CN203959689U - A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car - Google Patents

A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car Download PDF

Info

Publication number
CN203959689U
CN203959689U CN201420353569.1U CN201420353569U CN203959689U CN 203959689 U CN203959689 U CN 203959689U CN 201420353569 U CN201420353569 U CN 201420353569U CN 203959689 U CN203959689 U CN 203959689U
Authority
CN
China
Prior art keywords
depositing dust
pipeline
operation car
adjusted
entablatrance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420353569.1U
Other languages
Chinese (zh)
Inventor
刘健
张学忠
巩猛
李树河
王志楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin MCC20 Construction Co Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN201420353569.1U priority Critical patent/CN203959689U/en
Application granted granted Critical
Publication of CN203959689U publication Critical patent/CN203959689U/en
Anticipated expiration legal-status Critical
Active legal-status Critical Current

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model relates to a kind of large-type sinterer depositing dust pipeline and installs and adjust with operation car, comprise the driving wheel being arranged on Crane Rail, described driving wheel is arranged on the bottom girder of driving main body steelframe, the two ends, left and right of described bottom girder are respectively arranged with beam column, the upper end of described beam column is connected with entablatrance, described entablatrance is vertically arranged with at least two slide rails, is provided with the slide mechanism of at least two groups for moving forward and backward on described slide rail.The utility model can be realized installation and the adjustment of the pipeline of any length and weight, has saved loaded down with trivial details link and the potential safety hazard of site operation in prior art.

Description

A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car
Technical field
The utility model relates to a kind of industrial transportation means, especially relates to a kind of large-type sinterer depositing dust pipeline and installs and adjust with operation car.
Background technology
The main depositing dust pipe diameter of large scale sintering is generally about 6 meters, and volume, weight ratio are larger.Pipeline parallel arranged, is arranged on respectively A row~B row and B row~C row and 34 collapses altogether, and the single length of main depositing dust pipeline is about 130 meters; Depositing dust supervisor is about 260 meters altogether, is heavily about 350 tons.Pipeline installed height mark is generally about+10 meters (center absolute altitude), is installed on 7.5 meters of platforms, and the support beam that has 18 spacing to be about 8 meters along 1-18 post direction on 7.5 meters of platforms, often across approximately 8 meters of headroom.Because depositing dust pipeline is installed on the base between 7.5 meters and 19 meters, upper brace seals, cannot use common existing driving to install, and in factory building, landing beam below 7.5 meters and pillar are more again, crane also cannot enter factory building inside and lift, and so just causes installation, the adjustment job very difficult of depositing dust pipeline.The method that solves at present installation sintering machine depositing dust pipeline mainly contains:
1, pipeline field, by span group to becoming 30 multistages, while lifting each section, is first sling pipeline with large-scale crane, after pipeline setting height(from bottom), with elevator, jack, in manufacturer, pulls to pipeline center position.The method crane needs repeatedly erect-position, and high to workyard requirement, crane machine-team is used too much, and needs a large amount of manpowers, and construction safety is guarantee not.
2, on 7.5 meters of landing beams, lay two row H shaped steel as slideway, in 1 post outside, establish a transferring platform, use jack and coordinate elevator that the pipeline section assembling (is amounted to 30 multistages, every section approximately long 8 meters, weigh 20 tons) be dragged to installation site and install, while installing each section, all interim suspension centre must be set.The shortcoming of the method is mainly reflected in the following aspects:
(1) pipeline, because diameter is larger, need to install reinforced rib during field assembly, so just makes that pipeline difficulty when pulling is larger, safety is poor.
(2) while installing due to pipeline, 19 meters of platforms seal, and cause pipeline that suspension centre is set when in place more difficult, and all will reset suspension centre when each segment pipe is installed, and cause site operation link loaded down with trivial details, complicated.
Utility model content
The purpose of this utility model is to solve exist when above-mentioned large-type sinterer depositing dust pipeline is installed long in time limit, site operation link is loaded down with trivial details, complicated, adjustment difficulty large, crane machine-team is used too much, and need a large amount of manpowers, construction safety does not ensure, easily goes out the problems such as safety misadventure.
The utility model object originally realizes by following technical proposals:
A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car, comprise the driving wheel being arranged on Crane Rail, described driving wheel is arranged on the bottom girder of driving main body steelframe, the two ends, left and right of described bottom girder are respectively arranged with beam column, the upper end of described beam column is connected with entablatrance, described entablatrance is vertically arranged with at least two slide rails, is provided with the slide mechanism of at least two groups for moving forward and backward on described slide rail.
Described slide mechanism comprises two sliding wheels that be arranged in parallel, and described sliding wheel is connected with the jack wheel that is provided with suspension hook by connector.
The carrying force of described driving main body steelframe is 25 tons.
The utility model beneficial effect is: the driving main body steelframe that adopts 25 tons of carrying forces, the two ends, left and right of steelframe bottom girder are respectively arranged with beam column, the upper end of described beam column is connected with entablatrance, described entablatrance is vertically arranged with at least two slide rails, on described slide rail, be provided with the slide mechanism with jack wheel of at least two groups for moving forward and backward, the jack of described jack wheel can be according to the length of pipeline, freely adjust, convenient lifting, therefore can realize installation and the adjustment of the pipeline of any length and weight, saved loaded down with trivial details link and the potential safety hazard of site operation in prior art.After engineering finishes, just driving steelframe can be removed simultaneously, because steelframe section bar is selected the follow-up support of pipelines section bar of this engineering, after dismounting, still can use, reduce greatly engineering cost.
Accompanying drawing explanation
Fig. 1 figure below is the structural representation of the utility model transportation driving.
Fig. 2 is A-A structural representation in Fig. 1.
Reference numeral: 1 track 2 bottom girder 3 beam column 4 entablatrance 5 slide rail 6 sliding wheel 7 connector 8 suspension hook 9 jack wheels
The specific embodiment
Below in conjunction with accompanying drawing explanation, the utility model is described in further detail:
As shown in Figure 1 and Figure 2, a kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car, comprise the driving wheel being arranged on Crane Rail 1, described driving wheel is arranged on the bottom girder 2 of driving main body steelframe, the carrying force of driving main body steelframe described in the utility model is 25 tons, two ends, left and right at described bottom girder 2 are respectively arranged with beam column 3, the upper end of described beam column 3 is connected with entablatrance 4, described entablatrance 4 is vertically arranged with at least two slide rails 5, is provided with the slide mechanism of at least two groups for moving forward and backward on described slide rail 5.Described slide mechanism comprises two sliding wheels that be arranged in parallel 6, and described sliding wheel 6 is connected with the jack wheel 9 that is provided with suspension hook 8 by connector 7.
The utility model first reaches transferring platform by operation car while using, regulate respectively 4 jack mechanisms behind suitable position, with 4 10 tons of jacks, pipe level is sling, and make pipeline bottom surface higher than conduit saddle 100mm, then make to move garage and run to pipeline installation site, while adjusting the height of pipelines and levelness to installed height mark with 4 jacks, pipeline and conduit saddle are fixed, then repeated above process other pipelines are installed.The method installation rate is very fast, setting accuracy is high, safe, can shorten about 15 days than the general method duration.
Although by reference to the accompanying drawings the utility model has been carried out to foregoing description; but the utility model is not limited to the above-mentioned specific embodiment; above-mentioned concrete mode is only schematic; rather than restrictive; member of ordinary skill in the art is under of the present utility model opening; in the situation that not departing from the utility model aim and claim institute protection domain, can also make a lot of distortion, this all belongs to the row of protection of the present utility model.

Claims (3)

1. a large-type sinterer depositing dust pipeline is installed and is adjusted with operation car, comprise the driving wheel being arranged on Crane Rail, it is characterized in that, described driving wheel is arranged on the bottom girder of driving main body steelframe, the two ends, left and right of described bottom girder are respectively arranged with beam column, the upper end of described beam column is connected with entablatrance, and described entablatrance is vertically arranged with at least two slide rails, is provided with the slide mechanism of at least two groups for moving forward and backward on described slide rail.
2. a kind of large-type sinterer depositing dust pipeline according to claim 1 is installed and is adjusted with operation car, it is characterized in that, described slide mechanism comprises two sliding wheels that be arranged in parallel, and described sliding wheel is connected with the jack wheel that is provided with suspension hook by connector.
3. a kind of large-type sinterer depositing dust pipeline according to claim 1 is installed and is adjusted with operation car, it is characterized in that, the carrying force of described driving main body steelframe is 25 tons.
CN201420353569.1U 2014-06-27 2014-06-27 A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car Active CN203959689U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420353569.1U CN203959689U (en) 2014-06-27 2014-06-27 A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420353569.1U CN203959689U (en) 2014-06-27 2014-06-27 A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car

Publications (1)

Publication Number Publication Date
CN203959689U true CN203959689U (en) 2014-11-26

Family

ID=51920299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420353569.1U Active CN203959689U (en) 2014-06-27 2014-06-27 A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car

Country Status (1)

Country Link
CN (1) CN203959689U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104973517A (en) * 2015-06-26 2015-10-14 天津二十冶建设有限公司 Electric gantry platform for installing sintering machine head equipment and application method thereof
CN108160627A (en) * 2017-12-25 2018-06-15 天津市朋展钢管有限公司 A kind of double-submerged arc connects the surface cleaning apparatus of spiral steel pipe
CN110217702A (en) * 2019-06-06 2019-09-10 山东电力建设第三工程有限公司 The transport device and installation method of circulation large diameter pipeline
CN112919314A (en) * 2021-02-25 2021-06-08 华诚博远工程技术集团有限公司 Device for assisting in translational transportation and installation of overweight steel column and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104973517A (en) * 2015-06-26 2015-10-14 天津二十冶建设有限公司 Electric gantry platform for installing sintering machine head equipment and application method thereof
CN108160627A (en) * 2017-12-25 2018-06-15 天津市朋展钢管有限公司 A kind of double-submerged arc connects the surface cleaning apparatus of spiral steel pipe
CN110217702A (en) * 2019-06-06 2019-09-10 山东电力建设第三工程有限公司 The transport device and installation method of circulation large diameter pipeline
CN112919314A (en) * 2021-02-25 2021-06-08 华诚博远工程技术集团有限公司 Device for assisting in translational transportation and installation of overweight steel column and construction method
CN112919314B (en) * 2021-02-25 2022-03-08 华诚博远工程技术集团有限公司 Device for assisting in translational transportation and installation of overweight steel column and construction method

Similar Documents

Publication Publication Date Title
CN203959689U (en) A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN104016089B (en) Sintering machine large flue slide installation method and track installation mechanism thereof
CN105152032A (en) Installing method for bridge crane in enclosed environment workshop
CN103967284B (en) The steel column installation method of reserved stigma docking
CN102720432A (en) Self-propelled underground boring jumbo
CN104060835A (en) Lifting-sliding construction method for single plane truss
CN103194977B (en) Integration of transporting and building formula Bridge Erector sets up first hole case beam front launching nose machine installation method
CN103993745B (en) A kind of conversion beam integral hoisting device for rapid and hanging method thereof
CN111038940A (en) Rail mounted is used for hoist and mount traction system of transportation
CN204510844U (en) A kind of large-span steel girder high-altitude mounting slip device
CN107227686A (en) A kind of tunnel-type anchorage pre-stress system locating support construction method
CN205576749U (en) Pontic roof beam structure promotes and rackwork
CN102190249A (en) Method for hoisting equipment positioned at bottom of multilayer frame platform
CN203247031U (en) Hoisting device for curtain board transporting
CN203878979U (en) Bolt opposite-pulling type track sliding formwork
CN103669882A (en) Method for conducting component installation with steel wire ropes serving as rails in industrial factory building
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN105421246A (en) Installation method of towing cable hanging baskets
CN203257106U (en) Multifunctional power-driven walking type walking system
CN104060838A (en) Grouping and air-pairing installation method for corridor
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN108756197A (en) A kind of construction method of hoistway operation platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant