CN201914862U - Self-rising fan mounting platform - Google Patents

Self-rising fan mounting platform Download PDF

Info

Publication number
CN201914862U
CN201914862U CN2011200108855U CN201120010885U CN201914862U CN 201914862 U CN201914862 U CN 201914862U CN 2011200108855 U CN2011200108855 U CN 2011200108855U CN 201120010885 U CN201120010885 U CN 201120010885U CN 201914862 U CN201914862 U CN 201914862U
Authority
CN
China
Prior art keywords
platform body
main platform
meters
spud leg
blower fan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200108855U
Other languages
Chinese (zh)
Inventor
胡安康
王栋
蒋玮
杜伟平
郭海强
章浩
谢焱昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China International Marine Containers Group Co Ltd
CIMC Ocean Engineering Design and Research Institute Co Ltd
Original Assignee
China International Marine Containers Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China International Marine Containers Group Co Ltd filed Critical China International Marine Containers Group Co Ltd
Priority to CN2011200108855U priority Critical patent/CN201914862U/en
Application granted granted Critical
Publication of CN201914862U publication Critical patent/CN201914862U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

A self-rising fan mounting platform comprises a platform body, a plurality of pile legs, a plurality of pile shoes, a plurality of lifting devices, a small crane, a plurality of lifeboats, a living building, a plurality of positioning anchors and a crane. The pile legs position and support the platform body, the pile shoes are connected with the pile legs, the lifting devices connect the platform body with the pile legs, the small crane is used for hoisting small-sized components, the living building is arranged on a bow portion of the platform body, the positioning anchors are arranged at the periphery of the platform body, and the crane is disposed at the center of a stern portion of the platform body. The self-rising fan mounting platform which is in a better application mode can replace a crane ship, a stable operation platform can be built by means of inserting the pile legs into a seabed, and a total fan assembly is hoisted on a base, thereby increasing full-year operation period, improving work efficiency and also reducing cost.

Description

Jack up blower fan erecting stage
Technical field
The utility model relates to a kind of blower fan erecting stage, refers to a kind of jack up blower fan erecting stage especially.
Background technology
The installation of blower fan has been adopted at present half latent refuting and has been mounted to a whole set of blower fan group in advance in the marine wind electric field construction, and drags after reinforcing toward target bit, adopts the crane ship that hangs height, big lift heavy (500-1000 ton) greatly the whole series blower fan group to hang on pedestal again.Many ships work compound, personnel are many, interference is big, cost is high, and the stormy waves condition is bigger to its operation influence.
The utility model content
The technical problems to be solved in the utility model is to overcome the deficiency that above-mentioned prior art exists, and a kind of jack up blower fan erecting stage is provided, and it increases annual duty cycle, increases work efficiency, cost-cutting.
For solving the problems of the technologies described above, the utility model provides a kind of jack up blower fan erecting stage, and described erecting stage comprises that a main platform body, the spud leg of the described main platform body of some positioning supports, the shoe of some and described spud leg bonded assembly, some jacking systems, that is connected described main platform body and described spud leg are used to lift by crane the hoisting crane that the little loop wheel machine of small members, life building that some life boat, are located at described main platform body bow, some positioning anchors of being located at around the described main platform body and are located at described main platform body stern central authorities.
Further, described jacking system is symmetricly set in the both sides of described main platform body.
Further, the arm of described hoisting crane is towards stem.
Further, described life boat is positioned at the both sides and the contiguous described life building of described main platform body.
Further, the maximum hoisting weight of described hoisting crane is 800 tons.
Further, described spud leg is symmetrically set in the bow stern both sides of described main platform body.
Further, described erecting stage is used for 4.5 ~ 45 meters scopes of the depth of water and carries out operation.
Further, described spud leg has four, and the length of every pile leg is 75 meters, and the diameter of described spud leg is 3.2 meters, and the longitudinal pitch at adjacent two spud leg centers is 44.4 meters, and transverse pitch is 31.2 meters.
Further, the length and width height of described spud leg boots is of a size of 9.4 meters, 9.4 meters and 2.2 meters.
Further, the load-carrying ability of described little loop wheel machine is 10 tons.
Useful technique effect of the present utility model is: the better embodiment of the utility model jack up blower fan erecting stage can replace crane ship, utilize spud leg to insert the seabed and set up a firm job platform, a whole set of blower fan group is hung on pedestal, increased annual duty cycle like this, improve work efficiency, also reduced cost.
Description of drawings
Fig. 1 is the lateral plan of master layout of the better embodiment of the utility model jack up blower fan erecting stage.
Fig. 2 is the main deck birds-eye view of master layout of the better embodiment of the utility model jack up blower fan erecting stage.
The specific embodiment
Please consult Fig. 1 and Fig. 2 simultaneously, the better embodiment of the utility model jack up blower fan erecting stage is the installation or other ocean engineering device waterborne and the various main equipment lifting in bank task that are mainly used in offshore wind farm equipment.The full circle swinging hoisting crane is set, maximum hoisting weight 800t on the platform.Platform promptly can be used as crane barge and use, also can be in the about 45 meters scopes of the depth of water marine site, argillo arenaceous seabed or similar marine site carry out operation by the jack-up platform pattern.
Described erecting stage comprises some shoes 1, some spud legs 2, a main platform body 3, one little loop wheel machine 4, some jacking systems 5, a life building 6, some life boat 7, a positioning anchor 8, a hoisting crane 9.Described shoe 1 can be inserted the seabed, and the resistance to compression antiskid is for platform provides a stable basis.Shoe can be regained in the main platform body 3 during described erecting stage towage.Described spud leg 2 supports whole platform, for platform provides a stable operating environment.Described main platform body 3 is a single deck box type construction at the bottom of having local double layer, is used to carry tanks such as relevant device and fuel oil tank, fresh water tank, and job platform is provided.Described little loop wheel machine 4 various small members of lifting and the lifting that personnel go on board, daily necessities are supplied with.Four pairs of gears are set on every pile leg 2, and described jacking system 5 makes described erecting stage up-and-down movement by the tooth bar on the spud leg 2, and main platform body 3 and spud leg 2 are coupled together.Main platform body 3 can be lifted away from the water surface by described jacking system 5.Described life building 6 is the staff inhabitation places of living, and also is the main region of erecting stage.Described life boat 7 is an emergency escape equipment.Described positioning anchor 8 is used for the location of temporarily berthing.Described hoisting crane 9 is used for the lifting of fan part, 800 tons of maximum hoisting weights.
Described main platform body 3 is by spud leg 2 positioning supports.Described main platform body 3 stern central authorities are provided with hoisting crane 9, and bow is established life building 6, also is provided with positioning anchor 8 all around, and are equipped with life boat 7.Described jacking system 5 is symmetricly set in the both sides of described main platform body 3.The arm of described hoisting crane 9 can 360 degree full circle swingings during operation towards stem.Described life boat 7 is positioned at the both sides and the contiguous described life building 6 of described main platform body 3.Described spud leg 2 is symmetrically set in the bow stern both sides of described main platform body 3.Described spud leg has four, and the length of every pile leg is 75 meters, and the diameter of described spud leg is 3.2 meters, and the longitudinal pitch at adjacent two spud leg centers is 44.4 meters, and transverse pitch is 31.2 meters.
The main yardstick and the parameter of described erecting stage are: the long 76.8m of type, molded breadth 42.0m, moldeed depth 6.0m, draft full load (DFL) 2.7m, deck house floor height 3.0m, spud leg length overall 75.0m, the high 9.4m*9.4m*2.2m of the wide * of the long * of shoe, load-carrying ability is a 800t * 28m and a 10t * 15m, single pile allows normal lifting load 2200t, staffing 30 people, and the operating area is the operation of no ice formation, endurance 10 days, 20 years tenure of use.
Environmental parameters is: 1. from rising the operation operating mode.Lift heavy 800T, the depth of water 45 m, wave height 3.5 m, period of a wave 6.5s, maximum wind speed 12.5m/s, flow velocity 0.772m/s.2. rise the operation operating mode certainly.Lift heavy 100T, depth of water 45m, wave height 6.5m, period of a wave 10.3s, maximum wind speed 36m/s, flow velocity 0.772m/s.3. storm is from depositing operating mode.The depth of water 45 m, wave height 8m, period of a wave 11.6s, maximum wind speed 36m/s, flow velocity 0.772m/s.4. migration operating mode.Stability is checked: generally move boat 36 m/s, storm moves boat 51.5 m/s; Migration sea situation: wave height 1.5m, period of a wave 4.5s, maximum wind speed 9.8m/s, flow velocity 0.772m/s.5. crane barge operation operating mode.During operation, wave height 1.5 m, period of a wave 4.5s, maximum wind speed 9.8m/s, flow velocity 0.772 m/s; During stability calculation, wave height 5.5m, period of a wave 8s, maximum wind speed 17m/s, flow velocity 0.772 m/s.
The better embodiment of the utility model jack up blower fan erecting stage is a non-jack up workplatform of cutting sth. askew from boat, the rectangular casing of main body, bow stern end of steel.Establish four cylindrical spud legs on the platform, the shoe of spud leg lower end band square, spud leg is arranged in the platform bow stern left and right sides, is symmetric arrangement, and shoe can be regained in the platform body during platform towage.Jacking system adopts the rack-and-gear jacking system, by jacking system main platform body is moved up and down along spud leg, spud leg can be inserted in the argillo arenaceous soil or with it and extract.Main deck stern central authorities establish 1 800t full circle swinging hoisting crane; The main deck bow is an accommodation.Left and right sides string is provided with life boat on the main deck, and four jiaos respectively have a positioning anchor.This platform is mainly used in depth of water 4.5-45m(and contains astronomical tide and storm tide) the wind power equipment lifting operation is carried out in argillo arenaceous or shale offshore sea waters in the scope.
The better embodiment of the utility model jack up blower fan erecting stage can replace crane ship, utilize spud leg to insert the seabed and set up a firm job platform, a whole set of blower fan group is hung on pedestal, increased annual duty cycle like this, improve work efficiency, also reduced cost.
The above only is a preferable possible embodiments of the present utility model, and unrestricted protection domain of the present utility model, and the equivalent structure that all utilization the utility model specification sheetss and accompanying drawing content have been done changes, and all is included in the protection domain of the present utility model.

Claims (6)

1. jack up blower fan erecting stage is characterized in that: described erecting stage comprises that a main platform body, the spud leg of the described main platform body of some positioning supports, the shoe of some and described spud leg bonded assembly, some jacking systems, that is connected described main platform body and described spud leg are used to lift by crane the hoisting crane that the little loop wheel machine of small members, life building that some life boat, are located at described main platform body bow, some positioning anchors of being located at around the described main platform body and are located at described main platform body stern central authorities.
2. jack up blower fan erecting stage as claimed in claim 1 is characterized in that described jacking system is symmetricly set in the both sides of described main platform body.
3. jack up blower fan erecting stage as claimed in claim 1 is characterized in that, described life boat is positioned at the both sides and the contiguous described life building of described main platform body.
4. jack up blower fan erecting stage as claimed in claim 1 is characterized in that, described spud leg is symmetrically set in the bow stern both sides of described main platform body.
5. jack up blower fan erecting stage as claimed in claim 1 is characterized in that described spud leg has four, the length of every pile leg is 75 meters, the diameter of described spud leg is 3.2 meters, and the longitudinal pitch at adjacent two spud leg centers is 44.4 meters, and transverse pitch is 31.2 meters.
6. jack up blower fan erecting stage as claimed in claim 1 is characterized in that, the length and width height of described shoe is of a size of 9.4 meters, 9.4 meters and 2.2 meters.
CN2011200108855U 2011-01-14 2011-01-14 Self-rising fan mounting platform Expired - Fee Related CN201914862U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200108855U CN201914862U (en) 2011-01-14 2011-01-14 Self-rising fan mounting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200108855U CN201914862U (en) 2011-01-14 2011-01-14 Self-rising fan mounting platform

Publications (1)

Publication Number Publication Date
CN201914862U true CN201914862U (en) 2011-08-03

Family

ID=44414670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200108855U Expired - Fee Related CN201914862U (en) 2011-01-14 2011-01-14 Self-rising fan mounting platform

Country Status (1)

Country Link
CN (1) CN201914862U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704452A (en) * 2012-07-05 2012-10-03 南通中远船务工程有限公司 Ultra-large self-elevating wind turbine installation vessel with multi-type pile legs and design method thereof
CN103183109A (en) * 2011-12-30 2013-07-03 上海振华重工(集团)股份有限公司 Ocean wind power mounting platform
CN103963775A (en) * 2014-05-13 2014-08-06 广东明阳风电产业集团有限公司 Intertidal zone self-elevating air hover-working platform
CN107700450A (en) * 2017-06-12 2018-02-16 亨通华西海洋工程有限公司 A kind of mounting process of floating-supported type offshore wind farm mounting platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103183109A (en) * 2011-12-30 2013-07-03 上海振华重工(集团)股份有限公司 Ocean wind power mounting platform
CN102704452A (en) * 2012-07-05 2012-10-03 南通中远船务工程有限公司 Ultra-large self-elevating wind turbine installation vessel with multi-type pile legs and design method thereof
CN102704452B (en) * 2012-07-05 2014-07-02 南通中远船务工程有限公司 Ultra-large self-elevating wind turbine installation vessel with multi-type pile legs and design method thereof
CN103963775A (en) * 2014-05-13 2014-08-06 广东明阳风电产业集团有限公司 Intertidal zone self-elevating air hover-working platform
CN103963775B (en) * 2014-05-13 2017-01-11 广东明阳风电产业集团有限公司 Intertidal zone self-elevating air hover-working platform
CN107700450A (en) * 2017-06-12 2018-02-16 亨通华西海洋工程有限公司 A kind of mounting process of floating-supported type offshore wind farm mounting platform

Similar Documents

Publication Publication Date Title
CN101538844B (en) Construction method for building large-scale offshore wind farm with depth more than 2m
CN111469993B (en) Self-installation floating type fan foundation anchored by bucket foundation and self-installation method
CN201538962U (en) Offshore or intertidal zone mounting platform
DK201170319A (en) A self-propelled semi-submersible offshore wind farm installation vessel with a large crane
CN205653814U (en) Marine wind finding radar foundation structure of caisson type
CN101837929B (en) Operation method for lifting fan for barge in shoal area
EP2251254A1 (en) Installation vessel for offshore wind turbines
JP2004001750A (en) Special working ship and execution method for offshore structure
CA2980959C (en) Gravity-based foundation for the installation of offshore wind turbines
CN104727336A (en) Construction method of large single-pipe pile foundation of shallow-sea wind power plant
CN201914862U (en) Self-rising fan mounting platform
CN103600817A (en) Self-elevating offshore wind turbine installation vessel
CN105752282A (en) Self-elevating wind power generation work boat
CN204803913U (en) Take raft board combined type marine wind power fan single pile basis
CN203753364U (en) Self-elevating offshore wind turbine mounting ship
CN201971133U (en) Bottom-supported blower installation platform
CN104554639A (en) Installation equipment for large offshore wind power equipment
CN103195080B (en) Towing method for gravity foundation
CN204642060U (en) A kind of large-scale coastal waters wind power equipment installs equipment
CN202072417U (en) Semi-submersible type hoisting operation platform
CN201745721U (en) Special installation vessel for marine intertidal wind power generating set
CN202987472U (en) Truss type offshore wind turbine mounting barge capable of sitting on bottom
CN104760670B (en) It is capable of the low cost fixed artificial floating island of fast construction
CN102587340A (en) Installation platform of bottom-supported fan and method for installing fan equipment
CN104790368B (en) A kind of can the off-shore structure structure of self-floating towing and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) LTD.

Effective date: 20120716

Owner name: CIMC SHIP OFFSHORE ENGINEERING DESIGN INSTITUTE CO

Free format text: FORMER OWNER: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) LTD.

Effective date: 20120716

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518000 SHENZHEN, GUANGDONG PROVINCE TO: 201000 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20120716

Address after: 201000, Shanghai, Pudong New Area new Jinqiao Road, No. 10, building 27, building 2

Co-patentee after: Chinese International Marine Container (Group) Co., Ltd.

Patentee after: CIMC Ship Ocean Engineering Design and Research Institute Co., Ltd.

Address before: No. 2 Shekou Harbour Road in Shenzhen city of Guangdong Province in 518000

Patentee before: Chinese International Marine Container (Group) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110803

Termination date: 20190114

CF01 Termination of patent right due to non-payment of annual fee