CN108239989A - A kind of environment-friendly type collapsible loess foundation structure and its processing method - Google Patents

A kind of environment-friendly type collapsible loess foundation structure and its processing method Download PDF

Info

Publication number
CN108239989A
CN108239989A CN201810138546.1A CN201810138546A CN108239989A CN 108239989 A CN108239989 A CN 108239989A CN 201810138546 A CN201810138546 A CN 201810138546A CN 108239989 A CN108239989 A CN 108239989A
Authority
CN
China
Prior art keywords
pile
stake
foundation pit
isolated footing
sideline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810138546.1A
Other languages
Chinese (zh)
Other versions
CN108239989B (en
Inventor
行础
张培义
柏新博
许振宁
闫高
刘鹏华
张凯鹏
曹青霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Huabang Construction Engineering Co Ltd
Original Assignee
Shaanxi Huabang Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Huabang Construction Engineering Co Ltd filed Critical Shaanxi Huabang Construction Engineering Co Ltd
Priority to CN201810138546.1A priority Critical patent/CN108239989B/en
Publication of CN108239989A publication Critical patent/CN108239989A/en
Application granted granted Critical
Publication of CN108239989B publication Critical patent/CN108239989B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/16Foundations formed of separate piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

A kind of environment-friendly type collapsible loess foundation structure and its processing method including undisturbed soil, foundation pit and compaction pile, are undisturbed soil around foundation pit, have compaction pile in undisturbed soil.Compaction pile arranges that bed course is arranged at isolated footing lower part, and bed course lower part is real stake in original state soil layer for positive triangle blossom type.There is compaction pile around isolated footing, compaction pile is real stake and empty stake, and real stake is located at empty stake lower part.The method for processing foundation is:It lays out pile, drive piles, excavate.The present invention has the characteristics of excavated volume is small, and environment protecting is good, short time limit and low cost.

Description

A kind of environment-friendly type collapsible loess foundation structure and its processing method
Technical field
The invention belongs to foundation treatment technology fields, and in particular to a kind of environment-friendly type collapsible loess foundation structure and its place Reason method.
Background technology
The basement process of isolated footing is carried out in China collapsible loess region, as shown in Figure 1, usually way has whole open It digs to isolated footing absolute altitude, then drives piles in the whole field in the range of excavation;Also there is deep layer to change to fill out, this way must slope, basis amplification, Slope retaining etc. causes earthwork excavated volume big, long in time limit, and construction cost is high.In terms of environmental protection, Dust Improvement is costly, the period It is long;Construction equipment, mechanical movement amount are big, and the noise pollution time is long;Water resource waste is serious, and solid waste is more;Especially to winter The dust-proof haze that subtracts in construction site increases difficulty.
Invention content
To overcome above-mentioned the deficiencies in the prior art, the object of the present invention is to provide a kind of environment-friendly type collapsible loess foundation knots Structure and its processing method have the characteristics of excavated volume is small, and environment protecting is good, short time limit and low cost.
The technical scheme is that:A kind of foundation structure of environment-friendly type collapsible loess, foundation structure include undisturbed soil, base Hole and compaction pile are undisturbed soil around the foundation pit, have compaction pile in undisturbed soil.
The compaction pile has several, between centre-to-centre spacing be 800-1100mm, compaction pile aperture be 350-450mm;It is compacted Stake is arranged in undisturbed soil for positive triangle blossom type.
There is foundation pit bottom surface sideline in the bottom surface of the foundation pit, and foundation pit bottom surface sideline is not intersected with compaction pile.
The compaction pile includes real stake, empty stake, and real stake is located at empty stake lower part.
There is isolated footing in the foundation pit, bed course is arranged at isolated footing lower part, and bed course is on foundation pit bottom surface, foundation pit bottom surface lower part It is real stake.
There is compaction pile around the isolated footing, compaction pile is made of real stake and empty stake, and real stake is located at empty stake lower part.
There is isolated footing bottom surface sideline in the isolated footing bottom surface, and foundation pit bottom surface sideline is not small far from isolated footing bottom surface sideline In 300mm.
Lay out pile range line outside the sideline of the isolated footing bottom surface, between distance be isolated footing bottom surface sideline most short side line Length 1/4 and not less than 0.5m or 3/4 and not less than 1m.
A kind of environment-friendly type Treatment method of collapsible loess foundation, includes the following steps:
Step 1, it lays out pile:
In self-weight collapse loess place, isolated footing center line and bottom surface range first delimited, then along isolated footing bottom The range line that lays out pile is diffused into outside the sideline of face, per side extended range more than the 3/4 of isolated footing bottom surface sideline most short side line length, and Not less than 1m;It lays out pile in the range line that lays out pile, pile-type is compaction pile, and pile center is away from 800-1100mm, aperture 350-450mm;Cloth It puts using positive triangle blossom type, foundation pit bottom surface sideline is extended out in isolated footing bottom surface sideline at 300mm, foundation pit bottom surface sideline and stake When position is intersecting, foundation pit bottom surface sideline is moved to outside stake, tangent with compaction pile;
Step 2, it drives piles:
Compaction pile is made of empty stake and real stake, and empty stake is beaten between real stake top, foundation pit bottom surface sideline and the range line that lays out pile Compaction pile;Beat compaction pile in the range of the sideline of foundation pit bottom surface, compaction pile top is had time stake;From the range line that lays out pile to isolated footing center It drives piles in line direction;
Step 3, it excavates:
It independently excavates, digs deep to foundation pit bottom surface in the range of the sideline of each foundation pit top surface respectively.
In step 1, in non-self centred graph place, the range that lays out pile line is first to delimit isolated footing center line and bottom surface Then range diffuses into the range line that lays out pile along outside the sideline of isolated footing bottom surface, be more than isolated footing bottom surface sideline per side extended range Most the 1/4 of short side line length, and not less than 0.5m.
In the method for processing foundation of above-mentioned collapsible loess, should driving depth be determined according to the report that geological survey units provide And compacted material.
Compared with prior art, the present invention is since directly from piling of beginning primitively is opened flat, piling divides real stake, empty stake and sky Stake, compaction pile is real stake, empty stake and empty stake within foundation pit hemline range, and other than foundation pit hemline range, the bottom of foundation extends out Compaction pile is real stake and empty stake within range, is real stake below the bottom of foundation;It constructs from outside to inside;Piling is completed, and the earthwork is dug deep To substrate absolute altitude, sampling observation loess compactness reaches 93%-95%.Solve cost caused by current heavy excavation or strips of excavation into This height and engineering-environment pollute, moreover it is possible to effectively eliminate the collapsibility of ground, ensure foundation bearing capacity.
Description of the drawings
Fig. 1 lays out pile plan view for existing way.
Fig. 2 lays out pile plan view for place of the present invention.
Fig. 3 lays out pile amplification view for single isolated footing.
Fig. 4 is the A-A sectional views that the isolated footing of Fig. 3 lays out pile.
Fig. 5 is piling sectional view.
In figure, 1 is undisturbed soil, and 2 be foundation pit, and 3 be compaction pile, and 3-1 is real stake, and 3-2 is empty stake, and 3-3 is empty stake, and 4 be pad Layer, 5 be isolated footing, and 6 be isolated footing bottom surface sideline, and 7 be foundation pit bottom surface sideline, and 8 be foundation pit top surface sideline, and 9 be the model that lays out pile Contour.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.
As shown in Fig. 2, it is that a kind of place of environment-friendly type collapsible loess foundation structure lays out pile plan view.
As shown in Figure 3 and Figure 4, single isolated footing lays out pile the partial enlargement B figures of amplification view and Fig. 2, ground base junction Structure includes undisturbed soil 1, foundation pit 2 and compaction pile 3, it is characterised in that:It is undisturbed soil 1 around the foundation pit 2, has in undisturbed soil 1 crowded Close stake 3.
The compaction pile 3 has several, between centre-to-centre spacing be 800-1100mm, 3 aperture of compaction pile be 350-450mm;It squeezes Close stake 3 is arranged in undisturbed soil 1 for positive triangle blossom type.
There is foundation pit bottom surface sideline 7 in the bottom surface of the foundation pit 2, and foundation pit bottom surface sideline 7 is not intersected with compaction pile 3.
The compaction pile 3 includes real stake 3-1, void stake 3-2, real stake 3-1 are located at void stake 3-2 lower parts.
There is isolated footing 5 in the foundation pit 2, bed course 4 is arranged at 5 lower part of isolated footing, and bed course 4 is on foundation pit bottom surface, foundation pit bottom Face lower part is real stake 3-1.
There is compaction pile 3 around the isolated footing 5, compaction pile 3 is made of real stake 3-1 and void stake 3-2, real stake 3-1 In empty stake 3-2 lower parts.
There is isolated footing bottom surface sideline 6 in 5 bottom surface of isolated footing, and foundation pit bottom surface sideline 7 is away from isolated footing bottom surface sideline 6 Not less than 300mm.
Lay out pile outside isolated footing bottom surface sideline 6 range line 9, between distance it is most short for isolated footing bottom surface sideline 6 Side line length 1/4 and not less than 0.5m or 3/4 and not less than 1m.
A kind of environment-friendly type Treatment method of collapsible loess foundation, includes the following steps:
Step 1, it lays out pile:
In self-weight collapse loess place, 5 center line of isolated footing and bottom surface range first delimited, then along isolated footing bottom The range line 9 that lays out pile is diffused into outside face sideline 6, is more than the 3/4 of the most short side line length of isolated footing bottom surface sideline 6 per side extended range, And not less than 1m;It lays out pile in the range line 9 that lays out pile, pile-type is compaction pile 3, and pile center is away from 800-1100mm, aperture 350- 450mm;Arrangement is extended out in isolated footing bottom surface sideline 6 at 300mm using positive triangle blossom type, foundation pit bottom surface sideline 7, foundation pit When bottom surface sideline 7 is intersected with stake position, foundation pit bottom surface sideline 7 is moved to outside stake, tangent with compaction pile 3;
Step 2, it drives piles:
Compaction pile 3 is made of empty stake 3-2 and reality stake 3-1, and empty stake 3-2 is in real stake 3-1 tops, foundation pit bottom surface sideline 7 and cloth Compaction pile 3 is beaten between stake range line 9;Compaction pile 3 is beaten in the range of foundation pit bottom surface sideline 7, have time a 3-3 on compaction pile 3 top;From cloth Stake range line 9 is driven piles to 5 centerline direction of isolated footing, as shown in Figure 5;
Step 3, it excavates:
It independently excavates, digs deep to foundation pit bottom surface in the range of each foundation pit top surface sideline 8 respectively.
In step 1, in non-self centred graph place, the range that lays out pile line is first to delimit 5 center line of isolated footing and bottom Then face range diffuses into the range line 9 that lays out pile along outside isolated footing bottom surface sideline 6, be more than isolated footing bottom surface per side extended range The 1/4 of the most short side line length of sideline 6, and not less than 0.5m.
Embodiment:
Referring to Fig. 4 and Fig. 5, using XXXX projects as example, the construction site of the engineering is in Collapsible Loess District, The saturated yielding type in place is self-weight collapse loess, and saturated yielding grade is II grade (medium), it is desirable that the untreated collapsible loess in lower part Surplus wet sinking volume no more than 200mm, it is the downward 8.9m of indoor Horizon that report and result of calculation processing depth are surveyed in base area, former Design is heavy excavation and strips of excavation, is laid out pile as quincuncial pile, excavates part and all beats element earth pile, pile center is away from 900mm, stake Diameter 400mm.
The foundation structure of collapsible loess after optimization, isolated footing 5 are located in foundation pit 2, are original state around the foundation pit 2 Soil 1 has compaction pile 3 in undisturbed soil 1.The compaction pile 3 has several, between centre-to-centre spacing be 900mm, 3 aperture of compaction pile is 400mm;Compaction pile 3 arranges that there are foundation pit bottom surface sideline 7, the base in the bottom surface of foundation pit 2 in undisturbed soil 1 for positive triangle blossom type Do not intersect with compaction pile 3 in hole bottom surface sideline 7.Bed course 4 is arranged at 5 lower part of isolated footing, and 4 lower part of bed course is real stake 3-1.Isolated footing 5 Surrounding has compaction pile 3, and compaction pile 3 is that real stake 3-1 and void stake 3-2, real stake 3-1 are located at void stake 3-2 lower parts.
The method for processing foundation of collapsible loess after optimization, includes the following steps:
Step 1, it lays out pile:
In self-weight collapse loess place, 5 bottom surface range of isolated footing first delimited, then along isolated footing bottom surface sideline 6 Outer to diffuse into the range line 9 that lays out pile, extended range is 3/4 of the most short side line length more than isolated footing bottom surface sideline 6;From independent base 5 bottom surface of plinth starts to lay out pile to 9 direction of range line that lays out pile, and pile-type is compaction pile 3, and pile center is away from 900mm, aperture 400mm;Arrangement Using positive triangle blossom type, foundation pit bottom surface sideline 7 is extended out in isolated footing bottom surface sideline 6 at 300mm, foundation pit bottom surface sideline 7 with Stake position is intersected, and foundation pit bottom surface sideline 7 is moved to outside stake, tangent with compaction pile 3.
Step 2, it drives piles:
Site of Collapsible Loess except foundation pit bottom surface sideline 7, compaction pile 3 are made of empty stake 3-2 and reality stake 3-1, empty stake 3-2 beats compaction pile 3 between real stake 3-1 tops, foundation pit bottom surface sideline 7 and the range line 9 that lays out pile;In the range of foundation pit bottom surface sideline 7 Compaction pile 3 is beaten, have time a 3-3 on compaction pile 3 top;From laying out pile, range line 9 is driven piles to 5 centerline direction of isolated footing, and stake is deep 9.5m。
Step 3, it excavates:
It is independently excavated in the range of each foundation pit top surface sideline 8 respectively, digs deeply to foundation pit bottom surface, then do 500mm thickness 3:7 cushion limes.
After applying the present invention, this project cost reduces by 1/2, and the earthwork and piling amount also accordingly reduce 1/2, and the duration shortens 20 My god (referring to the following table 1).
1 XXXX project grounds of table handle contrast table
Explanation of nouns:
Undisturbed soil:Original soil without disturbance, including collapsible loess, miscellaneous fill, plantation soil etc..
Collapsible loess:Under a certain pressure by water-soaked, soil structure is destroyed rapidly, and generates the Huang of significantly additional sinking Soil.
Self-weight collapse loess:Significantly added obtaining collapsibility by water-soaked, generation under the gravity pressure of upper earthing Loess.
Non-self centred graph:By water-soaked under the gravity pressure of upper earthing, do not occur significantly to add wet Fall into property loess.
Plain soil:To can be used for the undisturbed soil of backfill after tested.
Empty stake:For compaction pile void stake top stake holes part, after compaction pile pile, sky dress part is all excavated.
Empty stake:The part for loosening soil is reserved on real stake top, assists pile.
Real stake:For the actually active compacted part of compaction pile.
Compaction pile:It is that the steel pipe with pipe close, valve or conehead is pressed into or be driven underground secret soil layer to form hole, then Launched in hole the fillers such as plain soil into stake.

Claims (10)

1. a kind of foundation structure of environment-friendly type collapsible loess, foundation structure includes undisturbed soil (1), foundation pit (2) and compaction pile (3), it is characterised in that:It is undisturbed soil (1) around the foundation pit (2), has compaction pile (3) in undisturbed soil (1).
A kind of 2. foundation structure of environment-friendly type collapsible loess according to claim 1, which is characterized in that the compaction pile (3) have several, between centre-to-centre spacing be 800-1100mm, compaction pile (3) aperture be 350-450mm;Compaction pile (3) is in undisturbed soil (1) it is arranged in for positive triangle blossom type.
A kind of 3. foundation structure of environment-friendly type collapsible loess according to claim 1, which is characterized in that the foundation pit (2) there is foundation pit bottom surface sideline (7) in bottom surface, and foundation pit bottom surface sideline (7) is not intersected with compaction pile (3).
A kind of 4. foundation structure of environment-friendly type collapsible loess according to claim 1, which is characterized in that the compaction pile (3) including real stake (3-1), empty stake (3-2), real stake (3-1) is positioned at empty stake (3-2) lower part.
A kind of 5. foundation structure of environment-friendly type collapsible loess according to claim 1, which is characterized in that the foundation pit (2) there is isolated footing (5) in, bed course (4) is arranged at isolated footing (5) lower part, and bed course (4) is on foundation pit bottom surface, foundation pit bottom surface lower part It is real stake (3-1).
A kind of 6. foundation structure of environment-friendly type collapsible loess according to claim 5, which is characterized in that the independence There is compaction pile (3) around basic (5), compaction pile (3) is made of real stake (3-1) and empty stake (3-2), and real stake (3-1) is positioned at empty stake (3-2) lower part.
A kind of 7. foundation structure of environment-friendly type collapsible loess according to claim 5, which is characterized in that the isolated footing (5) there is isolated footing bottom surface sideline (6) in bottom surface, and foundation pit bottom surface sideline (7) is away from isolated footing bottom surface sideline (6) not less than 300mm.
A kind of 8. foundation structure of environment-friendly type collapsible loess according to claim 7, which is characterized in that the independent base Lay out pile outside plinth bottom surface sideline (6) range line (9), between distance be the 1/4 of isolated footing bottom surface sideline (6) most short side line length And not less than 0.5m or 3/4 and not less than 1m.
9. a kind of environment-friendly type Treatment method of collapsible loess foundation, which is characterized in that include the following steps:
Step 1, it lays out pile:
In self-weight collapse loess place, isolated footing (5) center line and bottom surface range first delimited, then along isolated footing bottom surface The range line (9) that lays out pile is diffused into outside sideline (6), is more than isolated footing bottom surface sideline (6) most short side line length per side extended range 3/4, and not less than 1m;It lays out pile in the range line (9) that lays out pile, pile-type is compaction pile (3), and pile center is away from 800-1100mm, hole Diameter 350-450mm;Using positive triangle blossom type, foundation pit bottom surface sideline (7) extends out arrangement in isolated footing bottom surface sideline (6) At 300mm, when foundation pit bottom surface sideline (7) is intersected with stake position, foundation pit bottom surface sideline (7) is moved to outside stake, tangent with compaction pile (3);
Step 2, it drives piles:
Compaction pile (3) is made of empty stake (3-2) and real stake (3-1), and empty stake (3-2) is in real stake (3-1) top, foundation pit bottom surface sideline (7) compaction pile (3) is beaten between the range line (9) that lays out pile;Compaction pile (3), compaction pile (3) are beaten in the range of foundation pit bottom surface sideline (7) Top is had time stake (3-3);From laying out pile, range line (9) is driven piles to isolated footing (5) centerline direction;
Step 3, it excavates:
It independently excavates, digs deep to foundation pit bottom surface in the range of each foundation pit top surface sideline (8) respectively.
A kind of 10. environment-friendly type Treatment method of collapsible loess foundation according to claim 9, which is characterized in that step 1 In, in non-self centred graph place, the range that lays out pile line is first to delimit isolated footing (5) center line and bottom surface range, then The range line (9) that lays out pile is diffused into outside along isolated footing bottom surface sideline (6), is more than isolated footing bottom surface sideline (6) per side extended range Most the 1/4 of short side line length, and not less than 0.5m.
CN201810138546.1A 2018-02-10 2018-02-10 Environment-friendly collapsible loess foundation structure and treatment method thereof Active CN108239989B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810138546.1A CN108239989B (en) 2018-02-10 2018-02-10 Environment-friendly collapsible loess foundation structure and treatment method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810138546.1A CN108239989B (en) 2018-02-10 2018-02-10 Environment-friendly collapsible loess foundation structure and treatment method thereof

Publications (2)

Publication Number Publication Date
CN108239989A true CN108239989A (en) 2018-07-03
CN108239989B CN108239989B (en) 2024-02-13

Family

ID=62698825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810138546.1A Active CN108239989B (en) 2018-02-10 2018-02-10 Environment-friendly collapsible loess foundation structure and treatment method thereof

Country Status (1)

Country Link
CN (1) CN108239989B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824173A (en) * 2018-08-08 2018-11-16 中铁五局集团有限公司 Beam buttress system is deposited with pipe pile foundation for a kind of collapsible loess stratum
CN112962654A (en) * 2021-02-22 2021-06-15 中建三局集团有限公司 Construction method for foundation treatment
CN115859453A (en) * 2023-02-24 2023-03-28 陕西华邦建设工程有限公司 BIM-based foundation waterproof curtain design method and system

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU973712A1 (en) * 1980-11-04 1982-11-15 Днепропетровский Филиал Научно-Исследовательского Института Строительного Производства Госстроя Усср Method of constructing foundations of sagging soils
JPH09209371A (en) * 1996-02-02 1997-08-12 Mitani Sekisan Co Ltd Method for constructing foundation
RU2249082C1 (en) * 2003-10-29 2005-03-27 Федеральное государственное унитарное предприятие "Фундаментпроект" Method for erecting shallow and surface foundations in thawed ground located above underlying permafrost or rock grounds
KR20110115507A (en) * 2010-04-15 2011-10-21 엠에스건설주식회사 Prefabricated single footing and method for construction greenhouse foundation using thereof
JP2011236705A (en) * 2010-05-13 2011-11-24 Shimizu Corp Foundation structure of structure and method of constructing the same
CN202359570U (en) * 2011-11-23 2012-08-01 苏州市建筑设计研究院有限责任公司 Piled raft foundation with improved foundation pit slopes
JP5077857B1 (en) * 2012-02-28 2012-11-21 独立行政法人土木研究所 Seismic reinforcement structure of existing structure foundation by composite ground pile foundation technology
CN103243721A (en) * 2013-05-22 2013-08-14 中国建筑第八工程局有限公司 Raft foundation and core tube excavation construction method of high-rise building under weak geological conditions
JP2013155560A (en) * 2012-01-31 2013-08-15 Shimizu Corp Liquefaction damage reduction structure for structure
CN203213122U (en) * 2013-03-25 2013-09-25 中国二十冶集团有限公司 Muck foundation pit with bottom reinforced by sand-gravel piles
CN103603355A (en) * 2013-11-19 2014-02-26 中冶天工集团有限公司 Hollow pile handling method for cast-in-situ bored piles
CN207891907U (en) * 2018-02-10 2018-09-21 陕西华邦建设工程有限公司 A kind of environment-friendly type collapsible loess foundation structure

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU973712A1 (en) * 1980-11-04 1982-11-15 Днепропетровский Филиал Научно-Исследовательского Института Строительного Производства Госстроя Усср Method of constructing foundations of sagging soils
JPH09209371A (en) * 1996-02-02 1997-08-12 Mitani Sekisan Co Ltd Method for constructing foundation
RU2249082C1 (en) * 2003-10-29 2005-03-27 Федеральное государственное унитарное предприятие "Фундаментпроект" Method for erecting shallow and surface foundations in thawed ground located above underlying permafrost or rock grounds
KR20110115507A (en) * 2010-04-15 2011-10-21 엠에스건설주식회사 Prefabricated single footing and method for construction greenhouse foundation using thereof
JP2011236705A (en) * 2010-05-13 2011-11-24 Shimizu Corp Foundation structure of structure and method of constructing the same
CN202359570U (en) * 2011-11-23 2012-08-01 苏州市建筑设计研究院有限责任公司 Piled raft foundation with improved foundation pit slopes
JP2013155560A (en) * 2012-01-31 2013-08-15 Shimizu Corp Liquefaction damage reduction structure for structure
JP5077857B1 (en) * 2012-02-28 2012-11-21 独立行政法人土木研究所 Seismic reinforcement structure of existing structure foundation by composite ground pile foundation technology
CN203213122U (en) * 2013-03-25 2013-09-25 中国二十冶集团有限公司 Muck foundation pit with bottom reinforced by sand-gravel piles
CN103243721A (en) * 2013-05-22 2013-08-14 中国建筑第八工程局有限公司 Raft foundation and core tube excavation construction method of high-rise building under weak geological conditions
CN103603355A (en) * 2013-11-19 2014-02-26 中冶天工集团有限公司 Hollow pile handling method for cast-in-situ bored piles
CN207891907U (en) * 2018-02-10 2018-09-21 陕西华邦建设工程有限公司 A kind of environment-friendly type collapsible loess foundation structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824173A (en) * 2018-08-08 2018-11-16 中铁五局集团有限公司 Beam buttress system is deposited with pipe pile foundation for a kind of collapsible loess stratum
CN112962654A (en) * 2021-02-22 2021-06-15 中建三局集团有限公司 Construction method for foundation treatment
CN115859453A (en) * 2023-02-24 2023-03-28 陕西华邦建设工程有限公司 BIM-based foundation waterproof curtain design method and system
CN115859453B (en) * 2023-02-24 2023-04-28 陕西华邦建设工程有限公司 BIM-based foundation waterproof curtain design method and system

Also Published As

Publication number Publication date
CN108239989B (en) 2024-02-13

Similar Documents

Publication Publication Date Title
CN108166518B (en) Structure for synchronous treatment of underground pipeline foundation pit and soft soil foundation and reinforcing method thereof
CN108239989A (en) A kind of environment-friendly type collapsible loess foundation structure and its processing method
CN107859041B (en) The construction method of collapsible loess zanjon high roadbed structure
CN104711967A (en) Method for carrying out combined vacuum preloading treatment on soft foundation by gravel piles
CN106400776A (en) Drainage system of dredger fill of depressions and bottom vacuumizing and pre-pressing method
CN207891907U (en) A kind of environment-friendly type collapsible loess foundation structure
CN1807773A (en) Treatment method for thick collapsed loess foundation
CN211200426U (en) Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall
CN101967819B (en) Forced ramming displacement synthetic method for construction of soft soil foundations of transformer substations
CN207646754U (en) A kind of pile body penetration type bankets body reinforcement bearing structure
CN204000848U (en) A kind of socketed pile for subaqueous construction
CN207537975U (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN109162291A (en) Big thickness collapsible loess area blower foundation foundation structure and its construction method
CN107700528A (en) A kind of pile body penetration type bankets body reinforcement bearing structure and construction method
CN106836182A (en) A kind of compacted technique of vibroflotation water conservancy diversion
CN103774639A (en) Preloading system and construction method
CN208803456U (en) A kind of structure for reinforcing peat soil using sand pile and drain bar
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN206173944U (en) Lowland dredger fill drainage system
CN106149736B (en) The stable construction method of hillside fields bury excavation slope is kept based on draining is cut
CN209760216U (en) reinforcement system based on soft soil foundation drainage consolidation
CN106284447A (en) A kind of steel pipe grouting behind shaft or drift lining preloading underpinning pile construction method
CN207567752U (en) A kind of sealing ditch constructing structure for place Soft Ground Improved By Vacuum Preloading processing of rockfilling
CN106337409A (en) Method for treating peat soil foundation through preloading in combination with salt piles
CN208933947U (en) A kind of novel evacuated precompressed subgrade combined stack-load system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant