CN202488716U - Film punching device of receiver - Google Patents

Film punching device of receiver Download PDF

Info

Publication number
CN202488716U
CN202488716U CN2012200603005U CN201220060300U CN202488716U CN 202488716 U CN202488716 U CN 202488716U CN 2012200603005 U CN2012200603005 U CN 2012200603005U CN 201220060300 U CN201220060300 U CN 201220060300U CN 202488716 U CN202488716 U CN 202488716U
Authority
CN
China
Prior art keywords
axle
lifting platform
devices
punching
axis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012200603005U
Other languages
Chinese (zh)
Inventor
周锐
王忠明
朱德华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Corey Automation Technology (suzhou) Co Ltd
Original Assignee
Corey Automation Technology (suzhou) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Corey Automation Technology (suzhou) Co Ltd filed Critical Corey Automation Technology (suzhou) Co Ltd
Priority to CN2012200603005U priority Critical patent/CN202488716U/en
Application granted granted Critical
Publication of CN202488716U publication Critical patent/CN202488716U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)

Abstract

The utility model relates to a film punching device of a receiver. Y-axis feeding devices are arranged on a working platform of a rack, Z-axis lifting platform devices are arranged on the Y-axis feeding devices, clamping devices are arranged on the Z-axis lifting platform devices, X-axis transmitting units are arranged on the rack above the Z-axis lifting platform devices, thermal punching devices are arranged on the X-axis transmitting units, wherein each thermal punching device comprises a punching needle, a heating ring, a positive electrode and a negative electrode, the heating rings are in lap joint with the punching needles, and the positive electrodes and the negative electrodes are led out of the heating rings. Materials are placed on the Y-axis feeding devices arranged side by side, the Y-axis feeding devices respectively go forwards to working positions, the materials are lifted when the Z-axis lifting platform devices lift up, and the materials are clamped by the clamping devices, the heat punching devices downwards carry out punching, testing devices are arranged on the Z-axis lifting platform devices, and are used for immediately carrying out testing after punching. The film punching device has the advantages of high heat punching efficiency and high yield and can be used for carrying out online monitoring on a production process.

Description

Receiver film holed technique equipment
Technical field
The utility model relates to a kind of automatic assembly line production equipment that is applied to high-end micro-telephone receiver product, relates in particular to receiver film holed technique equipment.
Background technology
Vibration film is the topmost key core part of receiver, and parameters such as the size in the hole of being worn, position degree and circularity directly have influence on accepts and transmit the tonequality quality.
Mainly be to adopt anchor clamps at present, realize by resistive heater that because the handwork difficulty is high and resistance wire adds factors such as thermally labile, CPK is less than 1.0, UPH ability 200 is more.Low based on original efficient, qualification rate is low less than 70%, complex operation, and reasons such as single processing and measurement do not reach actual production and quality demand far away, add batch process and can't monitor effectively constantly.
Summary of the invention
The purpose of the utility model is to overcome the deficiency that prior art exists, and a kind of receiver film holed technique equipment is provided.
The purpose of the utility model realizes through following technical scheme:
Receiver film holed technique equipment; Characteristics are: comprise Y axle pay-off, Z axle lifting platform device, clamping device and hot piercing device, on the workbench of frame, be furnished with Y axle pay-off, be furnished with Z axle lifting platform device on the Y axle pay-off; On the Z axle lifting platform device clamping device is installed; Be furnished with X axle delivery unit on the frame of Z axle lifting platform device top, on the X axle delivery unit hot piercing device be installed, said hot piercing device comprises pecker, heating ring, positive electrode and negative electrode; The heating ring overlap joint is drawn positive electrode and negative electrode on the heating ring on pecker.
Further, above-mentioned receiver film holed technique equipment, said pecker end is provided with the crow silk of 0.05 ㎜.
Further; Above-mentioned receiver film holed technique equipment, said Y axle pay-off has one group, is to be symmetrically arranged; All arrange a Z axle lifting platform device on each Y axle pay-off; One clamping device is installed on each Z axle lifting platform device, is arranged an X axle delivery unit on the frame of each Z axle lifting platform device top, a hot piercing device is installed on each X axle delivery unit.
Again further, above-mentioned receiver film holed technique equipment is equipped with testing apparatus on the said Z axle lifting platform device.
Substantive distinguishing features and obvious improvement that the utility model technical scheme is outstanding are mainly reflected in:
The Y axle pay-off of this equipment, Z axle lifting platform device, clamping device and the collaborative work of hot piercing device; On the Y axle pay-off of arranging about material is placed on, Y axle pay-off advances to the service position respectively, and Z axle lifting platform device rises and holds up material; Clamping device clamps material; The hot piercing device is bored a hole downwards, on the Z axle lifting platform device testing apparatus is housed, and tests immediately after the perforation.The hot piercing device has 5 punch pin modules, on same billot, wears 5 products altogether at every turn, accurately moves 3 times then, has worn 20 products.Hot piercing efficient is high, and qualification rate is high, and production process is carried out on-line monitoring.Realize production capacity from original craft per hour 200 bring up to greater than 3000 (UHP >=3000), qualification rate is brought up to more than 99% from 70%, CPK brings up to greater than 1.67 from being lower than 1.0.
Description of drawings
Below in conjunction with accompanying drawing the utility model technical scheme is described further:
Fig. 1: the structural representation of the utility model;
Fig. 2: the structural representation of hot piercing device.
Embodiment
As shown in Figure 1; Receiver film holed technique equipment; Comprise be used for mass transport to perforation and the Y axle pay-off 4 of measured zone, be used for to send into perforation and measured zone wait bore a hole and measure the Z axle lifting platform device 3 of lifting material, be used for and be used to wait for the hot piercing device 1 that the heat of perforation and measurement material is worn treating behind the location bored a hole and the measurement object feed collet is tight clamping device 2; On the workbench of frame, be furnished with Y axle pay-off 4; Be furnished with Z axle lifting platform device 3 on the Y axle pay-off 4; On the Z axle lifting platform device 3 clamping device 2 is installed, is furnished with X axle delivery unit on the frame of Z axle lifting platform device 2 tops, on the X axle delivery unit hot piercing device 1 is installed.During concrete the design; Y axle pay-off 1 has one group; Be and be symmetrically arranged, all arrange a Z axle lifting platform device on each Y axle pay-off, a clamping device is installed on each Z axle lifting platform device; Arrange an X axle delivery unit on the frame of each Z axle lifting platform device top, a hot piercing device is installed on each X axle delivery unit.
As shown in Figure 2, the hot piercing device comprises pecker 11, heating ring 12, positive electrode 13 and negative electrode 14, and heating ring 12 overlap joints are on pecker 11; Draw positive electrode 13 and negative electrode 14 on the heating ring 12, pecker 11 ends are provided with the crow silk of 0.05 ㎜, are used for wearing film; Positive electrode 13 is received on the control box with negative electrode 14; Through regulating the big or small control punch pin temperature of electric current, adopt Teflon material transfer heat energy and insulation, guarantee that temperature is steady; Fixedly pecker is whole by curing agent, has characteristics such as the high temperature coefficient of expansion is little, high temperature resistant.
Each one of Y axle pay-off about 4 is used for the conveying of material film tape, and it sends into the service position with the material film tape along the Y direction, carries out hot piercing then and measures.Include servomotor, ball screw kinematic axis, positioner, material detection device etc.Load onto when material is put into the taper, after inductor had detected material, as long as press left and right sides starting button, pay-off just entered the service position automatically and waits for perforation and measurement.After hot piercing and measuring, left and right sides pay-off is got back to the home position automatically, and the operator takes off material, carries out next one circulation.
Respectively one in Z axle lifting platform device about 3 includes picking-up cylinder, line slideway, material detection device etc.After pay-off arrives the service position, after inductor detects pay-off and puts in place on the lifting platform, will upwards hold up material, wait for clamping.
Respectively one of clamping device about 2 includes clamping cylinder, line slideway, clamp system etc.After lifting platform up held up material, clamping device will down move, and clamped material, and the location material is fixed on same position, wait hot piercing and measurement.About the accurate measurement inductor each 10, be installed in the Measurement and Control System box.After hot piercing, detect at once, whether system judges whether OK then, can do over again, or scrap.
Respectively one in hot piercing device about 1, after pay-off was delivered to the service position to material, lifting platform rose and holds up material, and clamping device clamps material, and at this moment the cylinder of hot piercing head down moves and bores a hole, and perforation back measuring system is measured and is judged.One group of 5 product each time, servomotor drives kinematic axis and moves a step pitch and leave then, carries out other 5 products of second step perforation, accomplishes 20 products of a billot altogether for four times altogether.After all work were accomplished, pay-off was got back to the home position, waited for blanking and next periodic duty.
The said equipment is used on barrier film, piercing through 0.2 ㎜ hole, takes artificial material loading and blanking (raw material are stripe shapes).On the Y axle pay-off of arranging about at first material being placed on respectively 4, when left and right sides inductor had detected material, Y axle pay-off 4 advanced to the service position respectively; After Y axle pay-off 4 had arrived the service position, Z axle lifting platform device 3 rose and holds up material, and clamping device 2 clamps material, and hot piercing device 1 is bored a hole downwards.On Z axle lifting platform device 3, testing apparatus is housed, tests immediately after the perforation.About a Y axle pay-off 4 respectively is set, send material to carry out next step perforation separately to corresponding service position, test at same position immediately after the perforation.But hot piercing device 1 is installed on the X axle delivery unit of side-to-side movement, and hot piercing device 1 has 5 punch pin modules, and is corresponding with Y axle pay-off 4, on same billot, wears 5 products altogether at every turn, accurately moves 3 times then, worn 20 products.Each punch pin also can be controlled individually and move up and down and can be at X, Y, Z directional trim.
In sum, the utility model realize production capacity from original craft per hour 200 bring up to greater than 3000 (UHP >=3000), qualification rate is brought up to more than 99% from 70%, CPK brings up to greater than 1.67 from being lower than 1.0.Reduce to people's operation by original craft 12 people's operations, perforation process and test step are realized on a station.
What need understand is: the above only is the preferred implementation of the utility model; For those skilled in the art; Under the prerequisite that does not break away from the utility model principle; Can also make some improvement and retouching, these improvement and retouching also should be regarded as the protection range of the utility model.

Claims (4)

1. receiver film holed technique equipment; It is characterized in that: comprise Y axle pay-off, Z axle lifting platform device, clamping device and hot piercing device, on the workbench of frame, be furnished with Y axle pay-off, be furnished with Z axle lifting platform device on the Y axle pay-off; On the Z axle lifting platform device clamping device is installed; Be furnished with X axle delivery unit on the frame of Z axle lifting platform device top, on the X axle delivery unit hot piercing device be installed, said hot piercing device comprises pecker, heating ring, positive electrode and negative electrode; The heating ring overlap joint is drawn positive electrode and negative electrode on the heating ring on pecker.
2. receiver film holed technique equipment according to claim 1 is characterized in that: said pecker end is provided with the crow silk of 0.05 ㎜.
3. receiver film holed technique equipment according to claim 1; It is characterized in that: said Y axle pay-off has one group; Be and be symmetrically arranged, all arrange a Z axle lifting platform device on each Y axle pay-off, a clamping device is installed on each Z axle lifting platform device; Arrange an X axle delivery unit on the frame of each Z axle lifting platform device top, a hot piercing device is installed on each X axle delivery unit.
4. receiver film holed technique equipment according to claim 1 is characterized in that: on the said Z axle lifting platform device testing apparatus is installed.
CN2012200603005U 2012-02-23 2012-02-23 Film punching device of receiver Withdrawn - After Issue CN202488716U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200603005U CN202488716U (en) 2012-02-23 2012-02-23 Film punching device of receiver

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200603005U CN202488716U (en) 2012-02-23 2012-02-23 Film punching device of receiver

Publications (1)

Publication Number Publication Date
CN202488716U true CN202488716U (en) 2012-10-10

Family

ID=46963099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200603005U Withdrawn - After Issue CN202488716U (en) 2012-02-23 2012-02-23 Film punching device of receiver

Country Status (1)

Country Link
CN (1) CN202488716U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102595302A (en) * 2012-02-23 2012-07-18 科瑞自动化技术(苏州)有限公司 Film perforating device for receiver

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102595302A (en) * 2012-02-23 2012-07-18 科瑞自动化技术(苏州)有限公司 Film perforating device for receiver
CN102595302B (en) * 2012-02-23 2014-11-12 科瑞自动化技术(苏州)有限公司 Film perforating device for receiver

Similar Documents

Publication Publication Date Title
CN202196316U (en) Intelligent control system in welding production line
CN202606709U (en) Full-automatic accessory assembly machine
CN114156524A (en) Battery cell hot press and battery cell hot pressing method
CN108339761A (en) A kind of sorting welder and its method based on thermal infrared imager detection
CN107931909A (en) Automatic loading and unloading device and its system
CN206343803U (en) A kind of robot automatic soldering device
CN207771135U (en) Automatic loading and unloading device and its system
CN202488716U (en) Film punching device of receiver
CN207036870U (en) A kind of materiel delivery system based on tensile test apparatus
CN203811156U (en) Motor stator core detection mechanism
CN205967777U (en) Automatic welding machine unit of arranging of metal tray
CN102595302B (en) Film perforating device for receiver
CN205246838U (en) Naked electric core of lithium ion battery detects machine
CN207832924U (en) The short-circuit detecting and voltage detecting system of pcb board on a kind of assembly line
CN217112575U (en) Battery module low-voltage insulation testing device
CN204882832U (en) Hot pressing and hi -pot testing arrangement
CN214488721U (en) Full-automatic hot heading bolt production facility
CN212134862U (en) BDU insulation and voltage resistance test equipment and system
CN210182503U (en) Electric core hot hole and short circuit detection integrated equipment and cylindrical button type electric core production winding machine
CN204843252U (en) Temperature control device is used in welding of following aluminium alloy plate material of 1mm
CN210701240U (en) Linear integrated testing machine
CN209680594U (en) A kind of sorting conveyer system and steel plate production line
CN107779586A (en) Non-crystalline material crystallization and thermal treatment apparatus and method
CN205967880U (en) Weld assembly line from moving point entirely
CN109731805A (en) A kind of system for testing electric iron operating temperature

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20121010

Effective date of abandoning: 20141112

RGAV Abandon patent right to avoid regrant