CN202450838U - Assembling type iron tower base station - Google Patents
Assembling type iron tower base station Download PDFInfo
- Publication number
- CN202450838U CN202450838U CN2011205558336U CN201120555833U CN202450838U CN 202450838 U CN202450838 U CN 202450838U CN 2011205558336 U CN2011205558336 U CN 2011205558336U CN 201120555833 U CN201120555833 U CN 201120555833U CN 202450838 U CN202450838 U CN 202450838U
- Authority
- CN
- China
- Prior art keywords
- iron tower
- base station
- pin
- connected panel
- charge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to an assembling type iron tower base station. The assembling type iron tower base station comprises a steel structure pedestal and an assembling type iron tower, wherein the steel structure pedestal is assembled on site; the assembling type iron tower is assembled on the steel structure pedestal on site; the assembling type iron tower comprises multiple sections of iron tower units which are assembled on site; the iron tower units are stacked sequentially to form the assembling type iron tower; each section of iron tower unit comprises three main pipes, and web members and diagonal web members which are connected with the main pipes; the web members and the main pipes are connected through bolts; and the diagonal web members and the main pipes are connected through bolts. In the assembling type iron tower base station, the concrete base is replaced by the steel structure pedestal assembled on site, so that on-site pouring or prefabrication is avoided. The iron tower is formed by assembling the iron tower units assembled on site, the single component has light weight, heavy equipment such as a crane and the like is not required, and construction of the iron tower base station can be finished manually, so that the assembling type iron tower base station is particularly suitable for mountain areas and areas without traffic conditions.
Description
Technical field
The utility model relates to the iron tower base station, more particularly, relates to a kind of pin-connected panel iron tower base station.
Background technology
The iron tower base station is a kind of communication base station commonly used, and normally placing of concrete is basic at the scene, perhaps adopts prefabricated concrete foundation; Iron tower is installed on concrete foundation then; Because the weight ratio of iron tower is bigger, need crane etc. usually jumbo be auxiliary to carry out, this suits in job site that jumboes such as Plain arrive easily; But for mountain area, the relatively poor zone of some current conditions; Jumboes such as crane can't arrive the job site, and simple dependence is artificial, and building the iron tower base station almost is impossible mission.
The utility model content
The technical problem that the utility model will solve is; To the above-mentioned simple artificial defective that can't build that relies in the iron tower base station of prior art; A kind of pin-connected panel iron tower base station is provided, and this pin-connected panel iron tower base station need not precast concrete foundation, relies on manpower can accomplish the construction of iron tower base station merely.
The utility model solves the technical scheme that its technical problem adopted: construct a kind of pin-connected panel iron tower base station; The steel structure base that comprises on-site consolidation; And be arranged on the pin-connected panel iron tower that the on-site consolidation on the said steel structure base forms, and said pin-connected panel iron tower comprises the iron tower unit that the more piece on-site consolidation forms, said iron tower unit is cascading and constitutes said pin-connected panel iron tower; The said iron tower of every joint unit comprises three persons in charge; And the web member and the diagonal web member that connect the said person in charge, be connected through bolt between said web member and the said person in charge, connect through bolt between the said diagonal web member and the said person in charge.
In the described pin-connected panel iron tower of the utility model base station, said steel structure base comprises on-site consolidation many channel-section steels together.
In the described pin-connected panel iron tower of the utility model base station, the said person in charge's two ends are provided with adpting flange, and the person in charge of adjacent iron tower unit connects through said adpting flange.
In the described pin-connected panel iron tower of the utility model base station, said pin-connected panel iron tower base station also comprises tensioned cable, and said tensioned cable one end is fixed on the said pin-connected panel iron tower, and the other end is fixed on the said steel structure base.
In the described pin-connected panel iron tower of the utility model base station, the person in charge of said iron tower unit is provided with the fixedly auricle that is used for fixing said tensioned cable.
In the described pin-connected panel iron tower of the utility model base station, the said person in charge is a steel pipe.
In the described pin-connected panel iron tower of the utility model base station, said web member and diagonal web member are angle steel.
In the described pin-connected panel iron tower of the utility model base station, the said person in charge is no more than 70 kilograms steel pipe for weight.
Implement the pin-connected panel iron tower base station of the utility model, have following beneficial effect: in the pin-connected panel iron tower base station of the utility model, adopt the steel structure base of on-site consolidation to substitute concrete foundation; Avoid on-the-spot pouring or prefabricated; Iron tower adopts the iron tower unit of on-the-spot splicing to be spliced, and single member in light weight do not need jumboes such as crane; Rely on and artificially can accomplish the construction of iron tower base station, especially be fit to the mountain area and do not possess the construction of large-scale iron tower base station in the area of current condition.
Description of drawings
To combine accompanying drawing and embodiment that the utility model is described further below, in the accompanying drawing:
Fig. 1 is the sketch map of preferred embodiment of the pin-connected panel iron tower base station of the utility model;
Fig. 2 is the vertical view of preferred embodiment of the pin-connected panel iron tower base station of the utility model;
Fig. 3 is the sketch map of iron tower unit in the preferred embodiment of pin-connected panel iron tower base station of the utility model;
Fig. 4 is that the pin-connected panel iron tower of the pin-connected panel iron tower base station of the utility model is built sketch map.
The specific embodiment
Understand for technical characterictic, purpose and effect to the utility model have more clearly, contrast the specific embodiment that accompanying drawing specifies the utility model at present.
As depicted in figs. 1 and 2; A preferred embodiment for the pin-connected panel iron tower base station of the utility model; Comprise the steel structure base 1 of on-site consolidation in the pin-connected panel iron tower base station of present embodiment, and be arranged on the pin-connected panel iron tower 2 that the on-site consolidation on the steel structure base 1 forms that steel structure base 1 all is to be spliced at the construction field (site) with pin-connected panel iron tower 2; The weight of single member can be too not heavy; Most of member is controlled at below 40 kilograms, and utmost point individual components is controlled at below 70 kilograms, does not therefore need jumbo such as crane can realize the construction of iron tower base station.
In the present embodiment, steel structure base 1 is spliced by many channel-section steel scenes, for example adopts many No. 20 channel-section steel scenes to be spliced, and with sandy soil the space is filled and led up after the channel-section steel splicing is good, can avoid prefabricated at the scene basis like this as basic counterweight.
Referring to Fig. 1, Fig. 3 and Fig. 4, in the present embodiment, pin-connected panel iron tower 2 comprises the iron tower unit 20 that the more piece on-site consolidation forms, and iron tower unit 20 is cascading and constitutes pin-connected panel iron tower 2.Iron tower unit 20 in the present embodiment is to be spliced at the scene; Every joint iron tower unit 20 comprises that three are responsible for 21; And web member 22 and diagonal web member 23 that connect to be responsible for 21, web member 22 be responsible for 21 between be connected through bolt, diagonal web member 23 and be responsible for 21 between pass through the bolt connection.In order to build conveniently, the length of iron tower unit 20 can be inequality, such as, can the length of the iron tower unit of bottom is longer, the length of the iron tower unit 20 at top can be lacked.The person in charge 21 of iron tower unit 20 can be a steel pipe, for example can adopt the steel pipe of φ 85 * 5, and web member 22 can adopt angle steel with diagonal web member 23, and the angle steel of L70 * 5 for example is responsible for 21 weight and is no more than 70 kilograms.
In the present embodiment, the connection of iron tower unit for ease, the person in charge's 21 of every joint iron tower unit 20 two ends are provided with adpting flange 211, and the person in charge 21 of adjacent iron tower unit 20 connects through adpting flange 211.
Referring to Fig. 1, the pin-connected panel iron tower base station of present embodiment also comprises tensioned cable 3, is used for and prevents that iron tower from tilting, and tensioned cable 3 one ends are fixed on the pin-connected panel iron tower 2, and the other end is fixed on the steel structure base 1
The fixed tensioning cable wire 3 for ease, on the person in charge 21 of iron tower unit 20, can be provided with the fixedly auricle 212 that is used for fixing tensioned cable 3, and fixedly auricle 212 is provided with the through hole that supplies the tensioning rope to pass.
Referring to Fig. 4, in the pin-connected panel iron tower base station construction of the utility model, although do not need crane class jumbo; But need realize by the part instrument, for example in the pin-connected panel iron tower process of construction of present embodiment, accomplish the construction of assembly unit iron tower 4 by iron tower is installed; Specifically be after the assembly unit of the iron tower unit of accomplishing the bottom, on the good iron tower unit of assembly unit, to load onto iron tower 4 is installed; The size that iron tower 4 is installed is less than iron tower unit 20, and pulley 41 is equipped with on the top that iron tower 4 is installed, and utilizes pulley 41 can lifting component be got on; Carry out the assembly unit of iron tower unit, after assembly unit is accomplished, iron tower 4 will be installed upwards raise; Proceed the assembly unit of iron tower unit,, iron tower 4 will be installed then hang down until the construction of accomplishing whole iron tower.
In the pin-connected panel iron tower base station of the utility model; Adopt the steel structure base of on-site consolidation to substitute concrete foundation, avoid on-the-spot pouring or prefabricated, iron tower adopts the iron tower unit of on-the-spot splicing to be spliced; Single member in light weight; Do not need jumboes such as crane, rely on and artificially can accomplish the construction of iron tower base station, especially be fit to the mountain area and do not possess the construction of large-scale iron tower base station in the area of current condition.
Combine accompanying drawing that the embodiment of the utility model is described above; But the utility model is not limited to the above-mentioned specific embodiment, and the above-mentioned specific embodiment only is schematically, rather than restrictive; Those of ordinary skill in the art is under the enlightenment of the utility model; Not breaking away under the scope situation that the utility model aim and claim protect, also can make a lot of forms, these all belong within the protection of the utility model.
Claims (8)
1. pin-connected panel iron tower base station; It is characterized in that; The steel structure base (1) that comprises on-site consolidation; And be arranged on the pin-connected panel iron tower (2) that the on-site consolidation on the said steel structure base (1) forms, and said pin-connected panel iron tower (2) comprises the iron tower unit (20) that the more piece on-site consolidation forms, said iron tower unit (20) is cascading and constitutes said pin-connected panel iron tower (2); The said iron tower of every joint unit (20) comprises three persons in charge (21); And the web member (22) and the diagonal web member (23) that connect the said person in charge (21), be connected through bolt between said web member (22) and the said person in charge (21), connect through bolt between the said diagonal web member (23) and the said person in charge (21).
2. pin-connected panel iron tower according to claim 1 base station is characterized in that, said steel structure base (1) comprises on-site consolidation many channel-section steels together.
3. pin-connected panel iron tower according to claim 1 base station is characterized in that the said person in charge's (21) two ends are provided with adpting flange (211), and the person in charge (21) of adjacent iron tower unit (20) connects through said adpting flange (211).
4. pin-connected panel iron tower according to claim 1 base station; It is characterized in that; Said pin-connected panel iron tower base station also comprises tensioned cable (3), and said tensioned cable (3) one ends are fixed on the said pin-connected panel iron tower (2), and the other end is fixed on the said steel structure base (1).
5. pin-connected panel iron tower according to claim 4 base station is characterized in that, the person in charge (21) of said iron tower unit (20) is provided with the fixedly auricle (212) that is used for fixing said tensioned cable (3).
6. pin-connected panel iron tower according to claim 1 base station is characterized in that the said person in charge (21) is a steel pipe.
7. pin-connected panel iron tower according to claim 1 base station is characterized in that, said web member (22) and diagonal web member (23) are angle steel.
8. pin-connected panel iron tower according to claim 1 base station is characterized in that, the said person in charge (21) is no more than 70 kilograms steel pipe for weight.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205558336U CN202450838U (en) | 2011-12-27 | 2011-12-27 | Assembling type iron tower base station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205558336U CN202450838U (en) | 2011-12-27 | 2011-12-27 | Assembling type iron tower base station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202450838U true CN202450838U (en) | 2012-09-26 |
Family
ID=46866709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205558336U Expired - Fee Related CN202450838U (en) | 2011-12-27 | 2011-12-27 | Assembling type iron tower base station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202450838U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107246177A (en) * | 2017-07-28 | 2017-10-13 | 北京无线电测量研究所 | A kind of fixation calibration tower of fast demountable |
CN114482676A (en) * | 2022-01-26 | 2022-05-13 | 浙江八方电信有限公司 | Communication tower with wind driven generator |
-
2011
- 2011-12-27 CN CN2011205558336U patent/CN202450838U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107246177A (en) * | 2017-07-28 | 2017-10-13 | 北京无线电测量研究所 | A kind of fixation calibration tower of fast demountable |
CN114482676A (en) * | 2022-01-26 | 2022-05-13 | 浙江八方电信有限公司 | Communication tower with wind driven generator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2420639A2 (en) | Tower with adapter section | |
JP2022519449A (en) | Installation of wind power generator, separation device and construction method using this | |
CN101629408A (en) | Composite anchoring structure on guyed tower end of cable-stayed bridge | |
CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
CN105179183A (en) | Prestressed concrete wind power tower system and construction method thereof | |
CN202530769U (en) | Large span steel structure high-altitude subsection hoisting support system | |
CN102797643A (en) | Wind power generation tower device | |
CN105839947B (en) | A kind of lifting room and hanging method based on rectangle formed steel construction pedestal | |
CN202450838U (en) | Assembling type iron tower base station | |
CA2469060A1 (en) | Tower of a wind power installation | |
CN206015882U (en) | The steel structure of housing system that a kind of lateral resisting and antigravity separate | |
EP2702217B1 (en) | A wind turbine tower made of wood and a method of erection thereof | |
CN216587967U (en) | Box type counterweight type foundation fast-assembling base station communication rod | |
CN106523296A (en) | Truss type tower and wind generating set comprising truss type tower | |
CN203794505U (en) | Internal climbing steel beam conveying device of internal climbing movable arm tower crane | |
CN107143198B (en) | A method of UHV transmission steel tower is found suitable for mountain area sternness location group | |
CN110159051A (en) | Substation framework | |
CN105220609B (en) | Combined beam self-anchored suspension bridge and construction process thereof | |
CN103982076A (en) | Single cycle 110 kV/35 stay wire type aluminum alloy urgent repair tower | |
EP2388878A2 (en) | Transmission line tower | |
CN209482822U (en) | Assembling type fence in concrete | |
CN113175196A (en) | Cable net construction platform | |
CN101845914B (en) | Installation method of three-tube steel chimney | |
CN202245789U (en) | Special typhoon prevention device for gantry crane | |
CN213205153U (en) | Modular universal tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120926 Termination date: 20191227 |
|
CF01 | Termination of patent right due to non-payment of annual fee |