CN201991234U - Complete unit for high altitude construction in winter - Google Patents

Complete unit for high altitude construction in winter Download PDF

Info

Publication number
CN201991234U
CN201991234U CN2011200151658U CN201120015165U CN201991234U CN 201991234 U CN201991234 U CN 201991234U CN 2011200151658 U CN2011200151658 U CN 2011200151658U CN 201120015165 U CN201120015165 U CN 201120015165U CN 201991234 U CN201991234 U CN 201991234U
Authority
CN
China
Prior art keywords
brooder
winter
construction
group
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200151658U
Other languages
Chinese (zh)
Inventor
关荣财
王海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longjian Road and Bridge Co Ltd
Original Assignee
Longjian Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longjian Road and Bridge Co Ltd filed Critical Longjian Road and Bridge Co Ltd
Priority to CN2011200151658U priority Critical patent/CN201991234U/en
Application granted granted Critical
Publication of CN201991234U publication Critical patent/CN201991234U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A complete unit for high altitude construction in winter aims to solve the problem that the construction period in severe cold district in north china is short, the winter covers six months, and the temperature in winter is below minus 30 DEG C, however, a cable-stayed bridge main tower body requires long construction period. By adopting the high tower body winter-construction complete techniques, cross-year construction of the tower body is avoided. The complete unit comprises a strength steel skeleton (1), the strength steel skeleton is wrapped and connected with a movable greenhouse wall (2), a greenhouse roof (3) is arranged above the movable greenhouse wall, a hot air curtain (4) is mounted below the greenhouse roof, a hydraulic automatic creeping formwork device (5) is connected to the lower part of the movable greenhouse wall, and a group of steam pipes (6) and a group of warm water pipes (7) are mounted in the movable greenhouse wall (2). The complete unit is suitable for the bridge construction in severe cold district in north China in winter.

Description

High-altitude winter construction the complete sets of equipment
Technical field
Utility model relates to a kind of extremely frigid zones high tower pile winter construction the complete sets of equipment and method of being used for; Be specifically related to a kind of high-altitude winter construction the complete sets of equipment.
Background technology
Short in the northern China extremely frigid zones construction period, reach 6 months winter, and winter temperature is subzero below 30 ℃, cable stayed bridge king-tower body of the tower long construction period, and high tower body of the tower winter construction complete set technology is avoided the construction that straddles over year of body of the tower.
Summary of the invention
The purpose of utility model provides a kind of work that utilizes whole brooder to guarantee northern extremely frigid zones winter construction concreting.
Above-mentioned purpose realizes by following technical scheme:
A kind of high-altitude winter construction the complete sets of equipment, its composition comprises: the stiffness steel frame, described one group of stiffness steel frame wraps up mobile brooder wall all around, described mobile brooder wall top connects the brooder lid, one group of warm air curtain is equipped with in described brooder lid below, the automatic creeping formwork device of hydraulic pressure is equipped with in described mobile brooder wall bottom, and described mobile brooder is equipped with one group of steam comb and one group of warm water comb within the walls.
Described high-altitude winter construction the complete sets of equipment, described mobile brooder wall comprises template, and described template connects internal layer fire-retardant heat insulation plate, and described fire-retardant heat insulation plate connects air blanketing, described air blanketing connects outer fire-retardant heat insulation plate, and described outer fire-retardant heat insulation plate connects galvanized sheet iron.
Beneficial effect:
1. winter construction complete set technology in the utility model high-altitude has been avoided the construction that straddles over year of extremely frigid zones high tower pile.
The utility model can make brooder integral body climb; Rely on the hydraulic self-creeping formwork system, realize that the integral body of insulation brooder is climbed, reduced brooder and set up number of times, accelerated construction speed.
The utility model concrete temperature in construction is controlled according to technical requirements, adopts and is embedded in TEMP spare in the concrete in advance, and the timely monitor concrete temperature is adjusted greenhouse temperature.
The utility model adopts heat-insulating fireproof material as the canopy body, adds galvanized sheet iron, and is promptly windproof, fire-retardant again.
Insulation canopy temperature control of the present utility model provides thermal source by multiple modes such as steam comb, circulating hot water pipe, warm air curtains for the insulation canopy.
The utility model utilizes the hydraulic self-creeping formwork system to drive the whole lifting of brooder, reduces brooder and repeats to build number of times, has accelerated construction speed, has reduced construction cost.
Description of drawings:
Accompanying drawing 1 is the structural representation of this product.
The specific embodiment:
Embodiment 1:
A kind of high-altitude winter construction the complete sets of equipment, its composition comprises: stiffness steel frame 1, described one group of stiffness steel frame 1 all around wraps up and connects mobile brooder wall 2, described mobile brooder wall 2 tops connect brooder lid 3, described brooder covers 3 belows one group of warm air curtain 4 is housed, described mobile brooder wall 2 bottoms connect the automatic creeping formwork device 5 of hydraulic pressure, and one group of steam comb 6 and one group of warm water comb 7 are housed in the described mobile brooder wall 2.
Described high-altitude winter construction the complete sets of equipment, described mobile brooder wall 2 comprises template 8, described template 8 connects internal layer fire-retardant heat insulation plate 9, described fire-retardant heat insulation plate 9 connects air blanketing 10, described air blanketing 10 connects outer fire-retardant heat insulation plate 11, and described outer fire-retardant heat insulation plate 11 connects galvanized sheet iron 12.
Embodiment 2:
The method that the winter construction of a kind of high-altitude is complete, what will construct mobile brooder is set in the air, by brooder a construction sections is tightly wrapped up, bottom the exterior sheathing outside, brooder loam cake and internal mold, all adopt heat-insulating fireproof material to be incubated, adopt the circulating hot water pipe for connecing a batch concrete preheating, provide thermal source for brooder by steam comb, warm air curtain, circulating hot water pipe; After the construction of a construction sections is finished, utilize the automatic creeping formwork device of hydraulic pressure to drive brooder and upwards climb synchronously, begin the construction of next sections, until binding.
The method that the winter construction of described high-altitude is complete, described brooder integral body is climbed; Concrete temperature control described in the construction is determined according to designing requirement; 15-20 ℃ of temperature control in the described brooder.
Embodiment 3:
The method that above embodiment described high-altitude winter construction is complete, under ℃ condition of ambient temperature-25~-30, the movable brooder that the king-post construction adopts the fire-retardant heat insulation material to build, utilize the hydraulic self-creeping formwork system to drive the whole lifting of brooder, reduce brooder and repeat to build number of times, accelerate construction speed, reduced construction cost.Brooder adopts multiple modes such as steam comb, circulating hot water pipe, warm air curtain that thermal source is provided, and has satisfied the requirement of concreting in cold weather to environment temperature.Concrete mix, transport, build with health except that adopting effective insulation measure, also utilize the temperature pick up control technology, the timing monitoring concrete temperature is guaranteed the concreting in cold weather quality.Concrete king-post sections junction takes the method for The pre-heat treatment to guarantee the linkage section concrete quality.

Claims (2)

1. high-altitude winter construction the complete sets of equipment, its composition comprises: the stiffness steel frame, it is characterized in that: described one group of stiffness steel frame wraps up mobile brooder wall all around, described mobile brooder wall top connects the brooder lid, one group of warm air curtain is equipped with in described brooder lid below, the automatic creeping formwork device of hydraulic pressure is equipped with in described mobile brooder wall bottom, and described mobile brooder is equipped with one group of steam comb and one group of warm water comb within the walls.
2. winter construction the complete sets of equipment in high-altitude according to claim 1, it is characterized in that: described mobile brooder wall comprises template, described template connects internal layer fire-retardant heat insulation plate, described fire-retardant heat insulation plate connects air blanketing, described air blanketing connects outer fire-retardant heat insulation plate, and described outer fire-retardant heat insulation plate connects galvanized sheet iron.
CN2011200151658U 2011-01-18 2011-01-18 Complete unit for high altitude construction in winter Expired - Fee Related CN201991234U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200151658U CN201991234U (en) 2011-01-18 2011-01-18 Complete unit for high altitude construction in winter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200151658U CN201991234U (en) 2011-01-18 2011-01-18 Complete unit for high altitude construction in winter

Publications (1)

Publication Number Publication Date
CN201991234U true CN201991234U (en) 2011-09-28

Family

ID=44667723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200151658U Expired - Fee Related CN201991234U (en) 2011-01-18 2011-01-18 Complete unit for high altitude construction in winter

Country Status (1)

Country Link
CN (1) CN201991234U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102108678A (en) * 2011-01-18 2011-06-29 龙建路桥股份有限公司 High-altitude construction complete set device and method in winter
CN103225268A (en) * 2013-05-11 2013-07-31 中建六局土木工程有限公司 Winter construction method of bridge pier stud in extremely cold region
CN104400240A (en) * 2014-11-12 2015-03-11 中国十九冶集团有限公司南京分公司 Method for regulating welding construction environmental temperature in negative-temperature environment
CN108678400A (en) * 2018-06-11 2018-10-19 中建局集团建设发展有限公司 Automatic climbing brooder system in extremely frigid zones building structure and its construction method
CN110241739A (en) * 2019-06-28 2019-09-17 中铁七局集团有限公司 Hydraulic climbing formwork digital intelligent control platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102108678A (en) * 2011-01-18 2011-06-29 龙建路桥股份有限公司 High-altitude construction complete set device and method in winter
CN103225268A (en) * 2013-05-11 2013-07-31 中建六局土木工程有限公司 Winter construction method of bridge pier stud in extremely cold region
CN104400240A (en) * 2014-11-12 2015-03-11 中国十九冶集团有限公司南京分公司 Method for regulating welding construction environmental temperature in negative-temperature environment
CN108678400A (en) * 2018-06-11 2018-10-19 中建局集团建设发展有限公司 Automatic climbing brooder system in extremely frigid zones building structure and its construction method
CN108678400B (en) * 2018-06-11 2023-12-01 中建一局集团建设发展有限公司 Automatic climbing greenhouse system on building structure in alpine region and construction method thereof
CN110241739A (en) * 2019-06-28 2019-09-17 中铁七局集团有限公司 Hydraulic climbing formwork digital intelligent control platform

Similar Documents

Publication Publication Date Title
CN102108678B (en) High-altitude construction complete set device and method in winter
CN201991234U (en) Complete unit for high altitude construction in winter
CN205990776U (en) The complete mobile brooder of winter construction
CN103029208A (en) Novel intelligent automatic humidity and temperature kiln inside curing system and method for cement product
CN104652835A (en) Electric-tracing heat preservation method for winter construction of wet joint of composite beam
CN206289884U (en) A kind of heat insulation integrated light roof board of fabricated construction
CN201635205U (en) Spliced type heat-insulation template
CN103004525A (en) High-cold-area SF (scale factor) sunlight greenhouse
CN208183550U (en) A kind of pier body formwork of multilayer urethane insulation construction
CN105015101A (en) Heat preservation and insulation board and ecological mushroom house special for cultivating edible mushroom
CN205022094U (en) Special ecological mushroom room of heat preservation insulation panel and cultivating edible fungi
CN206999270U (en) Arid area low temperature season pier stud concrete heat-insulating health preserving equipment
CN208645645U (en) Precast concrete die station
CN202958310U (en) High cold region SF-type sunlight greenhouse
CN203045961U (en) Novel intelligent-automation cement product maintaining system in damp-and-hot kiln
CN206428875U (en) A kind of steel house ridge structure
CN103556764A (en) Self-balancing extra-large-area roof reservoir and building method thereof
CN102763577B (en) Dual-purpose demountable sunlight greenhouse used in winter and summer
CN203531205U (en) Self-balancing extra-large-area roof reservoir
CN205501838U (en) A wet system of accuse control by temperature change for making double -deck RPC steel longeron
CN103225268A (en) Winter construction method of bridge pier stud in extremely cold region
CN101509286B (en) Producing and installing technique for integral cement composite heat preserving external wall and matched panel spreading and applying machine
CN103437286A (en) Full-span box girder segmental prefabricating method applied to bridge construction
CN204090651U (en) Without column integral type double face sunlight greenhouse
WO2021089027A1 (en) Photovoltaic concrete precast panel having built-in energy storage tubes and thermal and acoustic insulation material core layer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20170118

CF01 Termination of patent right due to non-payment of annual fee