 9.The utility model tunnel double-lining chassis modular unit butt joint composite set is made up of main chassis I, modular unit chassis II, the whole butt joint of chassis combining structure three parts.
Each symmetry of both sides screw rod lifter 5 that is slidingly connected above the crossbeam 3 of the portal frame of main chassis I, screw rod lifter 5 bottoms inboard each is connected with a level jack 11.Screw rod lifter 5 tops are fixed in respectively on two backform longerons 6, and every backform longeron 6 two ends are equipped with top template longeron flange 14.Affixed carrier bar 18 above the backform longeron 6, carrier bar 18 connects into integral body with chassis top template A.Respectively establish a vertical jack 10 of activity at screw rod lifter 5 places above the crossbeam 3 of portal frame, movable vertical jack 10 tops and carrier bar 18 are fitted and connected.Following longeron 1 two ends of portal frame are equipped with down longeron flange 12.Last longeron 4 two ends of portal frame are equipped with longeron flange 13.Side form strip beam 8 two ends are equipped with side form strip beam flange 15.Chassis top template A two ends are equipped with template terminal port flange 16.
The structure of modular unit chassis II and main chassis I is basic identical.Difference is that the two ends of two backform longerons 6 of modular unit chassis II are equipped with top template longeron flange 14-1; Following longeron 1 two ends of the portal frame of modular unit chassis II are equipped with down longeron flange 12-1; Longeron 4 two ends are equipped with longeron flange 13-1 on the portal frame of modular unit chassis II; Side form strip beam 8 two ends of the chassis side template B of modular unit chassis II are equipped with side form strip beam flange 15-1; On the longeron 1 below the gantry pillar 2 of modular unit chassis II horizontal roller 17 is set also.
The top template longeron flange 14 of main chassis I is connected fixing form top template butt joint combining structure with the template terminal port flange 16 of modular unit chassis II through bolt with the top template longeron flange 14-1 of modular unit chassis II and main chassis I.The following longeron flange 12 of main chassis I is connected fixing form portal frame butt joint combining structure with the last longeron flange 13-1 of modular unit chassis II through bolt with the last longeron flange 13 of the following longeron flange 12-1 of modular unit chassis II and main chassis I.The side form strip beam flange 15 of main chassis I is connected fixing form side template butt joint combining structure with the template terminal port flange 16 of modular unit chassis II through bolt with the side form strip beam flange 15-1 of modular unit chassis II and main chassis I.Top template butt joint combining structure, portal frame butt joint combining structure and side template butt joint combining structure constitute the whole butt joint of chassis combining structure jointly.
As shown in Figure 4, screw rod lifter 5 has round sliding trace about through level jack 11 on crossbeam 3, and screw rod lifter 5 can move horizontally under level jack 11 effects.Chassis top template A has an elevating movement track through vertical jack 10 with screw rod lifter 5 relative crossbeams 3.Vertical jack 10 uses with screw rod lifter 5 cooperation, chassis top template A is gone up and down and fix, with the locations of structures of change chassis top template A.
Like Fig. 2, shown in Figure 5, laterally roller 17 is installed on the 90 degree displacement apparatus of longeron 1 of modular unit chassis II.Laterally roller 17 becomes the slip wheel set with the connection vertical shaft in parallel adjacent two tunnels or the horizontal ground rail of communication passage.Horizontal roller 17 is laterally placed, and modular unit chassis II is placed on the horizontal ground rail that is communicated with vertical shaft or communication passage, can push modular unit chassis II to another adjacent tunnel through horizontal roller 17.
In the utility model, modular unit chassis II total length is 3m, and template vertically branch block length is 1.5m, is linked to each other by bolt through flange between adjacent two blocks of branch plates.
Below, the butt joint combined method step of the tunnel double-lining chassis modular unit butt joint composite set through the utility model of providing further describes the tunnel double-lining chassis modular unit butt joint composite set left side of the utility model:
Prepare the kilter before should being in the combination butt joint of lengthening in step 1, the same tunnel of inspection, and preparation is docked with main chassis I and its structure of modular unit chassis II of being used to extend; Or the kilter before should being in the combination butt joint with main chassis I and its structure of modular unit chassis II that is used to extend of lengthening is prepared by inspection department in adjacent two tunnels; Needs are moved laterally to the modular unit chassis II in adjacent another tunnel, in vertical shaft, with jack it is propped earlier, under the longeron 1 of portal frame, horizontal roller 17 laterally is installed through 90 degree displacement apparatus; Fall modular unit chassis II afterwards; Horizontal roller 17 is dropped on the horizontal ground rail of tunnel connection vertical shaft or communication passage, and horizontal push module unit chassis II is when modular unit chassis II arrives another adjacent tunnel; Elder generation's jack-up modular unit chassis II; Lay down horizontal roller, fall modular unit chassis II again, vertical roller of modular unit chassis II is dropped on this tunnel longitudinal rail; Vertically move again modular unit chassis II to prepare lengthening with main chassis I place, and prepare to dock;
The modular unit chassis II be used to extend is prepared in step 3, adjustment, cooperates screw rod lifters 5 through jack 10, with the chassis top template A lift adjustment of modular unit chassis II to the highly identical specified altitude of chassis top template A of main chassis I; Cooperate screw rod lifters 5 through level jack 11, the chassis top template A of modular unit chassis II is moved horizontally the identical assigned position of chassis top template A axial location that is adjusted to main chassis I; Cooperate some adjusters 7 to carry out length adjustment through some side form hydraulic jack 9, the chassis side template B of modular unit chassis II is rotated the level assigned position of adjusting to main chassis I of chassis side template B coaxial line;
The step that the tunnel double-lining chassis modular unit butt joint composite set modular unit chassis II of the utility model is pulled down from main chassis I is included as: the adjuster of at first laying down chassis side template B; Lay down the connecting bolt of template terminal port flange 16 of the chassis side template B of modular unit chassis II and main chassis I; Break off the side form strip beam 8 of modular unit chassis II and main chassis I; Retraction hydraulic jack (9); Remove the connecting bolt of main chassis I and modular unit chassis II backform longeron 6 then; Remove the connecting bolt of the template terminal port flange 16 of main chassis I and modular unit chassis II chassis top template A, remove on main chassis I and the modular unit chassis II portal frame connecting bolt of longeron 1 under longeron 4, the portal frame at last, mobile module unit chassis II breaks away from itself and main chassis I.
Above-described embodiment describes the preferred implementation of the utility model; Be not that scope to the utility model limits; Under the prerequisite that does not break away from the utility model design spirit; Various distortion and improvement that those of ordinary skills make the technical scheme of the utility model all should fall in the definite protection domain of the utility model claims.
Claims (4)
1. a tunnel double-lining chassis modular unit docks composite set; Comprise the vertical roller that rolls and be connected with the tunnel ground rail is installed on the longeron (1) below gantry pillar (2); The crossbeam of portal frame (3) top is provided with chassis top template (A); The both sides of portal frame are through plurality of side Form board tape beam (8); Some adjusters (7) respectively are connected the main chassis (I) that a chassis side template (B) constitutes with some hydraulic jack (9); It is characterized in that: said tunnel double-lining chassis modular unit butt joint composite set is by said main chassis (I); Modular unit chassis (II); The whole butt joint of chassis combining structure three parts constitute
Each symmetry of both sides screw rod lifter (5) that is slidingly connected above the crossbeam (3) of the portal frame of said main chassis (I); Said screw rod lifter (5) bottom is inboard respectively to be connected with a level jack (11); Said screw rod lifter (5) top is fixed in respectively on the backform longeron (6); Said every backform longeron (6) two ends are equipped with top template longeron flange (14); Affixed carrier bar (18) above the said backform longeron (6); Said carrier bar (18) connects into integral body with said chassis top template (A), locates respectively to establish a vertical jack of activity (10) at said screw rod lifter (5) above the crossbeam of said portal frame (3), and the vertical jack of said activity (10) top and said carrier bar (18) are fitted and connected; Following longeron (1) two ends of said portal frame are equipped with down longeron flange (12); Longeron on the said portal frame (4) two ends are equipped with longeron flange (13), and said side form strip beam (8) two ends are equipped with side form strip beam flange (15), and said chassis top template (A) two ends are equipped with template terminal port flange (16);
Said modular unit chassis (II) is basic identical with the structure of said main chassis (I); Its difference is that the two ends of two backform longerons (6) of said modular unit chassis (II) are equipped with top template longeron flange (14-1); Following longeron (1) two ends of the said portal frame of said modular unit chassis (II) are equipped with down longeron flange (12-1); Longeron (4) two ends are equipped with longeron flange (13-1) on the said portal frame of said modular unit chassis (II); Said side form strip beam (8) two ends of the chassis side template (B) of said modular unit chassis (II) are equipped with side form strip beam flange (15-1), on the longeron (1) below the said gantry pillar (2) of said modular unit chassis (II) horizontal roller (17) are set also;
The top template longeron flange (14) of said main chassis (I) is connected fixing form top template butt joint combining structure with the template terminal port flange (16) of said modular unit chassis (II) through bolt with the top template longeron flange (14-1) of said modular unit chassis (II) and said main chassis (I); The following longeron flange (12) of said main chassis (I) is connected fixing form portal frame butt joint combining structure with the last longeron flange (13-1) of said modular unit chassis (II) through bolt with the last longeron flange (13) of the following longeron flange (12-1) of said modular unit chassis (II) and said main chassis (I); The side form strip beam flange (15) of said main chassis (I) is connected fixing form side template with the template terminal port flange (16) of said modular unit chassis (II) through bolt with the side form strip beam flange (15-1) of said modular unit chassis (II) and said main chassis (I) and docks combining structure, said top template butt joint combining structure, portal frame butt joint combining structure and the whole butt joint of the side template butt joint combining structure said chassis of common formation combining structure.
2. tunnel double-lining chassis modular unit butt joint composite set according to claim 1; It is characterized in that: said screw rod lifter (5) has round sliding trace about through said level jack (11) on said crossbeam (3), said chassis top template (A) has an elevating movement track through said vertical jack (10) and the said relatively crossbeam of screw rod lifter (5) (3).
3. tunnel double-lining chassis modular unit butt joint composite set according to claim 1 and 2; It is characterized in that: said horizontal roller (17) be installed in said modular unit chassis (II) said longeron (1) 90 the degree displacement apparatus on, said horizontal roller (17) becomes the slip wheel set with the connection vertical shaft in parallel adjacent two tunnels or the horizontal ground rail of communication passage.
4. tunnel double-lining chassis modular unit butt joint composite set according to claim 3, it is characterized in that: said modular unit chassis (II) total length is 3m, template vertically branch block length is 1.5m, is linked to each other by bolt through flange between adjacent two blocks of branch plates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220311422 CN202628119U (en) | 2012-06-29 | 2012-06-29 | Tunnel second-lining trolley module unit docking combination device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220311422 CN202628119U (en) | 2012-06-29 | 2012-06-29 | Tunnel second-lining trolley module unit docking combination device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202628119U true CN202628119U (en) | 2012-12-26 |
Family
ID=47381327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220311422 Expired - Lifetime CN202628119U (en) | 2012-06-29 | 2012-06-29 | Tunnel second-lining trolley module unit docking combination device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202628119U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704953A (en) * | 2012-06-29 | 2012-10-03 | 北京城建道桥建设集团有限公司 | module unit butt joint combining device and method for tunnel secondary lining trolley |
CN103089278A (en) * | 2013-02-27 | 2013-05-08 | 中交隧道工程局有限公司 | Continuous operation rolling over docking type tunnel lining formwork trolley |
CN104632251A (en) * | 2014-12-31 | 2015-05-20 | 上海市机械施工集团有限公司 | Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage |
CN104863616A (en) * | 2015-04-14 | 2015-08-26 | 安徽岚岛重工科技股份有限公司 | Adjustable top template device for full-automatic hydraulic concrete lining steel template trolley |
CN113464165A (en) * | 2021-06-30 | 2021-10-01 | 湖南五新模板有限公司 | Reversible inverted arch formwork and construction method thereof |
CN117930141A (en) * | 2024-03-25 | 2024-04-26 | 湖北高路公路工程监理咨询有限公司 | Tunnel defect detection device and method based on radar detection |
-
2012
- 2012-06-29 CN CN 201220311422 patent/CN202628119U/en not_active Expired - Lifetime
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704953A (en) * | 2012-06-29 | 2012-10-03 | 北京城建道桥建设集团有限公司 | module unit butt joint combining device and method for tunnel secondary lining trolley |
CN102704953B (en) * | 2012-06-29 | 2014-02-26 | 北京城建道桥建设集团有限公司 | Module unit butt joint combining device and method for tunnel secondary lining trolley |
CN103089278A (en) * | 2013-02-27 | 2013-05-08 | 中交隧道工程局有限公司 | Continuous operation rolling over docking type tunnel lining formwork trolley |
CN104632251A (en) * | 2014-12-31 | 2015-05-20 | 上海市机械施工集团有限公司 | Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage |
CN104863616A (en) * | 2015-04-14 | 2015-08-26 | 安徽岚岛重工科技股份有限公司 | Adjustable top template device for full-automatic hydraulic concrete lining steel template trolley |
CN113464165A (en) * | 2021-06-30 | 2021-10-01 | 湖南五新模板有限公司 | Reversible inverted arch formwork and construction method thereof |
CN117930141A (en) * | 2024-03-25 | 2024-04-26 | 湖北高路公路工程监理咨询有限公司 | Tunnel defect detection device and method based on radar detection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202628119U (en) | Tunnel second-lining trolley module unit docking combination device | |
CN102704953B (en) | Module unit butt joint combining device and method for tunnel secondary lining trolley | |
CN203866715U (en) | Multi-roof-truss rhombic truss hanging basket for long-cantilever box beam construction | |
CN109811603B (en) | Transfer device and transfer method for laying steel rail on seamless track of newly-built railway | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN202199990U (en) | Support platform for welding tubular bus-bars | |
CN203855866U (en) | Large-span frame bridge overhead roof with beams convenient to construct | |
CN203866654U (en) | Mobile assembly platform used for ballastless track laying construction | |
CN103967284B (en) | The steel column installation method of reserved stigma docking | |
CN102373673A (en) | Bridge construction rolling shaft hanging basket across railway existing line and use method thereof | |
CN104695335A (en) | Overall reinforcement binding and hoisting construction method and construction device adopting upstroke movable scaffolding | |
CN202417519U (en) | Synchronous trolley | |
CN104895336A (en) | Method for installing stiff mixed-structure steel girders in place | |
CN203959689U (en) | A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car | |
CN102926330B (en) | Installation method of hanging basket suitable for bridge construction | |
CN104948203A (en) | Integral construction method for inclined-shaft tunnel linings and asymmetric mid-wall linings | |
CN108004930A (en) | The construction method of vertical shift bowstring arch bridge | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN208501523U (en) | It is a kind of novel for setting up the Bridge Erector for spelling wide beam | |
CN207700074U (en) | The double limb triangle hanging baskets of continuous rigid frame bridge cantilever beam section construction | |
CN207919265U (en) | Suitable for covering rail plate-type ballastless track plate paver on steel truss girder bridge | |
CN204873491U (en) | Self -supporting does not have crossbeam hoist system | |
CN102251477B (en) | Traversing construction method for tie bar arch | |
CN202298467U (en) | Switching platform bridging device for crossing existing rail lines | |
CN204401473U (en) | Upstroke movable framework steel bar overall binding lifting construction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20121226 |