CN202416197U - 一种组合式明洞涵洞 - Google Patents
一种组合式明洞涵洞 Download PDFInfo
- Publication number
- CN202416197U CN202416197U CN2012200375687U CN201220037568U CN202416197U CN 202416197 U CN202416197 U CN 202416197U CN 2012200375687 U CN2012200375687 U CN 2012200375687U CN 201220037568 U CN201220037568 U CN 201220037568U CN 202416197 U CN202416197 U CN 202416197U
- Authority
- CN
- China
- Prior art keywords
- culvert
- combined type
- cut tunnel
- type open
- rightwall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型属于隧道桥梁技术领域,具体涉及一种组合式明洞涵洞。本实用新型主要解决现有的明洞和涵洞存在费工费时,工作人员的劳动强度大,且对工作人员的技术水平要求高,施工受地质和气候影响大,工期长等问题。本实用新型的技术方案为:一种组合式涵洞桥梁,由左边墙和右边墙组成,在左边墙的上部设有凸起,在右边墙的上部设有与凸起相匹配的凹槽,所述左边墙和右边墙通过凸起伸进凹槽相连接。本实用新型具有施工技术简单、对工作人员的技术要求不高,专用设备少、质量稳定、尺寸随意、现场装配施工简便迅速,工期短,不受地质和气候的影响。
Description
技术领域
本实用新型属于隧道桥梁技术领域,具体涉及一种组合式明洞涵洞。
背景技术
山区公路和铁路洞顶覆盖层较薄,难以用暗挖法建隧道时,隧道洞口或路堑地段受坍方、落石、泥石流、雪害等危害时,道路之间或道路与铁路之间形成立体交叉,但又不宜做立交桥时,通常设置明洞。现在的明洞一般是在现场使用钢筋水泥浇筑成,该方法费工费时,对技术和设备要求高,而且施工影响交通。
公路铁路跨越沟谷、溪沟、河流、人工渠道以及排除路基内侧边沟水流时,常常需要修建涵洞。涵洞是公路构造物的重要组成部分之一,常见的涵洞都是现场使用钢筋水泥浇筑或者用石头砖头垒等方法,该方法费工费时,工作人员的劳动强度大,且对工作人员的技术水平要求高,施工受地质和气候影响大,工期长等缺点。
发明内容
本实用新型主要针对现有的明洞和涵洞存在费工费时,工作人员的劳动强度大,且对工作人员的技术水平要求高,施工受地质和气候影响大,工期长等缺点,提供一种安装简单、工期短、不受地质和气候影响的组合式明洞涵洞。
本实用新型为实现上述目的而采取的技术方案为:
一种组合式涵洞桥梁,由左边墙和右边墙组成,在左边墙的上部设有凸起,在右边墙的上部设有与凸起相匹配的凹槽,所述左边墙和右边墙通过凸起伸进凹槽相连接。
进一步的,根据路面或者隧道宽度不同等实际情况,还可以采用下述技术方案:
一种组合式明洞涵洞,由左边墙、右边墙和顶部组成,在左边墙和右边墙的上端都设有凸起,在顶部的两端都设有凹槽,所述左边墙和右边墙的凸起分别与顶部的两个凹槽相连接。
本实用新型还可以使用其它的凸凹方法进行对接和固定。
本实用新型采用上述技术方案,左边墙、右边墙和顶部都是制备好的部件,需要组装明洞或者涵洞时只要将上述部件运到现场安装就可以,施工技术简单、对工作人员的技术要求不高,专用设备少、质量稳定、尺寸随意、现场装配施工简便迅速,工期短,不受地质和气候的影响。
附图说明
图1是本实用新型的结构示意图;
图2是本实用新型实施例2的结构示意图;
图3是本实用新型实施例3的结构示意图。
具体实施方式
实施例1
如图1所示,一种组合式明洞涵洞,由左边墙1和右边墙2组成,在左边墙1的上部设有凸起3,在右边墙2的上部设有与凸起3相匹配的凹槽4,所述左边墙1和右边墙2通过凸起3伸进凹槽4相连接。
现场安装时只需要将左边墙和右边墙安装好,可用螺丝或者焊接方法将接口处固定。
实施例2
如图2所示,一种组合式明洞涵洞,由左边墙1、右边墙2和顶部3组成,在左边墙1和右边墙2的上端都设有凸起4,在顶部3的两端都设有凹槽5,所述左边墙1和右边墙2的凸起4分别与顶部3的两个凹槽5相连接。
现场安装时只需要将左边墙和右边墙安装好,可用焊接方法将接口处固定。
实施例3
如图3所示,一种组合式明洞涵洞,由左边墙1、右边墙2和顶部3组成,在左边墙1和右边墙2的上端都设有凸起4,在顶部3的两端都设有凹槽5,所述左边墙1和右边墙2的凸起4分别与顶部3的两个凹槽5相连接。
现场安装时只需要将左边墙和右边墙安装好,可用螺丝将接口处固定。
Claims (2)
1.一种组合式明洞涵洞,其特征是由左边墙(1)和右边墙(2)组成,在左边墙(1)的上部设有凸起(3),在右边墙(2)的上部设有与凸起(3)相匹配的凹槽(4),所述左边墙(1)和右边墙(2)通过凸起(3)伸进凹槽(4)相连接。
2.根据权利要求1所述的一种组合式明洞涵洞,其特征是由左边墙(1)、右边墙(2)和顶部(3)组成,在左边墙(1)和右边墙(2)的上端都设有凸起(4),在顶部(3)的两端都设有凹槽(5),所述左边墙(1)和右边墙(2)的凸起(4)分别与顶部(3)的两个凹槽(5)相连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200375687U CN202416197U (zh) | 2012-02-07 | 2012-02-07 | 一种组合式明洞涵洞 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200375687U CN202416197U (zh) | 2012-02-07 | 2012-02-07 | 一种组合式明洞涵洞 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202416197U true CN202416197U (zh) | 2012-09-05 |
Family
ID=46740976
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200375687U Expired - Fee Related CN202416197U (zh) | 2012-02-07 | 2012-02-07 | 一种组合式明洞涵洞 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202416197U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561219A (zh) * | 2012-02-07 | 2012-07-11 | 孔民 | 一种组合式明洞涵洞 |
-
2012
- 2012-02-07 CN CN2012200375687U patent/CN202416197U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561219A (zh) * | 2012-02-07 | 2012-07-11 | 孔民 | 一种组合式明洞涵洞 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202626972U (zh) | 一种新型截面预制混凝土围护桩 | |
CN203960700U (zh) | 桩托u形槽封闭式路基结构 | |
CN204370384U (zh) | 一种泥石流分级消能排导系统 | |
CN103953366B (zh) | 单洞隧道改为连拱时中隔墙顶部原衬砌空腔回填施工方法 | |
CN108316089A (zh) | 一种采用素砼及钢筋砼修复路面方法 | |
CN106522248A (zh) | 加固土质边坡方法及边坡加固装置 | |
CN105926391A (zh) | 一种既有铁路路基的路肩加宽方法 | |
CN104233914A (zh) | 快捷式乡村道路硬化路面施工方法 | |
CN204825931U (zh) | 一种边坡治理防护结构 | |
CN207392215U (zh) | 一种岩质边坡生态绿化护坡装置 | |
CN202416197U (zh) | 一种组合式明洞涵洞 | |
CN203822325U (zh) | 用于膨胀性土层隧道初期的钢格栅钢拱架联合支护 | |
CN202440766U (zh) | 一种路堑段排水明洞渡槽 | |
CN201802136U (zh) | 防沙、导沙栅栏 | |
CN202482782U (zh) | 用于风沙地区道路防护的双峰阻沙结构 | |
CN104120649A (zh) | 具有桥头抗推力保护墙的无端梁v型刚构桥 | |
CN204151675U (zh) | 地锚式悬索桥猫道承重索的转向架 | |
CN203689815U (zh) | 一种隧道微台阶法工艺教学仿真体 | |
CN204530357U (zh) | 岩崖边坡栈道 | |
CN102561219A (zh) | 一种组合式明洞涵洞 | |
CN204326098U (zh) | 下穿高速公路紧邻桥梁墩台的路基结构 | |
CN204023348U (zh) | 快捷式乡村道路硬化路面 | |
CN211285505U (zh) | 一种顺向坡傍山渠道结构 | |
CN206233347U (zh) | 一种预制装配式隧道排水边沟 | |
CN209669898U (zh) | 一种公路工程施工用边坡防护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120905 Termination date: 20200207 |
|
CF01 | Termination of patent right due to non-payment of annual fee |