CN202304445U - 高强度闪速熔炼炉底强制冷却装置 - Google Patents

高强度闪速熔炼炉底强制冷却装置 Download PDF

Info

Publication number
CN202304445U
CN202304445U CN2011203757706U CN201120375770U CN202304445U CN 202304445 U CN202304445 U CN 202304445U CN 2011203757706 U CN2011203757706 U CN 2011203757706U CN 201120375770 U CN201120375770 U CN 201120375770U CN 202304445 U CN202304445 U CN 202304445U
Authority
CN
China
Prior art keywords
cooling device
cooling
wind box
forced cooling
furnace bottom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203757706U
Other languages
English (en)
Inventor
唐尊球
叶逢春
黄文华
何峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinguan Copper Industry Branch of Tongling Nonferrous Metals Group Holding Co Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN2011203757706U priority Critical patent/CN202304445U/zh
Application granted granted Critical
Publication of CN202304445U publication Critical patent/CN202304445U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

一种高强度闪速熔炼炉底强制冷却装置,其特征在于:包括炉底冷却风箱、风管、调节阀门、引风机、检修及操控专用平台,在闪速炉沉淀池底设置夹层,并通过风管与冷却风箱连接,冷却风箱安装于闪速炉混凝土基础上,在夹层与冷却风箱的连接风管上设置调节阀门,通过调节阀门控制沉淀池底部各处冷却风量大小,进而达到分别控制沉淀池底各处温度的目的。本实用新型填补了在闪速熔炼炉炉底采用冷却措施的空白,采用风冷结构无水冷方式漏水等隐患问题。具有投资小、易实施的优点,可有效消除沉淀池底部过热现象。并且无论是新建工厂或老厂改造都适宜采用。

Description

高强度闪速熔炼炉底强制冷却装置
技术领域
本实用新型涉及一种闪速熔炼炉结构,尤其涉及一种高强度闪速熔炼炉底强制冷却装置。
背景技术
目前闪速熔炼炉都采用了水套冷却方式,对反应塔、上升烟道、沉淀池顶部及侧墙进行保护。但沉淀池底部,特别是反应塔下方存在局部过热现象。目前闪速熔炼炉均未对炉底采取冷却措施,炉底过热对炉体寿命及操作安全带来隐患。因闪速炉所用耐火砖缘故,炉底不宜采用水套冷却方式。随着目前各冶炼厂产能规模越来越大,闪速熔炼炉投料量及热负荷越来越大,炉体过热现象越来越突出,给炉体寿命、操作工况、安全运行等方面带来隐患。
发明内容
    本实用新型的目的在于提供一种高强度闪速熔炼炉底强制冷却装置,克服原闪速熔炼炉结构存在炉底过热的缺点。
一种高强度闪速熔炼炉底强制冷却装置,其特征在于:包括炉底冷却风箱、风管、调节阀门、引风机、检修及操控专用平台,在闪速炉沉淀池底设置夹层,并通过风管与冷却风箱连接,冷却风箱安装于闪速炉混凝土基础上,在夹层与冷却风箱的连接风管上设置调节阀门,通过调节阀门控制沉淀池底部各处冷却风量大小,进而达到分别控制沉淀池底各处温度的目的。
一种高强度闪速熔炼炉底强制冷却装置,其特征在于:配置一台或数台引风机用以从冷却风箱处通风。
本实用新型的技术效果是:本实用新型填补了在闪速熔炼炉炉底采用冷却措施的空白,采用风冷结构无水冷方式漏水等隐患问题。具有投资小、易实施的优点,可在较小投资及较少占地的情况下完成闪速炉炉底冷却功能,延长炉体寿命,改善操作工况,预防事故发生。并且无论是新建工厂或老厂改造都适宜采用。
附图说明
附图1为本实用的高强度闪速熔炼炉底强制冷却装置结构示意图。
具体实施方式
下面结合附图详细说明本实用新型结构的实施方式:
1)炉底冷却风箱与闪速炉的连接
在闪速炉沉淀池底设置夹层6,并通过一定数量的风管2与冷却风箱1连接,冷却风箱1安装于闪速炉混凝土基础上,设置专用平台5进行检修及操控。
2)各处冷却强度的调节
在夹层6与冷却风箱1的连接风管2上设置调节阀门3,通过调节阀门3控制沉淀池底部各处冷却风量大小,进而达到分别控制沉淀池底各处温度的目的。
 3)烟气排放
配置一台或数台引风机4用以从冷却风箱1处通风。
以上内容是结合具体的优选实施方式对本实用新型所作的进一步详细说明,不能认定本实用新型的具体实施只局限于这些说明。对于本实用新型所属技术领域的普通技术人员来说,在不脱离本实用新型构思的前提下做出若干等同替代或明显变型,而且性能或用途相同,则应当视为属于本实用新型所提交的权利要求书确定的保护范围。

Claims (2)

1.一种高强度闪速熔炼炉底强制冷却装置,其特征在于:包括炉底冷却风箱(1)、风管(2)、调节阀门(3)、引风机(4)、检修及操控专用平台(5),在闪速炉沉淀池底设置夹层(6),并通过风管(2)与冷却风箱(1)连接,冷却风箱(1)安装于闪速炉混凝土基础上,在夹层(6)与冷却风箱(1)的连接风管(2)上设置调节阀门(3)。
2.根据权利要求1所述的高强度闪速熔炼炉底强制冷却装置,其特征在于:配置一台或数台引风机(4)用以从冷却风箱(1)处通风。
CN2011203757706U 2011-09-29 2011-09-29 高强度闪速熔炼炉底强制冷却装置 Expired - Fee Related CN202304445U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203757706U CN202304445U (zh) 2011-09-29 2011-09-29 高强度闪速熔炼炉底强制冷却装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203757706U CN202304445U (zh) 2011-09-29 2011-09-29 高强度闪速熔炼炉底强制冷却装置

Publications (1)

Publication Number Publication Date
CN202304445U true CN202304445U (zh) 2012-07-04

Family

ID=46373328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203757706U Expired - Fee Related CN202304445U (zh) 2011-09-29 2011-09-29 高强度闪速熔炼炉底强制冷却装置

Country Status (1)

Country Link
CN (1) CN202304445U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206866A (zh) * 2013-04-24 2013-07-17 中南大学 一种闪速熔炼炉体冷却余热回收的方法及其装置
CN105937854A (zh) * 2016-02-03 2016-09-14 石嘴山市宝马兴庆特种合金有限公司 风冷技术在电炉中的应用

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206866A (zh) * 2013-04-24 2013-07-17 中南大学 一种闪速熔炼炉体冷却余热回收的方法及其装置
CN103206866B (zh) * 2013-04-24 2014-11-05 中南大学 一种闪速熔炼炉体冷却余热回收的方法及其装置
CN105937854A (zh) * 2016-02-03 2016-09-14 石嘴山市宝马兴庆特种合金有限公司 风冷技术在电炉中的应用
CN105937854B (zh) * 2016-02-03 2018-10-09 石嘴山市宝马兴庆特种合金有限公司 降低冶炼铁合金用电炉耗水量的方法

Similar Documents

Publication Publication Date Title
CN202304445U (zh) 高强度闪速熔炼炉底强制冷却装置
CN103836950B (zh) 高效固体电热储能炉
CN204786479U (zh) 发电厂排烟系统
CN204220978U (zh) 一种铸造用浇包电烘烤装置
CN203561277U (zh) 一种新型的冷却水塔节能装置
CN203487176U (zh) 一种安全高温退火炉
CN101966563B (zh) 一种余热回收装置及其工作方法
CN205065783U (zh) 一种生物质燃烧器
CN203405084U (zh) 熔炼冶金炉熔炼区与放渣区的隔墙
CN202599091U (zh) 一种回转窑冷却器格栅
CN204630463U (zh) 一种水电混合冷却塔节能装置
CN201405540Y (zh) 层压机加热系统快速降温装置
CN204627721U (zh) 冷水套式排气管
CN204630465U (zh) 一种水电混合的内置式水轮机冷却塔节能装置
CN201443964U (zh) 金精矿硫酸化沸腾焙烧炉
CN204214012U (zh) 空冷机组的热能再利用系统
CN202671433U (zh) 一种套筒石灰窑液压站
CN205102378U (zh) 一种新型热循环管式热水器
CN205178349U (zh) 光伏发电箱变
CN202546804U (zh) 一种新型水冷式煤闸门装置
CN210198066U (zh) 一种铝合金熔化保温炉
CN210533073U (zh) 一种淬火炉余热再利用装置
CN203785444U (zh) 高效固体电热储能炉
CN204007167U (zh) 一种维护方便的环冷机内外风冷梁装置
CN202002493U (zh) 节能型板坯加热炉出料炉门

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JINGUAN COPPER INDUSTRY BRANCH OF TONGLING NONFERR

Effective date: 20150116

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Tang Zunqiu

Inventor after: Zhou Jun

Inventor after: Ye Fengchun

Inventor after: Zhang Jinsong

Inventor after: Huang Wenhua

Inventor after: Sun Laisheng

Inventor after: He Feng

Inventor after: Wang Shouquan

Inventor before: Tang Zunqiu

Inventor before: Ye Fengchun

Inventor before: Huang Wenhua

Inventor before: He Feng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: TANG ZUNQIU YE FENGCHUN HUANG WENHUA HE FENG TO: TANG ZUNQIU ZHOU JUN YE FENGCHUN ZHANG JINSONG HUANG WENHUA SUN LAISHENG HE FENG WANG SHOUQUAN

TR01 Transfer of patent right

Effective date of registration: 20150116

Address after: 330002 Jiangxi city of Nanchang province Hongjiaozhou Lake Road No. 888

Co-patentee after: JINGUAN COPPER INDUSTRY BRANCH OF TONGLING NONFERROUS METALS GROUP HOLDING CO., LTD.

Patentee after: China Nerin Engineering Co., Ltd.

Address before: 330002 Jiangxi city of Nanchang province Hongjiaozhou Lake Road No. 888

Patentee before: China Nerin Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20190929

CF01 Termination of patent right due to non-payment of annual fee