CN203654317U - Guide wall structure of basement exterior wall - Google Patents

Guide wall structure of basement exterior wall Download PDF

Info

Publication number
CN203654317U
CN203654317U CN201320836615.9U CN201320836615U CN203654317U CN 203654317 U CN203654317 U CN 203654317U CN 201320836615 U CN201320836615 U CN 201320836615U CN 203654317 U CN203654317 U CN 203654317U
Authority
CN
China
Prior art keywords
wall
concrete
guide wall
reinforced concrete
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320836615.9U
Other languages
Chinese (zh)
Inventor
熊壮
周睿
刘佳
胡志军
任书华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Group the Fifth Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201320836615.9U priority Critical patent/CN203654317U/en
Application granted granted Critical
Publication of CN203654317U publication Critical patent/CN203654317U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a guide wall structure of a basement exterior wall. The guide wall structure comprises a reinforced concrete guide wall arranged on a foundation slab, wherein the part, with the maximum thickness, of the reinforced concrete guide wall is flush with the outer surface of wall body reinforcing steel bars pre-buried on two sides of the guide wall; stubbles connected with post-poured concrete are chiseled on the inner side surface and the outer side surface of the reinforced concrete guide wall; a water-stop steel plate is arranged at the top of the reinforced concrete guide wall. The depths of the stubbles are not more than 10mm. The pouring thickness, of the post-poured concrete, along the outer side surface of a reinforced concrete wall body is 40mm, and the pouring thickness, of the post-poured concrete, along the inner side surface of the reinforced concrete wall body is 25mm. The guide wall structure solves the technical problems as follows: (1) in the traditional guide wall, faulting of slab ends is very likely happen to the outer wall body to cause misplacement and leakage of the outer wall body, so that the construction quality of the outer wall body is greatly reduced to affect the solid quality and outside impression effect of structural concrete; (2) material waste is caused by chiseling or filling the misplacement and leakage of the outer wall body.

Description

A kind of outer wall of basement lead wall construction
Technical field
The utility model relates to a kind of wall construction of leading of outer wall of basement.
Background technology
The construction that outer wall of basement is led wall is the critical process of guaranteeing wall construction quality and external wall waterproof, and the construction quality of therefore leading wall seems particularly important in construction.Tradition is led wall and is led the outer wall body generation faulting of slab ends phenomenon that the construction method of wall very easily causes, cause outer wall body dislocation and seepage, the construction quality of outer wall body reduces greatly, affects entity quality and the outside perception effect of structural concrete, has formed at present common quality defect.Therefore solve the faulting of slab ends phenomenon that often can run in outer wall of basement construction, become problem demanding prompt solution in construction of guide wall.
Utility model content
The purpose of this utility model is to provide a kind of wall construction of leading of outer wall of basement, solve tradition and lead the outer wall body generation faulting of slab ends phenomenon that wall very easily causes, cause outer wall body dislocation and seepage, the construction quality of outer wall body reduces greatly, affect the entity quality of structural concrete and the technical problem of outside perception effect, also will solve and pick cutter or fill up outer wall body dislocation and seepage causes the technical problem of waste of material.
For achieving the above object, the utility model adopts following technical scheme:
A kind of outer wall of basement lead wall construction, comprise that the steel concrete being arranged on sole plate leads wall, it is concordant with the exocuticle that is embedded in the wall steel bar of leading wall both sides that described steel concrete is led the thickness maximum of wall, the inner surface that described steel concrete is led wall is all carved with outer surface the stubble that connects being connected with rear pouring concrete, and this steel concrete is led coping and is provided with steel plate for sealing water.
The described cutter that connects stubble is not more than 10mm deeply.
Described rear pouring concrete is 40mm along the thickness of building of reinforced concrete wall outer surface, is 25mm along the thickness of building of reinforced concrete wall inner surface.
Compared with prior art the utlity model has following characteristics and beneficial effect:
The utility model improved because of the caused outside of outer wall body the faulting of slab ends bad and concrete entity of perception effect of poor quality, the underproof technical problem of wall size, reduce and picked cutter or fill up the waste of material that outer wall body misplaces and seepage causes, cost-saving, and simple to operate, effect is good.
The utility model is widely used in the construction of outer wall of basement.
Brief description of the drawings
Below in conjunction with accompanying drawing, the utility model is described in more detail.
Fig. 1 is the structural representation of the utility model construction method step one.
Fig. 2 is the structural representation of structural representation of the present utility model and construction method step two.
Fig. 3 is the structural representation of the utility model construction method step three.
Fig. 4 is the structural representation of the utility model construction method step four.
Reference numeral: 1-steel concrete is led pouring concrete after wall, 2-wall steel bar, 3-, 4-connects stubble, 5-steel plate for sealing water, 6-guide wall form board, 7-split bolt, 8-outer wall template, 9-sole plate, the former guide wall form board of 10-.
Detailed description of the invention
Embodiment is shown in Figure 2, a kind of outer wall of basement lead wall construction, comprise that the steel concrete being arranged on sole plate 9 leads wall 1, it is concordant with the exocuticle that is embedded in the wall steel bar 2 of leading wall both sides that described steel concrete is led the thickness maximum of wall 1, shown in Figure 2, the inner surface that described steel concrete is led wall 1 and outer surface be all carved be connected with rear pouring concrete 3 connect stubble 4, the top that this steel concrete is led wall 1 is provided with steel plate for sealing water 5.
The described cutter that connects stubble 4 is not more than 10mm deeply.Shown in Fig. 1 and Fig. 3, described rear pouring concrete 3 is built thickness a=40mm along reinforced concrete wall 1 outer surface, is b=25mm along the thickness of building of reinforced concrete wall 1 inner surface.
Construction method of the present utility model is divided into following four steps, and guide wall form board installs, leads that wall concrete picks cutter, outer wall template installs and body of wall concreting, specific as follows:
Step 1, guide wall form board install: shown in Figure 1; point out the position of former guide wall form board 10; installing the former guide wall form board of Thickness Ratio, to install thickness little; both sides are respectively than the little 40mm of original thickness and 25mm; wherein lead little a=40mm outside wall, lead the i.e. thickness of protection tier of outside and inner side of the little b=25mm(of side within the walls).Guide wall form board 6 is close to wall steel bar 2 and is installed, and avoid waste concrete and follow-up picking while cutter are caused unnecessary artificial waste, and split bolt 7 is installed.
Step 2, lead wall concrete and pick cutter: be shown in Figure 2, steel concrete is led after wall 1 built, in order to allow the better combination of New-old concrete, the leading wall of concrete final set both sides concrete respectively pick cutter c=10mm connect stubble 4, when concrete picks cutter, the control of picking the cutter degree of depth also be should be noted that, pick the cutter combination that can affect New-old concrete not in place, pick to cut a hole and deeply can cause concrete waste, also can cause the artificial waste while picking cutter concrete simultaneously.Note controlling picking the cutter time simultaneously, before leading the final set of wall concrete, complete.
Step 3, outer wall template install: shown in Figure 3, pick to have cut a hole and lead after wall concrete, install outer wall template 8 according to former design wall thickness, disposable of outer wall template 8 be set to sole plate 9 only on.
Step 4, body of wall concreting: shown in Figure 4, building as requested rear pouring concrete 3 is remaining walls concrete, and blocks unnecessary split bolt.
Wherein concrete gravel particle diameter must not be greater than 25mm.When concreting, answer staged and layered to carry out, building highly of every layer of body of wall should determine according to design feature and reinforcing bar density, but be no more than 500mm.Concrete uses internal vibration rod to insert and to pull out slowly soon, and slotting point is evenly distributed, and pointwise is moved, and carries out in order, must not omit, and evenly vibrates.Concreting should carry out continuously, and as intermittently necessary, the time should shorten as far as possible, and should be before anterior layer concrete initial set, by complete sublevel concreting.
Carry out as stated above body of wall and build, surface of wall concrete appearance is good, occurs without faulting of slab ends phenomenon, and effect is remarkable.

Claims (3)

  1. An outer wall of basement lead wall construction, comprise that the steel concrete being arranged on sole plate (9) leads wall (1), it is characterized in that: it is concordant with the exocuticle that is embedded in the wall steel bar (2) of leading wall both sides that described steel concrete is led the thickness maximum of wall (1), the inner surface that described steel concrete is led wall (1) is all carved with outer surface connect batch (4) that are connected with rear pouring concrete (3), and the top that this steel concrete is led wall (1) is provided with steel plate for sealing water (5).
  2. A kind of outer wall of basement according to claim 1 lead wall construction, it is characterized in that: described in connect stubble (4) cutter be deeply not more than 10mm.
  3. A kind of outer wall of basement according to claim 1 lead wall construction, it is characterized in that: described rear pouring concrete (3) is 40mm along the thickness of building of reinforced concrete wall (1) outer surface, is 25mm along the thickness of building of reinforced concrete wall (1) inner surface.
CN201320836615.9U 2013-12-18 2013-12-18 Guide wall structure of basement exterior wall Expired - Fee Related CN203654317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320836615.9U CN203654317U (en) 2013-12-18 2013-12-18 Guide wall structure of basement exterior wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320836615.9U CN203654317U (en) 2013-12-18 2013-12-18 Guide wall structure of basement exterior wall

Publications (1)

Publication Number Publication Date
CN203654317U true CN203654317U (en) 2014-06-18

Family

ID=50920724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320836615.9U Expired - Fee Related CN203654317U (en) 2013-12-18 2013-12-18 Guide wall structure of basement exterior wall

Country Status (1)

Country Link
CN (1) CN203654317U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196055A (en) * 2014-08-08 2014-12-10 山东万鑫建设有限公司 Construction method for frameworks on lower portion of basement exterior wall
CN107152111A (en) * 2017-05-16 2017-09-12 江苏南通三建集团股份有限公司 The lenticular plain concrete construction of guide wall technique used between many boiled water rooms
CN109457950A (en) * 2018-12-28 2019-03-12 上海绿地建设(集团)有限公司 Structural wall boundary Template Location fixed structure and casting method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196055A (en) * 2014-08-08 2014-12-10 山东万鑫建设有限公司 Construction method for frameworks on lower portion of basement exterior wall
CN104196055B (en) * 2014-08-08 2015-12-09 山东万鑫建设有限公司 Outer wall of basement lower die board construction method
CN107152111A (en) * 2017-05-16 2017-09-12 江苏南通三建集团股份有限公司 The lenticular plain concrete construction of guide wall technique used between many boiled water rooms
CN109457950A (en) * 2018-12-28 2019-03-12 上海绿地建设(集团)有限公司 Structural wall boundary Template Location fixed structure and casting method

Similar Documents

Publication Publication Date Title
CN105908862B (en) A kind of production method of masonry shell in 3D printing reinforced masonry shear wall
CN105544851A (en) Prefabricated sandwich thermal-insulation laminated wallboard and manufacturing method
CN2883532Y (en) Partition board connection structure-centipede type locking tenon
CN103276916B (en) A kind of building method of sealing light weight concrete construction board wall wall hole and filling plate
CN106149962A (en) Precast concrete shear wall and preparation method thereof
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN203654317U (en) Guide wall structure of basement exterior wall
CN102444285A (en) Method for manufacturing reinforced concrete basement external wall
CN205296388U (en) Apron is sealed to garage wall post -cast strip
CN204040078U (en) A kind of alter-pouring strips mould plate installs structure
CN204551547U (en) Outer wall of basement vertical ater-casting plugging device
CN203684414U (en) Rapid blocking structure of screw hole of concrete structure outer wall
CN203866973U (en) Inner-thread large-hole grouting sleeve of concrete precast component for housing industrialization
CN208363636U (en) Envelope storehouse tool for assembled architecture conversion layer sleeve grouting exterior wall
CN209408833U (en) The structure of transvers plate of multiple building wire box precast concrete blocks can be made simultaneously
CN208486388U (en) Waterproof precast floor slab
CN106836559A (en) A kind of reinforced concrete wall structure and its construction method for preventing from ftractureing
CN203613566U (en) Concrete construction joint water stop and grout stop structure
CN207597394U (en) The horizontally-spliced structure of coercion underground continuous wall
CN202214982U (en) One-shot forming ground beam template
CN103243913B (en) The method for blocking of fabricated shear wall architectural lower floor junction grout blanket
CN206844391U (en) A kind of assembled integral concrete shear force wall node
CN203296209U (en) Self-insulation mortarless block masonry shear wall system
CN205206055U (en) Basement outer wall post -cast strip thickening anti -seepage waterstop structure
CN203782922U (en) Wall structure with horizontal construction joint concealed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140618