CN208088318U - Stake top counterfort wall supporting construction - Google Patents
Stake top counterfort wall supporting construction Download PDFInfo
- Publication number
- CN208088318U CN208088318U CN201820509201.8U CN201820509201U CN208088318U CN 208088318 U CN208088318 U CN 208088318U CN 201820509201 U CN201820509201 U CN 201820509201U CN 208088318 U CN208088318 U CN 208088318U
- Authority
- CN
- China
- Prior art keywords
- wall
- stake
- counterfort
- supporting construction
- connection beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Retaining Walls (AREA)
Abstract
The utility model discloses a kind of stake top counterfort wall supporting construction and construction method.Stake top counterfort wall supporting construction includes stake and counterfort wall, stake is embedded within the scope of the 2m of present situation slight slope face or less, and counterfort wall is formed in an over top by connection beam, wherein, the shingle nail of counterfort wall is stood on vertically above connection beam, and wall heel slab is laterally extended to backfill side.The supporting construction combination stake of the utility model and the advantage of counterfort wall, supporting construction itself stability against overturning when can enhance slope edges or weaker foundation soil body bearing capacity, the transverse pressure that side slope high fill generates supporting construction, resistance to deformation and sliding can be born again.
Description
Technical field
The utility model is related to a kind of side slope embankment supporting construction, more particularly to a kind of stake top counterfort wall supporting knot
Structure.
Background technology
In Civil Engineering Construction, side slope embankment is common engineering usually to be needed to ensure the stability of engineering structure
Will in side slope construction supporting structure, in the processing of side slope embankment through frequently with supporting construction mainly have Cantilever Retaining
Structure and counterfort wall structure.
1, overhang mill pilework
In current slope retaining, overhang mill pilework is applied than wide.It is by artificial digging pile or drilling
Bored concrete pile is arranged in a straight line, and is connected by connection beam, the common structure type for resisting soil lateral pressure or side slope thrust.Cantilevered branch
The advantages of fender pile is, stake can bear larger vertical load, while also have the ability for undertaking stronger horizontal loading, structure by
Force mode is clear, and structure Design and Calculation is simple.
It is more than that certain altitude and support pile fixed section Rock And Soil intensity are insufficient in side slope embankment, overhang mill
Stake lateral force resisting is poor, and deformation is difficult to control, and safety is difficult to be guaranteed, to limit its use scope, even if
It uses reluctantly, it is insufficient to will also result in material use, deficiency in economic performance.
2, counterfort wall structure
Counterfort wall is a kind of armored concrete thin wall-type retaining wall, is mainly characterized by simple structure, construction party
Just, wall body section is smaller, and sole mass is light, can preferably play the strength character of material.On counterfort wall heel slab
Soil body gravity can be reasonably resistant to topple and slide, and riser and counterfort bear the moment of flexure and shearing that soil pressure generates jointly, relatively
Cantilever retaining wall stress is good.
Since the structural stability of counterfort wall is ensured by the gravity to banket above wall body and wall heel slab,
And the setting main function of toe of wall plate is to enhance itself stability against overturning and substrate contact stress, therefore, to foundation soil
Body self stability, bearing capacity and resistance to deformation are more demanding, when barricade ground is in slope edges, it is understood that there may be stability of slope
Property, foundation soil body bearing capacity etc. cannot meet situation, safety it cannot be guaranteed that, then application is restricted.
Invention content
In order to overcome the advantage of the disadvantages mentioned above of the prior art, the utility model combination stake and counterfort wall, provide
A kind of simple, practical, the superior new supporting structure of stress performance, i.e. stake top counterfort wall supporting construction, the supporting construction
By shortening cantilever pile length, stake top is set to be reduced to side slope top between the following ranges of original ground 2m, stake is in the supporting and retaining system lower part soil body
Lateral force (sliding force or soil pressure) while, also to help, the sliding of arm-type barricade provides lateral resistance and vertical ground is held
Power is carried, guarantee helps arm-type barricade to stablize.Since pile length is reduced, the arm of force shortens, and torque reduces, and the moment of flexure of stake is also reduced by, from
And achieve the purpose that the lateral resistance of enhancing.Stake top counterfort wall supporting construction and construction method provided by the utility model,
It itself stability against overturning when can enhance slope edges or weaker foundation soil body bearing capacity and bears side slope and bankets to branch
The transverse pressure that protection structure generates, resistance to deformation and sliding.
The utility model is technical solution used by solving its technical problem:A kind of stake top counterfort wall branch is provided
Protection structure, including stake, connection beam, chock and counterfort wall, wherein the stake is embedded in present situation slight slope face hereinafter, described
Connection beam is located at the stake top portion and connects adjacent studs, the chock be located at the connection beam top edge and with the connection beam
Vertical connection, the counterfort wall include the toe of wall plate that bottom level is arranged at the top of the connection beam and rectangle wall heel slab,
Perpendicular to the shingle nail of bottom and the triangle floor of the connection shingle nail and the wall heel slab, the shingle nail is located at institute
It states right at the top of connection beam, the wall heel slab and the floor extend to the backfill side of counterfort wall, the toe of wall
Plate and the chock horizontal connection.
Stake insertion protolith (soil) the body depth and stake top height determine that general stake top height exists according to stable calculation
Present situation below ground 0.5m~2.0m;Counterfort wall height is determined according to specific geology and project situation, generally takes 4m~15m;
Floor is triangular in shape, and thickness and height are calculated according to stress size and determined;Contact beam section size foundation helps arm-type barricade lotus
It carries and determines;Chock plays the role of blocking and helps arm-type barricade horizontal sliding, and wall heel slab, shingle nail, toe of wall plate are respectively according to the soil body
Horizontal and vertical load, which calculates, determines its thickness.
In the utility model, stake, connection beam, chock, counterfort wall use reinforced concrete structure, and concrete grade is not
Less than C30.
The construction method of the utility model:
According to engineering practice, operating condition and stress to stake and counterfort wall structure carry out Force Calculation, really
Determine number of steel bars, structural form, concrete grade and the quantity of stake and buried depth of stake, chock, connection beam and counterfort wall.
According to arrangement and method for construction, construction stake, connection beam, chock and counterfort wall backfill pressure after concrete strength reaches design strength
The soil body after blank wall.
The utility model compared with prior art, has the following advantages and beneficial effect:
(1) the utility model citation form has the advantages that easy, safe efficient, anti-slipping property is good and bearing capacity is good.
(2) being directed to counterfort wall has wall body section smaller, and sole mass is light, gives full play to soil body Gravitative Loads, gear
The strong feature of native ability, but when being used in that part of the foundation bearing capacity is poor or the place on soil-slope top, foundation capability is not
Both it can meet or ground is unstable, influence its application, the utility model organically combines stake and counterfort wall, give full play to
Advantage can enhance vertical foundation bearing capacity using stake and enhance the self stability of slope foundation, be increased using counterfort wall
The strong ability for resisting transversely acting of banketing, by stake and the common stress of barricade, to greatly improve the support capacity of retaining wall.
Description of the drawings
Fig. 1 is the concrete structure schematic cross-sectional view of the construction embodiment of the utility model;
Fig. 2 is the concrete structure vertical view of the construction embodiment of the utility model.
In figure:1- 2- floor 3- chock 4- wall heel slab 5- shingle nail 6- toe of wall plate 7- connection beams
Specific implementation mode
Detailed description furtherly is made to the utility model in the following with reference to the drawings and specific embodiments, so as to this field skill
Art personnel understand.
The supporting construction of stake top counterfort wall shown in Fig. 1-2, the supporting construction include stake 1 and counterfort wall, stake 1
It is embedded in the soil body, the stake 1 is embedded in present situation slight slope face or less 0.5m~2.0m;Stake 1 passes through connection beam 7 along arranged in a straight line
Connection, connection beam 7 are bound by reinforcing bar and are connect with 1 reserved steel bar of stake.The counterfort wall height is 4m~15m, including rib
Plate 2, wall heel slab 4, shingle nail 5 and toe of wall plate 6, wherein shingle nail 5 and wall heel slab 4, toe of wall plate 6 are bound and are joined by reinforcing bar
7 reserved steel bar of binder is connected, and shingle nail 5 is vertical with connection beam 7, and wall heel slab 4 laterally prolongs to the backfill side of counterfort wall
It stretches.Counterfort wall horizontal sliding in order to prevent, can also the top edge of connection beam 7 formed chock 3, chock 3 with contact
Binding reinforcing bars are carried out between beam 7 and the toe of wall plate 6 of counterfort wall.The utility model, stake 1, connection beam 7, chock 3, counterfort
The connection of formula barricade uses reinforced concrete structure, concrete grade to be not less than C30.
Construction method example:
A. according to engineering practice, to the working environment of the stake 1, connection beam 7, chock 3 and counterfort wall structure
Calculated with stress condition, determine the number of steel bars of the stake 1, connection beam 7, chock 3 and counterfort wall, structural form,
Concrete grade and the quantity and buried depth of the stake 1;
B. construction stake 1, connection beam 7 and chock 3:Use manually digging hole or machine drilling first, after manually digging hole pore-forming
Fabrication and installation steel reinforcement cage in hole is then fixed the reinforcing bar cage hoisting made after machine drilling pore-forming, then carries out concrete and pours
It builds and to form the stake 1 and reserved steel bar is connect with the connection beam 7;Conventional maintenance makes 1 concrete strength of the stake reaches to set
After count intensity 30%~70%, construct the connection beam 7 at the top of the stake 1;Excavation of foundation pit and basis are carried out first
Construction then makes 7 reinforcing bar of connection beam and itself and 1 reserved steel bar of the stake is carried out reinforcing bar binding, and installation form carries out coagulation
Soil pours to form the connection beam 7, the top of the connection beam 7 be formed with reserved steel bar so as to the chock 3, wall heel slab 4, wall
Panel 5, toe of wall plate 6 connect;Conventional maintenance makes 7 concrete strength of the connection beam reach the 30%~70% of design strength,
7 top edge of the connection beam construct chock 3, make 3 reinforcing bar of the chock and with 7 top reserved steel bar of the connection beam
Carry out reinforcing bar binding, installation form carries out concreting and forms the chock 3, the chock 3 be formed with reserved steel bar so as to
It is connect with the toe of wall plate 6;
C. it constructs counterfort wall:Counterfort wall is formed in side slope leading edge, makes toe of wall plate 6, wall heel slab 4, wall first
6 reinforcing bar of toe of wall plate is then carried out reinforcing bar with the chock 3,7 reserved steel bar of connection beam and tied up by 2 reinforcing bar of panel 5 and floor
It pricks, the wall heel slab 4, shingle nail 5 and 7 reserved steel bar of the connection beam carry out reinforcing bar binding, the floor 2 and wall heel slab 4, wall
Panel 5 carries out reinforcing bar binding, then installation form, carries out concreting formation and helps arm-type barricade;
D. conventional maintenance make it is described help arm-type barricade concrete strength reach design strength 30%~70% after, backfill
The soil body after compacting wall.
In the utility model, during paying attention to drilling construction, it is accurate, reasonable that stake position and barricade will be arranged, avoids wasting, together
When ensure stake top be completely embedded with counterfort wall.
Although above-described embodiment is made that detailed description to the utility model, it is only the utility model part
Embodiment, rather than whole embodiments, people can also obtain other implementations according to the present embodiment under the premise of without creativeness
Example, these embodiments belong to scope of protection of the utility model.
Claims (4)
1. a kind of stake top counterfort wall supporting construction, it is characterised in that:Including stake (1), connection beam (7), chock (3) and help
Wall type barricade, wherein the stake (1) is embedded in present situation slight slope face hereinafter, the connection beam (7) is located at the top of the stake (1) simultaneously
Adjacent studs (1) are connected, the chock (3) is located at the connection beam (7) top edge and is connect vertically with the connection beam (7),
The counterfort wall include the toe of wall plate (6) that bottom level is arranged at the top of the connection beam (7) and rectangle wall heel slab (4),
It is described perpendicular to the shingle nail (5) of bottom and the triangle floor (2) of the connection shingle nail (5) and the wall heel slab (4)
Shingle nail (5) is located at the connection beam (7) top surface, the wall heel slab (4) and the floor (2) to counterfort wall
Backfill side extend, the toe of wall plate (6) and the chock (3) horizontal connection.
2. stake top counterfort wall supporting construction as described in claim 1, it is characterised in that:The stake (1) is embedded in present situation
0.5m~2.0m below slight slope face.
3. stake top counterfort wall supporting construction as described in claim 1, it is characterised in that:The height of the counterfort wall
For 4m~15m.
4. stake top counterfort wall supporting construction as described in claim 1, it is characterised in that:The stake (1), connection beam (7),
Chock (3) and counterfort wall use reinforced concrete structure, concrete grade to be not less than C30.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820509201.8U CN208088318U (en) | 2018-04-11 | 2018-04-11 | Stake top counterfort wall supporting construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820509201.8U CN208088318U (en) | 2018-04-11 | 2018-04-11 | Stake top counterfort wall supporting construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208088318U true CN208088318U (en) | 2018-11-13 |
Family
ID=64055360
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820509201.8U Active CN208088318U (en) | 2018-04-11 | 2018-04-11 | Stake top counterfort wall supporting construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208088318U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108277814A (en) * | 2018-04-11 | 2018-07-13 | 王凯 | Stake top counterfort wall supporting construction and construction method |
-
2018
- 2018-04-11 CN CN201820509201.8U patent/CN208088318U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108277814A (en) * | 2018-04-11 | 2018-07-13 | 王凯 | Stake top counterfort wall supporting construction and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108277814A (en) | Stake top counterfort wall supporting construction and construction method | |
CN103452147B (en) | Self-balancing anchor counterweight broken pile forced-landing tilt correcting method | |
CN105240018B (en) | Construction of Silo device and method | |
CN104790429B (en) | A kind of construction method of monoblock type prestressing force reinforced soil retaining wall | |
CN102352632A (en) | Anchor rod sheet pile combined structure and method for reinforcing high filling body on one side of slope | |
CN207130754U (en) | The large-span arch bridge combined type pile foundation construction of two-way cooperative bearing | |
CN109944162A (en) | A kind of Combined light anchorage and construction method for large-tonnage Hoisting with Cableway System | |
CN103215889A (en) | Arch bridge foundation used on bad geological conditions and construction method of arch bridge foundation | |
CN106869138A (en) | A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method | |
CN102839686A (en) | Stabilizing plate type anchor pile retaining structure | |
CN108265733A (en) | Build-in soil body restricted type pile slab supporting structure and construction method before stake | |
CN208088311U (en) | Back-pressure de-bowed type pile slab supporting structure after stake | |
CN203716156U (en) | Pit-in-pit city gate hole type excavation construction structure in deep foundation pit | |
CN208088318U (en) | Stake top counterfort wall supporting construction | |
CN100473787C (en) | Connecting structure for use in piled anchor supporting system and construction method thereof | |
CN108330986A (en) | Back-pressure de-bowed type pile slab supporting structure and construction method after stake | |
CN211285725U (en) | Basin hills abrupt slope area high-rise building synthesizes earthquake-resistant structure | |
CN102888855B (en) | Combined balance weight retaining wall | |
CN209798847U (en) | Structure for enhancing anti-floating capacity of underground construction/structure | |
CN111576479A (en) | Retaining structure of filling slope and construction method | |
CN201202120Y (en) | Mixing pile foundation pit supporting structure | |
CN203625911U (en) | Soil discharging construction structure with pit-in-pit door opening arranged in deep foundation pit | |
CN108360555A (en) | A kind of the ground anchor structure formula cantilever barrier wall structure and its stability calculation method of railway sunk type station | |
CN206337566U (en) | Foundation ditch vertical prestressing anchor pole supporting construction | |
CN205475266U (en) | Side slope reinforcing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |