CN102162253B - 深基坑埋管降水施工方法 - Google Patents

深基坑埋管降水施工方法 Download PDF

Info

Publication number
CN102162253B
CN102162253B CN201110117034A CN201110117034A CN102162253B CN 102162253 B CN102162253 B CN 102162253B CN 201110117034 A CN201110117034 A CN 201110117034A CN 201110117034 A CN201110117034 A CN 201110117034A CN 102162253 B CN102162253 B CN 102162253B
Authority
CN
China
Prior art keywords
pit
ppr
pipe
foundation ditch
precipitation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110117034A
Other languages
English (en)
Other versions
CN102162253A (zh
Inventor
王玉伦
崔佃和
伊功善
韩爱强
朱立东
荆茂农
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG XINCHENG JIANGONG CO Ltd
Original Assignee
SHANDONG XINCHENG JIANGONG CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG XINCHENG JIANGONG CO Ltd filed Critical SHANDONG XINCHENG JIANGONG CO Ltd
Priority to CN201110117034A priority Critical patent/CN102162253B/zh
Publication of CN102162253A publication Critical patent/CN102162253A/zh
Application granted granted Critical
Publication of CN102162253B publication Critical patent/CN102162253B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

深基坑埋管降水施工方法,属于建筑施工技术领域。包括以下步骤,a、土方挖至工程基坑设计底面标高上方1m处时,将基坑内的电梯坑、集水坑位置测量准确并用挖掘机在其中间挖一个达到坑底标高下方100mm的坑;b、用挖掘机将一段钢管压入电梯坑或集水坑中部,再将钢管取出来,使其形成井眼,将PVC滤管(1)竖直安装在井眼内;c、将PPR埋管(3)一端与PVC滤管(1)上端插接固定,将PPR埋管(3)另一端引至基础外侧;d、在PPR埋管(3)另一端安装自吸泵(4),在自吸泵(4)上联接PPR管(5);e、达到降水标高后,将土方挖至坑底设计标高,在电梯坑或集水坑底部浇筑混凝土垫层(9)。有效的减少基坑外围降水深度,节约地下水资源,避免危及临边建筑且防水性能极佳。

Description

深基坑埋管降水施工方法
技术领域
深基坑埋管降水施工方法,属于建筑施工技术领域,具体涉及地下水位高,地下工程面积大,低于基坑底板的电梯坑、集水坑处的局部降水。
背景技术
随着施工技术的发展,建筑基坑工程不断向地下延伸,建筑基坑降水是一个较大的难题,特别是基坑宽度和深度较大,地下含水量大的工程。现有的降水技术是采用基坑周边钻深井降水或基坑周边钻井,基坑内的电梯坑、集水坑处局部钻井降水,待该处防水底板混凝土浇筑完,再将降水井填实封堵后浇上防水混凝土。
以上几种现有的施工方法存在以下几点不足:①基坑周边钻深井降水,大量浪费地下水资源,极易危及临边的原有建筑;②如果在基坑中间布置降水井,对于降水井的防水施工以及降水井封堵又是一个技术难题,基础底板以下的防水层不易施工,降水井封堵后在底板上形成施工缝,尤其是在地下水位高的地区很难保证施工缝处不渗漏,给地下工程防水造成很大的隐患;③对于基坑中间的降水效果较差,为了达到降水效果,必须加大降水井的深度,这样必然加大降水费用,提高工程造价,同时降水时间延长,影响施工工期进度。
发明内容
本发明要解决的技术问题是:克服现有技术的不足,提供一种减少外围降水深度、节约成本、不留施工缝、不渗漏的深基坑埋管降水施工方法。
本发明解决其技术问题所采用的技术方案是:该深基坑埋管降水施工方法,其特征在于:包括以下步骤,
a、根据工程图纸和地质条件,挖制基坑,土方挖至工程基坑设计底面标高上方1m处时,将要挖制的电梯坑或集水坑的位置测量准确,用挖掘机在其中间挖一个达到坑底标高下方100mm的坑,作为电梯坑或集水坑;
b、用挖掘机将一段钢管竖直压入电梯坑或集水坑中部,再将钢管取出来,使其形成相应直径的竖直井眼,然后将PVC滤管竖直安装在井眼内;
c、将PVC滤管周围与井眼之间的空隙用卵石填充料填充,再将PPR埋管一端与PVC滤管上端插接固定,管口粘牢封严,并将PPR埋管另一端引至基础外侧;
d、在PPR埋管基础外侧的另一端安装自吸泵,在自吸泵上联接PPR管,通过自吸泵和PPR管进行降水作业,并将PPR管内的水排入排水沟内;
e、达到降水标高后,将土方挖至工程基坑设计标高,把PPR埋管埋入基坑垫层设计标高下方,并在电梯坑或集水坑底部首先浇筑混凝土垫层,然后在电梯坑或集水坑四周砌筑砖模,砖模周围的空隙用沙石填充,砖模表面覆盖防水层,防水层表面覆盖防水保护层,在防水保护层上绑扎钢筋并浇筑底板防水混凝土。采用了多道防水构造措施,在防水层上覆盖防水保护层,防水性能高,防渗漏,防水性能完全满足相应的国家防水工程标准。底板防水混凝土整体浇筑不留施工缝,保证防水底板的整体性、不渗漏,安全可靠,确保基础工程的结构质量。
所述的PVC滤管的直径为40mm,下部为滤管,上部为直管。
所述的PPR埋管的直径为32mm。
与现有技术相比,本发明所具有的有益效果是:
1、在工程基坑内电梯坑或集水坑中部埋设PVC滤管,减小基坑周围降水深度,不需要抽出大量的地下水,在节约水资源的同时能够满足工程的正常施工,且能够保证对周边建筑不发生沉降变形,更好的保证基坑不易滑坡,保证了施工的安全;
2、加快施工进度,缩短施工工期,解决了降水井只布置在工程基坑周围存在的问题,大大降低工程造价,施工方法简便,操作人员不需要进行专业训练,普通工人即可完成,采用的材料均为施工中常用材料,材料成本低,其造价相当低廉,防水效果好,采用了多道防水构造措施,防水完全满足相应的国家防水工程标准。
3、本发明施工方法有效的减少了外围的降水深度,节省了钻井降水台班费用,且底板防水混凝土整体浇筑不留施工缝,保证防水底板的整体性、不渗漏,安全可靠,确保基础工程的结构质量。
附图说明
图1是本发明结构主视图示意图。
其中:1、PVC滤管  2、卵石填充料  3、PPR埋管  4、自吸泵  5、PPR管泵扬程  6、排水沟  7、砖模  8、沙石  9、混凝土垫层  10、防水层  11、防水保护层  12、底板防水混凝土  13、土钉墙  14、基坑周围井点。
图1是本发明的最佳实施例,下面结合附图1对本发明做进一步说明:
具体实施方式
参照附图1:
该深基坑埋管降水施工方法,包括以下步骤,
a、根据工程图纸和地质条件,挖制基坑,土方挖至工程基坑设计底面标高上方1m处时,将要挖制的电梯坑或集水坑的位置测量准确,用挖掘机在基坑中间挖一个达到基坑坑底标高下方100mm的坑,作为电梯坑或集水坑;
b、用挖掘机将一段直径为100mm的钢管竖直压入电梯坑或集水坑中部,再将钢管取出来,使其形成直径为100mm的竖直井眼,然后将PVC滤管1竖直安装在井眼内,PVC滤管1的直径为40mm;
c、将PVC滤管1周围与井眼之间的空隙用卵石填充料2填充,再将PPR埋管3一端与PVC滤管1上端插接固定,PPR埋管3的直径为32mm,管口粘牢封严,并将PPR埋管3另一端引至基础外侧;在基坑内电梯坑中部埋设PVC滤管1,减小基坑周围降水深度,因此不需要抽出大量的地下水,在节约水资源的同时能够满足工程的正常施工,且能够避免对周边建筑发生沉降变形,更好的保证基坑不易滑坡,保证了施工的安全;
d、在PPR埋管3基础外侧的一端安装自吸泵4,在自吸泵4上联接PPR管泵扬程5,通过自吸泵4和PPR管泵扬程5进行降水作业,并将PPR管泵扬程5内的水排入排水沟6内;
e、达到降水标高后,将土方挖至工程基坑设计标高,把PPR埋管3埋入基坑垫层设计标高以下,并在电梯坑或集水坑底部首先浇筑混凝土垫层9,然后在电梯坑或集水坑四周砌筑砖模7,砖模7周围的空隙用沙石8填充,砖模7表面覆盖防水层10,防水层10表面覆盖防水保护层11,在防水保护层11上绑扎钢筋并浇筑底板防水混凝土12。
本发明防水效果好,采用了多道防水构造措施,防水完全满足相应的国家防水工程标准,底板防水混凝土12整体浇筑不留施工缝,保证防水底板的整体性、不渗漏,确保基础工程的结构质量,安全可靠。
以上所述,仅是本发明的较佳实施例而已,并非是对本发明作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例。但是凡是未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与改型,仍属于本发明技术方案的保护范围。

Claims (3)

1.深基坑埋管降水施工方法,其特征在于:包括以下步骤,
a、根据工程图纸和地质条件,挖制基坑,土方挖至工程基坑设计底面标高上方1m处时,将要挖制的电梯坑或集水坑的位置测量准确,用挖掘机在其中间挖一个达到坑底标高下方100mm的坑,作为电梯坑或集水坑;
b、用挖掘机将一段钢管竖直压入电梯坑或集水坑中部,再将钢管取出来,使其形成相应直径的竖直井眼,然后将PVC滤管(1)竖直安装在井眼内;
c、将PVC滤管(1)周围与井眼之间的空隙用卵石填充料(2)填充,再将PPR埋管(3)一端与PVC滤管(1)上端插接固定,管口粘牢封严,并将PPR埋管(3)另一端引至基础外侧;
d、在PPR埋管(3)基础外侧的另一端安装自吸泵(4),在自吸泵(4)上联接PPR管(5),通过自吸泵(4)和PPR管(5)进行降水作业,并将PPR管(5)内的水排入排水沟(6)内;
e、达到降水标高后,将土方挖至工程基坑设计标高,把PPR埋管(3)埋入基坑垫层设计标高下方,并在电梯坑或集水坑底部首先浇筑混凝土垫层(9),然后在电梯坑或集水坑四周砌筑砖模(7),砖模(7)周围的空隙用沙石(8)填充,砖模(7)表面覆盖防水层(10),防水层(10)表面覆盖防水保护层(11),在防水保护层(11)上绑扎钢筋并浇筑底板防水混凝土(12)。
2.根据权利要求1所述的深基坑埋管降水施工方法,其特征在于:所述的PVC滤管(1)的直径为40mm,下部为滤管,上部为直管。
3.根据权利要求1所述的深基坑埋管降水施工方法,其特征在于:所述的PPR埋管(3)的直径为32mm。
CN201110117034A 2011-05-07 2011-05-07 深基坑埋管降水施工方法 Active CN102162253B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110117034A CN102162253B (zh) 2011-05-07 2011-05-07 深基坑埋管降水施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110117034A CN102162253B (zh) 2011-05-07 2011-05-07 深基坑埋管降水施工方法

Publications (2)

Publication Number Publication Date
CN102162253A CN102162253A (zh) 2011-08-24
CN102162253B true CN102162253B (zh) 2012-09-19

Family

ID=44463683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110117034A Active CN102162253B (zh) 2011-05-07 2011-05-07 深基坑埋管降水施工方法

Country Status (1)

Country Link
CN (1) CN102162253B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863168A (zh) * 2015-04-30 2015-08-26 中冶天工上海十三冶建设有限公司 一种基础底板下部的疏水装置及其使用方法
CN106948757A (zh) * 2017-04-05 2017-07-14 苏州华造建筑设计有限公司 一种利用基坑区域进行的地埋管打井施工工艺
CN106988342A (zh) * 2017-05-19 2017-07-28 中国水利水电第四工程局有限公司 一种地下管廊排水施工方法
CN107354950A (zh) * 2017-07-13 2017-11-17 中国建筑第七工程局有限公司 一种经济快速的集水坑局部降水方法
CN110792092A (zh) * 2019-11-11 2020-02-14 中国建筑第八工程局有限公司 基坑降水结构及其施工方法
CN111005386A (zh) * 2019-12-12 2020-04-14 中冶天工集团天津有限公司 一种深基坑降排二合一集水井结构及施工方法
CN110984198A (zh) * 2019-12-13 2020-04-10 中国十九冶集团有限公司 一种超挖集水井的施工方法
CN111236283A (zh) * 2020-01-06 2020-06-05 南通八建集团有限公司 深基坑集水坑局部连续式降水方法
CN116378044A (zh) * 2023-04-12 2023-07-04 中铁广州工程局集团有限公司 一种电梯基坑井施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB652570A (en) * 1948-10-13 1951-04-25 Solomon Akerib Improved method of and equipment for consolidating or stabilising sub-aqueous soil or deposits
EP1064432B1 (en) * 1998-03-17 2002-07-10 Hollandsche Beton Groep N.V. Consolidation method for soil layers with low permeability
CN201326176Y (zh) * 2008-12-15 2009-10-14 上海市第二建筑有限公司 深基坑降水保留井
CN101768976A (zh) * 2009-12-29 2010-07-07 中建城市建设发展有限公司 一种基坑降水节水装置及其施工方法
CN101936010A (zh) * 2010-08-19 2011-01-05 天津二十冶建设有限公司 地下混凝土结构中降水井的施工方法
CN201770990U (zh) * 2010-08-19 2011-03-23 叶香竹 一种深基坑降水井构造

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB652570A (en) * 1948-10-13 1951-04-25 Solomon Akerib Improved method of and equipment for consolidating or stabilising sub-aqueous soil or deposits
EP1064432B1 (en) * 1998-03-17 2002-07-10 Hollandsche Beton Groep N.V. Consolidation method for soil layers with low permeability
CN201326176Y (zh) * 2008-12-15 2009-10-14 上海市第二建筑有限公司 深基坑降水保留井
CN101768976A (zh) * 2009-12-29 2010-07-07 中建城市建设发展有限公司 一种基坑降水节水装置及其施工方法
CN101936010A (zh) * 2010-08-19 2011-01-05 天津二十冶建设有限公司 地下混凝土结构中降水井的施工方法
CN201770990U (zh) * 2010-08-19 2011-03-23 叶香竹 一种深基坑降水井构造

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李志平等.轻型井点降水在基坑工程中的应用.《土工基础》.2008,第22卷(第3期),33-35. *
章昕.深基坑降水技术浅析.《岩土工程学报》.2010,第32卷(第增刊2期),443-446. *

Also Published As

Publication number Publication date
CN102162253A (zh) 2011-08-24

Similar Documents

Publication Publication Date Title
CN102162253B (zh) 深基坑埋管降水施工方法
CN102454167B (zh) 大型超深沉井的施工方法
CN103967031B (zh) 一种加固地基的沉箱与桩组合基础及其施工方法
CN104612143B (zh) 一种溶洞/土洞地质条件下的钻孔复合桩结构
CN103046565B (zh) 超深岩基深基坑降排水方法
LU501539B1 (en) Pumping and drainage method for foundation pit bottom plate construction of deep foundation pit and pumping and drainage structure
CN105780779A (zh) 外设压密注浆的拉森钢板桩复合支护结构及其使用方法
CN111851597B (zh) 顶管近距离下穿管廊的穿越防护结构及施工方法
CN110219359A (zh) 一种沉管式检查井及其施工方法
CN110004991A (zh) 基于外凸式翼脚板的地下结构抗浮体系及构建方法
CN109811779A (zh) 一种预制沉井管片及沉井施工方法
CN105714769A (zh) 一种抗滑灌注桩施工方法
CN108798775A (zh) 一种顶管施工工作井
CN108867673A (zh) 一种基于抽水帷幕的基坑中地下水治理方法
CN209066468U (zh) 一种基坑降水装置
CN202108045U (zh) 一种锚杆穿越地下连续墙的套管
CN103015430A (zh) 长螺旋压灌水泥土型钢桩基坑止水支护方法
CN208803460U (zh) 一种增强水泥土搅拌桩截水效果的预制砼板桩
CN217053672U (zh) 一种大直径检查井钻桩法施工系统
CN110939142A (zh) 用于边坡的路基结构
CN100396854C (zh) 柱锤强夯置换基坑支护工法
CN110344395A (zh) 一种支腿式地下连续墙施工工法
CN102296618A (zh) 一种锚杆穿越地下连续墙的套管
CN115162347A (zh) 深基坑管网施工工艺
CN204898700U (zh) 一种桥梁基础结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant