CN205171386U - Interim mound in aquatic suitable for bridge erection - Google Patents

Interim mound in aquatic suitable for bridge erection Download PDF

Info

Publication number
CN205171386U
CN205171386U CN201520941712.3U CN201520941712U CN205171386U CN 205171386 U CN205171386 U CN 205171386U CN 201520941712 U CN201520941712 U CN 201520941712U CN 205171386 U CN205171386 U CN 205171386U
Authority
CN
China
Prior art keywords
steel pipe
temporary piers
water
bridge erection
piers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520941712.3U
Other languages
Chinese (zh)
Inventor
陈勇
彭水平
赵林
庄有云
蔡玉新
陈凌
王海龙
周宏伟
胡周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Machinery and Ship Co Ltd
Original Assignee
Ge Zhou Ba Mechanical Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ge Zhou Ba Mechanical Industry Co Ltd filed Critical Ge Zhou Ba Mechanical Industry Co Ltd
Priority to CN201520941712.3U priority Critical patent/CN205171386U/en
Application granted granted Critical
Publication of CN205171386U publication Critical patent/CN205171386U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bridges Or Land Bridges (AREA)
  • Foundations (AREA)

Abstract

The utility model provides an interim mound in aquatic suitable for bridge erection includes many hollow steel pipes, and connect the connecting piece of steel pipe, the stock can be worn to the other end from steel pipe one end through steel pipe cavity. The utility model has the advantages of, take the mode of gravity type stretch -draw stock to carry out the consolidation of interim mound, reach and reduce the construction degree of difficulty, the too big purpose of the volume of avoiding underwater operation.

Description

A kind ofly be applicable to Temporary Piers in the water of bridge erection
Technical field
The utility model relates to a kind of for Temporary Piers in the water of bridge erection, especially relates to Temporary Piers in the water on a kind of smooth limestone river course.
Background technology
Domesticly at present in erection process, usually can use Temporary Piers in water across river, crossing bridge and carry out auxiliary erection, in water, Temporary Piers can reduce bridge erection span, reduces erection difficulty and risk.In conventional water, Temporary Piers is mainly based on inserted to play castinplace pile, and Main is the covering layer first steel pile casting being positioned to scar in water, creeps into go deep into scar certain distance behind casing location with rig, and top extends to spreading after the water surface, as lattice column.Go deep into the part pouring underwater concrete of river bed under water, finally form Temporary Piers.
Inserted to play castinplace pile is adopted to need certain geological conditions, first the scar covering layer of location casing should be had, Yunnan Province of China, Guangxi province are based on karst landform, rapid place, river course lacks covering layer, mostly be smooth limestone, be difficult to locate casing, the way of inserted to play castinplace pile is very difficult, adds difficulty of construction and is difficult to control construction quality.The utility model provides Temporary Piers, on the water integral construction in a kind of novel gravity stretching anchor rod water, and entirety is transferred, and avoids a large amount of underwater operations, effectively saves construction cost, practical.
Utility model content
The utility model mainly provides Temporary Piers and construction method in a kind of water, being difficult to the area using inserted to play castinplace pile, taking the mode of gravity stretching anchor rod to carry out Temporary Piers consolidation, reaching reduction difficulty of construction, avoiding the object that underwater operation amount is excessive.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: be a kind ofly applicable to Temporary Piers in the water of bridge erection and comprise the steel pipe of many hollows, and the connector of joint steel pipe, and anchor pole is worn to the other end from steel pipe one end by steel pipe hollow.
Further, Temporary Piers also comprises end coaming plate, and Temporary Piers lower end encloses by end coaming plate.
All right, end coaming plate lower limb is provided with projection.
Further, steel pipe lower end is provided with type steel support.
A kind ofly be applicable to Temporary Piers construction method in the water of bridge erection and comprise that Temporary Piers is assembled, location is transferred, locate anchor hole, insert anchor pole, build, stretch-draw fixes;
Described Temporary Piers is assembled, and what be parallel to each other by the steel pipe of multiple hollow assembledly becomes a Temporary Piers assembly, and anchor pole is worn to the other end by steel pipe hollow from steel pipe one end;
Described location is transferred, and Temporary Piers assembly is transported to set-point, and transfers Temporary Piers to indication outer formation water;
Described location anchor hole, in water, Temporary Piers lays rig, the river course bottom surface corresponding with steel pipe lower ending opening to be bored respectively by the hollow of steel pipe and is opened by rig, form anchor hole, after anchor hole is shaping, anchor pole one end is entered from steel pipe upper end by hollow, and enters the anchor hole of bottom surface, river course from steel pipe lower end, and steel pipe upper end open place is stayed in anchor pole one end;
Describedly to build, inject microdilatancy mortar by steel pipe hollow to the anchor hole of bottom surface, river course, fix in anchor hole by anchor rod anchored;
Described stretch-draw is fixed, and arranges the anchor pole end of stretch-draw in steel pipe upper end by stretch-draw, makes anchor pole produce prestressing force, then is fixed;
The construction of Temporary Piers is completed through above step.
Further, construction method also comprises temperature pier, complete build after carry out temperature pier;
Described temperature pier, after completing the anchor hole microdilatancy mortar injection of bottom surface, river course, fills out in the space between outer surface of steel tube and waters underwater concrete.
The utility model has the advantage of, the utility model principal benefits is to solve the Temporary Piers construction not having scar covering layer to be difficult to carry out inserted to play castinplace pile, decrease a large amount of positioning work of pile tube under water, coxopodite one-time positioning, locate without the need to single pile tube, reduce construction cost, safe and reliable, achieve the construction of Temporary Piers quickly and easily.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Fig. 1 is Temporary Piers overall structure figure.
Fig. 2 is construction diagrams on ship.
Fig. 3 transfers figure in water.
Fig. 4 is coxopodite stretch-draw anchor figure.
Fig. 5 is top spreading figure.
As in figure, steel pipe 1, connector 2, anchor pole 3, end coaming plate 4, type steel support 5, the water surface 6, pontoon 7, rig 8, drilling rod 9, anchor hole 10, lower concrete 11.
Detailed description of the invention
As in Fig. 1, a kind of steel pipe 1 being applicable to Temporary Piers in the water of bridge erection and comprising many hollows, and the connector 2 of joint steel pipe, anchor pole 3 is worn to the other end by steel pipe 1 hollow from steel pipe 1 one end, steel pipe 1 lower end is provided with type steel support 5, and Temporary Piers can be made to level up.Preferably, Temporary Piers lower end encloses by end coaming plate 4, and further, end coaming plate 4 lower limb is provided with projection, can strengthen Temporary Piers cling property, prevent.
A kind ofly be applicable to Temporary Piers construction method in the water of bridge erection and comprise that Temporary Piers is assembled, location is transferred, locate anchor hole, insert anchor pole, build, stretch-draw fixes;
As in Fig. 2, the Temporary Piers of construction diagrams on pontoon 7, what be parallel to each other by the steel pipe 1 of multiple hollow assembledly becomes a Temporary Piers assembly, how many steel pipes 1 can be arranged according to the requirement of design, anchor pole 3 is worn to the other end by steel pipe 1 hollow from steel pipe 1 one end, preferably, should surface 2 meters and be advisable in steel pipe 1 top;
As in Fig. 3, location is transferred, and assembled good Temporary Piers assembly (coxopodite) is transported to located sites with pontoon, adopts large-scale floating crane to put into water by under Temporary Piers component integration, makes to put Temporary Piers assembly and is placed on indication position;
As in Fig. 4, location anchor hole, in water, Temporary Piers is laid rig 8, the river course bottom surface corresponding with steel pipe 1 lower ending opening to be bored respectively by the hollow of steel pipe 1 and is opened by the drilling rod 9 of rig 8, form anchor hole 10, after anchor hole 10 is shaping, anchor pole 3 one end is entered from steel pipe 1 upper end by hollow, and the anchor hole 10 of bottom surface, river course is entered from steel pipe 1 lower end, steel pipe upper end open place is stayed in anchor pole 3 one end;
Build, by the anchor hole injection microdilatancy mortar of steel pipe 1 hollow to bottom surface, river course, fix in anchor hole 10 by anchor rod anchored;
Stretch-draw is fixed, and arranges the anchor pole end of stretch-draw in steel pipe upper end by stretch-draw, and make anchor pole produce prestressing force, then be fixed, stretching force is 1000kN;
As in Fig. 5, preferably, construction method also comprises temperature pier, complete build after carry out temperature pier;
Temperature pier, after completing the anchor hole microdilatancy mortar injection of bottom surface, river course, end coaming plate 4 forms relatively closed space in Temporary Piers bottom, fill out in space between outer surface of steel tube and water underwater concrete and form lower concrete 11 under the effect of end coaming plate 4, adopt the steel pipe pile on crane barge progressively spreading water surface top afterwards, to design attitude.
The construction of Temporary Piers is completed through above step.
In Guigang, Guangxi Tongji University Bridge Steel Box Girder making and installation engineering, Shi Yu river, Tongji University's Bridge beam span waters is at the turning, a river course of Gang Nan village, Guigang section, river course is narrow herein, The turbulent river crashes its way through, riverbed almost do not have covering layer, be smooth limestone entirely, do not have covering layer to cause inserted to play bored pile in water to be very difficult, adopt traditional constructure scheme, difficulty of construction increases, and restive construction quality.Gravity stretching anchor rod Temporary Piers (i.e. this) is used by taking the Thinking Creation increasing Temporary Piers root frictional force.

Claims (4)

1. be applicable to a Temporary Piers in the water of bridge erection, it is characterized in that: described Temporary Piers comprises the steel pipe of many hollows, and the connector of joint steel pipe, anchor pole is worn to the other end from steel pipe one end by steel pipe hollow.
2. be according to claim 1ly a kind ofly applicable to Temporary Piers in the water of bridge erection, it is characterized in that: described Temporary Piers also comprises end coaming plate, Temporary Piers lower end encloses by end coaming plate.
3. be according to claim 2ly a kind ofly applicable to Temporary Piers in the water of bridge erection, it is characterized in that: coaming plate lower limb of the described end is provided with projection.
4. be according to claim 1ly a kind ofly applicable to Temporary Piers in the water of bridge erection, it is characterized in that: described steel pipe lower end is provided with type steel support.
CN201520941712.3U 2015-11-24 2015-11-24 Interim mound in aquatic suitable for bridge erection Expired - Fee Related CN205171386U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520941712.3U CN205171386U (en) 2015-11-24 2015-11-24 Interim mound in aquatic suitable for bridge erection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520941712.3U CN205171386U (en) 2015-11-24 2015-11-24 Interim mound in aquatic suitable for bridge erection

Publications (1)

Publication Number Publication Date
CN205171386U true CN205171386U (en) 2016-04-20

Family

ID=55735393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520941712.3U Expired - Fee Related CN205171386U (en) 2015-11-24 2015-11-24 Interim mound in aquatic suitable for bridge erection

Country Status (1)

Country Link
CN (1) CN205171386U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297636A (en) * 2015-11-24 2016-02-03 葛洲坝机械工业有限公司 Temporary pier applicable to bridge erection in water and construction method
CN110468721A (en) * 2019-08-29 2019-11-19 中铁大桥局集团有限公司 A kind of large span trestle Cantilever Construction Method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297636A (en) * 2015-11-24 2016-02-03 葛洲坝机械工业有限公司 Temporary pier applicable to bridge erection in water and construction method
CN110468721A (en) * 2019-08-29 2019-11-19 中铁大桥局集团有限公司 A kind of large span trestle Cantilever Construction Method
CN110468721B (en) * 2019-08-29 2021-04-20 中铁大桥局集团有限公司 Large-span trestle cantilever construction method

Similar Documents

Publication Publication Date Title
CN103835283B (en) Full wet joint prefabricated prestressed underground continuous wall and construction method thereof
CN104389318B (en) Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof
CN108035337B (en) The construction method of a kind of diaphram wall and applied to the connector in this method
CN104863108B (en) A kind of ground-connecting-wall soil lateral pressure box embedded device
CN205171386U (en) Interim mound in aquatic suitable for bridge erection
CN104711931B (en) Temporary underwater pier manufacturing, assembling and disassembling method suitable for bridge erection
CN203977437U (en) The anti-cofferdam structure of breaking through water under a kind of built hydropower complex dam
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN103485356B (en) Overwater laying frame and method for filling sand pockets with same
CN104314089A (en) Method for composite geo-membrane sloping core cofferdam
KR101262865B1 (en) Construction method for cofferdam
CN202170512U (en) Underwater combined base for open caisson and steel pipe piles
CN104213556A (en) End bearing anti-floating anchor assembly and anti-floating construction method
CN104153366B (en) The method of a kind of marine high wind wave high strength naked rock steel pipe pile foundation
CN105297636A (en) Temporary pier applicable to bridge erection in water and construction method
CN109610407A (en) It is a kind of based on dead-weight balanced landslide-proofing Ecological Retaining Wall
CN204401555U (en) A kind of gate dam wave wall structure
CN104652420A (en) Sinking pipe soil withdrawing and cast-in-place rectangular supporting pile diaphragm wall and construction method thereof
CN203924089U (en) For the pile foundation of offshore wind farm facility
CN103711115B (en) A kind of ground stabilization of overall transportation by driving formula water-fetching head and joint and construction method
CN103741724B (en) A kind of prefabricated prestressed underground continuous wall joint
CN207143843U (en) A kind of explosion-proof earth embankment of precast splice type
CN103711143B (en) The jointing of a kind of transportation by driving formula diversion box culvert ground stabilization and construction method
CN101985837A (en) Process and construction method for manufacturing integral submarine tunnel on land
CN206859085U (en) A kind of bracing means

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171228

Address after: 18 No. 443007 Hubei city in Yichang province Xiao Ting Road

Patentee after: CHINA GEZHOUBA GROUP MACHINERY & SHIP Co.,Ltd.

Address before: 18 No. 443007 Hubei city of Yichang province located in Xiaoting District Road

Patentee before: GEZHOUBA MACHINERY INDUSTRIAL CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420

Termination date: 20211124