CN201268389Y - Multifunctional construction platform - Google Patents

Multifunctional construction platform Download PDF

Info

Publication number
CN201268389Y
CN201268389Y CNU2008200155286U CN200820015528U CN201268389Y CN 201268389 Y CN201268389 Y CN 201268389Y CN U2008200155286 U CNU2008200155286 U CN U2008200155286U CN 200820015528 U CN200820015528 U CN 200820015528U CN 201268389 Y CN201268389 Y CN 201268389Y
Authority
CN
China
Prior art keywords
platform
construction
functional
multifunctional
convenient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200155286U
Other languages
Chinese (zh)
Inventor
刘明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN TIMEAST OFFSHORE ENGINEERING CO., LTD.
Original Assignee
刘明
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 刘明 filed Critical 刘明
Priority to CNU2008200155286U priority Critical patent/CN201268389Y/en
Application granted granted Critical
Publication of CN201268389Y publication Critical patent/CN201268389Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a multifunctional construction platform which belongs to a construction device in the field of ocean engineering. The multifunctional construction platform adopts a steel structure welded by a longitudinal member, a transverse member and a deck, buoyant boxes are respectively arranged on the longitudinal edge of the lower part of the platform, a rubber air bag is arranged between the two buoyant boxes, the upper part of the platform is provided with four shipboard slings, a pedrail crane and six anchor machines, and an electric station arranged on the platform is used for supplying required electric power. The platform has simple structure, low cost and convenient use, not only can be used for towing, but also can use a self device to shift and is suitable for offing sea operation, and the multifunctional construction platform can not influence construction in ebb especially and can flexibly and reliably complete various construction operations at sea. The platform can be disassemble and combined, is convenient for transportation and reusage and can greatly reduce construction cost.

Description

Multi-functional operation platform
Technical field
The utility model relates to a kind of multi-functional operation platform, and it belongs to the seabeach, the engineering auxiliary device in the location that personnel such as marsh, lake and preparation of construction are difficult to enter.
Background technology
At present, along with the develop rapidly of domestic economy, relate at the seabeach, the engineering construction in locations such as marsh, lake is more and more, and these locations, and personnel and preparation of construction are difficult to enter, some constructions that make be difficult to carry out or cost very high.The existing a kind of truss structures that exceed the water surface and have a level table can be divided into two classes basically for the platform that carries out production operation or other movable usefulness: fixed platform has a formula, guy wire formula and gravity type boat davit etc.Stake formula platform is made of cushion cap and pile foundation, and pile foundation has kinds such as timber, piling bar and reinforced concrete pile, when constructing it is squeezed into the seabed, and cushion cap has been installed on it; Guy wire formula platform claims lashing tower platform again, and a prefabricated head tower is placed on the seafloor foundation piece, forms along different directions grappling tension with cable wire; Gravity platform is to occupy stably on the firm stratum of seabed by the weight of platform self, and the ability of resisting the attack of storm and wave is strong.Another kind of floating platform has transportable and nonmigratory two kinds.Transportable floating platform claims movable decking again, and 4 kinds of bottom-sitting type, jack up, semisubmersible and boat forms etc. are arranged, and is used for the probing of submarine oil and natural fuels more; Nonmigratory floating platform often is built near bank or sea situation marine site preferably, common barge structure commonly used, anchor titration is adopted in mooring, is used to exploit submarine oil earlier, after be used to build marine floating factory and floating storage storehouse etc.Above-mentioned platform is used for offshore construction cost height, very flexible, now mostly adopts barge to carry out offshore constructions such as pipe laying, but also has some inconveniences.
Summary of the invention
In order to solve the problem that above-mentioned prior art exists, the utility model provides a kind of multi-functional operation platform.This platform should adopt steel structure and rubber pneumatic bag to combine, and is convenient to install the necessaries of offshore construction, can towage, also can lean on the equipment of itself displacement, and can also dismounting be convenient to transportation, satisfy the requirement of various constructions with flexibility and reliability ground.
The technical solution adopted for the present invention to solve the technical problems is: a kind of multi-functional operation platform adopts the steel structure by longitudinal, transverse member and deck weld together, there is a direction edge respectively to be provided with a buoyancy tank in the flat-bed bottom, is provided with rubber pneumatic bag in the centre of two buoyancy tanks; Be provided with on flat-bed top that the side of a ship hangs, tracklaying crane and windlass, have 1 power station that is located on the platform to supply with required electric power.
Described rubber pneumatic bag adopts vertically to be arranged or lateral arrangement.
The quantity of described windlass is 6, is arranged in the flat-bed boundary position.
Described platform is provided with 4 sides of a ship and hangs and 1 tracklaying crane.
The beneficial effects of the utility model are: this multi-functional operation platform adopts the steel structure by longitudinal, transverse member and deck weld together, respectively is provided with a buoyancy tank at flat-bed bottom longitudinal edge, is provided with rubber pneumatic bag in the centre of two buoyancy tanks; Be provided with on flat-bed top that 4 sides of a ship hang, 1 pedrail crane and 6 windlass, have a power station that is located on the platform to supply with required electric power.This platform structure is simple, cheap and easy to use, can towage, also can lean on the equipment of itself displacement, and be applicable to the offshore sea waters operation, especially can not influence construction during ebb seat beach, can finish to flexibility and reliability marine various construction operation.This platform can make up in dismounting, is convenient to transportation and repeated usage, reduces construction cost greatly.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is a kind of arrangement plan of multi-functional operation platform.
Fig. 2 is a kind of part sectional view of multi-functional operation platform.
Among the figure: 1, platform, 2, rubber pneumatic bag, 3, buoyancy tank, 4, the side of a ship hangs, 5, tracklaying crane, 6, windlass.
The specific embodiment
Fig. 1,2 shows a kind of multi-functional operation platform.This platform individual module is of a size of: long 8m, wide 4m; The platform of 6 the sliceable growth 16m of module, wide 12m.The basic structure of console module is: deck thickness 12mm, adopt transverse framing system, and the longitudinal spacing is 2 meters, the transverse member spacing is 1 meter; Longitudinal is No. 32 I-beam sections, and transverse member is No. 20 I-beam sections.Air bag is furnished with two schemes, and the steel structure of two schemes is identical, and difference is the arrangement of floating drum.Fig. 1,2 shows the scheme that air bag is longitudinally arranged, each air bag is about 16 meters, and weight is 466kg, and buoyancy tank 3 is located at longitudinal edge.Another program be air bag along lateral arrangement, each air bag is about 12 meters, weight is 350kg, buoyancy tank is located at transverse edge.The inflation pressure of air bag is 0.5kg/cm 2
According to the construction needs, be provided with 4 sides of a ship on the top of platform 1 and hang 4, pedrail cranes 5 and 6 windlass 6, also have 1 power station (not shown) and other equipment of supplying with required electric power.
At sea in the laying work, at first the pipe that connects (for example 2000m is long) is placed water, two tube ends that dock hang 4 with the side of a ship and hang out water surface butt welding, put into water after handling well and just become the long pipe of 4000m, just can finish very long pipeline construction by that analogy.Various lifting jobs during a pedrail crane 5 of platform 1 can participate in constructing easily.
6 windlass 6 that are provided with except that make platform 1 in stormy waves reliably the location, also can platform 1 be shifted in construction.Just by canoe anchor is sent certain distance to the direction that will move, receive anchor by windlass 6 then, platform 1 just can realize that the orientation that requires moves.
Described platform 1 also can participate in operations such as ditching, pipe laying, piling except that having above-mentioned functions.It will be further appreciated that: platform 1 can resolve into several modules, is convenient to transportation, has solved the engineering construction difficult problem in locations such as seabeach, marsh, lake.

Claims (4)

1, a kind of multi-functional operation platform, it is characterized in that: platform (1) adopts the steel structure by longitudinal, transverse member and deck weld together, there is a direction edge respectively to be provided with a buoyancy tank (3) in the bottom of platform (1), is provided with rubber pneumatic bag (2) in the centre of two buoyancy tanks (3); Be provided with the side of a ship on the top of platform (1) and hang (4), pedrail crane (5) and windlass (6), have 1 power station that is located on the platform (1) to supply with required electric power.
2, according to the described multi-functional operation platform of claim 1, it is characterized in that: described rubber pneumatic bag (2) adopts vertically to be arranged or lateral arrangement.
3, according to the described multi-functional operation platform of claim 1, it is characterized in that: the quantity of described windlass (6) is 6, is arranged in the boundary position of platform (1).
4, according to the described multi-functional operation platform of claim 1, it is characterized in that: described platform (1) is provided with 4 sides of a ship and hangs (4) and 1 tracklaying crane (5).
CNU2008200155286U 2008-09-08 2008-09-08 Multifunctional construction platform Expired - Fee Related CN201268389Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200155286U CN201268389Y (en) 2008-09-08 2008-09-08 Multifunctional construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200155286U CN201268389Y (en) 2008-09-08 2008-09-08 Multifunctional construction platform

Publications (1)

Publication Number Publication Date
CN201268389Y true CN201268389Y (en) 2009-07-08

Family

ID=40840980

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200155286U Expired - Fee Related CN201268389Y (en) 2008-09-08 2008-09-08 Multifunctional construction platform

Country Status (1)

Country Link
CN (1) CN201268389Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102108837A (en) * 2009-12-25 2011-06-29 上海奇谋能源技术开发有限公司 Method and device for moving drilling derrick on marsh or mudflat
CN105398540A (en) * 2015-12-21 2016-03-16 李宏江 Bombproof aircraft carrier
CN106080996A (en) * 2016-07-14 2016-11-09 蔡修坤 In-water foundation carrier module and processing technology thereof
CN106167077A (en) * 2016-07-05 2016-11-30 侯志远 The ultra-large type offshore steel structure buoyancy aid that can independently navigate by water and manufacture method thereof
CN107084784A (en) * 2016-12-21 2017-08-22 中国船舶重工集团公司第七0研究所 A kind of body ship type underwater measurement platform of movable lifting four
CN110203344A (en) * 2019-06-19 2019-09-06 黄芳 A kind of deep water buoyancy unit module and production method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102108837A (en) * 2009-12-25 2011-06-29 上海奇谋能源技术开发有限公司 Method and device for moving drilling derrick on marsh or mudflat
CN105398540A (en) * 2015-12-21 2016-03-16 李宏江 Bombproof aircraft carrier
CN106167077A (en) * 2016-07-05 2016-11-30 侯志远 The ultra-large type offshore steel structure buoyancy aid that can independently navigate by water and manufacture method thereof
CN106080996A (en) * 2016-07-14 2016-11-09 蔡修坤 In-water foundation carrier module and processing technology thereof
CN106080996B (en) * 2016-07-14 2018-05-04 蔡修坤 In-water foundation carrier module and its manufacture craft
CN107084784A (en) * 2016-12-21 2017-08-22 中国船舶重工集团公司第七0研究所 A kind of body ship type underwater measurement platform of movable lifting four
CN107084784B (en) * 2016-12-21 2019-08-23 中国船舶重工集团公司第七一0研究所 A kind of four body ship type underwater measurement platform of movable lifting
CN110203344A (en) * 2019-06-19 2019-09-06 黄芳 A kind of deep water buoyancy unit module and production method

Similar Documents

Publication Publication Date Title
AU2009229435B2 (en) Liquid storing and offloading device and drilling and production installations on the sea based thereon
CN201268389Y (en) Multifunctional construction platform
CN101774422B (en) Novel offshore installation construction resource-combined type pontoon barge
CN201092380Y (en) Ship mooring facilities of marine oil-gas production platform
JP2004001750A (en) Special working ship and execution method for offshore structure
US10919606B2 (en) Seabed base structure and method for installation of same
CN107075824B (en) Seabed terminal for offshore activities
CN101837929B (en) Operation method for lifting fan for barge in shoal area
CN103981846A (en) Pile positioning semi-submersible offshore dredging engineering ship
WO2018074977A1 (en) System and method for reconfiguring a mobile docking apparatus for transporting, removal, installation, housing and transferring assets
CN103195039B (en) Artificial island construction method for self-elevating straight-through deck platform
CN203937832U (en) A kind of combination is refuted
CN203475911U (en) Maritime liquid repository
CN104164885A (en) Caisson towing method
WO2010109243A2 (en) Apparatus and method for handling a submersible item
CN201971133U (en) Bottom-supported blower installation platform
CN211815983U (en) Water level adaptation adjusting foundation installation assembly for intelligent mooring system
CN203473217U (en) Supporting rod of offshore platform positioning column
CN201424121Y (en) Double-crane piling boat for construction of offshore artificial island
CN203937830U (en) The buoyancy tank module that a kind of combination is refuted
CN214729534U (en) Self-floating pile stabilizing platform
CN213262851U (en) Simple offshore LNG production, tank cabinet loading and unloading and ship berthing platform
CN210942162U (en) Ocean FPSO upper portion module combination bearing structure
EP3532678B1 (en) Harbour plant and method for mooring a floating body in a harbour plant
WO2015136086A1 (en) A quay structure, a quay arrangement and a method of installing such structure

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
C41 Transfer of patent application or patent right or utility model
ASS Succession or assignment of patent right

Owner name: TIANJIN TIANYI OFFSHORE ENGINEERING CO., LTD.

Free format text: FORMER OWNER: LIU MING

Effective date: 20090925

TR01 Transfer of patent right

Effective date of registration: 20090925

Address after: Block B, six floor, No. 2 Dongting Road, Tianjin Development Zone, postcode: 300457

Patentee after: TIANJIN TIMEAST OFFSHORE ENGINEERING CO., LTD.

Address before: No. 10, No. 9-2, Haidong Road, Xigang District, Liaoning, Dalian Province: 116011

Patentee before: Liu Ming

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090708

Termination date: 20130908

C17 Cessation of patent right