CN107246177A - A kind of fixation calibration tower of fast demountable - Google Patents

A kind of fixation calibration tower of fast demountable Download PDF

Info

Publication number
CN107246177A
CN107246177A CN201710633183.4A CN201710633183A CN107246177A CN 107246177 A CN107246177 A CN 107246177A CN 201710633183 A CN201710633183 A CN 201710633183A CN 107246177 A CN107246177 A CN 107246177A
Authority
CN
China
Prior art keywords
tower
tower base
ground
fixed
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710633183.4A
Other languages
Chinese (zh)
Other versions
CN107246177B (en
Inventor
崔二光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Institute of Radio Measurement
Original Assignee
Beijing Institute of Radio Measurement
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Institute of Radio Measurement filed Critical Beijing Institute of Radio Measurement
Priority to CN201710633183.4A priority Critical patent/CN107246177B/en
Publication of CN107246177A publication Critical patent/CN107246177A/en
Application granted granted Critical
Publication of CN107246177B publication Critical patent/CN107246177B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/20Side-supporting means therefor, e.g. using guy ropes or struts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2238Sockets or holders for poles or posts to be placed on the ground

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention relates to a kind of fixation calibration tower of fast demountable, including fixed ground, tower base, windproof towline, drive device, supporting plate, pull rope, Ta Jie and calibration device, fixed ground is pre-buried in ground;Tower base side is provided with opening and inner hollow, tower base being fixed on fixed ground vertically;One end of windproof towline and the top of tower base are connected, and the other end is fixed at ground, and tenses;Drive device is on tower base;Supporting plate is moving up and down in tower base;One end of pull rope and the drive end of drive device are connected, and the other end is connected through the top of tower base and with supporting plate;Pull rope can be tightened up or loosened to drive device, be moved up and down with drawing supporting plate in tower base;Tower section vertically on the supporting plate, its bottom is fixedly connected with tower base top;Calibration device is located at tower section top.Product of the present invention can realize the fast assembling-disassembling to fixed calibration tower.

Description

A kind of fixation calibration tower of fast demountable
Technical field
The present invention relates to the fixation calibration of a kind of technical field of fixed calibration tower, more particularly to a kind of fast demountable Tower.
Background technology
Fixed calibration tower is mainly used in radar calibration.Conventional fixation calibration tower includes at present:Truss-like tower body and calibration Device.During erection, all parts of the mode joined with spiral shell joggle truss formula tower body from the bottom to top, and tower body bottom is fixed on pre- On the concrete pedestal buried, complete after tower body installs, then calibration device is fixed on tower body top with bolt;It is erection during dismounting Inverse process.The whole process for setting up and removing is extremely complex, it is impossible to realize the fast assembling-disassembling of fixed calibration tower.
The content of the invention
The technical problems to be solved by the invention be how to provide it is a kind of can be with the fixation calibration tower of fast assembling-disassembling.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:
A kind of fixation calibration tower of fast demountable, including fixed ground, tower base, windproof towline, drive device, support Plate, pull rope, Ta Jie and calibration device, the fixed ground are pre-buried in ground;The tower base side is provided with opening and interior Portion is hollow, the tower base being fixed on the fixed ground vertically;One end of the windproof towline and the tower base Top connection, the other end is fixed at ground, and tenses;The drive device is on the tower base;The supporting plate can What is moved up and down is located in the tower base;One end of the pull rope is connected with the drive end of the drive device, the other end It is connected through the top of the tower base and with the supporting plate;The pull rope can be tightened up or loosened to the drive device, to lead Draw the supporting plate to move up and down in the tower base;The tower section vertically on the supporting plate, its bottom and the tower Base top is fixedly connected;The calibration device is located at the tower section top.
Compared with prior art, the beneficial effects of the invention are as follows:Product of the present invention directly can be driven by drive device Pull rope pulls tower section to rise on supporting plate along inside tower base, and tower section carries out after rising to the specified location on tower base top Fixed, calibration device is fixed at tower section top, and multiple tower sections can be installed according to such a operation, can quickly realized Tower section is dismounted, it is easy to operate.The bottom of other tower base is directly anchored to fix on ground, and top passes through the anti-of both sides Wind towline is tensed, fixation, reliable.
On the basis of above-mentioned technical proposal, the present invention can also do following improvement:
Further, the fixed ground includes reinforcing bar framework, bottom plate, and the bottom of the reinforcing bar framework is embedded in ground in advance Under, and filled with concrete in the reinforcing steel bar frame body, the bottom plate is fixed at the top of the reinforcing bar framework, the tower base Bottom be fixed at by foundation bolt on the bottom plate.
Beneficial effect using above-mentioned further scheme is:Ensure tower base be fixed on fixed ground more firmly, It is stable.
Further, one end of the windproof towline is connected by shackle with the top of the tower base, other end connection There are ground anchor assemblies, described ground anchor assemblies are fixed at ground, and tense the windproof towline.
Beneficial effect using above-mentioned further scheme is:Facilitate windproof towline to realize tower base and ground to tense admittedly It is fixed.
Further, the described one end of windproof towline away from the tower base is provided with shackle, described ground anchor assemblies and also set There is the shackle on shackle, the windproof towline to be connected by flower basket bolt with the shackle on described ground anchor assemblies.
Beneficial effect using above-mentioned further scheme is:Conveniently realize windproof towline and ground anchor assemblies fixed on ground Connection.
Further, the drive device is hoist engine, and the top of the tower base is provided with the first carriage, the support Plate bottom is provided with the second carriage, and one end of the pull rope is connected with the drive end of the hoist engine, and the other end passes through institute The first carriage is stated, is then passed through being fixed to the top of the tower base after second carriage, the hoist engine can drive Supporting plate is in the tower base described in the dynamic pull rope along first carriage, the second carriage sliding traction Move up and down.
Beneficial effect using above-mentioned further scheme is:Driven by hoist engine pull rope and the first carriage, Being slidably matched for second carriage, can stablize, convenient realization traction supporting plate is moved up and down along along tower base, and then driven Tower section, which rises, to be installed.
Further, first carriage includes first pulley, and second carriage includes a pair second cunnings Wheel, the first pulley is fixed at the top of the tower base;Second pulley described in a pair is symmetrically set in the supporting plate bottom; The one end of the pull rope away from the hoist engine is passed through after the first pulley, then is each passed through second pulley described in a pair, And it is fixed on the top of the tower base.
Beneficial effect using above-mentioned further scheme is:The structure setting of first pulley and a pair of second pulleys can cause The slip of pull rope can more facilitate drawing supporting plate, laborsaving and stably.
Further, the tower base upper inside wall is provided with guide part, and the tower section can be along the guide part described Moved up and down in tower base.
Beneficial effect using above-mentioned further scheme is:Ensure that tower energy-conservation is stable in tower base to move up and down.
Further, the cross section of the tower base is square, and the supporting plate is square plate, and four angles of the supporting plate are equal Provided with guide pad, the supporting plate can be moved up and down by four guide pads along the madial wall of the tower base.
Beneficial effect using above-mentioned further scheme is:When supporting plate is moved up and down along the madial wall of tower base, it can pass through The guide pad at four angles of supporting plate is oriented to, mobile more to stablize, it is to avoid occur position skew.
Further, the guide part includes eight sliding blocks, and eight sliding blocks are arranged at intervals at the tower in two layers On the inwall on base top, every layer is provided with four sliding blocks, and four sliding blocks are respectively arranged on the tower base inwall On four angles, the tower section can be moved up and down along sliding block described in two layers in the tower base.
Beneficial effect using above-mentioned further scheme is:The sliding block of two layers of setting moves up and down for tower section in tower base There is provided and be oriented to well, it is ensured that tower section will not shift in process of rising or falling, also more stablize when being assembled.
Further, the tower section is provided with multiple, and two adjacent tower sections can be connected from beginning to end, positioned at top layer and middle level The tower section be fixedly connected with the ground also by the windproof towline, and with the windproof fibre that is connected at the top of the tower base Rope and the angle on ground are 40 °~50 °, the windproof towline and the angle on ground being connected with tower section described in middle level be 40 °~ 50 °, the windproof towline and the angle on ground being connected with tower section described in top layer are 50 °~60 °.
Beneficial effect using above-mentioned further scheme is:After ensureing that multiple tower sections are assembled, each position can be with ground Face is tensed, and structure is more consolidated, to meet wind resistance requirement.
Brief description of the drawings
Fig. 1 is the structural representation of product preferred embodiment of the present invention;
Fig. 2 is product integral installation structural representation of the present invention;
Fig. 3 is the preferred structure schematic diagram of product tower base of the present invention;
Fig. 4 is the preferred structure schematic diagram of invention product tower section;
Fig. 5 is the preferred structure schematic diagram of invention product supporting plate;
Fig. 6 be invention product anchor assemblies preferred structure schematic diagram;
Fig. 7 is the preferred structure schematic diagram that invention product fixes ground.
In accompanying drawing, the list of parts representated by each label is as follows:
1st, tower base, 2, supporting plate, 3, second pulley, 4, guide pad, 5, hoist engine, 6, pull rope, 7, first pulley, 8, Anchor assemblies, 9, fixed ground, 10, tower section, 11, latch, 12, sliding block, 13, fixed corner fittings, 14, windproof towline, 15, shackle, 16, Flower basket bolt, 17, calibration device, 18, concrete, 19, reinforcing bar framework, 20, foundation bolt, 21, bottom plate.
Embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
As shown in figure 1, a kind of fixation calibration tower of fast demountable, including fixed ground 9, tower base 1, windproof towline 14th, drive device, supporting plate 2, pull rope 6, tower section 10 and calibration device 17, the fixed ground 9 are embedded in ground in advance;The tower The side of base 1 is provided with opening and inner hollow, and the tower base 1 is vertical to be fixed on the fixed ground 9;It is described windproof One end of towline 14 is connected with the top of the tower base 1, and the other end is fixed at ground, and tenses;The drive device is set In on the tower base 1;The supporting plate 2 is moving up and down in the tower base 1;One end of the pull rope 6 and institute The drive end connection of drive device is stated, the other end is connected through the top of the tower base 1 and with the supporting plate 2;The driving The pull rope 6 can be tightened up or loosened to device, be moved up and down with drawing the supporting plate 2 in the tower base 1;The tower section 10 Vertical is located on the supporting plate 2, and its bottom is fixedly connected with the top of tower base 1;The calibration device 17 is located at described The top of tower section 10.Product of the present invention directly can drive pull rope 6 to pull tower section 10 on supporting plate 2 along tower by drive device The inside of base 1 rises, and tower section 10 is fixed after rising to the specified location on the top of tower base 1, and calibration device 17 is fixed at The top of tower section 10, multiple tower sections can be installed according to such a operation, can quickly realize and tower section 10 is dismounted, operation side Just.The bottom of other tower base 1 is directly anchored to fix on ground 9, and top is tensed by the windproof towline 14 of both sides, Gu It is fixed firm, reliable.
As shown in fig. 7, in order to ensure that tower base 1 is fixed on fixed ground 9 more firmly, stably, it is described regularly Base 9 includes reinforcing bar framework 19, bottom plate 21, and the bottom of the reinforcing bar framework 19 is embedded in underground, and the reinforcing bar framework 19 in advance Filled with concrete 18, the bottom plate 21 is fixed at the top of the reinforcing bar framework 19, and the bottom of the tower base 1 passes through ground Foot bolt 20 is fixed on the bottom plate 21.
It is strained and fixed in view of facilitating windproof towline 14 to realize tower base 1 with ground, one end of the windproof towline 14 It is connected by shackle 15 with the top of the tower base 1, the other end is connected with ground anchor assemblies 8, as shown in fig. 6, the earth anchor group Part 8 is fixed at ground, and tenses the windproof towline 14.
In an embodiment, the described one end of windproof towline 14 away from the tower base 1 is provided with shackle 15, described The shackle 15 also being provided with ground anchor assemblies 8 on shackle 15, the windproof towline 14 passes through flower basket bolt 16 and described ground anchor assemblies 8 On shackle 15 connect.Conveniently realize that windproof towline 14 is connected with ground anchor assemblies 8 fixed on ground.
As shown in figure 3, in a preferred embodiment, the drive device is hoist engine 5, the tower base 1 Top is provided with the first carriage, and the bottom of supporting plate 2 is provided with the second carriage, one end and the volume of the pull rope 6 The drive end connection of machine 5 is raised, the other end passes through first carriage, is then passed through after second carriage being fixed to institute The top of tower base 1 is stated, the hoist engine 5 can drive the pull rope 6 to be slided along first carriage, described second and fill Supporting plate 2 described in sliding traction is put to move up and down in the tower base 1.Pull rope 6 and first is driven to slide by hoist engine 5 Device, the second carriage are slidably matched, can stablize, it is convenient realize that traction supporting plate 2 is moved up and down along along tower base 1, And then drive the rising of tower section 10 to be installed.
Specifically, first carriage includes first pulley 7, and second carriage includes a pair of second pulleys 3, the first pulley 7 is fixed at the top of the tower base 1;Second pulley 3 described in a pair is symmetrically set in the bottom of supporting plate 2 Portion;The one end of the pull rope 6 away from the hoist engine 5 is passed through after the first pulley 7, then is each passed through second described in a pair Pulley 3, and it is fixed on the top of the tower base 1.The structure setting of first pulley 7 and a pair of second pulleys 3 can cause traction The slip of rope 6 can more facilitate drawing supporting plate 2, laborsaving and stably.
Preferably, in order to ensure that tower section 10 stable in tower base 1 can be moved up and down, the upper inside wall of tower base 1 Guide part is provided with, the tower section 10 can be moved up and down along the guide part in the tower base 1.
As shown in Figure 5, it is preferable that the cross section of the tower base 1 is square, the supporting plate 2 is square plate, the supporting plate 2 four angles are equipped with guide pad 4, and the supporting plate 2 can be along along the madial wall of the tower base 1 by four guide pads 4 Lower movement.It when madial wall of the supporting plate 2 along tower base 1 is moved up and down, can be oriented to, be moved by the guide pad 4 at 2 four angles of supporting plate It is dynamic more to stablize, it is to avoid to occur position skew.
Specifically, the guide part includes eight sliding blocks 12, and eight sliding blocks 12 are described in two layers be arranged at intervals at On the inwall on the top of tower base 1, every layer is provided with four sliding blocks 12, and four sliding blocks 12 are respectively arranged on the tower base On four angles of 1 inwall, the tower section 10 can be moved up and down along sliding block described in two layers 12 in the tower base 1.Two layers of setting Sliding block 12 for tower section 10 moved up and down in tower base 1 offer well be oriented to, it is ensured that tower section 10 is in process of rising or falling In will not shift, when being assembled also more stablize.
As shown in Figure 2,4, after in order to ensure that multiple tower sections 10 are assembled, each position can be tensed with ground, and structure is more Plus it is firm, to meet wind resistance requirement, the tower section 10 is provided with multiple, and two adjacent tower sections 10 can be connected from beginning to end, be located at Top layer and the tower section 10 in middle level are fixedly connected with the ground also by the windproof towline 14, and with the top of the tower base 1 The windproof towline 14 of connection is 40 °~50 ° with the angle on ground, the windproof towline being connected with tower section 10 described in middle level 14 and the angle on ground are 40 °~50 °, and the windproof towline 14 and the angle on ground being connected with tower section 10 described in top layer are 50 °~60 °.
It should be noted that fixed ground 9 is embedded on position, tower base 1 is fixed on regularly by foundation bolt 20 On the bottom plate 21 of base 9, hoist engine 5 is bolted on the sidepiece of tower base 1, and 8 sliding blocks 12 are bolted on tower base 1 Top.2 four jiaos of supporting plate has guide pad 4, it is ensured that supporting plate 2 can only move up and down, and two second pulleys 3 are installed in the bottom of supporting plate 2.The One pulley 7 is fixed on the top of tower base 1.The one ends wound of pull rope 6 is on hoist engine 5, and the other end is up around first pulley 7, after two second pulleys 3 that the bottom of supporting plate 2 is bypassed still further below, the top of tower base 1 is fixed on upwards.Ground anchor assemblies 8 are pre-buried In the corresponding position of the diagonal of tower base 1, it is desirable to after erection, the windproof towline 14 at bottom and middle part is with the angle on ground at 40 ° Between~50 °, the windproof towline 14 at top and the angle on ground are between 50 °~60 °.Pull rope 6 can be steel wire rope.
Erection process:
1st, tower base 1 is fixed on by foundation bolt 20 on the bottom plate 21 of fixed ground 9;
The 2nd, the windproof towline 14 in bottom is installed.The windproof top of towline 14 is fixed on the top of tower base 1 by shackle 15, with unloading The windproof bottom of towline 14 is fixed on proximally anchor assemblies 8 and tensed by button 15 and flower basket bolt 16;
The 3rd, first segment tower section 10 is installed.Hoist engine 5 is rotated with crank, supporting plate 2 is dropped to the bottom of tower base 1, by tower Section 10 is inserted into the pin-and-hole on supporting plate 2, rotates hoist engine 5, and tower section 10 rises, it is ensured that the top of tower section 10 can enter sliding block 12 It is interior.Continue to rise a tower section 10, stop when top 200mm of tower base 1 or so is stretched out on the top of tower section 10, with bolt by calibration device 17 are fixed on the top of tower section 10 and the windproof towline 14 of top layer are fixed on into the top of tower section 10 by shackle 15.Continue to rise tower section 10, Until can be with 2 latches 11 by tower section 10 and the pinning of tower base 1;
The 4th, second section tower section 10 is installed.Hoist engine 5 is rotated with crank, supporting plate 2 is dropped to the bottom of tower base 1, by tower Section 10 is inserted into the pin-and-hole on supporting plate 2, rotates hoist engine 5, and tower section 10 rises, it is ensured that the top of tower section 10 can enter sliding block 12 It is interior.Continue to rise tower section 10, stop when the top pin-and-hole of second section tower section 10 is inserted into first segment tower 10 bottom bearing pin of section, use spiral shell Bolt fixes first segment tower section 10 and second section tower section 10.2 latches 11 are extracted, continue a liter tower, until that can be incited somebody to action with 2 latches 11 Second section tower section 10 and the pinning of tower base 1;
5th, the installation of other tower sections 10 is identical with the installation of second section tower section 10, only need to hang the tower of windproof towline 14 Windproof towline is fixed on the top of corresponding column section 10 with shackle 15 by section 10;
6th, after all tower sections 10 are installed, final section tower section 10 and the top of tower base 1 are entered with 8 fixed corner fittings 13 Row is connected firmly;The bottom of windproof towline 14 at top and middle part is fixed on distally anchor assemblies 8 with shackle 15 and flower basket bolt 16 And tense.
Remove the inverse process that receipts process is erection process.
In principle, the total height of calibration tower below 15 meters when only need the windproof towline 14 at hanging end portion and top;Total height is at 15 meters The windproof towline 14 at hanging end portion, middle part and top is needed when between~30 meters;When total height is more than 30 meters, windproof towline 14 need to be increased The number of plies to meet wind resistance requirement.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer ", " up time The orientation or position relationship of the instruction such as pin ", " counterclockwise ", " axial direction ", " radial direction ", " circumference " be based on orientation shown in the drawings or Position relationship, is for only for ease of the description present invention and simplifies description, rather than indicate or imply that the device or element of meaning must There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are only used for describing purpose, and it is not intended that indicating or implying relative importance Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can express or Implicitly include at least one this feature.In the description of the invention, " multiple " are meant that at least two, such as two, three It is individual etc., unless otherwise specifically defined.
In the present invention, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " fixation " etc. Term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be that machinery connects Connect or electrically connect;Can be joined directly together, can also be indirectly connected to by intermediary, can be in two elements The connection in portion or the interaction relationship of two elements, unless otherwise clear and definite restriction.For one of ordinary skill in the art For, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
In the present invention, unless otherwise clearly defined and limited, fisrt feature can be with "above" or "below" second feature It is that the first and second features are directly contacted, or the first and second features pass through intermediary mediate contact.Moreover, fisrt feature exists Second feature " on ", " top " and " above " but fisrt feature are directly over second feature or oblique upper, or be merely representative of Fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be One feature is immediately below second feature or obliquely downward, or is merely representative of fisrt feature level height less than second feature.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means to combine specific features, structure, material or the spy that the embodiment or example are described Point is contained at least one embodiment of the present invention or example.In this manual, to the schematic representation of above-mentioned term not Identical embodiment or example must be directed to.Moreover, specific features, structure, material or the feature of description can be with office Combined in an appropriate manner in one or more embodiments or example.In addition, in the case of not conflicting, the skill of this area Art personnel can be tied the not be the same as Example or the feature of example and non-be the same as Example or example described in this specification Close and combine.
Although embodiments of the invention have been shown and described above, it is to be understood that above-described embodiment is example Property, it is impossible to limitation of the present invention is interpreted as, one of ordinary skill in the art within the scope of the invention can be to above-mentioned Embodiment is changed, changed, replacing and modification.

Claims (10)

1. the fixation calibration tower of a kind of fast demountable, it is characterised in that including fixed ground (9), tower base (1), windproof fibre Rope (14), drive device, supporting plate (2), pull rope (6), tower section (10) and calibration device (17), the fixed ground (9) are pre- It is embedded in ground;Tower base (1) side is provided with opening and inner hollow, the tower base (1) it is vertical be fixed at it is described On fixed ground (9);One end of the windproof towline (14) is connected with the top of the tower base (1), and the other end is fixed at Ground, and tense;The drive device is on the tower base (1);The supporting plate (2) is moving up and down to be located at the tower In base (1);One end of the pull rope (6) is connected with the drive end of the drive device, and the other end passes through the tower base (1) top is simultaneously connected with the supporting plate (2);The pull rope (6) can be tightened up or loosened to the drive device, described to draw Supporting plate (2) is moved up and down in the tower base (1);The tower section (10) it is vertical on the supporting plate (2), its bottom with It is fixedly connected at the top of the tower base (1);The calibration device (17) is located at tower section (10) top.
2. the fixation calibration tower of fast demountable according to claim 1, it is characterised in that fixed ground (9) bag Reinforcing bar framework (19), bottom plate (21) are included, the bottom of the reinforcing bar framework (19) is embedded in underground, and the reinforcing bar framework (19) in advance Interior to be filled with concrete (18), the bottom plate (21) is fixed at the top of the reinforcing bar framework (19), the tower base (1) Bottom is fixed on the bottom plate (21) by foundation bolt (20).
3. the fixation calibration tower of fast demountable according to claim 1, it is characterised in that the windproof towline (14) One end is connected by shackle (15) with the top of the tower base (1), and the other end is connected with ground anchor assemblies (8), the earth anchor group Part (8) is fixed at ground, and tenses the windproof towline (14).
4. the fixation calibration tower of fast demountable according to claim 3, it is characterised in that the windproof towline (14) is remote One end from the tower base (1) is provided with shackle (15), also is provided with shackle (15), the windproof fibre on described ground anchor assemblies (8) Shackle (15) on rope (14) is connected by flower basket bolt (16) with the shackle (15) on described ground anchor assemblies (8).
5. the fixation calibration tower of fast demountable according to claim 1, it is characterised in that the drive device is elevator Machine (5), the top of the tower base (1) is provided with the first carriage, and supporting plate (2) bottom is provided with the second carriage, institute The one end for stating pull rope (6) is connected with the drive end of the hoist engine (5), and the other end passes through first carriage, then wears Cross after second carriage and be fixed to the top of the tower base (1), the hoist engine (5) can drive the pull rope (6) along supporting plate (2) described in first carriage, the second carriage sliding traction on the tower base (1) is interior Lower movement.
6. the fixation calibration tower of fast demountable according to claim 5, it is characterised in that the first carriage bag First pulley (7) is included, second carriage includes a pair of second pulleys (3), and the first pulley (7) is fixed at described The top of tower base (1);Second pulley described in a pair (3) is symmetrically set in the supporting plate (2) bottom;The pull rope (6) is remote One end of the hoist engine (5) is passed through after the first pulley (7), then is each passed through second pulley described in a pair (3), and fixed Top in the tower base (1).
7. the fixation calibration tower of fast demountable according to claim 1, it is characterised in that tower base (1) top Inwall is provided with guide part, and the tower section (10) can move up and down along the guide part in the tower base (1).
8. the fixation calibration tower of fast demountable according to claim 7, it is characterised in that the horizontal stroke of the tower base (1) Section is square, and the supporting plate (2) is square plate, and four angles of the supporting plate (2) are equipped with guide pad (4), the supporting plate (2) It can be moved up and down by four guide pads (4) along the madial wall of the tower base (1).
9. the fixation calibration tower of fast demountable according to claim 8, it is characterised in that the guide part includes eight Sliding block (12), eight sliding blocks (12) are arranged at intervals on the inwall on the tower base (1) top in two layers, and every layer is provided with Four sliding blocks (12), and four sliding blocks (12) are respectively arranged on four angles of the tower base (1) inwall, the tower Section (10) can be moved up and down along sliding block described in two layers (12) in the tower base (1).
10. the fixation calibration tower of fast demountable according to any one of claim 1 to 9, it is characterised in that the tower Save (10) and be provided with multiple, two adjacent tower sections (10) can connect from beginning to end, the tower section (10) positioned at top layer and middle level It is fixedly connected with the ground also by the windproof towline (14), and the windproof towline being connected with the tower base (1) top (14) angle with ground is 40 °~50 °, the windproof towline (14) being connected with tower section (10) described in middle level and the folder on ground Angle is 40 °~50 °, and the windproof towline (14) being connected with tower section (10) described in top layer and the angle on ground are 50 °~60 °.
CN201710633183.4A 2017-07-28 2017-07-28 A kind of fixation calibration tower of fast demountable Active CN107246177B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710633183.4A CN107246177B (en) 2017-07-28 2017-07-28 A kind of fixation calibration tower of fast demountable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710633183.4A CN107246177B (en) 2017-07-28 2017-07-28 A kind of fixation calibration tower of fast demountable

Publications (2)

Publication Number Publication Date
CN107246177A true CN107246177A (en) 2017-10-13
CN107246177B CN107246177B (en) 2019-04-09

Family

ID=60012531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710633183.4A Active CN107246177B (en) 2017-07-28 2017-07-28 A kind of fixation calibration tower of fast demountable

Country Status (1)

Country Link
CN (1) CN107246177B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924737A (en) * 2019-11-20 2020-03-27 国网辽宁省电力有限公司锦州供电公司 Telegraph pole assembling method for reducing land surface occupied area
CN111827764A (en) * 2020-07-20 2020-10-27 许昌学院 Electronic information is with multi-functional shockproof communication tower

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4912893A (en) * 1987-12-21 1990-04-03 Miller Harmon R Transportable CMR cell site
CN2471874Y (en) * 2000-02-18 2002-01-16 黎本海 Underground liftable storing platform with surface structure
CN101845912A (en) * 2010-06-23 2010-09-29 天津市银宇建筑结构工程技术有限公司 Segmental-body assembly type emergency communication tower
CN201771222U (en) * 2010-08-05 2011-03-23 浙江瑞能通信科技有限公司 Communication base station with lifting function
CN201826581U (en) * 2010-06-23 2011-05-11 天津市银宇建筑结构工程技术有限公司 Segmental-body assembly type emergency communication tower
CN202450838U (en) * 2011-12-27 2012-09-26 深圳市海生机房技术有限公司 Assembling type iron tower base station

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4912893A (en) * 1987-12-21 1990-04-03 Miller Harmon R Transportable CMR cell site
CN2471874Y (en) * 2000-02-18 2002-01-16 黎本海 Underground liftable storing platform with surface structure
CN101845912A (en) * 2010-06-23 2010-09-29 天津市银宇建筑结构工程技术有限公司 Segmental-body assembly type emergency communication tower
CN201826581U (en) * 2010-06-23 2011-05-11 天津市银宇建筑结构工程技术有限公司 Segmental-body assembly type emergency communication tower
CN201771222U (en) * 2010-08-05 2011-03-23 浙江瑞能通信科技有限公司 Communication base station with lifting function
CN202450838U (en) * 2011-12-27 2012-09-26 深圳市海生机房技术有限公司 Assembling type iron tower base station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924737A (en) * 2019-11-20 2020-03-27 国网辽宁省电力有限公司锦州供电公司 Telegraph pole assembling method for reducing land surface occupied area
CN111827764A (en) * 2020-07-20 2020-10-27 许昌学院 Electronic information is with multi-functional shockproof communication tower

Also Published As

Publication number Publication date
CN107246177B (en) 2019-04-09

Similar Documents

Publication Publication Date Title
CN105529648B (en) Hydraulic pressure assembled crossing frame
CN107246177A (en) A kind of fixation calibration tower of fast demountable
CN206280086U (en) A kind of adjustable height tunnel reinforcement trolley
CN205489264U (en) Hydraulic pressure assembled crossing structure
CN105239514B (en) Stepless-adjustment ball-hinge type multi-support-leg forward transverse shifting track system of bridge girder erection machine
CN209550211U (en) A kind of landfill site seepage prevention film laying apparatus
CN208220671U (en) Telescopic wire rope handling guide pulley device
CN112878754B (en) Reinforcing bar protection canopy based on building construction district reuse
CN205901247U (en) Electric wire wire barrow of not knoing
CN104459922A (en) Automatic ground pulley collimation device and method
CN115832956A (en) Single-core cable well-entering laying slideway auxiliary device and method
CN207092571U (en) A kind of discharging platform
CN208120673U (en) A kind of drum support device
CN207366158U (en) Horizontal tube curtain deflection test device
CN210186407U (en) Support frame structure for ski platforms
CN207014541U (en) The connection mould and mould of a kind of steel tube concrete pile production
CN103334447A (en) Tension-free filling pile structure
CN209601247U (en) A kind of material frame of prefabricated components storage
CN208691828U (en) Plant raw wall virescence fabric and suspension lifting formula vertical greening device
CN107775599A (en) Multi-functional substation equipment fractionation equipment
CN206038412U (en) Loading counter weight device
CN215106719U (en) Cantilever type rain-proof shed for ground wall reinforcement cage processing platform
CN110356769A (en) It is a kind of for store up the embedded belt coiling structure with device and its storage band method
CN207453997U (en) Hoisting mechanism is lifted for the retaining-plate of support apparatus
CN108825206A (en) Gas storage well detection wellhead cable deviator and detection method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant