CN202090007U - 用于高炉出铁沟挡渣坝的预制件 - Google Patents

用于高炉出铁沟挡渣坝的预制件 Download PDF

Info

Publication number
CN202090007U
CN202090007U CN2011201658674U CN201120165867U CN202090007U CN 202090007 U CN202090007 U CN 202090007U CN 2011201658674 U CN2011201658674 U CN 2011201658674U CN 201120165867 U CN201120165867 U CN 201120165867U CN 202090007 U CN202090007 U CN 202090007U
Authority
CN
China
Prior art keywords
dam
blast furnace
prefabricated member
prefabricated
part body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201658674U
Other languages
English (en)
Inventor
徐国涛
张洪雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Group Corp
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CN2011201658674U priority Critical patent/CN202090007U/zh
Application granted granted Critical
Publication of CN202090007U publication Critical patent/CN202090007U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Blast Furnaces (AREA)

Abstract

本实用新型涉及用于高炉出铁沟挡渣坝的预制件。其主要由预制件本体、预制件本体上的耐冲刷支撑体、预制件本体下端面上的过道模支撑件、预制件本体及耐冲刷支撑体上的增强件组成。本实用新型能提高主沟挡渣坝使用寿命,使用周期达到与主沟同步,从而减少了因为更换挡渣坝引起的休风等问题,对炉前作业有利,并能提高作业率,降低生产成本。

Description

用于高炉出铁沟挡渣坝的预制件
技术领域
本实用新型涉及高炉出铁沟,具体属于用于高炉出铁沟挡渣坝的预制件。
背景技术
高炉炼铁生产中,液体的铁水通过出铁沟流入铁水罐进入下道工序。一般的小型高炉不使用储铁式主沟,大、中型高炉使用储铁式主沟,铁水通过挡渣坝下的孔洞流出,沿铁沟进入铁水罐;在主沟中的液态渣被挡后进入渣沟流入渣处理装置。挡渣坝由于受铁水和渣的侵蚀及冲刷,成为高炉炉前作业中最容易被损坏的部位,为保证生产,需要及时更换,导致作业率下降,生产成本增加。曾经有人研究过采用活动的挡渣坝以解决问题,但存在更换很困难,且更换时间长的问题。
实用新型内容
本实用新型的目的在于克服上述不足,提供一种挡渣坝使用周期长,主沟与挡渣坝使用周期同步,降低炼铁生产成本的用于高炉出铁沟挡渣坝的预制件。
实现上述目的的技术措施:
用于高炉出铁沟挡渣坝的预制件,其主要由预制件本体、预制件本体上的耐冲刷支撑体、预制件本体下端面上的过道模支撑件、预制件本体及耐冲刷支撑体上的增强件组成。
其特征在于:耐冲刷支撑体为方形或倒梯形。
其特征在于:增强件由V形或Y形锚固件及固定V形或Y形锚固件的固定杆组成。
其特征在于:预制件本体上的耐冲刷支撑体至少为一个,多个时均匀分布。
本实用新型与现有技术相比,可以提高主沟挡渣坝使用寿命,使用周期达到与主沟同步,从而减少了因为更换挡渣坝引起的休风等问题,对炉前作业有利,并能提高作业率,降低生产成本。
附图说明
图1为本实用新型的结构示意图
图2为图1的A向结构示意图
图中:1-预制件本体,2-耐冲刷支撑体,3-过道模支撑件,4-增强件,5-固定杆,6-V形或Y形锚固件。
具体实施方式
下面结合附图做详尽描述:
用于高炉出铁沟挡渣坝的预制件:在预制件本体1上采用整体加工或焊接方式连接方形或倒梯形的耐冲刷支撑体2,也可根据预制件本体1的长度及耐冲刷支撑体2的使用材质强度,为保证使用的牢固性,增设1至2个耐冲刷支撑体2,并均匀分布;在预制件本体1下端面上采用整体加工或焊接过道模支撑件3,两个过道模支撑件3之间的间距为出铁沟处过道模的长度,使用时,过道模被卡在两个过道模支撑件3之间;在预制件本体1及耐冲刷支撑体2内埋设有金属增强件4;金属增强件4由金属固定杆5及焊接于金属固定杆5上的金属V形或Y形锚固件6组成。金属增强件4在预制件本体1及耐冲刷支撑体2内可以横向布局,也可以纵向布局,或横向与纵向交错布局,但不要露出预制件本体1及耐冲刷支撑体2浇注料面,以保持预制件本体1及耐冲刷支撑体2的表面平整。
本实用新型在主沟浇注前直接安装于过道模上,浇注主沟后,浇注料与本实用新型成为一个整体,进行烘烤,然后投入使用。

Claims (5)

1.用于高炉出铁沟挡渣坝的预制件,其特征在于:主要由预制件本体、预制件本体上的耐冲刷支撑体、预制件本体下端面上的过道模支撑件、预制件本体及耐冲刷支撑体上的增强件组成。
2.如权利要求1所述的用于高炉出铁沟挡渣坝的预制件,其特征在于:过道模支撑件之间的距离为过道模的长度。
3.如权利要求1所述的用于高炉出铁沟挡渣坝的预制件,其特征在于:耐冲刷支撑体为方形或倒梯形。
4.如权利要求1所述的用于高炉出铁沟挡渣坝的预制件,其特征在于:增强件由V形或Y形锚固件及固定V形或Y形锚固件的固定杆组成。
5.如权利要求1所述的用于高炉出铁沟挡渣坝的预制件,其特征在于:预制件本体上的耐冲刷支撑体至少为一个,多个时均匀分布。
CN2011201658674U 2011-05-23 2011-05-23 用于高炉出铁沟挡渣坝的预制件 Expired - Fee Related CN202090007U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201658674U CN202090007U (zh) 2011-05-23 2011-05-23 用于高炉出铁沟挡渣坝的预制件

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201658674U CN202090007U (zh) 2011-05-23 2011-05-23 用于高炉出铁沟挡渣坝的预制件

Publications (1)

Publication Number Publication Date
CN202090007U true CN202090007U (zh) 2011-12-28

Family

ID=45365088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201658674U Expired - Fee Related CN202090007U (zh) 2011-05-23 2011-05-23 用于高炉出铁沟挡渣坝的预制件

Country Status (1)

Country Link
CN (1) CN202090007U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106378442A (zh) * 2016-08-30 2017-02-08 洛阳利尔耐火材料有限公司 一种中间包挡渣墙的制备方法
CN107828926A (zh) * 2017-10-31 2018-03-23 马鞍山钢铁股份有限公司 一种大型高炉长期休风后复风初期渣铁分离方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106378442A (zh) * 2016-08-30 2017-02-08 洛阳利尔耐火材料有限公司 一种中间包挡渣墙的制备方法
CN107828926A (zh) * 2017-10-31 2018-03-23 马鞍山钢铁股份有限公司 一种大型高炉长期休风后复风初期渣铁分离方法

Similar Documents

Publication Publication Date Title
CN202845761U (zh) 一种高度净化钢液用新型中间包
CN203197232U (zh) 一种能有效减少钢包残留钢水量的钢包包底结构
CN205058277U (zh) 一种预制t梁钢筋胎具
CN202090007U (zh) 用于高炉出铁沟挡渣坝的预制件
CN203030854U (zh) 一种非直线型流钢通道
CN204529891U (zh) 高炉主铁沟大闸修补模具
CN203610667U (zh) 一种连铸钢水中间包稳流挡渣装置
CN202272893U (zh) 砂口挡渣板
CN106825529B (zh) 镍铁铸铁装置
CN205066463U (zh) 鼓风还原炉的冲渣溜槽
CN104525927A (zh) 一种具有导流水道的渣包
CN203495207U (zh) 一种方坯连铸中间包挡渣墙
CN204842866U (zh) 一种新型砂型浇口杯结构
CN204818042U (zh) 一种铁水扒渣板
CN202090006U (zh) 用于高炉出铁沟或渣沟沟口的预制件
CN208440657U (zh) 一种冲渣沟衬板
CN208701102U (zh) 一种耐冲刷的支铁沟
CN202701364U (zh) 一种长水口连铸中间包
CN203578742U (zh) 连铸中间包汇流旋涡抑制器及连铸中间包
CN204912739U (zh) 一种带有流线型侧壁的中间包装置
CN203356557U (zh) 上挠式中间罐
CN102921939B (zh) 一种铁水聚渣扒渣方法
CN111136252A (zh) 一种连铸中间包挡渣坝
CN203917899U (zh) 一种新型铁水罐罐嘴结构
CN204325395U (zh) 一种熔炉的主沟结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228

Termination date: 20160523