CN202359570U - Piled raft foundation with improved foundation pit slopes - Google Patents

Piled raft foundation with improved foundation pit slopes Download PDF

Info

Publication number
CN202359570U
CN202359570U CN 201120468928 CN201120468928U CN202359570U CN 202359570 U CN202359570 U CN 202359570U CN 201120468928 CN201120468928 CN 201120468928 CN 201120468928 U CN201120468928 U CN 201120468928U CN 202359570 U CN202359570 U CN 202359570U
Authority
CN
China
Prior art keywords
foundation
slope
stake
domatic
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120468928
Other languages
Chinese (zh)
Inventor
王开华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Institute of Architectural Design Co., Ltd.
Original Assignee
SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd filed Critical SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd
Priority to CN 201120468928 priority Critical patent/CN202359570U/en
Application granted granted Critical
Publication of CN202359570U publication Critical patent/CN202359570U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Retaining Walls (AREA)

Abstract

The utility model discloses a piled raft foundation with improved foundation pit slopes, wherein pit walls are slopes, slope piles are arranged under the slopes, and the top ends of intersection positions between the slope piles and the slopes are respectively partially made into a small flat bottom. The piled raft foundation with the improved foundation pit slopes has the advantages that: 1, stressing of piles and rafts is facilitated; 2, a foundation pit does not need to be maintained, the construction is simple, and the manufacture cost is saved; 3, the waterproofing function of the top of each pile is the same as that of a common pile, and convenience and simplicity are realized; and 4, the piled raft foundation is suitable for all pile types.

Description

The improved pile-raft foundation in foundation ditch slope
Technical field
the utility model relates to technical field of buildings, is specifically related to the foundation pile raft foundation of a kind of pile foundation+raft plate, the improved pile-raft foundation in particularly a kind of foundation ditch slope.
Background technology
The general base form that adopts pile foundation+raft plate in high-rise especially super highrise building basis, because elevator foundation ditch and sump etc. will be set, raft plate part will fall low.Following two kinds of methods are arranged in the construction usually: 1, straight slope is made at the end, hole, two kinds of stake top mark high score height, and the stake top directly anchors into base plate, sees figure one; 2, the sloping is done at the end, hole, and stake top mark height is along ramp, and the stake top is cut into hypotenuse and is anchored into base plate, sees figure two.
these two kinds of ways all have tangible weak point: in the method 1, the raft plate is generally thicker, bear directly or indirectly effects such as integrally bending, local buckling, shearing, die-cut, relative settlement, and stressing conditions is comparatively complicated; Foundation ditch is made straight slope, and the raft plate thickness has sudden change, can produce stress and concentrate, and is stressed very unfavorable to the raft plate; In addition, foundation ditch border adjacent studs top mark height differs bigger, general 2m ~ 3.5m, and stake will be born the lateral shear effect of soil before underplate concrete is built; In addition, foundation ditch is made straight slope, during construction; To do upright hole wall and to go along with sb. to guard him, increase construction costs, and go along with sb. to guard him difficult.In the method 2, because the stake top will be cut into hypotenuse, to castinplace pile, the stake top is cut hypotenuse and can be realized, but for prefabricated tubular pile, difficulty of hypotenuse is cut on the stake top, and hypotenuse stake top waterproofing process is more difficult than general stake.
Summary of the invention
the utility model technical problem to be solved is to overcome the defective of the improved pile-raft foundation on the foundation ditch slope of prior art, a kind of construction costs is provided, goes along with sb. to guard him the improved pile-raft foundation in foundation ditch slope easily.
are in order to solve these problems of the prior art; The technical scheme that the utility model provides is: the improved pile-raft foundation in foundation ditch slope; The hole wall is the slope; Said slope has domatic stake, it is characterized in that, make in the part, top of the intersection on said domatic stake and slope one little flat.
preferably, the little flat area on said domatic stake top equals domatic stake cross-sectional area.
preferably, the little flat area on said domatic stake top is not less than domatic stake cross-sectional area.
preferably, the little flat of said domatic stake top extends 15cm length at least in the other direction again along foundation ditch.
preferably, little flat the interconnecting on adjacent domatic stake top constitutes the stepped layer aggregated(particle) structure.
Additional bar is preferably laid on the little flat and vertical plane on domatic stake top in .
The advantage of the improvement pile-raft foundation on the foundation ditch slope of the utility model is: 1. pair stake and raft plate are stressed favourable; 2. foundation ditch need not safeguarded, constructs simple and convenient and the saving cost, and 3. a top waterproof is with general stake; Simple and convenient, 4. be applicable to nearly all type.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is further described:
Fig. 1 is the pile-raft foundation sketch map on the foundation ditch slope of prior art;
Fig. 2 is the pile-raft foundation sketch map on the foundation ditch slope of prior art;
Fig. 3 is the improvement pile-raft foundation sketch map on the foundation ditch slope of the utility model;
Fig. 4 is the improvement pile-raft foundation sketch map on the foundation ditch slope of the utility model.
Wherein, 1 is the excavation slope stake, and 11 is domatic stake, and 111 is the foundation ditch stake,
2 is the raft plate, and 3 is raft slab muscle, and 4 is additional bar,
5 are excavation slope, and 51 is the slope, and 52 is little flat, and 53 is foundation ditch.
The specific embodiment
further specify such scheme below in conjunction with specific embodiment.Should be understood that these embodiment are used to the utility model is described and the scope that is not limited to limit the utility model.The implementation condition that adopts among the embodiment can be done further adjustment according to the condition of concrete producer, and not marked implementation condition is generally the condition in the normal experiment.
embodiment such as Fig. 3, shown in Figure 4; The improved pile-raft foundation in foundation ditch slope, the hole wall is slope 51, said slope 51 has domatic stake 11; Make in the part, top of the intersection on said domatic stake 11 and slope 51 one little by flat 52; Little flat 52 areas on said domatic stake top equal the cross-sectional area of domatic stake 11, and in another preferred embodiment of the utility model, little flat 52 areas on domatic stake top are not less than domatic stake 11 cross-sectional areas; In another preferred embodiment of the utility model, little flat 52 of domatic stake 11 tops are extended 15cm length at least in the other direction again along foundation ditch.
are shown in Figure 4, and among the embodiment of the utility model, little flat 52 of adjacent domatic stake 11 tops interconnect and constitute the stepped layer aggregated(particle) structure.
are as shown in Figure 3, lay additional bar 4 on little flat 52 and the vertical plane on domatic stake 11 tops.
above advantage that shows and described basic principle, principal character and the utility model of the utility model.The technician of the industry should understand; The utility model is not restricted to the described embodiments; The principle of describing in the foregoing description and the manual that the utility model just is described; The utility model also has various changes and modifications under the prerequisite that does not break away from the utility model spirit and scope, and these variations and improvement all fall in the utility model scope that requires protection.

Claims (6)

1. improved pile-raft foundation in foundation ditch slope; The hole wall is slope (51); Said slope has domatic stake (11), it is characterized in that, makes one little flat (52) in the part, top of the intersection of said domatic stake (11) and slope (51).
2. the improved pile-raft foundation in foundation ditch as claimed in claim 1 slope is characterized in that, little flat (52) area on said domatic stake (11) top equals domatic stake (11) cross-sectional area.
3. the improved pile-raft foundation in foundation ditch as claimed in claim 1 slope is characterized in that, little flat (52) area on said domatic stake (11) top is not less than domatic stake (11) cross-sectional area.
4. the improved pile-raft foundation in foundation ditch as claimed in claim 1 slope is characterized in that, little flat (52) on said domatic stake top are extended 15cm length at least in the other direction again along foundation ditch (53).
5. the improved pile-raft foundation in foundation ditch as claimed in claim 1 slope is characterized in that, little flat (52) on adjacent domatic stake (11) top interconnect and constitute the stepped layer aggregated(particle) structure.
6. the improved pile-raft foundation in foundation ditch as claimed in claim 1 slope is characterized in that, lays additional bar (4) on little flat (52) on domatic stake top and the vertical plane thereof.
CN 201120468928 2011-11-23 2011-11-23 Piled raft foundation with improved foundation pit slopes Expired - Fee Related CN202359570U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120468928 CN202359570U (en) 2011-11-23 2011-11-23 Piled raft foundation with improved foundation pit slopes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120468928 CN202359570U (en) 2011-11-23 2011-11-23 Piled raft foundation with improved foundation pit slopes

Publications (1)

Publication Number Publication Date
CN202359570U true CN202359570U (en) 2012-08-01

Family

ID=46570765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120468928 Expired - Fee Related CN202359570U (en) 2011-11-23 2011-11-23 Piled raft foundation with improved foundation pit slopes

Country Status (1)

Country Link
CN (1) CN202359570U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213567A (en) * 2013-05-30 2014-12-17 中国二十冶集团有限公司 Construction method for controlling sliding of slope section of underground pipeline
CN108239989A (en) * 2018-02-10 2018-07-03 陕西华邦建设工程有限公司 A kind of environment-friendly type collapsible loess foundation structure and its processing method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213567A (en) * 2013-05-30 2014-12-17 中国二十冶集团有限公司 Construction method for controlling sliding of slope section of underground pipeline
CN108239989A (en) * 2018-02-10 2018-07-03 陕西华邦建设工程有限公司 A kind of environment-friendly type collapsible loess foundation structure and its processing method
CN108239989B (en) * 2018-02-10 2024-02-13 陕西华邦建设工程有限公司 Environment-friendly collapsible loess foundation structure and treatment method thereof

Similar Documents

Publication Publication Date Title
CN108277814A (en) Stake top counterfort wall supporting construction and construction method
CN111424535B (en) Single-column type bridge antidumping reinforcing apparatus
CN105421477A (en) Construction method for tower crane foundation
CN202359570U (en) Piled raft foundation with improved foundation pit slopes
CN104195956A (en) Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof
CN107988906A (en) A kind of high intensity anchorage
CN207017169U (en) A kind of high-filled subgrade culvert off-loading structure
CN203613565U (en) Connection structure of basic raft and dual-purpose underground diaphragm wall
CN108360555A (en) A kind of the ground anchor structure formula cantilever barrier wall structure and its stability calculation method of railway sunk type station
CN205000343U (en) Cross reinforced structure in landslide tunnel
CN207267994U (en) Corrugated sheet steel formula retaining wall
JP2014145176A (en) Continuous footing
CN208309591U (en) One kind not landing elevator foundation pit
CN103015447A (en) Piled raft foundation structure provided with column pier type pile cap structures
CN208088318U (en) Stake top counterfort wall supporting construction
CN202969339U (en) Building block for dry piled retaining wall
CN201232188Y (en) Buttress type soil nail wall
CN206887976U (en) A kind of caisset for being suitable for big wave
CN204959794U (en) Field word roof beam pile cap and flat slab floor structure system
CN205475300U (en) Utilize foundation pit retaining structure's tower crane foundation cushion cap
CN204282392U (en) A kind of extra-high voltage single-column Guywire tower V-type bracing wire foundation structure
CN104358272B (en) A kind of extra-high voltage single-column Guywire tower V-type bracing wire foundation structure
CN111206616A (en) A assembled wall brick and retaining wall for ecological retaining wall
CN203924048U (en) Fold-line-shaped pile foundation structure
CN204919872U (en) Shear force wall transform structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120711

Address after: 215021 Suzhou Industrial Park, Jiangsu Xinghai street, No. 9

Patentee after: Suzhou Institute of Architectural Design Co., Ltd.

Address before: 215021 Suzhou Industrial Park, Jiangsu Xinghai street, No. 9

Patentee before: Suzhou Institute of Architectural Design Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120801

Termination date: 20151123