CN202039587U - Temporary platform for installing mating flange on steel chimney - Google Patents

Temporary platform for installing mating flange on steel chimney Download PDF

Info

Publication number
CN202039587U
CN202039587U CN2011200742696U CN201120074269U CN202039587U CN 202039587 U CN202039587 U CN 202039587U CN 2011200742696 U CN2011200742696 U CN 2011200742696U CN 201120074269 U CN201120074269 U CN 201120074269U CN 202039587 U CN202039587 U CN 202039587U
Authority
CN
China
Prior art keywords
platform
platform support
temporary
steel
pocket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200742696U
Other languages
Chinese (zh)
Inventor
王泳
王国翔
武奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU RAINBOW HUADING CHIMNEY MANUFACTURING CO LTD
Original Assignee
SUZHOU RAINBOW HUADING CHIMNEY MANUFACTURING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU RAINBOW HUADING CHIMNEY MANUFACTURING CO LTD filed Critical SUZHOU RAINBOW HUADING CHIMNEY MANUFACTURING CO LTD
Priority to CN2011200742696U priority Critical patent/CN202039587U/en
Application granted granted Critical
Publication of CN202039587U publication Critical patent/CN202039587U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a temporary platform for installing a mating flange on a steel chimney, at least three hook grooves are welded on the cylinder wall of the steel chimney, the hook grooves are connected to a platform support via flat steel hooks, the platform support is a triangular bracing frame, the lower end of the platform support is provided with a backing plate, a column is arranged in the side edge of the platform support, and a cord through hole is opened at the upper end of the column. The temporary platform provided connects the hook grooves and the platform to build up a simple platform, therefore, the temporary platform provided has the advantages of simple and convenient operation, recycling ability, repeatable use, installation cost saving, safety and reliability.

Description

The temporary platform that the steel stack abutted flange is installed
Technical field
The utility model relates to a kind of platform, relates in particular to the temporary platform that a kind of steel stack abutted flange is installed.
Background technology
The general segmentation manufacturing of steel stack is at present docked chimney in the air at height.Abutted flange is installed is generally adopted basket method, or scaffolding.There is potential safety hazard in basket method, and its inconvenient operation.The scaffold method can adopt concerning not high chimney, but inapplicable to higher chimney, and its cost of use is higher, and efficient is not high, and the restriction that is subjected to the space, place sometimes can not be used.
Summary of the invention
The purpose of this utility model is to overcome the deficiency that prior art exists, the temporary platform that provides a kind of steel stack abutted flange to install.
The purpose of this utility model is achieved through the following technical solutions:
The temporary platform that the steel stack abutted flange is installed, it is characterized in that: the barrel at steel stack is welded with 3 pocket for the punch heads at least, pocket for the punch head connects platform support by the band steel hook, platform support is a triangular support bracket, the lower end of platform support is provided with backing plate, the platform support side is provided with column, and the column upper end has the cotton rope perforation.
Further, the temporary platform that above-mentioned steel stack abutted flange is installed, wherein, described steel stack is welded with the safety collar fixed head, and the height of safe fixed head is higher than pocket for the punch head, and safe fixed head has safety collar.
The substantive distinguishing features of technical solutions of the utility model and progressive being mainly reflected in:
The utility model adopts to link to each other between pocket for the punch head and the platform and erects simple platform and make it simple to operate convenient again, and has recuperability, reusable great saving mounting cost, and the while is safe and reliable.
Description of drawings
Below in conjunction with accompanying drawing technical solutions of the utility model are described further:
Fig. 1: organigram of the present utility model;
Fig. 2: platform support structural representation of the present utility model.
The implication of each Reference numeral sees the following form among the figure.
Reference numeral Implication Reference numeral Implication Reference numeral Implication
1 Platform support 2 Plank 3 Pocket for the punch head
4 Safety collar 5 Safe fixed head 6 Backing plate
7 The cotton rope perforation 8 The band steel hook 9 Column
The specific embodiment
The temporary platform that the steel stack abutted flange is installed, as shown in Figure 1 and Figure 2, the tube of steel stack at least wall be welded with 3 pocket for the punch heads 3, pocket for the punch head 3 connects platform supports 1 by band steel hook 8, platform support 1 be a triangular support bracket, guarantees the firm of platform support 1; The lower end of platform support 1 is provided with backing plate 6, stablizes with the long-pending bigger assurance platform support 1 of barrel veneer of steel stack, and platform support 1 side is provided with column 9, and the column upper end has cotton rope perforation 7.
Steel stack is welded with safety collar fixed head 5, and the height of safe fixed head 5 is higher than pocket for the punch head 3 and safe fixed head 5 and has safety collar 4 safety when guaranteeing operations.
During concrete the application, the platform support of making 1 is hung on the pocket for the punch head 3 by band steel hook 8, and bolt on, crane is vertically sling this section chimney to come, under action of gravity, platform support 1 can vertically hang on the steel stack barrel, and its lower end backing plate 6 can be adjacent to the steel stack barrel, this moment, the operating personnel climbed to platform support 1 place by the cat ladder that is arranged on the steel stack, the plank 2 that loop wheel machine is hung up is laid on the platform support 1 successively, and the about 350mm of two platform support spacings places plank 2 along the circumferencial direction of steel stack, wherein a plank must ride on 3 three platform supports 1, and adjacent plank is overlapping.By cotton rope perforation 7 cotton rope is worn around platform again.Platform building finishes like this.The operating personnel hangs over the inherently safe band on the safety collar 4 and to get final product safety work when the platform support operation.The dismounting of end of operation rear platform, successively with plank, cotton rope, the platform support dismounting, personnel are finally got off by cat ladder.
The utility model adopts to link to each other between pocket for the punch head and the platform and erects simple platform and make it simple to operate convenient again, and has recuperability, reusable great saving mounting cost, and the while is safe and reliable.
It is emphasized that: above only is preferred embodiment of the present utility model, be not that the utility model is done any pro forma restriction, every foundation technical spirit of the present utility model all still belongs in the scope of technical solutions of the utility model any simple modification, equivalent variations and modification that above embodiment did.

Claims (2)

1. the steel stack abutted flange temporary platform of installing, it is characterized in that: the barrel at steel stack is welded with 3 pocket for the punch heads at least, pocket for the punch head connects platform support by the band steel hook, platform support is a triangular support bracket, the lower end of platform support is provided with backing plate, the platform support side is provided with column, and the column upper end has the cotton rope perforation.
2. the temporary platform that steel stack abutted flange according to claim 1 is installed, it is characterized in that: described steel stack is welded with the safety collar fixed head, and the height of safe fixed head is higher than pocket for the punch head, and safe fixed head has safety collar.
CN2011200742696U 2011-03-21 2011-03-21 Temporary platform for installing mating flange on steel chimney Expired - Fee Related CN202039587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200742696U CN202039587U (en) 2011-03-21 2011-03-21 Temporary platform for installing mating flange on steel chimney

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200742696U CN202039587U (en) 2011-03-21 2011-03-21 Temporary platform for installing mating flange on steel chimney

Publications (1)

Publication Number Publication Date
CN202039587U true CN202039587U (en) 2011-11-16

Family

ID=44967036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200742696U Expired - Fee Related CN202039587U (en) 2011-03-21 2011-03-21 Temporary platform for installing mating flange on steel chimney

Country Status (1)

Country Link
CN (1) CN202039587U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102889019A (en) * 2012-10-17 2013-01-23 国家电网公司 Steel pole for iron tower of high-tension transmission line
CN103470093A (en) * 2013-09-24 2013-12-25 中国二十二冶集团有限公司 Concrete chimney dismantling device and dismantling method
CN104032944A (en) * 2014-06-23 2014-09-10 山东电力建设第一工程公司 Suspension frame construction platform device
CN104032940A (en) * 2014-05-30 2014-09-10 江苏柏诚工程股份有限公司 Chimney flange work platform
CN106940358A (en) * 2017-02-24 2017-07-11 西安三翼航空科技有限公司 Unmanned plane chimney pollution thing monitors the fixing device of opium pipe feeler lever
CN107227838A (en) * 2016-03-25 2017-10-03 五冶集团上海有限公司 Simple hook temporary platform support and its application
CN107795185A (en) * 2016-08-29 2018-03-13 中国二十冶集团有限公司 Chimney reinforces pylon high-altitude installation node security construction method
CN111472533A (en) * 2020-03-04 2020-07-31 中国核工业华兴建设有限公司 Block detachable annular operation platform and construction method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102889019A (en) * 2012-10-17 2013-01-23 国家电网公司 Steel pole for iron tower of high-tension transmission line
CN103470093A (en) * 2013-09-24 2013-12-25 中国二十二冶集团有限公司 Concrete chimney dismantling device and dismantling method
CN103470093B (en) * 2013-09-24 2015-06-10 中国二十二冶集团有限公司 Concrete chimney dismantling method
CN104032940A (en) * 2014-05-30 2014-09-10 江苏柏诚工程股份有限公司 Chimney flange work platform
CN104032940B (en) * 2014-05-30 2016-08-31 柏诚工程股份有限公司 A kind of chimney flange job platform
CN104032944A (en) * 2014-06-23 2014-09-10 山东电力建设第一工程公司 Suspension frame construction platform device
CN107227838A (en) * 2016-03-25 2017-10-03 五冶集团上海有限公司 Simple hook temporary platform support and its application
CN107795185A (en) * 2016-08-29 2018-03-13 中国二十冶集团有限公司 Chimney reinforces pylon high-altitude installation node security construction method
CN106940358A (en) * 2017-02-24 2017-07-11 西安三翼航空科技有限公司 Unmanned plane chimney pollution thing monitors the fixing device of opium pipe feeler lever
CN111472533A (en) * 2020-03-04 2020-07-31 中国核工业华兴建设有限公司 Block detachable annular operation platform and construction method

Similar Documents

Publication Publication Date Title
CN202039587U (en) Temporary platform for installing mating flange on steel chimney
CN104196222A (en) Cantilever frame of tool type profile steel cantilever scaffold
CN201635379U (en) Safety platform for installation and construction of roof contour plate hang ceiling
CN103206074A (en) Elevator shaft template construction method, platform and support
CN201040922Y (en) Anti-slip hook for fixing and suspending scaffold
CN204960269U (en) Integral pylon
CN204299145U (en) For the operating platform that external climbing tower crane support frame is installed
CN203639011U (en) Safety climbing channel for sized tower crane for building engineering
CN205259628U (en) Pipe truss structure anchor clamps formula safety protective guard pole
CN204675672U (en) A kind of spliced tower crane service platform
CN204238537U (en) A kind of elevated hoistway operation platform
CN205742975U (en) A kind of direct plugging type scaffold
CN210239201U (en) Cart type elevator wellhead and hoistway protection device
CN208858135U (en) A kind of integral lifting construction of lift well job platform
CN110206331B (en) Trolley type elevator shaft mouth and well protection device and construction method
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN203437842U (en) Pipeline welding platform
CN201702544U (en) Variable-paddle bearing installing walking table of wind power generator
CN216766397U (en) Building curtain wall mounting structure
CN206784303U (en) A kind of hanging building foot guard repairing treatment suspension platform device
CN203514813U (en) Novel overhanging discharging platform
CN201924585U (en) Fixed device for reinforcing bottom of upright rod of suspension scaffold for building
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN203199938U (en) Combined hydraulic lifting operation platform
CN201495788U (en) Safety protecting net system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111116

Termination date: 20130321