CN201826581U - Segmental-body assembly type emergency communication tower - Google Patents
Segmental-body assembly type emergency communication tower Download PDFInfo
- Publication number
- CN201826581U CN201826581U CN2010202337036U CN201020233703U CN201826581U CN 201826581 U CN201826581 U CN 201826581U CN 2010202337036 U CN2010202337036 U CN 2010202337036U CN 201020233703 U CN201020233703 U CN 201020233703U CN 201826581 U CN201826581 U CN 201826581U
- Authority
- CN
- China
- Prior art keywords
- tower
- triangle
- triangular
- segmental
- tower body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a segmental-body assembly type emergency communication tower. The segmental-body assembly type emergency communication tower is characterized in that a chassis, an adjustable triangular base, a triangular tower body lifting rack, a triangular leading rack, a segmental type tower body and balancing weights are mainly included, wherein the chassis comprises three pairs of balancing main frames and a triangular tower base that are fixedly connected in a Y-shaped manner, the balancing weights are arranged on the outer side ends of the three pairs of balancing main frames, a triangular leading rack bottom frame and the triangular base are perpendicularly and fixedly connected into a whole, a plurality of adjustable brackets that are in pin connection with one another are arranged on the inner side wall of the triangular tower body lifting rack, the outer side of the triangular tower body lifting rack is connected with the balancing main frames through a supporting rod fixedly connected with the triangular tower body lifting rack, and the triangular leading rack in slide fit with a bearing is arranged in the inner frame of the triangular tower body lifting rack. The utility model has the benefits that each segment of the tower body is lifted up slidably on the triangular tower body lifting rack through a lifting tool via the triangular leading rack, so that the tower body lifted segment by segment, and all segments of the tower body are assembled into a tower. The building is quick, the cost is low, and the removal is convenient.
Description
Technical field
The utility model belongs to communications tower, relates in particular to a kind of segmental-body assembly type emergency communication tower.
Background technology
Communications tower is being brought into play huge effect at current digital communication times.Fixing communications tower involves great expense, and the duration is very long.A fixed tower cost is more than 500,000 yuan; To purchase nearly 400,000 yuan of tower through doing 100,000 yuan of basic expenses.Engineering time needs a wheat harvesting period, long cost height of cycle.Run into convention on ordinary days, need to satisfy simultaneously the cellphone subscriber's that uprushes communication, communication company adopts the communication emergency car to solve an above-mentioned difficult problem.Import emergency car needs 8,000,000 yuan, and 1 year emergency car will leave unused time of 2/3, causes the significant wastage of resource.When running into removal or accident such as earthquake, can not interrupt in order to guarantee communication, have only and set up temporary fixed tower, not only build tower cost height, the cycle is long, uses a period of time to tear tower again open and can produce a removal expense again, and ground is then scrapped.Set up fixed tower and can not satisfy growing rate request at present, demand developing a kind of building soon urgently, cost is low, convenient communications tower of removing.
The utility model content
The purpose of this utility model is to overcome the deficiency of above-mentioned technology, builds soon and provide a kind of, and cost is low, the convenient segmental-body assembly type emergency communication tower of removing.
The utility model for achieving the above object, by the following technical solutions: a kind of segmental-body assembly type emergency communication tower, it is characterized in that: mainly by the chassis, triangle base, triangle body of the tower hoisting frame, the triangle saddle, segmented body of the tower and balancing weight constitute, described chassis is the Y font by three secondary counterweight body frames and triangle tower base and fixedlys connected and constitute the chassis, described three secondary counterweight body frame outboard ends are placed balancing weight, described triangle saddle underframe is vertical with triangle base affixed, the framework inside wall of described triangle body of the tower hoisting frame is provided with some the supports that are connected with bearing, the triangle body of the tower hoisting frame outside is by being connected with the counterweight body frame with its affixed support bar, be equipped with the triangle saddle that is slidingly matched with bearing in the triangle body of the tower hoisting frame inside casing, the framework of described triangle body of the tower hoisting frame is provided with body of the tower and imports and exports.
Each frame of described triangle base is provided with the engaging lug of band pin-and-hole, and described counterweight body frame top margin frame is provided with contiguous block, and contiguous block and triangle base engaging lug are pegged graft, and by the pin pin joint.
Described segmented body of the tower adopts manually or machinery segmentation from bottom to top promotes.
After described segmental-body is fixing, be fixed with the adjustable type fixed pulling rope on the segmental-body, the fixed pulling rope other end links to each other with triangle base and locks.
Described support bar is connected by stud by the two joint support bars that have bidirectional helical.
Beneficial effect: by the lifting instrument with every joint body of the tower by risings of on triangle body of the tower hoisting frame, sliding of triangle saddle, realize then every joint body of the tower being assembled into tower by saving lifting.Build soon, cost is low, the convenient dismounting.In order to guarantee that communication can not interrupt, can set up interim tower fast, not only reduce and build the tower cost, only need 4-5 hour time can build up 20 meters communications tower.Can reuse, reduce removal expense.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the structural representation of Fig. 1 intermediate cam shape body of the tower hoisting frame;
Fig. 4 is the vertical view of Fig. 2;
Fig. 5 is the right view of figure;
The structural representation of Fig. 6 triangle saddle;
Fig. 7 is the structural representation of Fig. 1 intermediate cam shape base;
Fig. 8 is the structural representation of support bar among Fig. 1;
Fig. 9 is the structural representation of counterweight body frame;
Figure 10 is the structural representation of segmented body of the tower.
Among the figure: 1, triangle base, 2, triangle body of the tower hoisting frame, 3, the triangle saddle, 4, segmented body of the tower, 5, balancing weight, 6, the counterweight body frame, 7, bearing, 8, support, 9, support bar, 10, import and export, 11, pin-and-hole, 12, engaging lug 13, contiguous block, 14, stud, 15, the adjustable type fixed pulling rope.
The specific embodiment
Describe the specific embodiment of the present utility model in detail below in conjunction with accompanying drawing and preferred embodiment.As shown in the figure, a kind of segmental-body assembly type emergency communication tower, mainly by the chassis, triangle base 1, triangle body of the tower hoisting frame 2, triangle saddle 3, segmented body of the tower 4 and balancing weight 5 constitute, described chassis is Y font bolt-type by three secondary counterweight body frames 6 with the triangle tower base and connects and composes the chassis, described three secondary counterweight body frame outboard ends are placed balancing weight, described triangle saddle underframe is connected in aggregates with the vertical bolt-type of triangle base, the framework inside wall of described triangle body of the tower hoisting frame is provided with some the supports 8 that are connected with bearing 7, the triangle body of the tower hoisting frame outside is by being connected with the counterweight body frame with its affixed support bar 9, be equipped with the triangle saddle that is slidingly matched with bearing in the triangle body of the tower hoisting frame inside casing, the framework of described triangle body of the tower hoisting frame reserves body of the tower in one side and imports and exports 10 when welding assembly.Each frame of described triangle base is provided with the engaging lug 12 of band pin-and-hole 11, and described counterweight body frame top margin frame is provided with contiguous block 13, and contiguous block and triangle base engaging lug are pegged graft, and by pin (not shown) pin joint.Described support bar is connected by stud 14 by the two joint support bars that have bidirectional helical.Described segmented body of the tower adopts manually or machinery segmentation from bottom to top promotes.After described segmental-body is fixing, be fixed with the adjustable type fixed pulling rope on the segmental-body, the fixed pulling rope other end links to each other with triangle base and locks.The fixed pulling rope of anchoring and body of the tower promote and locking synchronously in the segmental-body jacking process.
Operating principle:
The lifting installation steps of emergency communication tower: at first the epimerite body of the tower is imported and exported the framework inboard that enters triangle body of the tower hoisting frame 10 from body of the tower, be placed on the triangle base, utilize two palm hoist cranes that the body of the tower epimerite is promoted on 2 meters high.By that analogy, another joint body of the tower is placed on the triangle base, will be up and down two save Bolt Connection fastening after, utilize hand remove cucurbit up and down two joint bodies of the tower be promoted to simultaneously on 2 meters, joint body of the tower down according to said method is installed, require the tower height degree until reaching.
In the installation process of three turrets, when tower is promoted to certain altitude, should be at three supporting leg counterweight places, dispose three hands and remove the cucurbit stay cord 15 that fixes.Along with the lifting of tower, hand is removed the cucurbit fixed pulling rope and is slowly loosened, and the hoisting velocity that fixed pulling rope is put rope speed Ying Yuta is consistent, and makes fixed pulling rope keep certain pulling force, to guarantee the safety and stability of tower in lifting process.
After tower rises to needed height, will promote the fixed pulling rope tension, then that triangle body of the tower and triangle base is firm with Bolt Connection, the coxopodite body of the tower is with supporting clamp and supporting leg and promote the derrick fixation.Highl stratification according to tower is provided with fixed pulling rope, after fixed pulling rope installs, will protect the backguy hand to remove cucurbit and promote hand and remove the cucurbit dismounting.
The characteristics of interim three turrets of hand hoisting:
1, cost is low, and it is convenient to install, and 20 meters high towers is installed is only needed 4-5 hour.
2, because chassis master's supporting leg and triangle base adopt hinge-coupled, the placement of this tower is not subjected to the uneven restriction in bottom surface.
3, the interim triangle tower chassis of hand hoisting supporting leg is: 0.9*2.7 rice, secondary supporting leg is: 0.9*1-1.5 can regulate, and can regulate the chassis according to requirement for height and prop up leg length, therefore the floor space that can regulate tower.
4,, can not be used in earth anchor destruction bottom surface up and down, ground because backguy is fixed on hanging on the nose of counterweight hoop.
5, counterweight can be joined the concrete piece of Different Weight with the setting height(from bottom) of tower, to satisfy the stability of tower.
6, owing to adopt hand to remove the cucurbit hoisting way and utilize hand to remove cucurbit, can adjust hoisting velocity arbitrarily as fixed pulling rope, thus the steady safety when having guaranteed to install.
7, in the whole erection process, installation personnel all carries out fitting operation at two meters on the inner height scope of operation.
8, install the 3rd the joint after, can fix up an aerial wire at the epimerite place, antenna is along with the lifting of tower reaches desired height.
The above only is preferred embodiment of the present utility model, is not structure of the present utility model is done any pro forma restriction.Every foundation technical spirit of the present utility model all still belongs in the scope of the technical solution of the utility model any simple modification, equivalent variations and modification that above embodiment did.
Claims (4)
1. segmental-body assembly type emergency communication tower, it is characterized in that: mainly by the chassis, the adjustable type triangle base, triangle body of the tower hoisting frame, the triangle saddle, segmented body of the tower and balancing weight constitute, described chassis is the Y font by three secondary counterweight body frames and triangle tower base and fixedlys connected and constitute the chassis, described three secondary counterweight body frame outboard ends are placed balancing weight, described triangle saddle underframe vertical with triangle base affixed be an integral body, the framework inside wall of described triangle body of the tower hoisting frame is provided with some the supports that are connected with adjustable type, the triangle body of the tower hoisting frame outside is by being connected with the counterweight body frame with its affixed support bar, be equipped with the triangle saddle that is slidingly matched with bearing in the triangle body of the tower hoisting frame inside casing, the framework of described triangle body of the tower hoisting frame is provided with body of the tower and imports and exports.
2. segmental-body assembly type emergency communication tower according to claim 1, it is characterized in that: each frame of described triangle base is provided with the engaging lug of band pin-and-hole, described counterweight body frame top margin frame is provided with contiguous block, and contiguous block and triangle base engaging lug are pegged graft, and by the pin pin joint.
3. segmental-body assembly type emergency communication tower according to claim 1 is characterized in that: after described segmental-body is fixing, be fixed with the adjustable type fixed pulling rope on the segmental-body, the fixed pulling rope other end links to each other with triangle base and locks.
4. segmental-body assembly type emergency communication tower according to claim 1 is characterized in that:: described support bar is connected by stud by the two joint support bars that have bidirectional helical.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202337036U CN201826581U (en) | 2010-06-23 | 2010-06-23 | Segmental-body assembly type emergency communication tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202337036U CN201826581U (en) | 2010-06-23 | 2010-06-23 | Segmental-body assembly type emergency communication tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201826581U true CN201826581U (en) | 2011-05-11 |
Family
ID=43965126
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202337036U Expired - Fee Related CN201826581U (en) | 2010-06-23 | 2010-06-23 | Segmental-body assembly type emergency communication tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201826581U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105113838A (en) * | 2015-09-17 | 2015-12-02 | 广东电网有限责任公司电力科学研究院 | Windproof stay wire device of distribution network overhead line |
CN105781205A (en) * | 2015-11-30 | 2016-07-20 | 中国化学工程第三建设有限公司 | In-place guiding device for segmented hoisting and air pairing of heavy tower equipment |
CN107246177A (en) * | 2017-07-28 | 2017-10-13 | 北京无线电测量研究所 | A kind of fixation calibration tower of fast demountable |
CN108179913A (en) * | 2018-02-11 | 2018-06-19 | 电联工程技术股份有限公司 | A kind of bracing means of portable base station |
CN113216018A (en) * | 2021-05-19 | 2021-08-06 | 赵启林 | Erection system and method of emergency repair pier |
-
2010
- 2010-06-23 CN CN2010202337036U patent/CN201826581U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105113838A (en) * | 2015-09-17 | 2015-12-02 | 广东电网有限责任公司电力科学研究院 | Windproof stay wire device of distribution network overhead line |
CN105781205A (en) * | 2015-11-30 | 2016-07-20 | 中国化学工程第三建设有限公司 | In-place guiding device for segmented hoisting and air pairing of heavy tower equipment |
CN105781205B (en) * | 2015-11-30 | 2018-02-06 | 中国化学工程第三建设有限公司 | A kind of guider in place of the aerial group pair of heavy tower equipment segmental hoisting |
CN107246177A (en) * | 2017-07-28 | 2017-10-13 | 北京无线电测量研究所 | A kind of fixation calibration tower of fast demountable |
CN108179913A (en) * | 2018-02-11 | 2018-06-19 | 电联工程技术股份有限公司 | A kind of bracing means of portable base station |
CN113216018A (en) * | 2021-05-19 | 2021-08-06 | 赵启林 | Erection system and method of emergency repair pier |
CN113216018B (en) * | 2021-05-19 | 2022-09-27 | 赵启林 | Erection system and method of emergency repair pier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101845912A (en) | Segmental-body assembly type emergency communication tower | |
CN201826581U (en) | Segmental-body assembly type emergency communication tower | |
CN102444086B (en) | Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge | |
CN201458596U (en) | Crane with self-dismounting device | |
CN202090286U (en) | Traction system suitable for self-anchored type double cable plane suspension bridge | |
CN204024676U (en) | A kind of novel tunnel concrete steel form carrier | |
CN103669885A (en) | Segmental hoisting process of ultra-large-span steel truss | |
CN202881852U (en) | Suspension bridge cable installation system | |
CN102409838B (en) | Moveable operating platform and method for constructing suspended ceiling of roof by using same | |
CN202248941U (en) | Integral lifting, positioning and mounting device for large-scale steel members | |
CN102251483A (en) | Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane | |
CN101284628A (en) | Hoisting method for framework of large tonnage pressing machine | |
CN203128000U (en) | Hoisting device for direct-driven wind power generator set | |
CN103266799A (en) | Mast and installation technology thereof | |
CN204938800U (en) | Tower crane rood beam basis | |
CN103206852A (en) | Installation method for rotary kiln for large-sized cement production line | |
CN201826320U (en) | Assembling and sinking device for double wall steel cofferdam | |
CN204111235U (en) | A kind of voltage transformer and JP cabinet dismounting special purpose device | |
CN201635390U (en) | Automatic formwork supporting machine for high-rise building elevator shaft construction | |
CN104129730B (en) | A kind of transformer and JP cabinet dismounting suspender | |
CN204980945U (en) | Supplementary tower crane dismounting device | |
CN105152052A (en) | Glass curtain wall component lifting device and glass curtain wall component installing method | |
CN200996605Y (en) | Self-unloading binding overhead torch and its loading-unloading system | |
CN101858165B (en) | Tower mast structural segmented sheathing and piercing drawout integral installation technology | |
CN205429592U (en) | Tunnel cabling hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110511 Termination date: 20130623 |