CN202577730U - 蒸压加气混凝土布线砌块 - Google Patents

蒸压加气混凝土布线砌块 Download PDF

Info

Publication number
CN202577730U
CN202577730U CN 201220245264 CN201220245264U CN202577730U CN 202577730 U CN202577730 U CN 202577730U CN 201220245264 CN201220245264 CN 201220245264 CN 201220245264 U CN201220245264 U CN 201220245264U CN 202577730 U CN202577730 U CN 202577730U
Authority
CN
China
Prior art keywords
building block
wiring
concrete
wire laying
aerated concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220245264
Other languages
English (en)
Inventor
杨庆昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220245264 priority Critical patent/CN202577730U/zh
Application granted granted Critical
Publication of CN202577730U publication Critical patent/CN202577730U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

一种蒸压加气混凝土布线砌块,涉及蒸压加气混凝土砌块墙体的管线埋设。本实用新型在砌块上形成纵向和横向的布线沟槽,解决了现有布线作业要在砌块上大量镂槽的问题。在生产砌块的切割阶段,在砌块坯体未经高压釜蒸压,砌块坯体经过初养初凝后在切割机上加装开槽装置进行布线沟槽的开槽、成型,经过蒸压后,在砌块上形成规则的纵向、横向布线沟槽,各布线砌块与混凝土砌块分层码放,错开叠压,相互咬合,使布线砌块上的布线沟槽上下贯通,左右贯通。

Description

蒸压加气混凝土布线砌块
所属技术领域
本实用新型涉及蒸压加气混凝土砌块墙体的管线埋设。
背景技术
蒸压加气混凝土砌块以其重量轻、保温、隔噪、阻燃、省工时、节约土地资源等诸多好处受到青睐,但这种墙体在埋设管线时又有许多不便,如埋设管线前需要专用工具进行镂槽,会产生噪音、粉尘污染,危害工人呼吸系统,工人在砌好的墙体上镂槽,还要爬高下低,不便操作,甚至会造成切割到身体的意外伤害,耗时耗资,如切割不慎,会破坏制品及受力性能,而使用本实用新型可以摒除现有布线作业中的弊端,提高布线效率。
发明内容
为了克服在蒸压加气混凝土砌块上镂槽以埋设管线的诸多不便,本实用新型提供一种蒸压加气混凝土布线砌块,在砌块上形成纵向和横向的布线沟槽,解决了现有布线作业要在砌块上大量镂槽的问题。
本实用新型解决其技术问题所采用的技术方案是:在生产蒸压加气混凝土砌块的切割阶段,在砌块坯体未经高压釜蒸压,砌块坯体经过初养初凝后在切割机上加装开槽装置进行布线沟槽的开槽、成型,经过蒸压后,在砌块上形成规则的纵向、横向布线沟槽,其形状为图1、图2所示。各布线砌块与混凝土砌块分层码放,错开叠压,相互咬合,使布线砌块上的布线沟槽上下贯通,左右贯通。
本实用新型的有益效果是,使用本实用新型布线砌块进行埋设管线时,不进行大量镂槽作业,从而省时省工,减轻劳动强度,提高布线施工效率。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1是本实用新型纵向布线砌块透视图;
图2是本实用新型横向布线砌块透视图;
图3是本实用新型第一个实施例透视图,纵向布线砌块与混凝土砌块分层码放,错开叠压,相互咬合,使纵向布线砌块上的布线沟槽上下贯通;
图4是本实用新型第二个实施例透视图,横向布线砌块处在同一层面,使横向布线砌块上的布线沟槽左右贯通;
图5是本实用新型纵向布线砌块开槽位置示意图;
图6是本实用新型横向布线砌块开槽位置示意图;
图中1是布线沟槽,2是砌块边棱,3是砌块四分之一长处,4是砌块三分之一长处,5是砌块二分之一长处,。6是砌块二分之一高处,7是砌块三分之一高处。
具体实施方式
本实用新型是在蒸汽加压混凝土砌块未经高压釜蒸压、砌块坯体经过初养初凝后,在切割机上加装开槽装置进行布线沟槽的开槽、成型,本实用新型纵向布线砌块的开槽处在砌块的四分之一长处(图1),横向布线砌块的开槽处在砌块二分之一高处(图2),开槽的数量、开槽位置、开槽规格可以调整,本实用新型纵向布线砌块开槽数量为1至4条之间,横向布线砌块开槽数量为1至3条之间;纵向布线砌块开槽位置可以在砌块边棱、四分之一长处、三分之一长处、二分之一长处(图5),横向布线砌块开槽位置可以在砌块边棱、二分之一高处、三分之一高处(图6);布线沟槽开槽宽度与深度随线管进行调整,宽度与深度不小于管材外径加20毫米。图3第一个实施例中,砌墙时,把纵向布线砌块与混凝土砌块分层码放,错开叠压,相互咬合,使纵向布线砌块上的布线沟槽上下贯通;图4第二个实施例中,砌墙时,把横向布线砌块处在同一层面,使横向布线砌块上的布线沟槽左右贯通。上述本实用新型布线砌块的生产质量标准执行GB11968-2006,本实用新型布线砌块的施工与普通蒸压加气混凝土砌块的要求相同,须执行GB50203-2002《砌体工程质量验收规范》、GB50303-2002建筑电气工程施工验收规范》。

Claims (2)

1.一种蒸压加气混凝土布线砌块,在其上预设一些布线沟槽,其特征是:这些布线沟槽在混凝土砌块坯体未经高压釜蒸压,砌块坯体经过初养初凝后进行布线沟槽的开槽、成型,其形状为纵向布线砌块,横向布线砌块。
2.根据权利要求1所述的蒸压加气混凝土布线砌块,其特征是:蒸压加气混凝土布线砌块上布线沟槽的开槽位置、开槽数量、开槽规格可以调整,布线沟槽开槽宽度与深度随线管进行调整,宽度与深度不小于管材外径加20毫米。
CN 201220245264 2012-05-22 2012-05-22 蒸压加气混凝土布线砌块 Expired - Fee Related CN202577730U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220245264 CN202577730U (zh) 2012-05-22 2012-05-22 蒸压加气混凝土布线砌块

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220245264 CN202577730U (zh) 2012-05-22 2012-05-22 蒸压加气混凝土布线砌块

Publications (1)

Publication Number Publication Date
CN202577730U true CN202577730U (zh) 2012-12-05

Family

ID=47247157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220245264 Expired - Fee Related CN202577730U (zh) 2012-05-22 2012-05-22 蒸压加气混凝土布线砌块

Country Status (1)

Country Link
CN (1) CN202577730U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758272A (zh) * 2014-01-08 2014-04-30 永生建设集团有限公司 蒸压加气混凝土砌块墙体内置管线预埋施工方法
CN104989099A (zh) * 2015-05-22 2015-10-21 重庆一建建设集团有限公司 预埋线盒施工方法
CN109876111A (zh) * 2019-04-19 2019-06-14 杨庆昌 一种治疗小儿尿床遗尿的中药配方及其制备方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758272A (zh) * 2014-01-08 2014-04-30 永生建设集团有限公司 蒸压加气混凝土砌块墙体内置管线预埋施工方法
CN103758272B (zh) * 2014-01-08 2015-12-30 永升建设集团有限公司 蒸压加气混凝土砌块墙体内置管线预埋施工方法
CN104989099A (zh) * 2015-05-22 2015-10-21 重庆一建建设集团有限公司 预埋线盒施工方法
CN109876111A (zh) * 2019-04-19 2019-06-14 杨庆昌 一种治疗小儿尿床遗尿的中药配方及其制备方法

Similar Documents

Publication Publication Date Title
CN103321436B (zh) 建筑砖砌体上线盒预安装施工方法及其预安装支架
CN202577730U (zh) 蒸压加气混凝土布线砌块
CN203684509U (zh) 免开槽砌块砌筑墙体
CN105350701A (zh) 一种建筑砌块材料单元及其对接结构
CN206405386U (zh) 一种改善射砂排气的砂芯模具
CN204898946U (zh) 建筑用轻钢龙骨连接结构
CN205637305U (zh) 一种建筑砌块材料单元及其对接结构
CN204131037U (zh) 一种应用于混凝土预制楼板中结构改进的预埋接线盒
CN103317778A (zh) 一种定子绝缘纸成型用压痕装置
CN204343297U (zh) 一种大体积混凝土中后浇筑梁预留孔洞处理的结构
CN103231446B (zh) 建筑内墙板工厂化生产装置
CN102661024A (zh) 一种管孔板结构的实木复合地板
CN203961436U (zh) 一种新型木塑围栏
CN201850670U (zh) 一种墙体及插接式砌块
CN202595992U (zh) 斜面式集成灯带装饰吊顶龙骨
CN204899034U (zh) 一种预制墙柱
CN204914144U (zh) 一种抗震轻质墙板模具
CN204817688U (zh) 一种用于压制光缆抱箍的压模模具
CN201778430U (zh) 复合式板材结构
CN201320802Y (zh) 一种石膏线条模具
CN202831412U (zh) 多功能cl网架板保护层砂浆垫块
CN203961437U (zh) 一种安装方便的新型木塑围栏
CN202248716U (zh) 地板块坯料
CN204311648U (zh) 一种顶部开槽的预应力叠合板
CN205875580U (zh) 一种软垫型的装饰板

Legal Events

Date Code Title Description
DD01 Delivery of document by public notice

Addressee: Yang Qingchang

Document name: Notification of Acceptance of Patent Application

C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20130522