CN202248389U - Connection structure of lightweight wallboard - Google Patents

Connection structure of lightweight wallboard Download PDF

Info

Publication number
CN202248389U
CN202248389U CN2011203742024U CN201120374202U CN202248389U CN 202248389 U CN202248389 U CN 202248389U CN 2011203742024 U CN2011203742024 U CN 2011203742024U CN 201120374202 U CN201120374202 U CN 201120374202U CN 202248389 U CN202248389 U CN 202248389U
Authority
CN
China
Prior art keywords
wallboard
groove
tenon
width
connection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203742024U
Other languages
Chinese (zh)
Inventor
彭彪
李继荣
杨永菊
孙群
刘光宗
李宏雷
张建福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN INSTITUTE OF BUILDING RESEARCH
Original Assignee
YUNNAN INSTITUTE OF BUILDING RESEARCH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN INSTITUTE OF BUILDING RESEARCH filed Critical YUNNAN INSTITUTE OF BUILDING RESEARCH
Priority to CN2011203742024U priority Critical patent/CN202248389U/en
Application granted granted Critical
Publication of CN202248389U publication Critical patent/CN202248389U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

A connection structure of a lightweight wallboard is obtained through mortising a wallboard (4) with a groove and a wallboard (5) with a tenon. According to the connection structure of the lightweight wallboard, the width a of wallboard tenon (2) is equipped to equal with or smaller than the width A of the groove end of wallboard groove (1); the length b of the wallboard tenon (2) is equipped to smaller than the groove depth B of the wallboard groove (1); dovetail inclination of a dovetail structure of the wallboard tenon (2) is consistent with concave surface inclination of the wallboard groove (1); a space c is provided between the top end of the wallboard tenon (2) and the bottom of the wallboard groove (1); and the space for mortising the wallboard tenon (2) and the wallboard groove (1) is internally provided with solidification type filling material (3). The connection structure of the lightweight wallboard is advantageous in that: the tenon and groove of the wallboard can facilitate splicing; and a splicing seam crack problem of the wallboard is settled.

Description

A kind of Light trabs syndeton
Technical field
The utility model relates to the wall board structure technical field, relates in particular to the mutual syndeton of Light trabs.
Background technology
In the building partition engineering; The Light trabs of producing according to national standard has lightweight, thin body, intensity height, shock resistance, heat insulation, sound insulation, fire prevention, waterproof usually, is prone to cut, fluting, environmental protection, the incomparable comprehensive advantage of high other materials for walls of efficiency of construction arbitrarily;, applied rapidly progressively by people's understanding.
Connection between the Light trabs adopts tongue and groove to splice usually, and seam crossing uses the wallboard cementitious materials.For ease of installing, common tongue and groove adopts trapezoidal or semicircular structure closely cooperates.Trapezoidal or semicircle tongue and groove connection mode can retrain the wall surface levelling that wallboard constitutes, and wallboard itself expands with heat and contract with cold or reason such as vibrations causes the splicing seams cracking but be difficult to retrain.It is present Light trabs installation common quality defects encountered that crackle appears in the Light trabs splicing seams, also is the problem of engineering circle headache.
Summary of the invention
The purpose of the utility model provides a kind of Light trabs syndeton for the defective that overcomes above-mentioned prior art existence just.
The purpose of the utility model realizes through following technical scheme.
A kind of Light trabs syndeton; Form by the wallboard of band groove and the wallboard joggle of band tenon; The tenon width a of the utility model wallboard tenon is set to be equal to or less than the groove end width A of wallboard groove, and the tenon length b of wallboard tenon is set to the depth of groove B less than the wallboard groove; The dovetail gradient of said wallboard tenon swallowtail-shaped structure should be consistent with the concave surface gradient of wallboard groove, and the bottom on the top of wallboard tenon apart from the wallboard groove is provided with a spacing c; In the spacing of wallboard tenon and wallboard groove joggle, be provided with and solidify the formula packing material.
The beneficial effect of the utility model is; Through changing the interconnective tongue and groove structure of Light trabs; Groove is made into the section of Bottle cap connected with bottle shape big in young; Tenon is made into the section of swallowtail shape, guarantees that the width on tenon swallowtail-shaped structure top is big or small consistent or smaller with the width of slot opening, thereby can guarantee that the tenon of wallboard and groove can conveniently splice; Solidify the cementitious material that formula is filled through perfusion in groove; After solidifying, form ungulate inlay spacing; Utilize the closely knit formed rigid structures of groove that is filled in Bottle cap connected with bottle shape big in young of ungulate inlay pitch space parcel swallow-tail form tenon and shoe-shaped inlay, thereby overcome the cracking problem of wallboard splicing seams.
Description of drawings
Fig. 1 is the wallboard concaveconvex structure sketch map of the utility model;
Fig. 2 is the wallboard mortise structure sketch map of the utility model.
The specific embodiment
Like Fig. 1; Shown in Figure 2; A kind of Light trabs syndeton; Formed by the wallboard 4 of band groove and wallboard 5 joggles of band tenon, the tenon width a of the utility model wallboard tenon 2 is set to be equal to or less than the groove end width A of wallboard groove 1, and the tenon length b of wallboard tenon 2 is set to the depth of groove B less than wallboard groove 1; The dovetail gradient of said wallboard tenon 2 swallowtail-shaped structures should be consistent with the concave surface gradient of wallboard groove 1, and the bottom on the top of wallboard tenon 2 apart from wallboard groove 1 is provided with a spacing c; In the spacing of wallboard tenon 2 and wallboard groove 1 joggle, be provided with and solidify formula packing material 3.
The utility model can be according to wallboard thickness, choose reasonable tenon and groove sectional dimension.According to tenon and the groove sectional dimension selected, can when wallboard manufacture, adopt mould or after the wallboard manufacture completion, carry out craft or the automatic processing and fabricating of machine goes out tenon and groove finished product with cutting tool.After tenon and groove complete, can be before tenon and groove splicing in groove an amount of semi-fluid cementitious material of perfusion, the extruding force that embeds the groove generation through tenon solidify to form ungulate inlay, thereby finally accomplishes the utility model syndeton; Also can be with behind the tenon of wallboard and the groove splicing location, solidify the formula packing material at an end filler for fluid of splicing seams, solidify the back and form ungulate inlay, thereby finally accomplish the utility model syndeton.
The described a kind of Light trabs syndeton of the utility model is made up of wallboard groove and wallboard tenon, it is characterized in that, forms the style of the shoe inlay that prevents generation slit, tongue and groove joint portion by cementitious material to solidify between said wallboard groove and the wallboard tenon.Require: the wallboard groove be young in big Bottle cap connected with bottle cross-section structure; The wallboard tenon is a swallowtail-shaped structure, and the width on structure top is consistent or smaller with the A/F of wallboard groove, and the wallboard tenon can embed in the wallboard groove easily when guaranteeing connection; The height of wallboard tenon is consistent or smaller with wallboard groove bevel altitude, and the dovetail gradient of wallboard tenon swallowtail-shaped structure should be consistent with wallboard groove inclined-plane gradient, and the shoe-shaped inlay limit wall thickness that the cementitious material to solidify that pours into when guaranteeing connection forms is consistent; There is a distance on the top of wallboard tenon apart from the bottom of wallboard groove, and certain bonding thickness and intensity are arranged at the bottom of the ungulate inlay that the cementitious material to solidify that pours into when guaranteeing connection forms.
Concrete fabrication and processing can be according to following method:
Make wallboard tenon and groove: according to wallboard thickness, the dovetail top width of choose reasonable tenon and tenon height; Guarantee that the slot opening width is consistent or smaller with the dovetail top width and the tenon height of tenon with the groove bevel altitude; There is a distance on the top of assurance tenon apart from the bottom of wallboard groove.According to tenon and the groove sectional dimension of design, can when wallboard manufacture, adopt mould or after wallboard manufacture completion, carry out craft or the automatic processing and fabricating of machine goes out tenon and groove finished product with cutting tool.
Make ungulate inlay: can before tenon and groove splicing, in groove, pour into an amount of semi-fluid cementitious material, the extruding force that embeds the groove generation through tenon solidify to form ungulate inlay; Also can in an end filler for fluid cementitious material of splicing seams, solidify the back and form ungulate inlay behind the tenon of wallboard and the groove splicing location.

Claims (1)

1. Light trabs syndeton; Form by the wallboard (4) of band groove and wallboard (5) joggle of band tenon; It is characterized in that; The tenon width a of wallboard tenon (2) is set to be equal to or less than the groove end width A of wallboard groove (1), and the tenon length b of wallboard tenon (2) is set to the depth of groove B less than wallboard groove (1); The dovetail gradient of said wallboard tenon (2) swallowtail-shaped structure should be consistent with the concave surface gradient of wallboard groove (1), and the bottom on the top of wallboard tenon (2) apart from wallboard groove (1) is provided with a spacing c; In the spacing of wallboard tenon (2) and wallboard groove (1) joggle, be provided with and solidify formula packing material (3).
CN2011203742024U 2011-09-29 2011-09-29 Connection structure of lightweight wallboard Expired - Fee Related CN202248389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203742024U CN202248389U (en) 2011-09-29 2011-09-29 Connection structure of lightweight wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203742024U CN202248389U (en) 2011-09-29 2011-09-29 Connection structure of lightweight wallboard

Publications (1)

Publication Number Publication Date
CN202248389U true CN202248389U (en) 2012-05-30

Family

ID=46109651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203742024U Expired - Fee Related CN202248389U (en) 2011-09-29 2011-09-29 Connection structure of lightweight wallboard

Country Status (1)

Country Link
CN (1) CN202248389U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174311A (en) * 2013-03-08 2013-06-26 王中好 Flat plate component connection structure of retractable garage
CN103696491A (en) * 2014-01-02 2014-04-02 黄军海 Novel mounting structure of building and house using mounting structure
CN103806440A (en) * 2014-03-05 2014-05-21 中国建筑股份有限公司 Assembled plug-in-connection-type self-clamped hollow fabricated underground diaphragm wall and construction method thereof
CN106592859A (en) * 2016-12-13 2017-04-26 山东隆和节能科技股份有限公司 Interior partition board and construction method
WO2018032824A1 (en) * 2016-08-15 2018-02-22 宣中光 Connectable wall
CN109297169A (en) * 2018-10-29 2019-02-01 浙江汇隆空调设备有限公司 Coil pipe of air-conditioner blower grid
CN109667351A (en) * 2019-01-16 2019-04-23 中南大学 Assembled architecture prefabricated panel horizontal joint mud jacking Alveolus type waterproof connecting structure
WO2020238152A1 (en) * 2019-05-24 2020-12-03 蓬莱正泰木业有限公司 Panel insert-connection edge structure and insert-connection component and assembly method
CN113137004A (en) * 2021-03-31 2021-07-20 恒尊集团有限公司 Quick assembly type building wallboard

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174311B (en) * 2013-03-08 2015-04-01 王中好 Flat plate component connection structure of retractable garage
CN103174311A (en) * 2013-03-08 2013-06-26 王中好 Flat plate component connection structure of retractable garage
CN103696491A (en) * 2014-01-02 2014-04-02 黄军海 Novel mounting structure of building and house using mounting structure
CN103696491B (en) * 2014-01-02 2016-02-17 黄军海 A kind of mounting structure of building and apply the house of this mounting structure
CN103806440A (en) * 2014-03-05 2014-05-21 中国建筑股份有限公司 Assembled plug-in-connection-type self-clamped hollow fabricated underground diaphragm wall and construction method thereof
CN103806440B (en) * 2014-03-05 2016-05-25 中国建筑股份有限公司 One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof
WO2018032824A1 (en) * 2016-08-15 2018-02-22 宣中光 Connectable wall
CN106592859A (en) * 2016-12-13 2017-04-26 山东隆和节能科技股份有限公司 Interior partition board and construction method
CN109297169A (en) * 2018-10-29 2019-02-01 浙江汇隆空调设备有限公司 Coil pipe of air-conditioner blower grid
CN109297169B (en) * 2018-10-29 2019-09-27 浙江汇隆空调设备有限公司 Coil pipe of air-conditioner blower grid
CN109667351A (en) * 2019-01-16 2019-04-23 中南大学 Assembled architecture prefabricated panel horizontal joint mud jacking Alveolus type waterproof connecting structure
CN109667351B (en) * 2019-01-16 2024-01-30 中南大学 Tooth socket type waterproof connecting structure of prefabricated wallboard horizontal joint grouting method of assembled building
WO2020238152A1 (en) * 2019-05-24 2020-12-03 蓬莱正泰木业有限公司 Panel insert-connection edge structure and insert-connection component and assembly method
CN113137004A (en) * 2021-03-31 2021-07-20 恒尊集团有限公司 Quick assembly type building wallboard

Similar Documents

Publication Publication Date Title
CN202248389U (en) Connection structure of lightweight wallboard
CN207260068U (en) Ecoscape combines shore protection
CN105019404B (en) A kind of construction method of sealing rod and its water sealing structure and water sealing structure
CN204040078U (en) A kind of alter-pouring strips mould plate installs structure
CN203347229U (en) Bolt preformed hole die
CN205116713U (en) Concrete wall post mould with water and electricity pipeline provided groove fetal membrane
CN209837372U (en) Wall structure member built by cutting barred rocks by prestress machine
CN206571004U (en) A kind of nothing is built by laying bricks or stones, nothing is plastered, complete cast-in-place building filling wall construction
CN206625437U (en) A kind of building block water proof structure
CN203654317U (en) Guide wall structure of basement exterior wall
CN216331152U (en) Plastic stone rockery formed by splicing cement rock slices
CN206173983U (en) Building foundation water -blocking weir
CN205276317U (en) Utility tunnel's steel construction
CN205171386U (en) Interim mound in aquatic suitable for bridge erection
CN204000756U (en) Clinker brick building block
CN202626939U (en) Specially-shaped building block and basic building block matched with specially-shaped building block
CN207260071U (en) Universal prestressing force ecoscape combines shore protection
CN102644376A (en) Construction method of recycled concrete wall
CN103266712B (en) A kind of wall-building brick
CN207582743U (en) Light and thin type prefabricated section
CN201850537U (en) Anti-cracking normal state concrete gravity dam
CN205296569U (en) Light energy saving building panel
CN204781428U (en) Xin qiang and old wall connecting piece
CN102392404A (en) Local build-in precast repair slab for concrete road
CN204266462U (en) A kind of civil engineering concrete precasting plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530