CN202007407U - 深基坑支护体系 - Google Patents

深基坑支护体系 Download PDF

Info

Publication number
CN202007407U
CN202007407U CN2011201153909U CN201120115390U CN202007407U CN 202007407 U CN202007407 U CN 202007407U CN 2011201153909 U CN2011201153909 U CN 2011201153909U CN 201120115390 U CN201120115390 U CN 201120115390U CN 202007407 U CN202007407 U CN 202007407U
Authority
CN
China
Prior art keywords
curtain
deep foundation
foundation pit
supporting system
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201153909U
Other languages
English (en)
Inventor
邢占东
王奋
岳霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Wei Jian ground Science and Technology Ltd.
Original Assignee
WEIHAI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WEIHAI CONSTRUCTION GROUP CO Ltd filed Critical WEIHAI CONSTRUCTION GROUP CO Ltd
Priority to CN2011201153909U priority Critical patent/CN202007407U/zh
Application granted granted Critical
Publication of CN202007407U publication Critical patent/CN202007407U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型提供了一种止水帷幕中加钢管混凝土灌注桩的深基坑支护体系,安全性高、经济合理且维修方便。本实用新型上述目的是通过以下方案实施的:一种深基坑支护体系,包括设置深基坑外围的帷幕,在帷幕初凝之前,按照设计间距和规格在帷幕中施工钢管混凝土灌注桩。本实用新型的深基坑支护体系具有以下优点:1、与连续墙支护体系相比,不需要单独设置止水措施,造价非常低廉,适合大面积推广;2、钢管和钢筋笼沿竖直方向从外安装,能充分发挥钢材的抗拉抗压性能,充分发挥钢材的力学性能,使用的混凝土能大幅度提高抗拉、抗压强度,增加了施工过程中的安全性;3、钢管混凝土桩与帷幕结合紧密,形成一体,防水性能非常可靠,受力状态更好更安全,帷幕直接暴露在表面,若有漏水点,非常容易发现,也便于修复。

Description

深基坑支护体系
技术领域
本实用新型涉及深基坑支护技术领域,具体涉及一种深基坑支护体系。
背景技术
随着经济的高速发展,建筑物逐渐向高层大面积发展,而且人防设施的要求越来越严格,几乎所有的高层建筑物都有地下室、地下车库等,而且在城区施工受周围建筑物、管线的影响,多数都需要垂直支护,如何选择安全、可靠、经济、合理的支护体系是岩土工程界一直追求的目标。
现有的垂直支护体系,一般常用的有连续墙支护体系、排桩支护体系、水泥土墙支护体系等,连续墙支护体系安全可靠,但造价高昂;排桩支护体系,虽然一般造价较低,但是桩的不连续,一般要增加相应的止水措施,才能保证体系的安全使用,而且二者的结合一直存在隐患,原有工艺在排桩后面增加帷幕的做法,桩与帷幕各为一体,受力不均匀,桩与桩之间需要冠梁连结,帷幕在桩后面有漏水点时,不易察觉,也很难修复;水泥土墙支护体系虽然连续性较好,能够有效的止水,但水泥土的强度很低,尤其是抗拉强度极低,一般不足0.1Mpa,使用中一般需要增加大量的型钢和大量的锚杆来弥补强度的不足,不但经济上浪费,而且在地下水位线以下施工大量的锚杆,在施工过程中本身也存在着一定的安全隐患,如何能把排桩的安全、经济、与水泥土的连续性相结合,设计一种支护体系,将是一种非常优秀适用的支护体系。
发明内容
为了解决上述现有支护体系存在的问题,本实用新型目的是提供了一种止水帷幕中加钢管混凝土灌注桩的深基坑支护体系,安全性高、经济合理且维修方便。
本实用新型上述目的是通过以下方案实施的:
一种深基坑支护体系,包括设置深基坑外围的帷幕,在帷幕初凝之前,按照设计间距和规格在帷幕中施工钢管混凝土灌注桩。
本实用新型实施例中,所述钢管混凝土桩内部设有钢筋笼。
本实用新型实施例中,所述钢管混凝土桩为圆管或方管。
本实用新型的深基坑支护体系具有以下优点:
1、与连续墙支护体系相比,不需要单独设置止水措施,造价非常低廉,适合大面积推广;
2、钢管和钢筋笼沿竖直方向从外安装,能充分发挥钢材的抗拉抗压性能,充分发挥钢材的力学性能,使用的混凝土能大幅度提高抗拉、抗压强度,增加了施工过程中的安全性;
3、钢管混凝土桩与帷幕结合紧密,形成一体,防水性能非常可靠,受力状态更好更安全,帷幕直接暴露在表面,若有漏水点,非常容易发现,也便于修复。
附图说明
图1为深基坑支护体系的立面示意图。
图2为深基坑支护体系的平面示意图。
具体实施方式
下面结合附图和具体实施例对本实用新型做进一步详细说明,下述说明仅示例性的,不限定本实用新型的保护范围。
参考附图1、2,一种深基坑支护体系,包括设置深基坑4外围的帷幕2,帷幕2中施工钢管混凝土灌注桩3,所述钢管混凝土灌注桩3内部可以设有钢筋笼5。
考虑到受力,钢管桩3为圆管或方管,当然本领域人员可以想到钢管桩3的圆管形状可以为其他形状。
一种深基坑支护体系的施工方法,包括以下步骤:
1)采用三轴钻机钻孔,一次钻成三个连在一起的单元槽,钻到预定深度,钻机停止转动;
2)通过高压注浆泵及安装在钻具中间的注浆管路系统自下而上自单元槽底注入水泥浆,钻机同时反转并匀速向上提升钻具,形成帷幕2,钻具提出地面,再顺序施工下一槽段,槽段之间相互咬合切割搭接,如此连续施工,形成整体连续的防渗帷幕;
3)在帷幕2初凝之前,按照理论计算,利用高频振动锤向帷幕2中插入上端敞口下端封闭的钢管1作为模具,在钢管达到设计位置后,固定钢管1上口;
4)在钢管1中,根据需要安装钢筋笼5,并灌注混凝土成钢管混凝土灌注桩3。
以上仅为本实用新型的优选实施例,并不用于限制本实用新型,显然本领域人员可以对本实用新型进行改动和变形而不脱离本实用新型的精神和范围。这些修改和变形属于本实用新型的权利要求及等同技术范围内的,则属于本实用新型的保护范围。

Claims (3)

1.一种深基坑支护体系,其特征在于:包括设置深基坑(4)外围的帷幕(2),帷幕(2)中设有多个钢管混凝土灌注桩(3)。
2.根据权利要求1所述深基坑支护体系,其特征在于:所述钢管混凝土桩(3)内部设有钢筋笼(5)。
3.根据权利要求1或2所述深基坑支护体系,其特征在于:钢管混凝土桩(3)为圆管或方管。
CN2011201153909U 2011-04-19 2011-04-19 深基坑支护体系 Expired - Lifetime CN202007407U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201153909U CN202007407U (zh) 2011-04-19 2011-04-19 深基坑支护体系

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201153909U CN202007407U (zh) 2011-04-19 2011-04-19 深基坑支护体系

Publications (1)

Publication Number Publication Date
CN202007407U true CN202007407U (zh) 2011-10-12

Family

ID=44749062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201153909U Expired - Lifetime CN202007407U (zh) 2011-04-19 2011-04-19 深基坑支护体系

Country Status (1)

Country Link
CN (1) CN202007407U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220764A (zh) * 2011-04-19 2011-10-19 威海建设集团股份有限公司 深基坑支护体系及其施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220764A (zh) * 2011-04-19 2011-10-19 威海建设集团股份有限公司 深基坑支护体系及其施工方法
CN102220764B (zh) * 2011-04-19 2012-09-05 邢占东 深基坑支护体系的施工方法

Similar Documents

Publication Publication Date Title
CN105840207B (zh) 一种穿越浅埋偏压松散堆积体大跨度隧道综合进洞结构施工方法
CN109024651B (zh) 一种钢管混凝土混合桩基及施工方法
CN103422501B (zh) 砂层地质中的抗浮锚杆结构及其施工方法
CN202689031U (zh) 深基坑支护挡墙
CN106013052A (zh) 钢板桩与沉井组合式地下停车库及其施工方法
CN102776899B (zh) 浅埋盾构法隧道的抗浮结构
CN103938634B (zh) 一种深基坑支护结构及施工方法
CN110004919B (zh) 一种用于管线影响范围内的基坑围护施工方法
CN105780779A (zh) 外设压密注浆的拉森钢板桩复合支护结构及其使用方法
CN104775440A (zh) 一种井筒式地下车库深基坑支护结构
CN105350531A (zh) 可承受拉压双向荷载的管桩-锚杆复合基础及施工工艺
CN102220764B (zh) 深基坑支护体系的施工方法
CN111364532B (zh) 一种基于浆液控制的既有桩基加固方法
CN104632250A (zh) 圆形基坑倒挂管片装配式衬砌结构及其施工方法
CN104264683A (zh) 三面环绕文保建筑凹字形超深基坑分区支护方法
CN206204972U (zh) 一种兼作井点降水的预制管桩
CN101793027B (zh) 一种桩心注浆静压锚杆桩
CN111501771A (zh) 多椭圆环形组合撑在深大淤泥基坑工程的应用方法
CN204311456U (zh) 基坑加固结构
CN203476354U (zh) 一种地下暗挖工程主体结构
CN203613568U (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系
CN202108045U (zh) 一种锚杆穿越地下连续墙的套管
CN209941754U (zh) 一种高压电力管涵原地保护结构
CN205382942U (zh) 既有设施下多层地下空间幕架式暗挖施工的支护结构
CN107178088A (zh) 一种地下室防水基坑结构及其施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160315

Address after: 264200 Kunming Road, Shandong, China, No. 13, No.

Patentee after: Xing Zhandong

Patentee after: Shandong Wei Jian ground Science and Technology Ltd.

Patentee after: Weihai Construction Group Co., Ltd.

Address before: 264200 Kunming Road, Shandong, China, No. 13, No.

Patentee before: Xing Zhandong

Patentee before: Weihai Construction Group Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20111012

CX01 Expiry of patent term