CN202124401U - 一种轿厢下梁体 - Google Patents
一种轿厢下梁体 Download PDFInfo
- Publication number
- CN202124401U CN202124401U CN2011202229500U CN201120222950U CN202124401U CN 202124401 U CN202124401 U CN 202124401U CN 2011202229500 U CN2011202229500 U CN 2011202229500U CN 201120222950 U CN201120222950 U CN 201120222950U CN 202124401 U CN202124401 U CN 202124401U
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- cross beam
- end plates
- connect
- plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Cage And Drive Apparatuses For Elevators (AREA)
Abstract
本实用新型公开了一种轿厢下梁体,包括第一横梁以及第二横梁,所述第一横梁和第二横梁的两端部之间分别通过两相互平行的端板连接,所述的两组端板之间设置加强筋架,该加强筋架包括斜拉筋板以及三块纵向连接筋板,该三块纵向连接筋板均布在两组端板之间,且相邻的两块纵向连接筋板之间通过倾斜设置的斜拉筋板连接,同时,每一块纵向连接筋板的两端分别与第一横梁和第二横梁固定连接。因此,本实用新型将两横梁通过加强筋架连接成一体,一方面可以极大地提高下梁体的整体刚性,另一方面还可以增加下梁体自重,可以在一定程度上减轻电梯运行时因自重轻导致的潜在危害。
Description
技术领域
本实用新型涉及一种轿厢下梁体。
背景技术
现有的轿厢下梁,一般包括两根平行放置的横梁,该两根横梁的端部分别采用端板连接,从而形成一承重底架。
在电梯安装过程中,一般将轿底框架安装在轿厢下梁,而轿底框架上则通过设置减震元件以进行轿厢的支撑。同时,电梯轿厢的运行速度与其自重成正比,如果电梯轿厢的自重轻,则电梯的运行摩擦力和稳定性得不到有效保证,从而对电梯运行带来很大影响。而电梯轿厢的大部分重量是由电梯轿架体现。
由此可知:现有的轿厢下梁结构刚性不够,自重轻,对于电梯的运行存在极大的危害。
实用新型内容
本实用新型针对现有技术的不足,提供一种轿厢下梁体,其通过在两横梁之间固定连接加强筋架,从而将两横梁、加强筋架连接成一体,一方面可以极大地提高下梁体的整体刚性,另一方面还可以增加下梁体自重,可以在一定程度上减轻电梯运行时因自重轻导致的潜在危害。
为实现以上的技术目的,本实用新型将采取以下的技术方案:
一种轿厢下梁体,包括第一横梁以及第二横梁,所述第一横梁和第二横梁的两端部之间分别通过两相互平行的端板连接,所述的两组端板之间设置加强筋架,该加强筋架包括斜拉筋板以及三块纵向连接筋板,该三块纵向连接筋板均布在两组端板之间,且相邻的两块纵向连接筋板之间通过倾斜设置的斜拉筋板连接,同时,每一块纵向连接筋板的两端分别与第一横梁和第二横梁固定连接。
所述第一横梁、第二横梁为角钢或者槽钢。
根据以上的技术方案,可以实现以下的有益效果:
本实用新型在第一横梁、第二横梁以及两组端板围接成的区域之间设置加强筋架,该加强筋架包括斜拉筋板以及三块纵向连接筋板,斜拉筋板用于连接两相邻的纵向连接筋板,而纵向连接筋板则用于连接第一横梁和第二横梁,因此,本实用新型将两横梁通过加强筋架连接成一体,一方面可以极大地提高下梁体的整体刚性,另一方面还可以增加下梁体自重,可以在一定程度上减轻电梯运行时因自重轻导致的潜在危害。
附图说明
图1是本实用新型的结构示意图;
其中:第一横梁11;第二横梁12;端板13;斜拉筋板21;纵向连接筋板22。
具体实施方式
附图非限制性地公开了本实用新型所涉及优选实施例的结构示意图。以下将结合附图详细地说明本实用新型的技术方案。
如图1所示,本实用新型所述的轿厢下梁体,包括第一横梁以及第二横梁,所述第一横梁和第二横梁的两端部之间分别通过两相互平行的端板连接,所述的两组端板之间设置加强筋架,该加强筋架包括斜拉筋板以及三块纵向连接筋板,该三块纵向连接筋板均布在两组端板之间,且相邻的两块纵向连接筋板之间通过倾斜设置的斜拉筋板连接,斜拉筋板的一端处于其中一块纵向连接筋板的上端面轴线上,另一端则处于余下的另一块纵向连接筋板的下端面轴线上;同时,每一块纵向连接筋板的两端分别与第一横梁和第二横梁固定连接。所述第一横梁、第二横梁为角钢或者槽钢。
Claims (2)
1.一种轿厢下梁体,包括第一横梁以及第二横梁,所述第一横梁和第二横梁的两端部之间分别通过两相互平行的端板连接,其特征在于:所述的两组端板之间设置加强筋架,该加强筋架包括斜拉筋板以及三块纵向连接筋板,该三块纵向连接筋板均布在两组端板之间,且相邻的两块纵向连接筋板之间通过倾斜设置的斜拉筋板连接,同时,每一块纵向连接筋板的两端分别与第一横梁和第二横梁固定连接。
2.根据权利要求1所述的轿厢下梁体,其特征在于:所述第一横梁、第二横梁为角钢或者槽钢。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202229500U CN202124401U (zh) | 2011-06-28 | 2011-06-28 | 一种轿厢下梁体 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202229500U CN202124401U (zh) | 2011-06-28 | 2011-06-28 | 一种轿厢下梁体 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202124401U true CN202124401U (zh) | 2012-01-25 |
Family
ID=45487472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202229500U Expired - Fee Related CN202124401U (zh) | 2011-06-28 | 2011-06-28 | 一种轿厢下梁体 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202124401U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102344082A (zh) * | 2011-06-28 | 2012-02-08 | 苏州新达电扶梯部件有限公司 | 一种轿厢下梁体 |
-
2011
- 2011-06-28 CN CN2011202229500U patent/CN202124401U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102344082A (zh) * | 2011-06-28 | 2012-02-08 | 苏州新达电扶梯部件有限公司 | 一种轿厢下梁体 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201901149U (zh) | 适合宽轨高速运行的机车转向架构架 | |
CN101830415A (zh) | 一种多功能锅炉炉膛检修平台 | |
CN102367139A (zh) | 一种轿厢的轿底组件 | |
WO2015089977A1 (zh) | 一种电梯下提升轿厢架 | |
CN202879514U (zh) | 轨道车辆动车转向架构架 | |
CN103663302B (zh) | L型龙门安装架 | |
CN105035112A (zh) | 一种用于重型设备的吊挂结构 | |
CN202879513U (zh) | 轨道车辆拖车转向架构架 | |
CN103770803B (zh) | 轨道车辆拖车转向架构架 | |
CN207158570U (zh) | 一体式电梯轿底 | |
CN202124401U (zh) | 一种轿厢下梁体 | |
CN104590985B (zh) | 轨道车辆整体提吊的提吊装置及提吊方法 | |
CN202130976U (zh) | 一种轿厢下梁组件 | |
CN202464658U (zh) | 一种带式输送机组合机架 | |
CN203079487U (zh) | 一种大吨位电梯轿厢底 | |
CN204778234U (zh) | 一种电梯主机承重装置 | |
CN202296720U (zh) | 用于经济型乘客电梯的轿架 | |
CN102344082A (zh) | 一种轿厢下梁体 | |
CN205472121U (zh) | 一种无机房电梯的轿厢绳头架 | |
CN204490302U (zh) | 轨道车辆整体提吊的提吊装置 | |
CN205906868U (zh) | 加强型轿厢与对重导轨支架 | |
CN207581135U (zh) | 一种新型电梯轿架 | |
CN207175160U (zh) | 一种无对重电梯的新型机房结构 | |
CN205023672U (zh) | 曳引机底座结构 | |
CN205989756U (zh) | 一种横梁贯通式车底架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120125 Termination date: 20200628 |