CN202014474U - Fixing structure for greening planting box - Google Patents

Fixing structure for greening planting box Download PDF

Info

Publication number
CN202014474U
CN202014474U CN201120018885XU CN201120018885U CN202014474U CN 202014474 U CN202014474 U CN 202014474U CN 201120018885X U CN201120018885X U CN 201120018885XU CN 201120018885 U CN201120018885 U CN 201120018885U CN 202014474 U CN202014474 U CN 202014474U
Authority
CN
China
Prior art keywords
cultivation box
fixed
planting box
pin holes
planting technique
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120018885XU
Other languages
Chinese (zh)
Inventor
丁荣
黄敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN BOYI BUILDING ENGINEERING DESIGN Co Ltd
Original Assignee
SHENZHEN BOYI BUILDING ENGINEERING DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN BOYI BUILDING ENGINEERING DESIGN Co Ltd filed Critical SHENZHEN BOYI BUILDING ENGINEERING DESIGN Co Ltd
Priority to CN201120018885XU priority Critical patent/CN202014474U/en
Application granted granted Critical
Publication of CN202014474U publication Critical patent/CN202014474U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model provides a fixing structure for a greening planting box. The fixing structure comprises an embedded part (3), main keels (4), a plurality of pieces of flat steel (5) and a plurality of planting box brackets (6), wherein at least two main keels (4) are fixed on the embedded part (3) which is embedded in a building protective layer (2) in advance; the plurality of planting box brackets (6) are fixed between the adjacent main keels (4); the plurality of pieces of flat steel (5) are fixed between the adjacent planting box brackets (6); the bottom of a planting box (8) is borne on the flat steel (5); planting box fixing pin holes (9) are formed on the planting box (8); and the planting box (8) is fixed on the main keels (4) through connecting pieces passing through the planting box fixing pin holes (9). The fixing structure has the advantages of reasonable design, simple structure, simplicity and convenience in mounting, convenience in maintenance, overhaul and replacement, low construction cost, convenience and practicability, and can be fixed and used on vertical or inclined wall surfaces of facades of various low rise, multi-storey and middle and high rise buildings to achieve the purposes of improving the ratio of green space, beautifying the environment, and improving the heat-insulating property of the enclosure structure of a building.

Description

A kind of fixed structure of planting technique case
Technical field
The utility model is a kind of fixed structure of planting technique case, particularly a kind of galvanized steel skeleton system that is applicable to the vertical or sloping core face that is fixed on the outer facade of all kinds of low, many, middle-high buildings, be used to install the plastics cultivation box, vertical planting system and architectural image are combined closely, reach beautify, energy-conservation, the multiple action that purifies air.The renovation technique that belongs to the fixed structure of planting technique case.
Background technology
At present, the vertical planting system has become building energy conservation, has beautified the environment, improved the important means that local microclimate combines.But traditional vertical greening means are difficult to organically combine with architectural image, and existing finished product grass planting plate greening system exists cost height, system complex, problems such as later stage maintenance renewal cost height.Vertical planting is to the influence of architectural image, building all is in passive state to surperficial planting system, how existing vertical planting planting system becomes the essential element of elevation of building moulding, architectural image whether to the plantation growth of grass planting plate and safeguard provide rationally, economic and practical hsrdware requirements, do not obtain insider's attention.
The utility model content
The purpose of this utility model is to consider the problems referred to above and provides a kind of simple installation, the fixed structure of the planting technique case that maintains easily, overhauls and change.The utility model is reasonable in design, and is simple in structure, and cost is low, convenient and practical.
The technical solution of the utility model is: the fixed structure of planting technique case of the present utility model; include built-in fitting, main joist, band steel, cultivation box carriage; wherein at least two main joists are fixed on the built-in fitting (3) that is embedded in the building protection layer in advance; some cultivation box carriages are fixed between the adjacent main joist; some band steels are fixed between the adjacent cultivation box carriage; the bottom supporting of cultivation box is on band steel; and cultivation box is provided with the cultivation box fixed pin holes, and cultivation box is fixed on the main joist by the connector that passes the cultivation box fixed pin holes.
Also be provided with the cultivation box connecting hole on the above-mentioned cultivation box carriage, cultivation box can also be fixed on by the connector that passes the cultivation box connecting hole on the cultivation box carriage.
Above-mentioned building protection layer is laid in the civil engineering basic unit.
Be equipped with the automatic dripping irrigation pipeline on the above-mentioned main joist.
The above-mentioned connector that passes the connector of cultivation box connecting hole and pass the cultivation box fixed pin holes is bolt.
Above-mentioned building protection layer includes insulation water-proof layer and cracking-resistant cement mortar protective layer.
The utility model is owing to adopt the structure that includes built-in fitting, main joist, band steel, cultivation box carriage, and its simple installation maintains easily, overhauls and changes.The utility model is fixed on the vertical or sloping core face of the outer facade of all kinds of low, many, middle-high buildings and uses, and can reach the purpose that improves ratio of green space, beautifies the environment, improves the heat-proof quality of building maintenance structure.The utility model is a kind of reasonable in design, simple in structure, and cost is low, the fixed structure of convenient and practical planting technique case.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the end view of Fig. 1.
Embodiment
Embodiment:
Structural representation of the present utility model such as Fig. 1; shown in 2; the fixed structure of planting technique case of the present utility model; include built-in fitting 3; main joist 4; band steel 5; cultivation box carriage 6; wherein at least two main joists 4 are fixed on the built-in fitting 3 that is embedded in building protection layer 2 in advance; some cultivation box carriages 6 are fixed between the adjacent main joist 4; some band steels 5 are fixed between the adjacent cultivation box carriage 6; the bottom supporting of cultivation box 8 is on band steel 5; and cultivation box 8 is provided with cultivation box fixed pin holes 9, and cultivation box 8 is fixed on the main joist 4 by the connector that passes cultivation box fixed pin holes 9.Built-in fitting 3 should exceed civil engineering finished surface 100~150mm, is used to get rid of the infiltration of rainwater and cultivation box, and in conjunction with the access path of architectural image design vertical direction, spacing is preferably 3~5 meters, is used for safeguarding, maintenance and change cultivation box 8.
In the present embodiment, also be provided with cultivation box connecting hole 7 on the above-mentioned cultivation box carriage 6, cultivation box 8 can also be fixed on by the connector that passes cultivation box connecting hole 7 on the cultivation box carriage 6.
In the present embodiment, above-mentioned building protection layer 2 is laid in the civil engineering basic unit 1.Be equipped with the automatic dripping irrigation pipeline on the above-mentioned main joist 4.Above-mentioned building protection layer 2 includes insulation water-proof layer and cracking-resistant cement mortar protective layer.
In the present embodiment, the above-mentioned connector that passes the connector of cultivation box connecting hole 7 and pass cultivation box fixed pin holes 9 is bolt.
The utility model is a kind of building exterior wall face or oblique galvanized steel skeleton system of roofing of being fixed on, and is used to install the plastics cultivation box, and vertical planting system and architectural image are combined closely, reach beautify, energy-conservation, the multiple action that purifies air.Sequence of construction of the present utility model is: civil engineering basic unit 1 and built-in fitting 3 → insulation, waterproof, protective layer 2 → main joist 4 → cultivation box carriage 6 → installation cultivation box 8.
The utility model needs to implant more built-in fitting on the structural slab face, therefore should be cautiously to considering the influence of building insulating layer and watertight composition, recommend way for after finishing in the steel structure connecting member construction, the hard-foam polyurethane that spraying density is not less than 55kg/m is as insulation water-proof layer, and thickness is determined according to energy saving calculation.Or adopt polymer cement-based waterproof to film to add the way of thermal insulation mortar, should require select according to insulation, waterproof, the fireproof of concrete engineering.
The utility model should combine with cultivation box, access path and drip irrigation control system, solved the problem that vertical planting and architectural image organically combine, reduce the cost of vertical planting and the cost of later maintenance, take into account the influence that the roofing or the gradient are safeguarded vegetation pruning, irrigation technique has solved the maintenance problem of vegetation in the cultivation box simultaneously.The utility model is technical to can be used for vertical wall or oblique roofing, and from the growth that helps plant and the aspect of maintenance, recommending metope (roofing) angle is 20~60 degree.When the design building moulding, should should consider simultaneously to provide advantage to plant growing and maintenance.
The slope of roof of the application of the utility model in the project of International Conference Centre, Kweiyang is 60 degree, the plastics cultivation box is fixed on the roofing steel joist, drip irrigation system is laid along keel, constructed and finished, plant growth state is good, combine closely with architectural image and function of use, reached the target that improves ratio of green space, beautifies the environment, improves the heat-proof quality of building maintenance structure.

Claims (6)

1. the fixed structure of a planting technique case; it is characterized in that including built-in fitting (3); main joist (4); band steel (5); cultivation box carriage (6); wherein at least two main joists (4) are fixed on the built-in fitting (3) that is embedded in building protection layer (2) in advance; some cultivation box carriages (6) are fixed between the adjacent main joist (4); some band steels (5) are fixed between the adjacent cultivation box carriage (6); the bottom supporting of cultivation box (8) is on band steel (5); and cultivation box (8) is provided with cultivation box fixed pin holes (9), and cultivation box (8) is fixed on the main joist (4) by the connector that passes cultivation box fixed pin holes (9).
2. the fixed structure of planting technique case according to claim 1, it is characterized in that also being provided with on the above-mentioned cultivation box carriage (6) cultivation box connecting hole (7), cultivation box (8) can also be fixed on the cultivation box carriage (6) by the connector that passes cultivation box connecting hole (7).
3. the fixed structure of planting technique case according to claim 1 is characterized in that above-mentioned building protection layer (2) is laid in the civil engineering basic unit (1).
4. the fixed structure of planting technique case according to claim 1 is characterized in that being equipped with the automatic dripping irrigation pipeline on the above-mentioned main joist (4).
5. according to the fixed structure of each described planting technique case of claim 2 to 4, it is characterized in that the above-mentioned connector that passes the connector of cultivation box connecting hole (7) and pass cultivation box fixed pin holes (9) is bolt.
6. the fixed structure of planting technique case according to claim 5 is characterized in that above-mentioned building protection layer (2) includes insulation water-proof layer and cracking-resistant cement mortar protective layer.
CN201120018885XU 2011-01-20 2011-01-20 Fixing structure for greening planting box Expired - Fee Related CN202014474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120018885XU CN202014474U (en) 2011-01-20 2011-01-20 Fixing structure for greening planting box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120018885XU CN202014474U (en) 2011-01-20 2011-01-20 Fixing structure for greening planting box

Publications (1)

Publication Number Publication Date
CN202014474U true CN202014474U (en) 2011-10-26

Family

ID=44808154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120018885XU Expired - Fee Related CN202014474U (en) 2011-01-20 2011-01-20 Fixing structure for greening planting box

Country Status (1)

Country Link
CN (1) CN202014474U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105724226A (en) * 2016-04-12 2016-07-06 合肥学院 Water-saving building elevation greening structure and construction method
CN107691023A (en) * 2017-10-30 2018-02-16 苏州大学 One kind can quick-assembling into scape greening wall
CN109716958A (en) * 2019-01-30 2019-05-07 五冶集团上海有限公司 Fabricated ecology exterior wall
CN109757251A (en) * 2019-01-30 2019-05-17 五冶集团上海有限公司 Ecology external wall structure
CN109779072A (en) * 2019-01-30 2019-05-21 五冶集团上海有限公司 The construction method of ecology exterior wall
CN109779079A (en) * 2019-01-30 2019-05-21 五冶集团上海有限公司 The construction method of fabricated ecology exterior wall

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105724226A (en) * 2016-04-12 2016-07-06 合肥学院 Water-saving building elevation greening structure and construction method
CN107691023A (en) * 2017-10-30 2018-02-16 苏州大学 One kind can quick-assembling into scape greening wall
CN109716958A (en) * 2019-01-30 2019-05-07 五冶集团上海有限公司 Fabricated ecology exterior wall
CN109757251A (en) * 2019-01-30 2019-05-17 五冶集团上海有限公司 Ecology external wall structure
CN109779072A (en) * 2019-01-30 2019-05-21 五冶集团上海有限公司 The construction method of ecology exterior wall
CN109779079A (en) * 2019-01-30 2019-05-21 五冶集团上海有限公司 The construction method of fabricated ecology exterior wall

Similar Documents

Publication Publication Date Title
CN202014474U (en) Fixing structure for greening planting box
CN102505763B (en) Externally laid masonry composite heat-insulating sintered building block exterior wall heat insulating system
CN207499403U (en) A kind of FS composite thermal-insulating exterior formworks system
CN207878960U (en) A kind of construction material for installing high-strength durable fiber cloth or/and plastic film
CN201236412Y (en) Exterior wall external thermal insulation structure with built-in cast-in-place concrete mould plate
CN203174810U (en) Bearing-and-leaning type installed assembly wall body
CN104234256A (en) Energy-saving heat-insulating wall body
CN202787603U (en) Light-weight heat preservation house roof plate or floor plate
CN202340527U (en) Plastic-covered greenhouse for severe cold district
CN102900204A (en) Construction method of permeable roof system and permeable roof system as well as special construction member
CN104631650B (en) Screen plate outer wall with heat insulation layer and construction method
CN206205276U (en) A kind of bamboo roof structure
CN203008189U (en) Steel planting roof structure
CN205024919U (en) Roofing system
CN201991147U (en) Novel roof water-proof, heat insulation and flame-retardant decoration system
CN104420556A (en) Assembly type energy-saving wall
CN207484846U (en) A kind of modularization seaweed house roofing
CN206737161U (en) The mounting structure of external wall of house compound insulating material
CN204090621U (en) A kind of fabricated lightweight roof greening system
CN104115698A (en) Assembly type light roof greening system
CN105089148B (en) The lateral facade system in aluminium alloy house
CN204983133U (en) Balcony ground structure
CN204152074U (en) Combined wall board
CN207453175U (en) Assembled architecture outer wall structure
CN101603343A (en) A kind of heat-insulating water-proofing accessible steel roof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111026

Termination date: 20160120

CF01 Termination of patent right due to non-payment of annual fee