CN202108045U - 一种锚杆穿越地下连续墙的套管 - Google Patents
一种锚杆穿越地下连续墙的套管 Download PDFInfo
- Publication number
- CN202108045U CN202108045U CN2011201704761U CN201120170476U CN202108045U CN 202108045 U CN202108045 U CN 202108045U CN 2011201704761 U CN2011201704761 U CN 2011201704761U CN 201120170476 U CN201120170476 U CN 201120170476U CN 202108045 U CN202108045 U CN 202108045U
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- underground continuous
- continuous wall
- diaphragm wall
- anchor rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型属于基坑支护领域的一种锚杆穿越地下连续墙的套管,该套管预埋在地下连续墙内,所述套管的直径满足后置锚杆能够插入,所述套管在地下连续墙内的预埋方向根据所述后置锚杆的插入方向确定,套管两端分别采用橡皮塞封堵,所述套管的两端分别穿过所述地下连续墙的纵向主筋外,并插入所述地下连续墙的钢筋保护层范围内。该套管在地下连续墙施工时布置在地下连续墙须设置锚杆的墙身范围,避免锚杆施工时对地下连续墙的凿除,并满足地下室防水要求。
Description
技术领域
本实用新型属于固定建筑物基坑支护领域中的一种锚杆穿越地下连续墙的构造装置,能被广泛应用于采用地下连续墙结合锚杆的基坑支护工程中。
背景技术
随着我国城市化进程的加速,地下建筑面积也越来越大,开挖深度不断加深,基坑支护方式不断创新,如软土地区开挖深度超过12米的基坑工程围护体多采用造价相对便宜的“两墙合一”地下连续墙;土质较好地区一般采用钻孔灌注桩结合锚杆的基坑支护方案,采用锚杆作为水平支撑体系,具有较大的经济优势。在基坑工程中,如采用“两墙合一”地下连续墙结合锚杆的支护设计方案,由于地下连续墙是整片连续的墙体,锚杆施工时需在地下连续墙中凿出一个一个的洞以方便锚杆穿越地下连续墙。地下连续墙凿洞过程不仅费时费力,而且凿洞过程是对墙体的一种损伤,影响日后正常使用阶段地下连续墙的受力,存在工程安全隐患,并且地下连续墙作为地下室外墙,凿洞之后,开洞区域则成为地下连续墙的防水薄弱点,使正常使用阶段地下室存在渗漏水的隐患。
实用新型内容
本实用新型所要解决的技术问题是提供了一种锚杆穿越地下连续墙的套管,该套管在地下连续墙施工时布置在地下连续墙需设置锚杆的墙身内,避免锚杆施工时对地下连续墙的凿除,并满足地下室防水要求。
为解决上述技术问题,本实用新型的基本构思是:套管预埋在地下连续墙内,所述套管的直径满足后置锚杆能够插入,所述套管在地下连续墙内的预埋方向根据所述后置锚杆的插入方向确定,套管两端分别采用橡皮塞封堵,所述套管的两端分别穿过所述地下连续墙的纵向主筋外,并插入所述地下连续墙的钢筋保护层范围内。在套管两端采用橡皮塞进行封堵,避免在地下连续墙施工混凝土浇筑过程中,混凝土进入套管内部,将套管堵塞;在后置的锚杆施工时,凿除表层的钢筋保护层,打开橡皮塞即可进行锚杆施工,在迎土面,采用钻机亦可方便地穿越橡皮塞和钢筋保护层,满足锚杆施工的要求。
基于上述技术特征,环形止水板套在所述套管外,所述环形止水板的内圈与所述套管的外壁连接。环形止水板在地下连续墙混凝浇筑后直接嵌固在地下连续墙内部,同时增加地下水渗流路径,达到止水的效果。止水板的厚度和宽度根据所处环境的地下水情况具体确定。
由于上述锚杆穿越地下连续墙套管的使用,实现锚杆施工阶段免凿除地下连续墙的工作,从而确保了地下连续墙的受力和地下室的方式,并且节省了大量的人力和物力,使基坑工程以及地下结构更加安全。
附图说明
下面结合附图和实例及应用施工方法对本实用新型作进一步的描述。
图1是本实用新型的纵剖面图。
图2是本实用新型的环形止水板示及橡皮塞的示意图
图3是本实用新型周边加强筋的节点详图。
具体实施方式
本实用新型通过将套管预埋在地下连续墙内部,起到方便施工、满足地下连续墙受力以及地下室防水要求的作用。结合附图,具体描述如下:
如图1所示,通过在地下连续墙1中预埋套管2,待后置的锚杆3施工时,可直接穿越地下连续墙1,避免在地下连续墙1上凿洞,最后将锚杆3固定在锚座4上。如图2所示,套管2固定到地下连续墙1的钢筋笼上之前,可先将止水板6焊接到套管2上,止水板6的厚度及宽度应该根据基坑工程所处的地理环境综合确定。套管2固定到钢筋笼上之前亦应先将套管2两端用橡皮塞5进行封堵,避免地下连续墙1混凝土浇筑过程中,混凝土进入套管2内部,堵塞套管2;套管2的直径大小应根据锚杆的设计以及锚杆施工需要的最小尺寸来确定,使锚杆能够顺利插入。
如图1所示,所述套管的两端应分别穿过所述地下连续墙的纵向主筋7外,所述套管2两端位于所述地下连续墙的钢筋保护层范围内。如套管2的直径大于地下连续墙主筋7的间距,但地下连续墙主筋7的数量需保持不变,如图3所示,地下连续墙主筋7避开套管2后,地下连续墙主筋7的间距可能会较其他区域变大,因此需在地下连续墙1迎土面和迎坑面均相应设置加强筋8,加强筋8为围成井字形钢筋,套管2位于井字形钢筋的中部,加强钢的锚固长度需满足现行的钢筋混凝土规范要求,当然,也可以采取其他的加强措施。
以上对本实用新型实例所提供的方案详细介绍,对于本领域的一般技术人员,依据本实用新型实施例的思想,在具体实施方式及应用范围上均会有改变之处。综上所述,本说明书内容不应理解为对本实用新型的限制,凡依本实用新型设计思想所做的任何改变都在本实用新型的保护范围之内。
Claims (2)
1.一种锚杆穿越地下连续墙的套管,其特征在于:套管(2)预埋在地下连续墙(1)内,所述套管(2)的直径满足后置锚杆(3)能够插入,所述套管(2)在所述地下连续墙(1)内的预埋方向根据所述后置锚杆(3)的插入方向确定,所述套管(2)两端分别采用橡皮塞(5)封堵,所述套管的两端分别穿过所述地下连续墙(1)的纵向主筋(7)外,并插入所述地下连续墙(1)的钢筋保护层范围内。
2.根据权利要求1所述的一种锚杆穿越地下连续墙的套管,其特征在于:环形止水板(6)套在所述套管(2)壁外,所述环形止水板(6)的内圈与所述套管(2)的外壁连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201704761U CN202108045U (zh) | 2011-05-25 | 2011-05-25 | 一种锚杆穿越地下连续墙的套管 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201704761U CN202108045U (zh) | 2011-05-25 | 2011-05-25 | 一种锚杆穿越地下连续墙的套管 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202108045U true CN202108045U (zh) | 2012-01-11 |
Family
ID=45433483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201704761U Expired - Lifetime CN202108045U (zh) | 2011-05-25 | 2011-05-25 | 一种锚杆穿越地下连续墙的套管 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202108045U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102296618A (zh) * | 2011-05-25 | 2011-12-28 | 华东建筑设计研究院有限公司 | 一种锚杆穿越地下连续墙的套管 |
CN103362125A (zh) * | 2012-03-26 | 2013-10-23 | 上海市基础工程有限公司 | 地下连续墙内预埋预应力锚索施工用钢套管 |
CN103510540A (zh) * | 2012-06-29 | 2014-01-15 | 深圳市工勘岩土工程有限公司 | 浆砌片石挡土墙加固施工方法及其结构 |
CN106149765A (zh) * | 2016-08-24 | 2016-11-23 | 武汉市市政建设集团有限公司 | 一种地下连续墙墙段连接装置及连接方法 |
-
2011
- 2011-05-25 CN CN2011201704761U patent/CN202108045U/zh not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102296618A (zh) * | 2011-05-25 | 2011-12-28 | 华东建筑设计研究院有限公司 | 一种锚杆穿越地下连续墙的套管 |
CN103362125A (zh) * | 2012-03-26 | 2013-10-23 | 上海市基础工程有限公司 | 地下连续墙内预埋预应力锚索施工用钢套管 |
CN103510540A (zh) * | 2012-06-29 | 2014-01-15 | 深圳市工勘岩土工程有限公司 | 浆砌片石挡土墙加固施工方法及其结构 |
CN103510540B (zh) * | 2012-06-29 | 2016-08-17 | 深圳市工勘岩土工程有限公司 | 浆砌片石挡土墙加固施工方法及其结构 |
CN106149765A (zh) * | 2016-08-24 | 2016-11-23 | 武汉市市政建设集团有限公司 | 一种地下连续墙墙段连接装置及连接方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104612143B (zh) | 一种溶洞/土洞地质条件下的钻孔复合桩结构 | |
CN104099943B (zh) | 地下连续墙与废弃地下人防工程交会处理方法 | |
CN102162253B (zh) | 深基坑埋管降水施工方法 | |
CN202689031U (zh) | 深基坑支护挡墙 | |
CN105464074B (zh) | 一种人工挖孔桩高聚物注浆防护结构及其施工方法 | |
CN203729306U (zh) | 抗滑桩和挡土板支护结构 | |
CN202108045U (zh) | 一种锚杆穿越地下连续墙的套管 | |
CN201538975U (zh) | 地下连续墙防渗接头 | |
CN104652495B (zh) | 基坑内支撑立柱与底板节点防水施工工艺 | |
CN103572764A (zh) | 超深人工挖孔桩护壁止水结构及其施工方法 | |
CN105386610A (zh) | 非对称深基坑坑顶天然地基古建筑保护施工方法 | |
CN102296618A (zh) | 一种锚杆穿越地下连续墙的套管 | |
CN102220764B (zh) | 深基坑支护体系的施工方法 | |
CN104164895A (zh) | 一种不产生水浮力的地下室 | |
CN211735379U (zh) | 穿透地下室底板的抗浮锚杆的防水结构 | |
CN203475486U (zh) | 一种不产生水浮力的地下室 | |
CN106088762B (zh) | 一种插槽式外包钢板预制装配式圆形地下粮仓 | |
CN106013911B (zh) | 一种带预制嵌缝条的内包钢板装配式圆形地下粮仓 | |
CN106193744B (zh) | 一种内外均包钢板圆形预制装配式地下粮仓 | |
CN202007407U (zh) | 深基坑支护体系 | |
CN206035047U (zh) | 一种外包塑料预制装配式地下粮仓 | |
CN206035048U (zh) | 一种内外包塑料预制装配式地下粮仓 | |
CN106088759B (zh) | 一种内外均包钢板阶梯状预制装配式圆形地下粮仓 | |
CN106049948B (zh) | 一种插槽式内包塑料预制仓壁地下粮仓 | |
CN206034482U (zh) | 一种内包钢板圆形预制装配式地下粮仓 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181102 Address after: 211800 No. 12, Xing Long Road, Pukou District, Nanjing, Jiangsu. Patentee after: Nanjing Jiangbei new area Underground Space Research Institute Co., Ltd. Address before: 200002 No. 151, Hankou Road, Shanghai, Huangpu District Patentee before: East China Architectural Design & Research Institute Co., Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120111 |