CN201971133U - Bottom-supported blower installation platform - Google Patents

Bottom-supported blower installation platform Download PDF

Info

Publication number
CN201971133U
CN201971133U CN2011200109078U CN201120010907U CN201971133U CN 201971133 U CN201971133 U CN 201971133U CN 2011200109078 U CN2011200109078 U CN 2011200109078U CN 201120010907 U CN201120010907 U CN 201120010907U CN 201971133 U CN201971133 U CN 201971133U
Authority
CN
China
Prior art keywords
erecting stage
platform body
main platform
blower fan
described main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200109078U
Other languages
Chinese (zh)
Inventor
胡安康
冯军
孙建
郭宇
张春涛
魏永
张睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China International Marine Containers Group Co Ltd
CIMC Ocean Engineering Design and Research Institute Co Ltd
Original Assignee
China International Marine Containers Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China International Marine Containers Group Co Ltd filed Critical China International Marine Containers Group Co Ltd
Priority to CN2011200109078U priority Critical patent/CN201971133U/en
Application granted granted Critical
Publication of CN201971133U publication Critical patent/CN201971133U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

A bottom-supported blower installation platform comprises a platform main body for loading blower equipment, a plurality of positioning poles for positioning the installation platform through plugging into the sea bottom, a living building, a crane for hoisting the blower equipment, and a surrounding pole bracket for fixing a blower seat. The living building is arranged in the middle of one end of the platform main body, the crane is positioned in the center of the other end of the platform main body, and the surrounding pole bracket is arranged on the edge of the other end of the platform main body and protrudes out of the other end of the platform main body. After the bottom-supported blower installation platform is applied to use, single-tube piles and pile pressing equipment are utilized at first, the single-tube piles are beat into the sea bottom in targeted sites, and then the blower set is hoisted by piece. The groundwork and the installation are combined into one, so that the operation is simplified, the risks are reduced, and the cost is reduced.

Description

Bottom-sitting type blower fan erecting stage
Technical field
The utility model relates to a kind of blower fan erecting stage, refers to a kind of bottom-sitting type blower fan erecting stage especially.
Background technology
Method in common is to surround well after adopting pile-driving barge to beat a clump of piles earlier in the marine wind electric field construction, mixes the earth pedestal with mixing the pouring of earth mixer ship again, adopts the crane ship handling that the wind-powered electricity generation unit is installed then.Also there is employing to dive to refute and is mounted to a whole set of blower fan group in advance, and after reinforcing, drag, adopt the crane ship that hangs height, big lift heavy (500-1000 ton) greatly the whole series blower fan group to hang on pedestal again toward target bit half.Many ships work compound, personnel are many, interference is big, cost is high, and big lift heavy operational risk is big, and shallow water along the coast argosy can't enter.
The utility model content
The technical problems to be solved in the utility model is to overcome the deficiency that above-mentioned prior art exists, and a kind of bottom-sitting type blower fan erecting stage is provided, and it simplifies the operation, reduces risks, cost-cutting.
For solving the problems of the technologies described above, the utility model provides a kind of bottom-sitting type blower fan erecting stage, described erecting stage comprises that one can and be arranged on some in order to insert the work pile that the seabed is described erecting stage location on the described main platform body in order to the main platform body of carrying Fan Equipment, the 1st life building, one can be in order to the fixing pile holding frame of blower fan pedestal in order to the hoisting crane of lifting fan equipment and, described life building is arranged on the central position of an end of described main platform body, described hoisting crane is positioned at the central position of the other end of described main platform body, and described pile holding frame is arranged on the edge of the other end of described main platform body and protruding in the other end of described main platform body.
Further, described main platform body comprise be provided with both sides, described life building and away from the end at described hoisting crane place, can be in order to the deck and the fixed mechanism of carrying Fan Equipment.
Further, described erecting stage comprises three work piles, and wherein two work piles side place, another work pile of being arranged on the described hoisting crane of being positioned at of described main platform body both sides is arranged on the central position by described hoisting crane one end that is positioned at described life building of described main platform body.
Further, described main platform body is the single deck box-structure with local Double bottom layer, in order to carrying relevant device and tank.
Further, described erecting stage also comprises some described main platform body positioning anchors on every side that are positioned at, and described positioning anchor is used for the location of temporarily berthing.
Further, described erecting stage comprises that also one is positioned at the life boat of described main platform body side, and described life boat is used for emergency escape.
Further, described hoisting crane is that maximum hoisting weight is 300 tons a full circle swinging hoisting crane.
Further, the bearing capacity of described erecting stage is 450 tons.
Useful technique effect of the present utility model is: this platform can carry single tube stake and piling equipment earlier after implementing, and in target bit the seabed is squeezed in the single tube stake in advance, implements the lifting of wind-powered electricity generation unit bulk-breaking then.So collect foundation work and be installed on one, simplified operation, reduced risk, also reduced cost.
Description of drawings
Fig. 1 is the lateral plan of master layout of the better embodiment of the utility model bottom-sitting type blower fan erecting stage.
Fig. 2 is the main deck birds-eye view of master layout of the better embodiment of the utility model bottom-sitting type blower fan erecting stage.
The specific embodiment
Please consult Fig. 1 and Fig. 2 simultaneously, the better embodiment of the utility model bottom-sitting type blower fan erecting stage is non-from boat, square chest type, the steel that the bow stern is oblique, full welding, single deck maritime works workboat.Adopt anchoring to add and help the stake location, have the end of seat function.Be suitable in the depth of water 0~5m waters and carry out blower foundation operation and the erection work of blower fan unit.
Described erecting stage comprises a work pile 1, a main platform body 2, a life building 3, a life boat 4, a positioning anchor 5, a pile holding frame 6 and a hoisting crane 7.Described work pile 1 can insert the seabed, for platform provides a metastable operating environment.Adopt pile up and down each two pulley and piling winch by the rising of assembly pulley operation side or press down.Described main platform body 2 is a single deck box type construction at the bottom of having local double layer, is used to carry tanks such as relevant device and fuel oil tank, fresh water tank, provides job platform on the floating water surface.Described life building 3 also is the main region of control platform for the staff inhabitation place of living.Described life boat 4 is an emergency escape equipment.Described positioning anchor 5 is used for the location of temporarily berthing.Fixing blower fan pedestal when described pile holding frame 6 is used to drive piles guarantees squareness.Described hoisting crane 7 is used for the lifting of fan part and pedestal, 300 tons of maximum hoisting weights.Described hoisting crane 7 is that maximum hoisting weight is 300 tons a full circle swinging hoisting crane.
Described life building 3 and described hoisting crane 7 are positioned at the two ends of described main platform body 2.Described pile holding frame 6 contiguous described hoisting cranes 7.Described pile holding frame 6 stretches out an end of described main platform body 2.Described hoisting crane 7 is positioned at the medium position place of described main platform body 2 one ends.Described positioning anchor 5 be positioned at described main platform body 2 around.Described life boat 4 is positioned at the side of described main platform body 2.
The main yardstick of described erecting stage is: captain L 68.4m, molded breadth B 36.0m, moldeed depth D 4.5m, operation Mean Draft Td~1.8m, scantling draft Ts 2.0m, deck house floor height 2.8m, camber 0.2m(main deck), rib is apart from 0.6m.Among the personnel: crewman 20 people, endurance 15 days, 4 of single rooms, 8 of double rooms all contain sanitary unit.Carrying capacity is: a cover 3MW blower fan unit (about 450t) or two 40m are long, the single tube stake of diameter 5m (about 450t).Environmental parameters is: ambient temperature-10 ℃ ~+35 ℃; Normal operation: wind≤10.7m/s (6 grades of Pu Shi), ocean current≤2kn has adopted wave height≤1m; Stay where one is, pending further orders: wind≤13.8m/s (7 grades of Pu Shi), ocean current≤2kn has adopted wave height≤1.5m; Dispatch wind sheltering: wind>13.8m/s (Pu Shi is more than 7 grades).
The better embodiment of the utility model bottom-sitting type blower fan erecting stage adopts anchoring, helps machinery and equipment such as stake, pile holding, hoisting crane, on platform, properly arrange and arrangement, make that platform floading condition when operation is suitable, intensity is enough, stability buoyancy is appropriate, working area is abundant, safety of operation, convenience.
This platform can carry single tube stake and piling equipment earlier after implementing, and in target bit the seabed is squeezed in the single tube stake in advance, implements the lifting of wind-powered electricity generation unit bulk-breaking then.So collect foundation work and be installed on one, simplified operation, reduced risk, also reduced cost.
This ship type is non-from boat, square chest type single deck maritime works job platform, adopts anchoring to add three and helps the stake location, has the end of seat function, and 300 tons of ocean hoisting cranes of full circle swinging are set.Applicable to coastal and beach, carry out wind energy turbine set basis operation and wind-powered electricity generation unit installation exercise in the depth of water 0-5 rice waters.
This flat-bed adopts and can make many types of auxiliary vessel commonly used in present such engineering concentrate the form of construction work of operation to simplify, and has reduced operating cost, has also increased operational security.
The above only is a preferable possible embodiments of the present utility model, and unrestricted protection domain of the present utility model, and the equivalent structure that all utilization the utility model specification sheetss and accompanying drawing content have been done changes, and all is included in the protection domain of the present utility model.

Claims (8)

1. bottom-sitting type blower fan erecting stage, it is characterized in that: described erecting stage comprises that one can and be arranged on some in order to insert the work pile that the seabed is described erecting stage location on the described main platform body in order to the main platform body of carrying Fan Equipment, the 1st life building, one can be in order to the fixing pile holding frame of blower fan pedestal in order to the hoisting crane of lifting fan equipment and, described life building is arranged on the central position of an end of described main platform body, described hoisting crane is positioned at the central position of the other end of described main platform body, and described pile holding frame is arranged on the edge of the other end of described main platform body and protruding in the other end of described main platform body.
2. bottom-sitting type blower fan erecting stage as claimed in claim 1 is characterized in that, described main platform body comprise be provided with both sides, described life building and away from the end at described hoisting crane place, can be in order to the deck and the fixed mechanism of carrying Fan Equipment.
3. bottom-sitting type blower fan erecting stage as claimed in claim 1, it is characterized in that, described erecting stage comprises three work piles, and wherein two work piles side place, another work pile of being arranged on the described hoisting crane of being positioned at of described main platform body both sides is arranged on the central position by described hoisting crane one end that is positioned at described life building of described main platform body.
4. bottom-sitting type blower fan erecting stage as claimed in claim 1 is characterized in that, described main platform body is the single deck box-structure with local Double bottom layer, in order to carrying relevant device and tank.
5. bottom-sitting type blower fan erecting stage as claimed in claim 1 is characterized in that, described erecting stage also comprises some described main platform body positioning anchors on every side that are positioned at, and described positioning anchor is used for the location of temporarily berthing.
6. bottom-sitting type blower fan erecting stage as claimed in claim 1 is characterized in that, described erecting stage comprises that also one is positioned at the life boat of described main platform body side, and described life boat is used for emergency escape.
7. bottom-sitting type blower fan erecting stage as claimed in claim 1 is characterized in that, described hoisting crane is that maximum hoisting weight is 300 tons a full circle swinging hoisting crane.
8. bottom-sitting type blower fan erecting stage as claimed in claim 1 is characterized in that the bearing capacity of described erecting stage is 450 tons.
CN2011200109078U 2011-01-14 2011-01-14 Bottom-supported blower installation platform Expired - Fee Related CN201971133U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200109078U CN201971133U (en) 2011-01-14 2011-01-14 Bottom-supported blower installation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200109078U CN201971133U (en) 2011-01-14 2011-01-14 Bottom-supported blower installation platform

Publications (1)

Publication Number Publication Date
CN201971133U true CN201971133U (en) 2011-09-14

Family

ID=44576237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200109078U Expired - Fee Related CN201971133U (en) 2011-01-14 2011-01-14 Bottom-supported blower installation platform

Country Status (1)

Country Link
CN (1) CN201971133U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102514690A (en) * 2012-01-09 2012-06-27 广东华尔辰海上风电工程有限责任公司 Multifunctional twin-hull wind power engineering ship for offshore high-altitude heavy-duty lifting installation operation
CN102587340A (en) * 2011-01-14 2012-07-18 中国国际海运集装箱(集团)股份有限公司 Installation platform of bottom-supported fan and method for installing fan equipment
CN103981846A (en) * 2014-05-15 2014-08-13 上海交通大学 Pile positioning semi-submersible offshore dredging engineering ship
CN105253249A (en) * 2015-10-23 2016-01-20 上海船舶研究设计院 Novel superstructure-cabin structure of vessel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587340A (en) * 2011-01-14 2012-07-18 中国国际海运集装箱(集团)股份有限公司 Installation platform of bottom-supported fan and method for installing fan equipment
CN102514690A (en) * 2012-01-09 2012-06-27 广东华尔辰海上风电工程有限责任公司 Multifunctional twin-hull wind power engineering ship for offshore high-altitude heavy-duty lifting installation operation
CN103981846A (en) * 2014-05-15 2014-08-13 上海交通大学 Pile positioning semi-submersible offshore dredging engineering ship
CN105253249A (en) * 2015-10-23 2016-01-20 上海船舶研究设计院 Novel superstructure-cabin structure of vessel

Similar Documents

Publication Publication Date Title
CN101538844B (en) Construction method for building large-scale offshore wind farm with depth more than 2m
CN101565091B (en) Installation equipment of above-water wind generator and construction method thereof
CN101774422B (en) Novel offshore installation construction resource-combined type pontoon barge
JP2004001750A (en) Special working ship and execution method for offshore structure
EP2724021A1 (en) A self-propelled offshore wind farm installation vessel, and method of installation used in the construction of an offshore wind turbine farm
CN111469993A (en) Self-installation floating type fan foundation anchored by bucket foundation and self-installation method
CN108284923A (en) A kind of hybrid offshore wind farm buoyant foundations partly latent-Spar
CN201268389Y (en) Multifunctional construction platform
CN104627331A (en) Wind power generation floating foundation
CN201971133U (en) Bottom-supported blower installation platform
CN105752282A (en) Self-elevating wind power generation work boat
CN103661827A (en) Installation system and construction method of wind turbine assembly in sea intertidal zone
CN103979081B (en) The marine buoyant wind machine integral installation workboat of deep drinking water
CN110217346B (en) Method for towing offshore wind power installation vessel based on multi-point anchoring and positioning system
CN102556292A (en) Self-propelled marine wind-power engineering operation boat capable of operating by sitting on sea bed
CN102587340A (en) Installation platform of bottom-supported fan and method for installing fan equipment
CN102337746B (en) Installation and construction method of offshore wind power generation tower foundation and structure
CN108018841A (en) Mobile ocean pasture device
CN201914862U (en) Self-rising fan mounting platform
CN212243734U (en) Self-installation floating type fan foundation anchored by bucket foundation
CN201530464U (en) Special diving barge for installing shallow water wind power generating set
CN203095441U (en) Combined floating crane for mud flats
CN201745721U (en) Special installation vessel for marine intertidal wind power generating set
CN102050198A (en) Split installation process of submerged barge seat of wind driven generator in shallow water
KR101297669B1 (en) Installation method using vessel for installing sea wind power generator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) LTD.

Effective date: 20120719

Owner name: CIMC SHIP MARINE ENGINEERING DESIGN RESEARCH INSTI

Free format text: FORMER OWNER: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) LTD.

Effective date: 20120719

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518000 SHENZHEN, GUANGDONG PROVINCE TO: 201000 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20120719

Address after: 201000, Shanghai, Pudong New Area new Jinqiao Road, No. 10, building 27, building 2

Co-patentee after: Chinese International Marine Container (Group) Co., Ltd.

Patentee after: CIMC Ship Ocean Engineering Design and Research Institute Co., Ltd.

Address before: No. 2 Shekou Harbour Road in Shenzhen city of Guangdong Province in 518000

Patentee before: Chinese International Marine Container (Group) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110914

Termination date: 20190114

CF01 Termination of patent right due to non-payment of annual fee