CN103661827A - Installation system and construction method of wind turbine assembly in sea intertidal zone - Google Patents
Installation system and construction method of wind turbine assembly in sea intertidal zone Download PDFInfo
- Publication number
- CN103661827A CN103661827A CN201310749409.9A CN201310749409A CN103661827A CN 103661827 A CN103661827 A CN 103661827A CN 201310749409 A CN201310749409 A CN 201310749409A CN 103661827 A CN103661827 A CN 103661827A
- Authority
- CN
- China
- Prior art keywords
- job platform
- pile
- blower fan
- crawler crane
- intertidal zone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to an installation system and construction method of a wind turbine assembly in a sea intertidal zone. The installation system comprises an operation platform and a crawling crane, wherein the operation platform can float, move and be docked on the sea and can also be set on a muddy surface of a beach to carry out construction operation. The construction method includes the steps that when a tide rises, the operation platform is moved and docked through a tug, and a pile transporting boat is docked; when the tide falls, the operation platform is set on the beach, and steel pipe piles are craned by the crawling crane to sink; when the tide rises, the operation platform is moved and docked, and the pile transporting boat carries wind turbine equipment and then is berthed; when the tide falls, the operation platform is set on the beach, and the whole wind turbine assembly is craned by the crawling crane to be installed. The installation system and construction method of the wind turbine assembly in the sea intertidal zone have the advantages that the operation platform does not need to be leveled by adding ballast water when in a floating state, and the depth of immersion is smaller than 1.6m; the operation platform can be set on the muddy surface of the beach to carry out construction, and the 1000t crawling crane is carried by the operation platform and can move on the operation platform and be used for large-diameter steel pipe pile sinking operation and wind turbine separate installation; the problem that large ships can not run into a shallow intertidal zone to carry out construction is solved.
Description
Technical field
The invention belongs to offshore construction method, relate in particular to blower fan assembly installation system and the construction method thereof in region, a kind of marine intertidal zone.
Background technology
Under the combineds action such as high wind load, alluvion load, stream load, marine corrosion, it is large more than the technical risk of land that marine wind electric field fan is built, complex structure, and cost is high.
At present offshore wind turbine foundation type mainly contains: gravity type foundation, single pile type foundation, tripod type basis, jacket-type are basic, buoyant foundation.Wherein single pile type foundation has and manufactures simply, and without arranging sea bed, to landform strong adaptability, the advantage such as construct quick is most widely used in blower foundation.The type basis adopts the large diameter steel pipe pile of diameter 3~5m, after pile sinking, on stake top, fixes transition phase, blower fan pylon can be installed on it.But the type foundation construction needs large-scale sinking apparatus, as large-scale crane ship etc., its drinking water is generally larger, conventionally more than 2.5m.Simultaneously Fan Equipment size is generally larger, the high about 100m of blower fan tower barrel, and fan blade length is generally in 40~50m left and right, so the transportation of Fan Equipment, installs and also need large ship.Current at sea intertidal zone or offshore region of wind energy turbine set operated by rotary motion, the depth of water is more shallow, the large ship constructional difficulties of marching into the arena.And when the depth of water is less than 2m, the construction of cannot marching into the arena of existing traditional construction ship, has limited applying of offshore wind turbine greatly.
China is carrying out large-scale offshore wind farm exploitation, in the urgent need to developing according to offshore condition, is applicable to the special construction apparatus of wind power construction feature and new execution of work thereof, for the sustainable development of China's offshore wind farm industry provides support.
Summary of the invention
The object of the invention is to overcome the deficiency of above-mentioned technology, and provide a kind of, be especially suitable for the construction operation of assembling that the depth of water is less than the region, marine intertidal zone of 1.6m.On special operation platform, can carry 1000t crawler crane and carry out the installation exercise that large diameter steel pipe sunk pile and Fan Equipment are divided body component.
The present invention for achieving the above object, by the following technical solutions: the blower fan assembly installation system in region, a kind of marine intertidal zone, comprise that floating movement at sea stays position, can directly drop on again job platform and the crawler crane of construction operation on the mud face of seabeach, described job platform consists of the truss structure anyhow welding, and the area of described job platform is 2000~8000m
2described crawler crane is at job platform superior displacement, described job platform middle part is provided with crawler crane anchor fitting, described job platform carries crawler crane gage under floating condition and is less than 1.5-1.6m, described job platform is provided with piling saddle, described piling saddle consists of steel structure truss, and its top is provided with jack.
Described job platform periphery is provided with the anti-collision rubber fender that can stop other boats and ships.
Described crawler crane rated load weight is 500t~1000t.
Described job platform is provided with lifting means, and described lifting means is connected with the work pile of fixed operation platform.
Height 10~the 20m of described piling saddle.
Four jiaos of described job platforms are equipped with winch, and described winch is connected with anchor.
Described job platform is equipped with generator set and office life room.
The blower fan assembly construction method in region, described marine intertidal zone, is characterized in that: concrete steps are as follows:
One, at the incoming tide, when water level meets the requirement of job platform draft, utilizing tugboat that job platform is moved to the rough position of staying, place, injection stake position casts anchor, then by folding and unfolding anchor hawser, realize and accurately stay position, move ship time in position, crawler crane is positioned at job platform middle part, utilizes anchor fitting to fix, to guarantee mooring stability; After accurately staying position, work pile is inserted in mud, guarantee that hull is steady; Pile transport ship is stayed to position and rest in job platform one side, by hawser, pile transport ship and job platform are fixed;
Two, on the ebb time, when job platform is sat behind beach, the 1000t crawler crane carrying on it moves near pile transport ship, lifting large diameter steel pipe pile, then steel pipe pile is inserted in the piling saddle on job platform, jack pair stake by saddle top is finely tuned, when the squareness of stake meets standard and designing requirement, transfer suspension hook and make stake from sinking to mud, when stake from sink to mud stable after, crawler crane is packed up suspension hook, lifting drive hammer, carries out pile sinking operation, when stake top is beaten to design elevation, unload drive hammer, pile sinking is complete;
Three, at the incoming tide, when water level meets the requirement of job platform draft, by tugboat towing operation platform, move ship and stay position, to carry out next step Fan Equipment installation, pile transport ship returns to still alongside in job platform one side after loading Fan Equipment;
Four, on the ebb time, when job platform is sat behind beach, the 1000t crawler crane carrying on it moves near pile transport ship, first carrying out the lifting of foundation pile connecting cylinder installs, by grouting or welding manner, it is connected with steel pipe pile foundation, carry out again the installation of blower fan tower barrel, then on job platform by the as a whole blower fan assembly that is assembled in fan blade, wheel hub, cabin, finally by the crawler crane integral body blower fan assembly of slinging, be arranged on blower fan tower barrel, so far Fan Equipment installs.
Beneficial effect: compared with prior art, need not use the leveling of pressurized compartment water under operation platform floating condition, drinking water is less than 1.6m; Can be seated on the mud face of seabeach and construct, be equipped with 1000t crawler crane, can on platform, move and carry out the operation of large diameter steel pipe sunk pile, blower fan partial installation operation.Need not pressurized compartment water under operation platform floating condition, drinking water is less than 1.6m, can be seated on the mud face of seabeach and construct.Especially be suitable for the depth of water and be less than region, the marine intertidal zone blower fan construction operation of 1.6m, solved the depth of water more shallow, cannot the march into the arena difficult problem of construction of large ship.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is pile transport ship alongside schematic diagram;
Fig. 3 carries out large diameter steel pipe sunk pile operation schematic diagram;
Fig. 4 carries out assembling operation schematic diagram.
In figure: 1, job platform, 2, piling saddle, 3, work pile level lifting means, 4, winch, 5, anchor, 6, generator set, 7, office life room, 8, crawler crane, 9, steel pipe pile, 10, pile transport ship, 11, blower fan assembly.
The specific embodiment
Below in conjunction with preferred embodiment, describe the specific embodiment of the present invention in detail.
Refer to accompanying drawing 1-4, compared with prior art, the invention provides the blower fan assembly installation system in region, a kind of marine intertidal zone, comprise that job platform 1 and crawler crane 8 have formed blower fan construction system, job platform consists of the truss structure anyhow welding, and the area of job platform is 2000~8000m
2crawler crane is in the operation of job platform superior displacement, job platform at sea floating movement is stayed position, also can directly be seated on the mud face of seabeach and carry out construction operation, described job platform middle part is provided with crawler crane anchor fitting (not shown), and anchor fitting plays indication crawler crane stop position and fixation.When floating condition, crawler crane moves to platform middle part, utilizes anchor fitting to fix, and to guarantee that platform steadily moves, anchor fitting adopts frame cushion block, or ground locking-type folds the conventional fixedly devices of car such as positioning plate.Described job platform carries crawler crane gage under floating condition and is less than 1.5-1.6m, described job platform carries after crawler crane, directly sinking is carried out construction operation on the mud face of seabeach, also the floating construction operation that carries out at sea, under floating condition, gage is less than 1.6m.The structural strengthening of described job platform regional area, can meet crawler crane mobile construction operation that carries out in regulation region.Described job platform periphery is provided with anti-collision rubber fender, can stop other boats and ships.Described crawler crane rated load weight is 500t~1000t, can move above deck and operation.Described job platform is provided with piling saddle 2, and high 10~20m, consists of steel structure truss, and top is provided with jack.Described job platform is provided with work pile and lifting means 3, and work pile can sink to inserting mud face, adopts work pile fixed operation platform when platform is sat beach.Described job platform is provided with winch 4 and anchor 5, and fixed operation platform can cast anchor when floating condition.Described job platform is provided with generator set 6, so that be equipment availability and the personnel life power supply of handling official business, platform is provided with office room 7 for life.Job platform is rectangle, long 90m, and wide 50m, moldeed depth 4m, drinking water 1.5m, crawler crane moving area structure truss adopts close rib design, and rib spacing is 0.4m.Platform is provided with a set of piling saddle, and high 15m, consists of steel pipe truss, and shape of cross section is " mouth " font, and a side can folding, and four limits, top are equipped with jack.Job platform is equipped with two cover work pile and lifting means, is positioned at piling saddle one side; Be equipped with quadruplet winch and anchor, be positioned at four jiaos, platform.When job platform carries after crawler crane, job platform can directly be seated on the mud face of seabeach and carry out construction operation, and also at sea floating movement stayed position.Job platform carries crawler crane and moves time in position, and crawler crane is positioned in the middle part of platform, need not the leveling of pressurized compartment water, and under floating condition, gage is less than 1.6m.The structural strengthening of described job platform regional area, can meet crawler crane mobile construction operation that carries out in regulation region.
The blower fan assembly construction method in region, described marine intertidal zone, concrete steps are as follows:
One, at the incoming tide, when water level meets the requirement of job platform draft, utilizing tugboat that job platform is moved to the rough position of staying, place, injection stake position casts anchor, then by folding and unfolding anchor hawser, realize and accurately stay position, move ship time in position, crawler crane is positioned at job platform middle part, utilizes anchor fitting to fix, to guarantee mooring stability; After accurately staying position, work pile is inserted in mud, guarantee that hull is steady; Pile transport ship is stayed to position and rest in job platform one side, by hawser, pile transport ship 10 and job platform are fixed;
Two, on the ebb time, when job platform is sat behind beach, the 1000t crawler crane carrying on it moves near pile transport ship, lifting large diameter steel pipe pile 9, then steel pipe pile is inserted in the piling saddle on job platform, jack pair stake by saddle top is finely tuned, when the squareness of stake meets standard and designing requirement, transfer suspension hook and make stake from sinking to mud, when stake from sink to mud stable after, crawler crane is packed up suspension hook, lifting drive hammer, carries out pile sinking operation, when stake top is beaten to design elevation, unload drive hammer, pile sinking is complete;
Three, at the incoming tide, when water level meets the requirement of job platform draft, by tugboat towing operation platform, move ship and stay position, to carry out next step Fan Equipment installation, pile transport ship returns to still alongside in job platform one side after loading Fan Equipment;
Four, on the ebb time, when job platform is sat behind beach, the 1000t crawler crane carrying on it moves near pile transport ship, first carrying out the lifting of foundation pile connecting cylinder installs, by grouting or welding manner, it is connected with steel pipe pile foundation, carry out again the installation of blower fan tower barrel, then on job platform by the as a whole blower fan assembly that is assembled in fan blade, wheel hub, cabin, finally by the crawler crane integral body blower fan assembly 11 of slinging, be arranged on blower fan tower barrel, so far Fan Equipment installs.
The above, be only preferred embodiment of the present invention, not structure of the present invention done to any pro forma restriction.Any simple modification, equivalent variations and modification that every foundation technical spirit of the present invention is done above embodiment, all still belong in the scope of technical scheme of the present invention.
Claims (8)
1. the blower fan assembly installation system in region, a marine intertidal zone, comprise that floating movement at sea stays position, can directly drop on again job platform and the crawler crane of construction operation on the mud face of seabeach, described job platform consists of the truss structure anyhow welding, and the area of described job platform is 2000~8000m
2described crawler crane is at job platform superior displacement, described job platform middle part is provided with crawler crane anchor fitting, described job platform carries crawler crane gage under floating condition and is less than 1.5-1.6m, described job platform is provided with piling saddle, described piling saddle consists of steel structure truss, and its top is provided with jack.
2. the blower fan assembly installation system in region, marine intertidal zone according to claim 1, is characterized in that: described job platform periphery is provided with the anti-collision rubber fender that can stop other boats and ships.
3. the blower fan assembly installation system in region, marine intertidal zone according to claim 1 and 2, is characterized in that: described crawler crane rated load weight is 500t~1000t.
4. the blower fan assembly installation system in region, marine intertidal zone according to claim 3, is characterized in that: described job platform is provided with lifting means, and described lifting means is connected with the work pile of fixed operation platform.
5. the blower fan assembly installation system in region, marine intertidal zone according to claim 4, is characterized in that: the height 10~20m of described piling saddle.
6. the blower fan assembly installation system in region, marine intertidal zone according to claim 5, is characterized in that: four jiaos of described job platforms are equipped with winch, and described winch is connected with anchor.
7. the blower fan assembly installation system in region, marine intertidal zone according to claim 6, is characterized in that: described job platform is equipped with generator set and office life room.
8. the blower fan assembly construction method in region, marine intertidal zone according to claim 1, is characterized in that: concrete steps are as follows:
One, at the incoming tide, when water level meets the requirement of job platform draft, utilizing tugboat that job platform is moved to the rough position of staying, place, injection stake position casts anchor, then by folding and unfolding anchor hawser, realize and accurately stay position, move ship time in position, crawler crane is positioned at job platform middle part, utilizes anchor fitting to fix, to guarantee mooring stability; After accurately staying position, work pile is inserted in mud, guarantee that hull is steady; Pile transport ship is stayed to position and rest in job platform one side, by hawser, pile transport ship and job platform are fixed;
Two, on the ebb time, when job platform is sat behind beach, the 1000t crawler crane carrying on it moves near pile transport ship, lifting large diameter steel pipe pile, then steel pipe pile is inserted in the piling saddle on job platform, jack pair stake by saddle top is finely tuned, when the squareness of stake meets standard and designing requirement, transfer suspension hook and make stake from sinking to mud, when stake from sink to mud stable after, crawler crane is packed up suspension hook, lifting drive hammer, carries out pile sinking operation, when stake top is beaten to design elevation, unload drive hammer, pile sinking is complete;
Three, at the incoming tide, when water level meets the requirement of job platform draft, by tugboat towing operation platform, move ship and stay position, to carry out next step Fan Equipment installation, pile transport ship returns to still alongside in job platform one side after loading Fan Equipment;
Four, on the ebb time, when job platform is sat behind beach, the 1000t crawler crane carrying on it moves near pile transport ship, first carrying out the lifting of foundation pile connecting cylinder installs, by grouting or welding manner, it is connected with steel pipe pile foundation, carry out again the installation of blower fan tower barrel, then on job platform by the as a whole blower fan assembly that is assembled in fan blade, wheel hub, cabin, finally by the crawler crane integral body blower fan assembly of slinging, be arranged on blower fan tower barrel, so far Fan Equipment installs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310749409.9A CN103661827A (en) | 2013-12-27 | 2013-12-27 | Installation system and construction method of wind turbine assembly in sea intertidal zone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310749409.9A CN103661827A (en) | 2013-12-27 | 2013-12-27 | Installation system and construction method of wind turbine assembly in sea intertidal zone |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103661827A true CN103661827A (en) | 2014-03-26 |
Family
ID=50300849
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310749409.9A Pending CN103661827A (en) | 2013-12-27 | 2013-12-27 | Installation system and construction method of wind turbine assembly in sea intertidal zone |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103661827A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105133632A (en) * | 2015-08-19 | 2015-12-09 | 天津港航工程有限公司 | Offshore wind turbine foundation structure and construction method thereof |
CN105178316A (en) * | 2015-08-17 | 2015-12-23 | 中交第三航务工程局有限公司 | Vibrating pile-sinking pile driving barge used for global position system (GPS) overwater pile-sinking control |
CN107059850A (en) * | 2017-05-25 | 2017-08-18 | 中交第三航务工程局有限公司 | A kind of inland river deep water rock quality base steel tube pile embeded in rock construction system and technique |
US10718185B2 (en) | 2016-09-15 | 2020-07-21 | Equinor Energy As | Handling of hydrocarbons and equipment of an offshore platform |
US10888724B2 (en) | 2016-09-15 | 2021-01-12 | Equinor Energy As | Optimising fire protection for an offshore platform |
US11196255B2 (en) | 2017-03-10 | 2021-12-07 | Equinor Energy As | Power supply system for an offshore platform |
CN115258063A (en) * | 2022-05-12 | 2022-11-01 | 中国水利水电第十二工程局有限公司 | Construction method for concrete pipe pile on tidal flat with rising and falling tides |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4566850B2 (en) * | 2005-07-25 | 2010-10-20 | 鹿島建設株式会社 | Stakeout method |
CN102182205A (en) * | 2011-05-18 | 2011-09-14 | 江苏海上龙源风力发电有限公司 | Construction process for single-pile wind turbine foundation in intertidal zone |
CN102312438A (en) * | 2010-07-02 | 2012-01-11 | 南通市海洋水建工程有限公司 | Piling construction equipment for large steel pipe piles of seaborn intertidal zone wind power station |
CN102392450A (en) * | 2011-10-14 | 2012-03-28 | 江苏海上龙源风力发电有限公司 | Special device for offshore wind power sunk pile righting guide frame |
CN102425167A (en) * | 2011-11-25 | 2012-04-25 | 天津港航工程有限公司 | Pile sinking method for driving large-diameter steel pipe pile in intertidal zone |
CN202832993U (en) * | 2012-08-27 | 2013-03-27 | 龙源电力集团股份有限公司 | Intertidal zone large-capacity wind generating set hoisting system |
CN203684191U (en) * | 2013-12-27 | 2014-07-02 | 天津港航工程有限公司 | Fan construction system of offshore intertidal zone |
-
2013
- 2013-12-27 CN CN201310749409.9A patent/CN103661827A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4566850B2 (en) * | 2005-07-25 | 2010-10-20 | 鹿島建設株式会社 | Stakeout method |
CN102312438A (en) * | 2010-07-02 | 2012-01-11 | 南通市海洋水建工程有限公司 | Piling construction equipment for large steel pipe piles of seaborn intertidal zone wind power station |
CN102182205A (en) * | 2011-05-18 | 2011-09-14 | 江苏海上龙源风力发电有限公司 | Construction process for single-pile wind turbine foundation in intertidal zone |
CN102392450A (en) * | 2011-10-14 | 2012-03-28 | 江苏海上龙源风力发电有限公司 | Special device for offshore wind power sunk pile righting guide frame |
CN102425167A (en) * | 2011-11-25 | 2012-04-25 | 天津港航工程有限公司 | Pile sinking method for driving large-diameter steel pipe pile in intertidal zone |
CN202832993U (en) * | 2012-08-27 | 2013-03-27 | 龙源电力集团股份有限公司 | Intertidal zone large-capacity wind generating set hoisting system |
CN203684191U (en) * | 2013-12-27 | 2014-07-02 | 天津港航工程有限公司 | Fan construction system of offshore intertidal zone |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105178316A (en) * | 2015-08-17 | 2015-12-23 | 中交第三航务工程局有限公司 | Vibrating pile-sinking pile driving barge used for global position system (GPS) overwater pile-sinking control |
CN105133632A (en) * | 2015-08-19 | 2015-12-09 | 天津港航工程有限公司 | Offshore wind turbine foundation structure and construction method thereof |
US10718185B2 (en) | 2016-09-15 | 2020-07-21 | Equinor Energy As | Handling of hydrocarbons and equipment of an offshore platform |
US10888724B2 (en) | 2016-09-15 | 2021-01-12 | Equinor Energy As | Optimising fire protection for an offshore platform |
US11196255B2 (en) | 2017-03-10 | 2021-12-07 | Equinor Energy As | Power supply system for an offshore platform |
US11601011B2 (en) | 2017-03-10 | 2023-03-07 | Equinor Energy As | Power supply system for an offshore platform |
CN107059850A (en) * | 2017-05-25 | 2017-08-18 | 中交第三航务工程局有限公司 | A kind of inland river deep water rock quality base steel tube pile embeded in rock construction system and technique |
CN115258063A (en) * | 2022-05-12 | 2022-11-01 | 中国水利水电第十二工程局有限公司 | Construction method for concrete pipe pile on tidal flat with rising and falling tides |
CN115258063B (en) * | 2022-05-12 | 2024-01-09 | 中国水利水电第十二工程局有限公司 | Construction method for concrete pipe pile on tidal flat with rising and falling tide |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Guo et al. | Review of integrated installation technologies for offshore wind turbines: Current progress and future development trends | |
CN103661827A (en) | Installation system and construction method of wind turbine assembly in sea intertidal zone | |
CN102277878B (en) | Floating foundation and construction method thereof | |
CN103332269B (en) | Backpack complete offshore wind power machine transport installation ship | |
CN102369134B (en) | Installation method and recovery method for offshore wind turbine | |
CN102278291B (en) | Construction method and special transport and installation ship for marine transport and installation of wind-driven generator | |
CN112523969B (en) | Truss inhaul cable type floating offshore wind turbine structure | |
CN102107720B (en) | Marine fan integrated setting system | |
CN105059489B (en) | A kind of marine nuclear power platform of constant | |
CN108248783B (en) | construction method of offshore wind power submersible floating foundation | |
CN101837929B (en) | Operation method for lifting fan for barge in shoal area | |
CN101774422A (en) | Novel offshore installation construction resource-combined type pontoon barge | |
JP2004001750A (en) | Special working ship and execution method for offshore structure | |
CN106965906A (en) | A kind of marine three basic formula wind-powered electricity generation whole machine installation ships and its single step construction method | |
CN109911125A (en) | A kind of rolling of offshore wind power foundation steel-pipe pile takes on board method | |
CN108626078A (en) | A kind of offshore wind turbine Spar types buoyant foundation barge helps fortune to help dress technique | |
CN103979081B (en) | The marine buoyant wind machine integral installation workboat of deep drinking water | |
CN110155264B (en) | Marine fan composite cylinder foundation towing structure and towing method | |
CN102639868A (en) | Marine wind turbine whole machine | |
CN104554639A (en) | Installation equipment for large offshore wind power equipment | |
CN201971133U (en) | Bottom-supported blower installation platform | |
CN204642060U (en) | A kind of large-scale coastal waters wind power equipment installs equipment | |
CN203684191U (en) | Fan construction system of offshore intertidal zone | |
KR20130120164A (en) | Wind turbine installation vessel | |
CN214092145U (en) | Truss inhaul cable type floating offshore wind turbine structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140326 |