CN208102275U CN201820112012.7U CN201820112012U CN208102275U CN 208102275 U CN208102275 U CN 208102275U CN 201820112012 U CN201820112012 U CN 201820112012U CN 208102275 U CN208102275 U CN 208102275U
Authority
CN
China
Prior art keywords
line
buoyancy tank
column
foundation
reserving hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820112012.7U
Other languages
Chinese (zh)
Inventor
丁红岩
李彦娥
乐丛欢
练继建
张浦阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201820112012.7U priority Critical patent/CN208102275U/en
Application granted granted Critical
Publication of CN208102275U publication Critical patent/CN208102275U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to offshore wind power foundation technical field, disclose it is a kind of can transportation by driving offshore wind farm buoyant foundation, be made of floating platform and anchoring system;Floating platform includes the column of upper end connection blower fan tower barrel, and column lower end is fixedly connected with buoyancy tank, connection inclination strut between column and buoyancy tank;Buoyancy tank is internally provided with the first reserving hole channel, the second reserving hole channel, circumferential inner panel;Anchoring system includes oblique mooring line, lineal pool line and anchor foundation, oblique mooring line and lineal pool line lower end are anchored in anchor foundation, oblique mooring line upper end is protruded into the first reserving hole channel and is anchored, and direct line pool line upper end passes through the second reserving hole channel and worn to column and anchored by inclination strut.The utility model is capable of providing stability floating enough in towage, and when state in place is influenced small by wave load;It realizes layering tensioning system waterborne, reduces the difficulty of underwater installation mooring line;Withdrawal resistance is provided using ballast weight and frictional resistance, and by preloading and inside and outside differential pressure injection sea bed, it is easy for construction.

Description

It is a kind of can transportation by driving offshore wind farm buoyant foundation
Technical field
The utility model belongs to offshore wind power foundation technical field, in particular to it is a kind of can transportation by driving sea turn Electric buoyant foundation, stability is preferable, and construction and installation are convenient, and project cost and installation cost are low.
Background technique
The concept source on floatation type basis refers to that basis does not contact directly with sea bed in deep-sea oil gas development platform, and leads to It crosses anchor cable or hawser and it is connected with seabed, move freely Wind turbines can in a certain relatively fixed region, such basis Research and development and demonstration phase are mostly at present, but, with bed basis compared with difficulty of construction stronger to the adaptability of marine environment It is smaller, O&M cost is low, therefore have a good application prospect in terms of developing deep-sea wind-powered electricity generation.
Compared with coastal waters, deep-marine-environment is more severe, there is a variety of hydrology phenomenons such as ocean current, wave, tide, interior wave with And burn into washes away, washes in a pan the long-term physical and chemical effects such as sky, the technologies such as integrated to blower foundation, submarine cable, offshore platform undoubtedly propose More harsh requirement.In view of the factor of technical difficulty and construction cost, fixed basis is no longer applicable in, deep-sea wind power plant Mainly use buoyant foundation.
The broad form of existing offshore wind farm buoyant foundation has:Spar type, TLP type and semisubmersible-type basis.Spar type basis Water Plane is small, and small, deeper suitable for depth of water sea area is influenced by wave load, and it is mobile inconvenient to install;TLP type foundation motion performance Preferably, mooring uses tension tendon, and higher cost is limited greatly by the depth of water;Semisubmersible-type basis can transportation by driving towage, but biggish waterline Face influences it by wave load, and stability is poor.Above-mentioned base form each own difference in terms of stability and economy The drawbacks of, and three kinds of foundation pattern mooring lines are both needed to install under water, difficulty of construction is larger.
Utility model content
It is to be solved in the utility model to be that offshore wind farm buoyant foundation motor imagination under stormy waves load is larger and underwater The technical issues of work progress complexity higher cost, provide it is a kind of can transportation by driving offshore wind farm buoyant foundation, the base form Water Plane is smaller, and stability is good, and construction and installation are convenient, and installation cost is low, and offshore wind farm buoyant foundation can be made preferably to apply In Practical Project.
In order to solve the above-mentioned technical problem, the utility model is achieved by technical solution below:
It is a kind of can transportation by driving offshore wind farm buoyant foundation, be made of floating platform and anchoring system;
The floating platform includes the column for being hollow structure, buoyancy tank, inclination strut, and the upper end of the column is for connecting Blower fan tower barrel, the column lower end are fixedly connected with the buoyancy tank, and more circumferential directions are connected between the column and the buoyancy tank Uniformly distributed inclination strut;The buoyancy tank is provided centrally with the first reserving hole channel being connected with the column, and described first is reserved Duct is internally provided with circumferential inner panel, and the circumferential direction inner panel is fixedly connected with the bottom plate of the buoyancy tank;Setting inside the buoyancy tank There are radial subdivision plate and circumferential subdivision plate, the radial direction subdivision plate and the circumferential subdivision plate will divide multiple inside the buoyancy tank Subdivision room, each subdivision room are equipped with the valve system that can carry out aqueous vapor displacement;It is pre- that second is provided on per pass radial direction subdivision plate It boxes out, the quantity of second reserving hole channel is identical as the inclination strut and correspondence connects one by one with the inclination strut lower end It connects and communicates, the inclination strut upper end is connected with the column;
The anchoring system includes oblique mooring line, lineal pool line and anchor foundation, and the oblique mooring line and the direct line are moored Line lower end is anchored in the anchor foundation;The more oblique mooring lines are inclined at externally to center described from the bottom to top Between anchor foundation and the buoyancy tank, first reserving hole channel inside the buoyancy tank and anchor are protruded into the oblique mooring line upper end It is fixed in the circumferential inner panel;The more lineal pool lines are vertically arranged between the anchor foundation and the buoyancy tank, described straight The quantity of mooring line is identical as second reserving hole channel and the inclination quantity of strut, and the upper end is each passed through the buoyancy tank Internal second reserving hole channel, and worn by the inclination strut to the column inside and be anchored in the column;It is described Anchor foundation includes anchoring plate body, which is provided with barrel, lower edges setting sheath skirt.
Preferably, second reserving hole channel is smoothly connected with the inclination strut with radian.
Preferably, the quantity of the lineal pool line is 3-8 root, and the quantity of the oblique mooring line is the 2 of the lineal pool line Times.
Preferably, the angle of the oblique mooring line and vertical direction is 3 °~60 °.
Preferably, the oblique mooring line and the lineal pool line upper end are provided with buoy ball before anchoring, after anchoring Each anchor point is equipped with maintenance device.
Preferably, the exposed parts of the oblique mooring line and the lineal pool line are all made of gum sleeve package.
The utility model has the beneficial effects that:
(1) the utility model can transportation by driving offshore wind farm buoyant foundation, floating platform by the column of small-waterplane-area and The buoyancy tank of big Water Plane combines design, it is ensured that basis provides stability floating enough, while blower by big Water Plane buoyancy tank in towage State buoyancy tank in place is dived beneath the water, and the column of the small line water surface is influenced small by wave load, guarantees basic stability.
(2) the utility model can transportation by driving offshore wind farm buoyant foundation, anchoring system is by direct line pool line and oblique mooring Knot closes design, provides preferable heaving and rotating property by direct line pool line, skewed mooring line provides greater level to about Beam force, so that basis is small in the motor imagination of all directions, stability is good;Direct line pool line upper end is anchored in column, on oblique mooring line Buoyancy tank inner panel is fixed at end, realizes layering tensioning system waterborne, reduces the difficulty of underwater installation mooring line, easy for construction;It is lineal It moors line and oblique mooring line uses steel strand wires material, good economy performance.
(3) the utility model can transportation by driving offshore wind farm buoyant foundation, the anchor foundation of anchoring system utilizes ballast The frictional resistance that weight and sheath skirt provide provides withdrawal resistance, and for lineal pool line and the positioning of oblique mooring line, anchor foundation is that top can fill The structure of sand ballast, lower bands sheath skirt, biggish Water Plane make its can towage to operation waters, and preloading and interior external pressure can be passed through Poor injection sea bed, it is easy for construction.
Detailed description of the invention
Fig. 1 is the schematic perspective view of offshore wind farm buoyant foundation provided by the utility model;
Fig. 2 is the mooring line distribution schematic diagram of offshore wind farm buoyant foundation provided by the utility model;
Fig. 3 is the main view of offshore wind farm buoyant foundation provided by the utility model;
Fig. 4 is the top view of offshore wind farm buoyant foundation provided by the utility model.
In figure:1, column, 2, inclination strut, 3, buoyancy tank, 4, lineal pool line, 5, oblique mooring line, 6, anchor foundation, 7, second Reserving hole channel, the 8, first reserving hole channel, 9, radial subdivision plate, 10, circumferential subdivision plate, 11, circumferential inner panel.
Specific embodiment
For the summary of the invention, feature and effect that can further appreciate that the utility model, the following examples are hereby given, and cooperates Detailed description are as follows for attached drawing:
Show as shown in Figure 1 to Figure 4, present embodiment discloses it is a kind of can transportation by driving offshore wind farm buoyant foundation, by floating platform and Anchoring system composition.
Floating platform includes column 1, inclination strut 2, buoyancy tank 3, and 1 upper end of column is connected with blower fan tower barrel by flange, is stood 1 lower end of column is fixedly connected with buoyancy tank 3, and more circumferentially uniformly distributed inclination struts 2 are provided between column 1 and buoyancy tank 3.In view of sea The cabin of upper fan and the weight of blade it is larger and more than the water surface 80~100m, to make blower normal power generation, it is necessary to assure base Stability of the plinth under stormy waves synergy and the ability for resisting storm load.Column 1 and buoyancy tank 3 select steel construction, concrete knot The material of structure or other lighter weights can carry biggish wind-powered electricity generation load.3 phase knot of small-waterplane-area column 1 and big Water Plane buoyancy tank The design of conjunction provides stability floating enough by big Water Plane buoyancy tank 3 and realizes floating platform-tower-blower entirety transportation by driving towage, installation Convenient transportation;And buoyancy tank 3 slips into the water surface hereinafter, the column 1 of small-waterplane-area is located on the water surface, to reduce wave lotus when state in place The influence of load.Strut 2 is inclined is connected between column 1 and buoyancy tank 3 for inclination, reinforces the connection knot of column 1 and buoyancy tank 3 with this Structure, and horizontal and vertical bearing capacity is provided for top wind-powered electricity generation structure.
Column 1 is the cylinder-like structure with cavity, and a diameter of 8m is highly 20m, wall thickness 50mm.
Buoyancy tank 3 is the flat cylindrical-shaped structure with cavity, and a diameter of 33m is highly 10m, wall thickness 15mm.Buoyancy tank 3 are provided centrally with the first reserving hole channel 8 that diameter is 8m, and the first reserving hole channel 8 is connected with column 1, and diameter and column 1 are straight Diameter is identical.First reserving hole channel 8 is internally provided with the circumferential inner panel 11 that a loop diameter is 6m, wall thickness is 30mm, circumferential inner panel 11 It is fixedly connected with 3 bottom plate of buoyancy tank, for fixing oblique mooring line 5.Buoyancy tank 3 is internally provided with the radial subdivision plate of four radial equipartitions 9 with together with circumferential subdivision plate 10, radial subdivision plate 9 and circumferential subdivision plate 10 inside and outside each four, two circles will be divided into inside buoyancy tank 3 Subdivision room, each subdivision room are equipped with the valve system that can carry out aqueous vapor displacement, and buoyancy tank 3 can be by adding Water Ballast in each subdivision room Center-of-gravity regulating position guarantees basic towage stability.Same position on per pass radial direction subdivision plate 9 is provided with second preformed hole Road 7, four the second reserving hole channels 7 are connected with four inclination struts 2 respectively.Second reserving hole channel 7 is with inclination strut 2 with certain Radian smoothly connect, avoid when mooring line tensioning stress stress concentration from causing mooring line impaired, influence system worked well.The Two reserving hole channels 7 and the first reserving hole channel 8 can prevent mooring line from contacting with water, guarantee that mooring anchor point is not damaged.
Inclination strut 2 is hollow long column shape structure, a diameter of 2m.The circumferentially uniformly distributed setting of four inclination struts 2 is vertical Around column 1, the upper end of every inclination strut 2 is fixedly connected on 1 sidewall upper of column and is connected with column 1, and lower end is fixed to be connected It is connected to the outer position in 3 upper surface of buoyancy tank and is connected with the second reserving hole channel 7.
Anchoring system includes lineal pool line 4, oblique mooring line 5 and anchor foundation 6.
Four lineal pool lines 4 are vertically arranged between buoyancy tank 3 and anchor foundation 6, and eight oblique mooring lines 5 are in buoyancy tank 3 and anchor Gu be from top to bottom obliquely installed from the outside portion in center is radial between basis 6, the angle of oblique mooring line 5 and vertical direction 3 °~ Within the scope of 60 °.Direct line pool line 4 and oblique 5 lower end of mooring line are anchored in anchor foundation 6.Four lineal pool 4 upper ends of line are each passed through Four the second reserving hole channels 7 inside buoyancy tank 3, and worn by four inclination struts 2 to column 1, finally it is anchored in 1 side of column Wall inner surface.Eight oblique 5 upper ends of mooring line are protruded into 8 inside of the first reserving hole channel and are anchored on circumferential inner panel 11.It is lineal as a result, Pool line 4 and oblique mooring line 5 form layering tensioning system waterborne, reduce the difficulty of underwater installation mooring line.Direct line pool line 4 provides good Good heaving and rotating property, oblique mooring line 5 provide biggish horizontal restraint power, and radiate centroclinal design and reduce Sea bed area is occupied, is reduced and seafloor structure collision phenomenon.The diameter of direct line pool line 4 and oblique mooring line 5 is 167mm, can Using steel strand wires, polyester fiber line etc.;Upper end is provided with buoy ball before anchoring, it is facilitated to pass through 7 He of the second reserving hole channel First reserving hole channel 8;Each anchor point after anchoring is equipped with maintenance device.
It is all made of gum sleeve package outside direct line pool line 4 and oblique mooring line 5, avoids its corrosion failure in the seawater.
Anchor foundation 6 includes the round anchor plate body of diameter 40m, which is 2m's along height is provided with Annular tube wall, lower edges are provided with the annular sheath skirt that height is 5m.Anchoring plate body is for providing lineal pool line 4 and oblique mooring line The superstructure that the anchor point of 5 lower ends, anchoring plate body and barrel are constituted can fill sand ballast, and sheath skirt passes through ballast weight and inside and outside differential pressure Injection sea bed.Anchor foundation 6 can be provided by preloading and inside and outside differential pressure injection sea bed, anchor foundation 6 using ballast weight and sheath skirt Frictional resistance to provide withdrawal resistance be lineal pool line 4 and the positioning of oblique mooring line 5.
In this way, anchoring system can effectively control floating platform in heaving, surging, swaying, yawing, rolling, pitching The movement of six-freedom degree, it is ensured that the offshore wind farm buoyant foundation has lesser motor imagination, to show good dynamic Power performance thus greatly reduces the design requirement to Wind turbines.
It is above-mentioned can transportation by driving offshore wind farm buoyant foundation construction method, carry out in accordance with the following steps:
(1) first by floating platform and anchoring system respectively in the prefabricated completion in land, by top blower fan tower barrel in floating platform Upper installation is stablized, and top blower fan tower barrel and floating platform towage are transported to operation sea area, is provided using the buoyancy tank 3 of big Water Plane Floating stability realizes floating platform-tower-blower entirety transportation by driving towage;Anchoring system towage is transported to operation sea area simultaneously, directly Mooring line 4 and oblique 5 upper end of mooring line are provided with buoy ball;
(2) floating platform and anchoring system for being equipped with top blower fan tower barrel are distinguished towage and are transported to operation sea area, apply Pressurization, which carries, makes the anchor foundation 6 in anchoring system sink, and is fixed the insertion of anchor foundation 6 seabed by preloading and inside and outside differential pressure;
(3) four lineal pool 4 upper ends of line are sequentially passed through into the second reserving hole channel 7 according to buoy ball indicating positions and inclination is supportted Bar 2, while protruding into eight oblique 5 upper ends of mooring line inside the first reserving hole channel 8 according to buoy ball indicating positions, line is moored to direct line 4 and oblique mooring line 5 carry out the pre- tensioning of certain proportion (10%~50%) and make lineal pool line 4 to balance the buoyancy of floating platform Tensioning state is in oblique mooring line 5;
(4) it is filled the water by the valve system that aqueous vapor is replaced to the inner ring subdivision room of buoyancy tank 3, makes that top blower fan tower barrel is installed Floating platform lose the sinking of part buoyancy, the outer ring subdivision room air of buoyancy tank 3 is supplied to basic certain in sinking watching Buoyancy guarantees the stability of offshore wind farm buoyant foundation;When the floating platform sinks down into designed draft position, direct line pool line 4 Reach preset length with oblique mooring line 5, pre- of remaining proportion (50%~90%) is completed to lineal pool line 4 and oblique mooring line 5 It draws, to balance the buoyancy of floating platform;Direct line pool 4 upper end of line is anchored in 1 side wall inner surfaces of column, oblique 5 upper end anchor of mooring line It is fixed in circumferential inner panel 11;
(5) water body in 3 inner ring subdivision room of buoyancy tank is discharged by the valve system that aqueous vapor is replaced, guarantees that offshore wind farm is floating Formula basis has certain floating stability;
(6) water body, oblique mooring line 5 that lineal pool line 4 brings the second reserving hole channel 7 and inclination strut 2 into are brought into first in advance The water body boxed out in 8 inflates discharge by high pressure, seals 3 bottom of buoyancy tank, guarantees the second reserving hole channel 7, the first reserving hole channel 8 Drying regime is in inclination strut 2;
(7) after position, the center of gravity position of offshore wind farm buoyant foundation is adjusted by filling the water to the outer ring subdivision room of buoyancy tank 3 It sets, guarantees offshore wind farm buoyant foundation safe and stable operation.
Although being described above in conjunction with preferred embodiment of the attached drawing to the utility model, the utility model is not It is confined to above-mentioned specific embodiment, the above mentioned embodiment is only schematical, is not restrictive, ability The those of ordinary skill in domain is not departing from present inventive concept and scope of the claimed protection under the enlightenment of the utility model In the case of, the specific transformation of many forms can also be made, these are belonged within the protection scope of the utility model.

Claims (6)

1. one kind can transportation by driving offshore wind farm buoyant foundation, which is characterized in that be made of floating platform and anchoring system;
The floating platform includes the column for being hollow structure, buoyancy tank, inclination strut, and the upper end of the column is for connecting blower Tower, the column lower end are fixedly connected with the buoyancy tank, and it is uniformly distributed that more circumferential directions are connected between the column and the buoyancy tank Inclination strut;The buoyancy tank is provided centrally with the first reserving hole channel being connected with the column, first reserving hole channel It is internally provided with circumferential inner panel, the circumferential direction inner panel is fixedly connected with the bottom plate of the buoyancy tank;The buoyancy tank is internally provided with diameter To subdivision plate and circumferential subdivision plate, the radial direction subdivision plate and the circumferential subdivision plate will divide multiple subdivisions inside the buoyancy tank Room, each subdivision room are equipped with the valve system that can carry out aqueous vapor displacement;The second preformed hole is provided on per pass radial direction subdivision plate Road, the quantity of second reserving hole channel is identical as the inclination strut and is correspondingly connected with one by one simultaneously with the inclination strut lower end It communicates, the inclination strut upper end is connected with the column;
The anchoring system includes oblique mooring line, lineal pool line and anchor foundation, and the oblique mooring line and the direct line are moored under line End is anchored in the anchor foundation;The more oblique mooring lines are inclined at the anchoring externally to center from the bottom to top Basic first reserving hole channel that between the buoyancy tank, the oblique mooring line upper end is protruded into inside the buoyancy tank is simultaneously anchored in The circumferential direction inner panel;The more lineal pool lines are vertically arranged between the anchor foundation and the buoyancy tank, the lineal pool The quantity of line is identical as second reserving hole channel and the inclination quantity of strut, and the upper end is each passed through inside the buoyancy tank Second reserving hole channel, and worn by the inclination strut to inside the column and being anchored in the column;The anchoring Basis includes anchoring plate body, which is provided with barrel, lower edges setting sheath skirt.
2. one kind according to claim 1 can transportation by driving offshore wind farm buoyant foundation, which is characterized in that described second is reserved Duct is smoothly connected with the inclination strut with radian.
3. one kind according to claim 1 can transportation by driving offshore wind farm buoyant foundation, which is characterized in that the lineal pool line Quantity be 3-8 root, the quantity of the oblique mooring line is 2 times of the lineal pool line.
4. one kind according to claim 1 can transportation by driving offshore wind farm buoyant foundation, which is characterized in that the oblique mooring line Angle with vertical direction is 3 °~60 °.
5. one kind according to claim 1 can transportation by driving offshore wind farm buoyant foundation, which is characterized in that the oblique mooring line Buoy ball is provided with before anchoring with the lineal pool line upper end, each anchor point after anchoring is equipped with maintenance device.
6. one kind according to claim 1 can transportation by driving offshore wind farm buoyant foundation, which is characterized in that the oblique mooring line Gum sleeve package is all made of with the exposed parts of the lineal pool line.
CN201820112012.7U 2018-01-23 2018-01-23 It is a kind of can transportation by driving offshore wind farm buoyant foundation Expired - Fee Related CN208102275U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820112012.7U CN208102275U (en) 2018-01-23 2018-01-23 It is a kind of can transportation by driving offshore wind farm buoyant foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820112012.7U CN208102275U (en) 2018-01-23 2018-01-23 It is a kind of can transportation by driving offshore wind farm buoyant foundation

Publications (1)

Publication Number Publication Date
CN208102275U true CN208102275U (en) 2018-11-16

Family

ID=64128022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820112012.7U Expired - Fee Related CN208102275U (en) 2018-01-23 2018-01-23 It is a kind of can transportation by driving offshore wind farm buoyant foundation

Country Status (1)

Country Link
CN (1) CN208102275U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108407986A (en) * 2018-01-23 2018-08-17 天津大学 It is a kind of can transportation by driving offshore wind farm buoyant foundation and its construction method
CN113460256A (en) * 2021-07-30 2021-10-01 重庆大学 Floating body platform for mooring of offshore floating type wind turbine
CN116001999A (en) * 2022-12-12 2023-04-25 上海勘测设计研究院有限公司 Marine floating platform device, construction method and working method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108407986A (en) * 2018-01-23 2018-08-17 天津大学 It is a kind of can transportation by driving offshore wind farm buoyant foundation and its construction method
CN108407986B (en) * 2018-01-23 2019-10-25 天津大学 It is a kind of can transportation by driving offshore wind farm buoyant foundation and its construction method
CN113460256A (en) * 2021-07-30 2021-10-01 重庆大学 Floating body platform for mooring of offshore floating type wind turbine
CN116001999A (en) * 2022-12-12 2023-04-25 上海勘测设计研究院有限公司 Marine floating platform device, construction method and working method
CN116001999B (en) * 2022-12-12 2024-03-01 上海勘测设计研究院有限公司 Marine floating platform device, construction method and working method

Similar Documents

Publication Publication Date Title
CN108407986B (en) It is a kind of can transportation by driving offshore wind farm buoyant foundation and its construction method
EP1891328B1 (en) Floating wind turbine installation
CN108248783A (en) A kind of novel offshore wind power submersible buoyant foundation and its construction method
CN108407987A (en) A kind of offshore wind farm buoyant foundation of tensioning waterborne and its construction method
KR101933168B1 (en) Column-stabilized offshore platform with water-entrapment plates and asymmetric mooring system for support of offshore wind turbines
US8197208B2 (en) Floating underwater support structure
CN111469992B (en) Floating offshore wind power structure foundation with damping effect and stability control method
US7520237B1 (en) Hurricane prevention system and method
WO2018095304A1 (en) Movable ballast leveling control device for use in floating wind turbine
Bagbanci et al. Review of offshore floating wind turbines concepts
US20150104259A1 (en) Method of construction, installation, and deployment of an offshore wind turbine on a concrete tension leg platform
CN104816797B (en) A kind of offshore wind turbine and its installation method
CN107738730A (en) A kind of three column semi-submersible type offshore wind turbine foundations
CN208102275U (en) It is a kind of can transportation by driving offshore wind farm buoyant foundation
CN206554109U (en) A kind of three column semi-submersible type offshore wind turbine foundations
CN212243735U (en) Floating type offshore wind power structure foundation with damping effect
CN108454799B (en) A kind of offshore wind farm buoyant foundation transportation by driving construction method
CN109278949A (en) A kind of sea Spar type 5MW buoyant wind generation platform
US20140248091A1 (en) Construction and installation process to deploy a wind turbine "WTG" on a tension leg platform/spar in medium to deep water
CN207985139U (en) A kind of novel offshore wind power submersible buoyant foundation
CN207987953U (en) A kind of tension type mooring submersible buoyant foundation
CN207985140U (en) A kind of offshore wind farm buoyant foundation of tensioning waterborne
CN111577551A (en) Floating type fan foundation
GB2459172A (en) A stable deep water floating platform
CN207998856U (en) A kind of offshore wind turbine buoyant foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181116

Termination date: 20200123

CF01 Termination of patent right due to non-payment of annual fee